CA2645253C - Procede pour mesurer la production de puits de petrole - Google Patents

Procede pour mesurer la production de puits de petrole Download PDF

Info

Publication number
CA2645253C
CA2645253C CA2645253A CA2645253A CA2645253C CA 2645253 C CA2645253 C CA 2645253C CA 2645253 A CA2645253 A CA 2645253A CA 2645253 A CA2645253 A CA 2645253A CA 2645253 C CA2645253 C CA 2645253C
Authority
CA
Canada
Prior art keywords
well
production
wells
cluster
segment
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CA2645253A
Other languages
English (en)
Other versions
CA2645253A1 (fr
Inventor
Jan Jozef Maria Briers
Keat-Choon Goh
Charles Edward Moncur
Peter Overschee
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shell Canada Ltd
Original Assignee
Shell Canada Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shell Canada Ltd filed Critical Shell Canada Ltd
Publication of CA2645253A1 publication Critical patent/CA2645253A1/fr
Application granted granted Critical
Publication of CA2645253C publication Critical patent/CA2645253C/fr
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B47/00Survey of boreholes or wells
    • E21B47/10Locating fluid leaks, intrusions or movements
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B49/00Testing the nature of borehole walls; Formation testing; Methods or apparatus for obtaining samples of soil or well fluids, specially adapted to earth drilling or wells
    • E21B49/08Obtaining fluid samples or testing fluids, in boreholes or wells
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells

Landscapes

  • Geology (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Physics & Mathematics (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Fluid Mechanics (AREA)
  • Environmental & Geological Engineering (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geophysics (AREA)
  • Measuring Volume Flow (AREA)
  • Physical Or Chemical Processes And Apparatus (AREA)
  • Sampling And Sample Adjustment (AREA)
  • Crystals, And After-Treatments Of Crystals (AREA)
  • Turbine Rotor Nozzle Sealing (AREA)
  • Drilling And Exploitation, And Mining Machines And Methods (AREA)
  • Investigating Or Analysing Materials By The Use Of Chemical Reactions (AREA)

Abstract

L'invention concerne un procédé permettant de déterminer la contribution d'un puits à la production d'un groupe de puits, les courants produits des effluents des puits étant mélangés et transportés, par l'intermédiaire d'un ensemble séparation, en écoulements séparés de pétrole brut, de gaz naturel et d'eau, sur la base des mesures de production faites sur lesdits écoulements séparés de l'ensemble séparation (séparateur de production et/ou de masse), et en l'absence d'une installation spécialisée de test de puits permettant de mesurer directement la production d'un puits testé.
CA2645253A 2006-04-07 2007-04-05 Procede pour mesurer la production de puits de petrole Active CA2645253C (fr)

Applications Claiming Priority (5)

Application Number Priority Date Filing Date Title
EP06112397 2006-04-07
EP06112397.2 2006-04-07
EP06112438.4 2006-04-10
EP06112438 2006-04-10
PCT/EP2007/053345 WO2007116006A1 (fr) 2006-04-07 2007-04-05 Procédé pour mesurer la production de puits de pétrole

Publications (2)

Publication Number Publication Date
CA2645253A1 CA2645253A1 (fr) 2007-10-18
CA2645253C true CA2645253C (fr) 2014-11-25

Family

ID=38017147

Family Applications (1)

Application Number Title Priority Date Filing Date
CA2645253A Active CA2645253C (fr) 2006-04-07 2007-04-05 Procede pour mesurer la production de puits de petrole

Country Status (10)

Country Link
EP (1) EP2013447B1 (fr)
AT (1) ATE455234T1 (fr)
AU (1) AU2007235957B2 (fr)
BR (1) BRPI0709899B1 (fr)
CA (1) CA2645253C (fr)
DE (1) DE602007004316D1 (fr)
EA (1) EA200802115A1 (fr)
NO (1) NO339225B1 (fr)
NZ (1) NZ571239A (fr)
WO (1) WO2007116006A1 (fr)

Families Citing this family (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
AU2008290584B2 (en) * 2007-08-17 2011-09-15 Shell Internationale Research Maatschappij B.V. Method for virtual metering of injection wells and allocation and control of multi-zonal injection wells
WO2009024545A1 (fr) 2007-08-17 2009-02-26 Shell Internationale Research Maatschappij B.V. Procédé pour commander les pressions de production et de fond de trou d'un puits avec de multiples zones et/ou ramifications sous la surface
EP2508707B1 (fr) * 2011-04-05 2019-10-30 GE Oil & Gas UK Limited Surveillance de la composition de phase de fluide de production à partir d'un puits d'extraction d'hydrocarbure
EP2780549A2 (fr) 2011-11-17 2014-09-24 NTNU Norwegian University of Science and Technology Essai de puits
GB201306967D0 (en) 2013-04-17 2013-05-29 Norwegian Univ Sci & Tech Ntnu Control of flow networks
US9702243B2 (en) 2013-10-04 2017-07-11 Baker Hughes Incorporated Systems and methods for monitoring temperature using a magnetostrictive probe
EA036893B1 (ru) * 2014-09-25 2021-01-12 Тоталь С.А. Добыча углеводородов с помощью тестового сепаратора
CN105808913B (zh) * 2014-12-31 2018-07-31 中国石油天然气股份有限公司 一种页岩气产量递减分析方法
CN104948166A (zh) * 2015-06-30 2015-09-30 西安长庆科技工程有限责任公司 一种大规模丛式井组组合计量装置及方法
WO2017015079A1 (fr) * 2015-07-17 2017-01-26 Genscape Intangible Holding, Inc. Procédé et système servant à estimer la production d'un produit énergétique par un producteur sélectionné
US10370945B2 (en) * 2016-04-08 2019-08-06 Khalifa University of Science and Technology Method and apparatus for estimating down-hole process variables of gas lift system
US10677038B2 (en) 2016-10-13 2020-06-09 Honeywell International Inc. System and method for production well test automation
CN110566198A (zh) * 2019-09-17 2019-12-13 克拉玛依红山油田有限责任公司 多井共用在线含水计量方法
CN116263098B (zh) * 2021-12-14 2025-09-05 中国石油天然气集团有限公司 基于产气系数的页岩气平台井测试产量预测方法及装置

