CA2957931A1 - Procede de traitement d'une formation souterraine presentant une stimulation a point unique - Google Patents
Procede de traitement d'une formation souterraine presentant une stimulation a point unique Download PDFInfo
- Publication number
- CA2957931A1 CA2957931A1 CA2957931A CA2957931A CA2957931A1 CA 2957931 A1 CA2957931 A1 CA 2957931A1 CA 2957931 A CA2957931 A CA 2957931A CA 2957931 A CA2957931 A CA 2957931A CA 2957931 A1 CA2957931 A1 CA 2957931A1
- Authority
- CA
- Canada
- Prior art keywords
- fracturing
- data
- wellbore
- treatment
- section
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/14—Obtaining from a multiple-zone well
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/25—Methods for stimulating production
- E21B43/26—Methods for stimulating production by forming crevices or fractures
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B47/00—Survey of boreholes or wells
- E21B47/10—Locating fluid leaks, intrusions or movements
- E21B47/11—Locating fluid leaks, intrusions or movements using tracers; using radioactivity
Landscapes
- Life Sciences & Earth Sciences (AREA)
- Engineering & Computer Science (AREA)
- Geology (AREA)
- Mining & Mineral Resources (AREA)
- Physics & Mathematics (AREA)
- Environmental & Geological Engineering (AREA)
- Fluid Mechanics (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Geophysics (AREA)
- Physical Or Chemical Processes And Apparatus (AREA)
Applications Claiming Priority (3)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| US201462037873P | 2014-08-15 | 2014-08-15 | |
| US62/037,873 | 2014-08-15 | ||
| PCT/US2015/044980 WO2016025672A1 (fr) | 2014-08-15 | 2015-08-13 | Procédé de traitement d'une formation souterraine présentant une stimulation à point unique |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CA2957931A1 true CA2957931A1 (fr) | 2016-02-18 |
Family
ID=55304609
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CA2957931A Pending CA2957931A1 (fr) | 2014-08-15 | 2015-08-13 | Procede de traitement d'une formation souterraine presentant une stimulation a point unique |
Country Status (2)
| Country | Link |
|---|---|
| CA (1) | CA2957931A1 (fr) |
| WO (1) | WO2016025672A1 (fr) |
Families Citing this family (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US10480311B2 (en) * | 2017-06-30 | 2019-11-19 | Baker Hughes, A Ge Company, Llc | Downhole intervention operation optimization |
| US12442284B2 (en) * | 2018-12-27 | 2025-10-14 | Halliburton Energy Services, Inc. | Hydraulic fracturing job plan real-time revisions utilizing collected time-series data |
| US11719083B2 (en) | 2021-08-17 | 2023-08-08 | Saudi Arabian Oil Company | Maintaining integrity of lower completion for multi-stage fracturing |
| CN115898379B (zh) * | 2021-08-24 | 2024-11-26 | 中国石油化工股份有限公司 | 一种油气井全生命周期生产动态监测解释方法及应用 |
Family Cites Families (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| WO2009056992A2 (fr) * | 2007-11-01 | 2009-05-07 | Schlumberger Canada Limited | Simulation de fracture de réservoir |
| WO2010144872A1 (fr) * | 2009-06-12 | 2010-12-16 | Altarock Energy, Inc. | Technique de retour d'écoulement d'injection pour mesurer une surface de fracture au voisinage d'un puits de forage |
| US8695716B2 (en) * | 2009-07-27 | 2014-04-15 | Baker Hughes Incorporated | Multi-zone fracturing completion |
| WO2012087864A2 (fr) * | 2010-12-20 | 2012-06-28 | Schlumberger Technology Coproration | Procédé d'utilisation des données relatives aux formations souterraines pour améliorer les opérations de traitement |
| US9262713B2 (en) * | 2012-09-05 | 2016-02-16 | Carbo Ceramics Inc. | Wellbore completion and hydraulic fracturing optimization methods and associated systems |
-
2015
- 2015-08-13 WO PCT/US2015/044980 patent/WO2016025672A1/fr not_active Ceased
- 2015-08-13 CA CA2957931A patent/CA2957931A1/fr active Pending
Also Published As
| Publication number | Publication date |
|---|---|
| WO2016025672A1 (fr) | 2016-02-18 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| US9822626B2 (en) | Planning and performing re-fracturing operations based on microseismic monitoring | |
| US9803467B2 (en) | Well screen-out prediction and prevention | |
| RU2663011C2 (ru) | Система и способ выполнения операции интенсификации скважины | |
| Sharma et al. | The role of induced un-propped (IU) fractures in unconventional oil and gas wells | |
| US12006819B2 (en) | Hydraulic integrity analysis | |
| EP2427788B1 (fr) | Appareil et procédé permettant de prédire les propriétés de formations terrestres | |
| US11753919B2 (en) | Method to improve hydraulic fracturing in the near wellbore region | |
| CA2881718A1 (fr) | Systeme et procede d'execution d'operations de stimulation | |
| Cramer et al. | Pumpdown Diagnostics for Plug-and-Perf Treatments | |
| US20160123126A1 (en) | Use of Real-Time Pressure Data to Evaluate Fracturing Performance | |
| WO2019191349A1 (fr) | Plate-forme entraînée par des données intégrée pour optimisation de complétion et caractérisation de réservoir | |
| US20240229630A1 (en) | System and Method for Determining Parameters corresponding to Hydraulic Connection between Monitor Well and Treatment Well | |
| CA2957931A1 (fr) | Procede de traitement d'une formation souterraine presentant une stimulation a point unique | |
| Khan et al. | Comparative Look at Wellbore/Rock Connection Techniques: An Integrated Perspective from Stimulation, Intervention, and Laboratory Research | |
| Retnanto et al. | Managing uncertainty of reservoir heterogeneity and optimizing acid placement in thick carbonate reservoirs | |
| Strother et al. | Challenges of refracturing horizontal wells in unconventional and tight reservoirs | |
| Hamadah et al. | Comprehensive Fracturing Evaluation of the First Mauddud Formation Injector in South & East Kuwait | |
| Parker et al. | Technology integration: A methodology to enhance production in horizontal Wolfcamp shale wells in the Delaware basin | |
| Yoshida et al. | Unlocking the Potential of Acid Stimulation in Volcanic Rocks: A Successful Case with Integrated Analysis in Minami-Nagaoka Gas Field, Japan | |
| Aftab et al. | First Multistage Fracturing of Horizontal Well Drilled in Conventional Tight Carbonate Reservoir in An Onshore Field in the UAE–Challenges and Lessons Learned | |
| Ramadan et al. | Formation Sampling in Ultra-Low Mobility Reservoirs with the Aid of Targeted Stimulation Utilizing Wireline Formation Testing Tool | |
| Malhotra et al. | Coiled Tubing Horizontal Well Fracturing in the Low Young's Modulus, Low Permeability Belridge Diatomite: Challenges Faced and Lessons Learned | |
| Yudhanto et al. | Overview of Multi-Stage Fracturing Using Fiber Enabled Coiled Tubing Plug and Perf Method: First Deployment in Indonesia | |
| Alsubaih et al. | Well Integrity for Unconventional Resources | |
| Nygaard et al. | Improved Methods and Workflows for Multi-Zone Stimulation |