CH324574A - Process for the production of a ceiling and ceiling containing concrete and reinforcing iron produced by this process - Google Patents

Process for the production of a ceiling and ceiling containing concrete and reinforcing iron produced by this process

Info

Publication number
CH324574A
CH324574A CH324574DA CH324574A CH 324574 A CH324574 A CH 324574A CH 324574D A CH324574D A CH 324574DA CH 324574 A CH324574 A CH 324574A
Authority
CH
Switzerland
Prior art keywords
bricks
concrete
ceiling
rows
beams
Prior art date
Application number
Other languages
German (de)
Inventor
Haller August
Original Assignee
Hunziker & Cie Ag
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hunziker & Cie Ag filed Critical Hunziker & Cie Ag
Publication of CH324574A publication Critical patent/CH324574A/en

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B5/00Floors; Floor construction with regard to insulation; Connections specially adapted therefor
    • E04B5/44Floors composed of stones, mortar, and reinforcing elements
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B5/00Floors; Floor construction with regard to insulation; Connections specially adapted therefor
    • E04B5/16Load-carrying floor structures wholly or partly cast or similarly formed in situ
    • E04B5/17Floor structures partly formed in situ
    • E04B5/18Floor structures partly formed in situ with stiffening ribs or other beam-like formations wholly cast between filling members
    • E04B5/21Cross-ribbed floors

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Finishing Walls (AREA)

Description

  

  Verfahren zur Herstellung einer Decke und nach diesem Verfahren hergestellte, Beton  und     Armierungseisen    enthaltende Decke    Gegenstand des     vorliegenden    Patentes ist  ein Verfahren zur Herstellung einer     Deeke.     



       Dieses    Verfahren     bezweckt,    mit aus Ton  gebrannten,     gewöhnlichen        Alauersteinen,        naeh-          stehend    Backsteine genannt,     wirtschaftliche     und statisch     einwap.d'freie    Decken zu     erstellen,     die     ntgleielr    den     sclial1-    und     wärmetechnischen          Forderungen    entsprechen.

   Damit,     wird    dem       Baekstein,    der     bisher    nur für tragende     und     : isolierende, vertikale     Wände    Verwendung fin  den konnte, durch die     I'bernahme    einer drit  ten Funktion in der     Horizontalen        (Deeke)    ein       neues        Anwendungsgebiet    im     Wohnungs-,        In-          d.tLsirie-        und        Landwirtsebaftsbau        ersehlossen.     



  Das     erfindungsgemässe    Verfahren     isst    da  dureh     rekenn.zeiehnet,    dass     mitteils        Backsteinen          paralliele    Reihen     gebildet    werden und Back  steine mittels Beton, in den     Armierungse:isen          einbetoniert    werden, gegenseitig in festen Ver  band     äebraeht    werden.  



       Gegenstand    des Patentes ist weiter eine  nach diesem Verfahren     hergestellte,    Beton mit       ArmierLingseisen    enthaltende     D@eeke,    die sich       diadureh        auszeiehnet,    dass sie in Reihen an  geordnete, gegenseitig in festen Verband     ge-          braehte        Baeksteine    enthält.  



  Die Vorteile     cles        Verfahrens    und der da  mit hergestellten     Deeke    liegen in der durch  die Typenrationalisierung gegebenen     Verein-          faehung,        d.        h.    in der Möglichkeit, die gleichen       normalisierten        Bachsteine    nicht nur für tra  gende, isolierende, sondern auch für Decken-         konstruktionen        ziu    verwenden.

   Damit wird  aber auch die     Materialibezugs-    und     Verwen-          drnngsdisposition        erleichtert.     



  Das Gegenstand des     Patentes        bildende     Verfahren soll     beispielsweise    an Hand der       zum    Teil     schematischen        Zeiehnung    näher er  klärt. werden, in welcher eine     Anzahl    Bei  spiele     erfindungsgemässer        Deeken    im     Senk-          reehtschnitt    und     mim    Teil in     schaabildlieher          Darstellung        gezeichnet    sind:

         Fig.    1 und 2     zeigen    je     eine        auf        Sehalimg          hergestellte        Deek    .e     mit        zwischen    den Back  steinen vorgesehener     Verbindung        aits    Beton,  wobei in die     Betonmasse    eine     kreuzweise    ver  legte     Eisenbewehrung    eingebettet     ist.     



  Gemäss     Fig.1    handelt es     sich    um. eine     AZw-          führung    mit     LTtb-erbet.on,    gemäss     Fig.    2     iun    eine  .Ausführung ohne     überbeton.     



  In     Pig.    1 bezeichnet 1     Backsteine,        vorzua      weise     Gittersteine,        jedoeh    kommen auch an  ders gelochte     sowie    volle     Steine    in Betracht.

