CH246084A - Thermal power plant with gas turbine, a combustion air preheater that can be acted upon by the exhaust gases from the gas turbine, and a steam generator that can be acted upon by the same. - Google Patents

Thermal power plant with gas turbine, a combustion air preheater that can be acted upon by the exhaust gases from the gas turbine, and a steam generator that can be acted upon by the same.

Info

Publication number
CH246084A
CH246084A CH246084DA CH246084A CH 246084 A CH246084 A CH 246084A CH 246084D A CH246084D A CH 246084DA CH 246084 A CH246084 A CH 246084A
Authority
CH
Switzerland
Prior art keywords
gas turbine
acted
combustion air
power plant
thermal power
Prior art date
Application number
Other languages
German (de)
Inventor
Cie Aktiengesellschaft Boveri
Original Assignee
Bbc Brown Boveri & Cie
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Bbc Brown Boveri & Cie filed Critical Bbc Brown Boveri & Cie
Publication of CH246084A publication Critical patent/CH246084A/en

Links

Classifications

    • F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F02—COMBUSTION ENGINES; HOT-GAS OR COMBUSTION-PRODUCT ENGINE PLANTS
    • F02C—GAS-TURBINE PLANTS; AIR INTAKES FOR JET-PROPULSION PLANTS; CONTROLLING FUEL SUPPLY IN AIR-BREATHING JET-PROPULSION PLANTS
    • F02C6/00—Plural gas-turbine plants; Combinations of gas-turbine plants with other apparatus; Adaptations of gas-turbine plants for special use
    • F02C6/18—Plural gas-turbine plants; Combinations of gas-turbine plants with other apparatus; Adaptations of gas-turbine plants for special use using the waste heat of gas-turbine plants outside the plants themselves, e.g. gas-turbine power heat plants

Landscapes

  • Engineering & Computer Science (AREA)
  • Chemical & Material Sciences (AREA)
  • Combustion & Propulsion (AREA)
  • Mechanical Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Engine Equipment That Uses Special Cycles (AREA)

Description

  

      wärmekraftanlage    mit     Gastarbine,    einem von den     Abgasen    der Gasturbine       beaufsehlagbaren        Verbrennungsluftvorwärmer    und einem von denselben       beaufsehlagbaren    Dampferzeuger.

      Es ist bekannt, mit den Abgasen von       Gasturbinen    Dampf zu erzeugen und diesen  in Dampfturbinen oder Heizanlagen auszu  nützen, nachdem diese Abgase bereits durch  einen     Vorwärmer    für die Verbrennungsluft  der     Gasturbine    geführt worden sind, so dass  also die Ausnützung in     Hintereinanderschal-          tung        erfolgt    ist.

   Diese Anordnung hat den  Vorteil, dass sie in der Abgasleitung keiner  Schieber bedarf, dagegen hat sie den     schwer-          vv-iegenden    Nachteil, dass beide Wärmeaus  tauscher, derjenige für     Luftvorwärmung    und  derjenige für Dampferzeugung,     stets    von der  gleichen Gasmenge durchflossen werden, so  dass das     Verhältnis    der in diesen     Wärme-          austauschern        übertragenen        Wärmemengen    bei  gewählten Austauschflächen für jede Be  lastung ein für allemal gegeben ist.  



       Vorteilhafter    ist es, wenn gemäss der     Er-          .Eindung    zwei mit dem     Turbinengehäuse    ver  bundene und zum     Verbrennungsluftvorwär-          mer        bezw.    zum Dampferzeuger führende    Leitungen mit Einstellorgan zum     Ändern     des Verhältnisses der     Durchflussmengen     dieser     Leitungen    angeordnet sind.  



  Zweckmässig geht die     Abgasleitung    der  Gasturbine in zwei mit einem Einstellorgan  versehene Leitungen über, von denen die eine  zum     Vorwärmer    für die Verbrennungsluft  und die andere zum     Abhitzekessel    geführt ist.  



  An Hand der Zeichnung sei die Erfin  dung beispielsweise erläutert.  



       Fig.    1 stellt     schematisch    eine beispiels  weise Wärmekraftanlage im Grundriss und       Fig.    2 in grösserem Massstab im     Aufriss    der  hier in Betracht kommenden Teile dar.  



  In     Fig.    1 ist 1 eine     Gasturbine,    2 ein  von ihr angetriebener Verdichter, 3 ein  elektrischer     Stromerzeuger    auf derselben  Welle zur     Erzeugung    der Nutzleistung, 4 ein       Luftvorwärmer,    5 eine Brennkammer und  6 ein     Abhitzekessel    zur Erzeugung von  Dampf. Der offene Prozess des     Arbeitsmittels     ist folgender: Luft tritt in den Verdichter 2      bei 7 ein, wird im     Vorwärmer    4 vorgewärmt  und gelangt zusammen mit Brennstoff in die  Brennkammer 5, wo die Entzündung statt  findet. Die entstehenden heissen Gase strömen  zur Gasturbine 1 und leisten dort Arbeit.