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6561041B1 (en) * 2001-11-28 2003-05-13 Conocophillips Company Production metering and well testing system
US6944563B2 (en) * 2003-05-09 2005-09-13 Abb Research Ltd. On-line compositional allocation

Also Published As

Publication number Publication date
EP2013447B1 (fr) 2010-01-13
EP2013447A1 (fr) 2009-01-14
ATE455234T1 (de) 2010-01-15
AU2007235957B2 (en) 2010-12-02
DE602007004316D1 (de) 2010-03-04
AU2007235957A1 (en) 2007-10-18
NO339225B1 (no) 2016-11-21
EA200802115A1 (ru) 2009-02-27
NO20084550L (no) 2008-10-28
NZ571239A (en) 2011-06-30
BRPI0709899A2 (pt) 2011-08-02
BRPI0709899B1 (pt) 2018-01-09
WO2007116006A1 (fr) 2007-10-18
CA2645253A1 (fr) 2007-10-18

Similar Documents

Publication Publication Date Title
CA2645253C (fr) Procede pour mesurer la production de puits de petrole
CA2694014C (fr) Procede pour la mesure virtuelle de puits d'injection et l'affectation et la commande de puits d'injection a multiples zones
CA2645902C (fr) Procedes pour optimiser la production d'un groupe de puits
US8290632B2 (en) Method for controlling production and downhole pressures of a well with multiple subsurface zones and/or branches
EP1807606B1 (fr) Procede et systeme pour mesurer la production de puits de petrole
CN101415905A (zh) 优化井组产量的方法
CN101421489A (zh) 油井产量计量的方法
RU2645055C1 (ru) Способ автоматического прослушивания газовых и газоконденсатных скважин на месторождениях крайнего севера
RU2607004C1 (ru) Способ оперативного контроля технического состояния газовых и газоконденсатных скважин
Kapusta et al. Complex approach for gas lift wells optimization for Orenburgskoe field
Ausen et al. Uncertainty evaluation applied to a model-based Virtual Flow Metering system
Eugene et al. Complex Approach for Gas Lift Wells Optimization for Orenburgskoe Field
CN119790214A (zh) 测量来自井的多相流

Legal Events

Date Code Title Description
EEER Examination request
MPN Maintenance fee for patent paid

Free format text: FEE DESCRIPTION TEXT: MF (PATENT, 18TH ANNIV.) - STANDARD

Year of fee payment: 18

U00 Fee paid

Free format text: ST27 STATUS EVENT CODE: A-4-4-U10-U00-U101 (AS PROVIDED BY THE NATIONAL OFFICE); EVENT TEXT: MAINTENANCE REQUEST RECEIVED

Effective date: 20250304

U11 Full renewal or maintenance fee paid

Free format text: ST27 STATUS EVENT CODE: A-4-4-U10-U11-U102 (AS PROVIDED BY THE NATIONAL OFFICE); EVENT TEXT: MAINTENANCE FEE PAYMENT DETERMINED COMPLIANT

Effective date: 20250304

Free format text: ST27 STATUS EVENT CODE: A-4-4-U10-U11-U102 (AS PROVIDED BY THE NATIONAL OFFICE); EVENT TEXT: MAINTENANCE FEE PAYMENT PAID IN FULL

Effective date: 20250304

MPN Maintenance fee for patent paid

Free format text: FEE DESCRIPTION TEXT: MF (PATENT, 19TH ANNIV.) - STANDARD

Year of fee payment: 19

U00 Fee paid

Free format text: ST27 STATUS EVENT CODE: A-4-4-U10-U00-U101 (AS PROVIDED BY THE NATIONAL OFFICE); EVENT TEXT: MAINTENANCE REQUEST RECEIVED

Effective date: 20260303

U11 Full renewal or maintenance fee paid

Free format text: ST27 STATUS EVENT CODE: A-4-4-U10-U11-U102 (AS PROVIDED BY THE NATIONAL OFFICE); EVENT TEXT: MAINTENANCE FEE PAYMENT PAID IN FULL

Effective date: 20260303