    Die vorgesehenen     Backsteine    1     sind    ohne  Mörtel in     gegebenen    Abständen reihenweise  verlegt.     Diese    Backsteine 1     tder        gezeichneten          Gebäudedeeke    erfüllen die Funktion     als        Füll-          körper    infolge     gleiehmässiger        Querschnitts-          strniktur        besser    als jeder     bekannte        lierkömrn     liehe     Tonhohlkörper;

      dies     gilt.        aueh    für die       sehall-    und wärmetechnischen Belange. Dia     aus     gebranntem Ton hergestellten     Rippenplatten     2 dienen.     gUichzeitig    sowohl     als,        Distanzhalter     für die     Einhaltung        der        Rippenbreite    als     aueh         als     Isolationslamellen    zur     Erreichung    einer  einheitlichen     Deekenuntersicht    bzw. Putzträ  gerfläche.  



  Gegenüber den bekannten     Tonhohlkörpern     liegt ein weiterer, bei geneigter Decke und       Flaehdach        besonders    wichtiger Vorteil darin,  dass auch an der Deckenunterseite Lochungen  für Dübel:     uusw.        ausgespitzt    werden können,  ohne     dass    grosse Löcher entstehen, die erfah  rungsgemäss nur     mühsam        zugeputzt    werden.  können.

   Soweit     Bodenbeläge    wie Kork,     Lino-          leiun,    Klebeparkett,     Asphalt.auisguss    vorgese  hen     sind,    tritt eine Küstensenkung dadurch  ein,     da.ss    der notwendige     Betoilglatt;strich    beim  Betonieren, im     Gegensatz    zur     I4Tassivdeeke    aus  Beton, im     gleiehen    Arbeitsgang     erstellt    wer  den kann.  



  Die     stat.isehe        Ausbildung    für Balken über  zwei Stützen     erfolgt    in bekannter     Weise.     Bei der     Ausführung    der     Decke        als        Balken     über     mehreren    Stützen oder als Balkon mit       Kragarinen    ergibt sich, im     Zusammenhange     mit dem gleichmässigen     Strukturquers        -hnitt,     z.

   B.     des        Gittersteines,        erstmalig,    der Vorteil       des        Wegfalles        von"Drnekpaatten        bzw,        massiver          Driickglurtstreifen,    die zur Aufnahme der ne  gativen     Driielüspannungen    unbedingt     erfordier-          lich    sind. Der Querschnitt dies     Bachsteines     kann     somit,    voll und ganz statisch     ausgenützt     werden.  



       Infolge    Gleichmässigkeit des     Putzgrandes     fahlen die bekannten nachteiligen     Putzverfäl=          bunggen,    wie diese speziell bei der Ausbildung  von Ballionen auftreten, weg.  



  Auch :der Architektur steht eine Reihe von       Gestaltumgysmäglichkeiten    offen, indem ähn  lich wie beim     Sichtmauerwerk    durch verschie  dene Verbandanordnungen     unverputzte,    aus       Verblendern    kombinierte,     sichtbare    Decken  hergestellt werden können, was     insbesondere     für Keller, Dielen, Hallen     und.    dergleichen  vorteilhaft.     ist.     



  Nötigenfalls     können    in     @np.asaung    an spe  zielle Belastungsfälle     arrn.ierte        Beton-Querver-          bände        und    auch     Ausriegelungen    an     beliebiger     Stelle     vorgesehen    werden.  



  Auf Grund gemachter     Erfahrmigen    mit.       Hohlkörperdeeken,        die    sich aus     Deckensteinen       mit speziell     angeordneten    Druckplatten     zu-          sammensetzen,    darf festgestellt. werden, dass  sieh     Baclü¯teine    aus :den bereits angeführten  Gründen     vorzüglieh    für die     direkte        Aufnahme     der     Di@iekkrä.fte    eignen.  



       Dureh    die z. B. im     Sinne    der     Fig.    ? vor  gesehene     abw        eeluslungsweise    Verwendung z. B.  von     Gittersteinen    1 und 3     ungleicher    Höhe,  aber gleicher     Normenlänge    und     Breite,    ent  stehen senkrecht, zu der aus Eisenbeton beste  henden Tragrippe 4 entsprechende     Einsehnitte,     die     gleichzeitig    mit der     Eistellung    der Trag  rippen 4     a.nsbetoniert    werden.

   Dadurch wird       erreicht,    dass  1. ein     guter    Verband zur     einwandfreien          Druekübertragung    entsteht,  '?. die Fugen zwischen den Steinen ge  schlossen werden, unter Vermeidung durch  gehender Rippen,  3. nach Einlage     d-er        Veiteilbewehrmg        eile          einwandfreier        Querverband    mittels den Beton  rippen gebildet wird,  4. der Hohlraum zwischen den Steinlagen  für das Einlegen von Röhren,     Leitungsrohren,          Befestigungsdübel    usw. benützt werden kann,  5.

   auf     dien    höheren Steinen der     Ausgu.ss-          bet.on    leicht abzuziehen     ist,    und  6. die Decken im Zusammenhang mit den  durch die Steine 3 gebildeten festen     Obe2-          flächent,eil.en    sofort. nach dem Vergiessen be  gehbar sind, so dass ohne     Arbeitsunterbruch     weiter gearbeitet- werden kann.  