   Die  Abgase teilen sich und können durch die  Leitungen 8 und 9 teils zum     Vorwärmer    4  der Verbrennungsluft, teils zum     Abhitzkessel     6 zur Erzeugung von Dampf und dann ins  Freie oder zu weiteren Verwertungsstellen  strömen.  



  Das Mengenverhältnis der sich teilenden  Abgase wird nun beispielsweise eingestellt,  wie in     Fig.    2     veranschaulicht    ist. Ein Ein  stellorgan 10 an der Teilungsstelle kann so  eingestellt werden,     da.ss    ein beliebiges Ver  hältnis der Teilung hergestellt werden kann.  



  Wird     beispielsweise    die Leitung 9 gänz  lich     abgesperrt,    so     da.ss    die Anlage ohne  Dampferzeugung läuft und die ganze Ab  gasmenge durch     Leitung    8 zum     Vorwärmer     4 strömt, so arbeitet sie mit bestem thermi  schem Wirkungsgrad, bezogen ' auf die er  zeugte     elektrische    Leistung. Die Luft möge       etwa    mit 200  C in den     Vorwärmer    gelan  gen, werde dort auf     etwa        800     C     erwärmt,     worauf die Brenngase mit etwa 600  C zur  Turbine strömen.

   Es ist heute ein thermi  scher     Wirkungsgrad    von etwa 26 bis 28  erreichbar.  



  Je mehr nun das Einstellorgan 10 die  Leitung 9 zum Kessel 6 hin freigibt, desto  weniger     erfolgt    eine     Vorwärmung    der Luft  durch die Abgase, desto mehr Brennstoff  muss in die Brennkammer 5 gegeben werden,  um auf die     Eintrittstemperatur    von 600  C  vor der Turbine     zu    gelangen, desto schlechter  wird also der     thermische    Wirkungsgrad  dieser Seite der Anlage, während die andere  Seite, das heisst die Seite der Dampferzeu-         gung,    einen entsprechend steigenden Nutzen  hat.  



  Um bei     Verbrennungsturbinen        aiilaen.     die bei kleinen Belastungen noch eine ver  hältnismässig grosse Dampfmenge erzeugen  müssen, diese tatsächlich abgeben zu können,  ist es zweckmässig. in die Leitung 9 einen  Brenner einzubauen, durch den die fehlende       Wärrnemenge    zugeführt wird.



      thermal power plant with gas turbine, a combustion air preheater that can be acted upon by the exhaust gases from the gas turbine and a steam generator that can be acted upon by the same.

      It is known to generate steam with the exhaust gases from gas turbines and to use them in steam turbines or heating systems after these exhaust gases have already been passed through a preheater for the combustion air of the gas turbine, so that they are used in series.

   This arrangement has the advantage that it does not require a slide valve in the exhaust pipe, on the other hand it has the serious disadvantage that the same amount of gas always flows through both heat exchangers, the one for air preheating and the one for steam generation, so that the The ratio of the heat quantities transferred in these heat exchangers for the selected exchange surfaces is given once and for all for every load.



       It is more advantageous if, according to the invention, two ver connected to the turbine housing and respectively to the combustion air preheater. Lines leading to the steam generator are arranged with an adjusting element for changing the ratio of the flow rates of these lines.



  The exhaust gas line of the gas turbine expediently merges into two lines provided with an adjusting element, one of which is led to the preheater for the combustion air and the other to the waste heat boiler.



  The invention is explained using the drawing, for example.



       Fig. 1 shows schematically an example of a thermal power plant in plan and Fig. 2 in a larger scale in elevation of the parts under consideration here.



  In Fig. 1, 1 is a gas turbine, 2 is a compressor driven by it, 3 is an electric power generator on the same shaft for generating the useful power, 4 is an air preheater, 5 is a combustion chamber and 6 is a waste heat boiler for generating steam. The open process of the working medium is as follows: air enters the compressor 2 at 7, is preheated in the preheater 4 and, together with fuel, enters the combustion chamber 5, where ignition takes place. The resulting hot gases flow to the gas turbine 1 and do work there.

   The exhaust gases divide and can flow through the lines 8 and 9 partly to the preheater 4 of the combustion air, partly to the waste heat boiler 6 for generating steam and then to the outside or to other recycling points.



  The quantity ratio of the dividing exhaust gases is now set, for example, as illustrated in FIG. 2. An actuator 10 at the division point can be set so that any ratio of division can be established.



  If, for example, line 9 is completely shut off so that the system runs without steam generation and the entire amount of exhaust gas flows through line 8 to preheater 4, it works with the best thermal efficiency, based on the electrical power it generates. The air should enter the preheater at around 200 C, where it is heated to around 800 C, whereupon the combustion gases flow to the turbine at around 600 C.

   A thermal efficiency of around 26 to 28 can be achieved today.



  The more the setting element 10 releases the line 9 to the boiler 6, the less the air is preheated by the exhaust gases, the more fuel must be added to the combustion chamber 5 in order to reach the inlet temperature of 600 C upstream of the turbine, the worse the thermal efficiency of this side of the system becomes, while the other side, that is the side of the steam generation, has a correspondingly increasing benefit.



  To aiilaen with combustion turbines. which have to generate a relatively large amount of steam with small loads in order to actually be able to release it, it is useful. to install a burner in the line 9, through which the missing amount of heat is supplied.

 

Claims (1)

PATENTANSPRUCH: Wärmekraftanlage reit Gasturbine, einem von den Abgasen der Gasturbine beaufschlag- baren Verbrennungsluftvorwärmer und einem von denselben beaufschla.gbaren Dampf erzeuger, PATENT CLAIM: Thermal power plant reit gas turbine, a combustion air preheater that can be acted upon by the exhaust gases from the gas turbine and a steam generator that can be acted upon by the same, gekennzeiehnet durch zwei mit dem Turbinengehäuse verbundene und zum Ver- brennungsluftvorv-ärmer bez-%v. zum Dampf erzeuger führende. Leitungen mit Einstell organ zum Andern des Verhältnisses der Durchflussmengen dieser Leitungen. marked by two connected to the turbine housing and with lower combustion air pre-%% v. leading to the steam generator. Lines with adjustment organ for changing the ratio of the flow rates of these lines. UN TER AN SPR17"CHE 1. Wärmekraftanlage nach Patentan spruch, dadurch gekennzeiehnet, da,ss die Abgasleitung der Gasturbine (1) in zwei mit einem Einstellorgan (10) versehene Leitun gen (8, 9) übergeht, von denen die eine (8) zum Vorwä.rmer (4) für die Verbrennungs luft und die andere (9) zu einem Abhitze- kessel (6) geführt ist. UN TER AN SPR17 "CHE 1. Thermal power plant according to patent claim, characterized in that the exhaust line of the gas turbine (1) merges into two lines (8, 9) provided with an adjusting element (10), one of which (8 ) to the preheater (4) for the combustion air and the other (9) to a waste heat boiler (6). 2. Wärmekraftanlage nach Patentan spruch und Unteranspruch 1, gekennzeichnet durch einen Brenner in der zum Abhitzekessel führenden Leitung (9), um bei kleiner Be lastung der Gasturbine und damit geringer zur Verfügung stehender Abgasmenge die erzeugte Dampfmenge durch Zuführen 'der fehlenden Wärmemenge steigern zu können. 2. A thermal power plant according to patent claim and dependent claim 1, characterized by a burner in the line (9) leading to the waste heat boiler, in order to be able to increase the amount of steam generated by supplying the missing amount of heat with a small loading of the gas turbine and thus less amount of exhaust gas available .
CH246084D 1945-06-21 1945-06-21 Thermal power plant with gas turbine, a combustion air preheater that can be acted upon by the exhaust gases from the gas turbine, and a steam generator that can be acted upon by the same. CH246084A (en)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CH246084T 1945-06-21

Publications (1)

Publication Number Publication Date
CH246084A true CH246084A (en) 1946-12-15

Family

ID=4465320

Family Applications (1)

Application Number Title Priority Date Filing Date
CH246084D CH246084A (en) 1945-06-21 1945-06-21 Thermal power plant with gas turbine, a combustion air preheater that can be acted upon by the exhaust gases from the gas turbine, and a steam generator that can be acted upon by the same.

Country Status (1)

Country Link
CH (1) CH246084A (en)

Similar Documents

Publication Publication Date Title
DE826804C (en) Gas steam turbine system for the joint generation of heat and mechanical energy with associated control
DE839290C (en) Steam-gas thermal power plant
DE1476903B2 (en) GAS STEAM TURBINE SYSTEM
DE1526897C3 (en) Gas-steam turbine plant
GB562155A (en) Improvements in or relating to a steam-air heat-power plant
US2341490A (en) Gas turbine plant
DE4117189C2 (en) Process for generating electrical energy in a combined gas-steam power plant and plant for carrying out the process
DE873628C (en) Thermal power plant with gas turbine and waste heat steam boiler
DE917284C (en) Gas-steam power plant
AT135256B (en) Steam generator.
US2499108A (en) Arrangement for the utilization of turbine exhaust gases in steam generators and air preheaters
DE1050609B (en) A thermal power plant comprising a gas turbine and a steam turbine plant
CH526717A (en) Combined gas / steam power plant
AT201624B (en) Thermal power plant to utilize the heat generated in a nuclear reactor
AT213153B (en) Method for operating a gas turbine plant
DE19542917A1 (en) Combined turbine generating set
DE487256C (en) Fire gas heated reheater
CH226747A (en) Procedure for expanding an existing steam plant.
CH239167A (en) Steam-gas thermal power plant.
DE829080C (en) Process for the operation of gas-steam thermal power plants
DE826772C (en) Electric power generation plant with a gas and a steam turbine
CH228518A (en) Steam-gas thermal power plant.
CH238795A (en) Steam-gas thermal power plant.
CH343716A (en) Thermal power plant to utilize the heat generated in a nuclear reactor
DE1476903C (en) Gas-steam turbine plant