  Ein     eigeiler        Vorteil    solcher Decken gegen  über der Ausführung mit Überbeton liegt  im geringeren Eigengewicht. (3 cm Beton =_  75     kg/m2    Gewicht) und der damit erreichten       Einsparung    an     Armicrun        Ratseisen.    Der Vorteil .  des     @ruckguutivegfalles    bleibt auch hier ge  wahrt. Im übrigen     gelten.    auch     hinsichtlich     der     a.rchitelktonisehen    Belange die bereits an  geführten Bemerkungen.  



       Fig.    3     Lind    4 zeigen je eine ohne Schalung       mittels        Steinbalken,    z. B. aus     Gittersteinen,          hergeste@llte    Decke,     und    zwar mit. bzw. ohne       Überbeton.     



  Die Balken     werden    in geeigneten Räumen       (Ziegelei    oder Magazin des     Bauunternehmers)     in der Weise hergestellt,     da.ss    reihenweise           Backsteine    5     und    6 In der     Längsrichtung,          unter    Einhaltung des     Rippenabst.and'es,    der  durch die     Einlage    der     Rippenplatte    2 gegeben       ist,    ohne oder gegebenenfalls mit.

   Mörtel an  der     Stirnseite        aneinandergestossen        weiden,    bis  die vorgesehene     Balkenlänge    erreicht. ist. Die       Armierung    der     Betonrippe    7     erfolgt.    in be  kannter     Weise.    In der     Lä.nagossriclitiung    des Bal  kens     sind        hercorkragende    Bügel 8, die als       Befestiätlngshak    en für die Transport- und       Hubbewegungen    (Kran) dienen, einbetoniert.  



  Das     Einbrringen        des        Rippenbetons    erfolgt  im     (Tussverfah        ren.    Je nach     Lochquersehnitt          und    Lochanzahl der     Backsteine        kann    der Be  ton auch vibriert, evakuiert,     jedenfalls    in der   'eise eingebracht werden,     diass    eine einwand  freie     Verbüidung    bzw.

       Haftfestigkeit.        zwischen     den tragenden     R.i.ppen-        und    dien     Steinlängs-          schnitten    entsteht.  



       Fig.4    zeigt. eine der     verschiedenen        Aas          führangsmögliehk        eiten    mit     vorfabrizierten          Fertigbalken    ohne     -Überbeton,    wobei z. B. der  Balken auf einer Hälfte, rechts der Beton  rippe 7     aus        aneinandergestossenen    Backstei  nen 5 von gleicher Höhe zusammengesetzt ist,  während .die andere Balkenhälfte     zum    Teil  höhere     Backsteine    6     aufwelst,    die zueinander  in geeigneten Abständen vorgesehen sind.

         qeilxstverstän.dlieh        können    höhere     Backsteine     6     abwechslungsweise    beidseitig der     Betonrippe     7 vorgesehen werden. Die infolge der Höhen  differenz entstandenen Zwischenräume dienen  zur     Aufnahme    der     Verteila:rmieramg    und des       Ausglassbetons,    wodurch ein für die     Druck-          kräfteübertragung    wirksamer     Querverband     entsteht.

   Die Decke ist. sofort begehbar und       speziell    für Bauten geeignet., bei denen ein  rascher und störungsfreier Baufortschritt er  wünscht     ist.        Eine        gleichmässig    beschaffene       Untersicht    ist auch hier gewährleistet.  



  Die Rippe 7 kann     gleichfalls    ganz oder  zum Teil aus     Ziegelschrotbeton    hergestellt       werden,    womit dem Nachteil des     untei-schiecl-          liehen        Wärmedurchganges        zwischen    Tragrippe  und     isolierendem        Füllkörper    und somit.     Putz-          ab7eichnungen    vorgebeugt     werden    kann. So  wohl bei     Keller-    als auch bei     Estrichdeeken     besteht die     Möglichkeit,    den Überbeton bzw.

           Qa@erverband    mit     Ziegelsplitt        herzustellen,    so       da,l@        damit    eine     besseme        Isolation.        erreicht    wird.  



       Fig.5    und 6 zeigen je eine     weitere    ohne  Schalung mit bzw. ohne Überbeton     mittels          Gitterst.einbalken        hergestellte    Decke.

       Diese     zwei Decken     unterscheiden    sich von     denjenigen          na.eh        Fig.    3     und.    4     insofern,        als    hier nicht die       Backstein-        bzw.        Isolati@onalamellen    die     Decken-          ianterafeht        bilden,        sondern    die     aus    Ziegel  sehrot oder     aus        Normalbeton    bestehenden,

         eisenbewehrten        Platten    9, die     vorzugsweise    mit  Nut und     Kamm        ausgebildet    sind. Der damit  erreichte Vorteil liegt in     einer        materialem-          heiflichen        Deckenuntersicht    bzw.     Putzgrandi.     



  Die     Tragri@ppien    7     können        zusammen    mit  den     Sichtplatten    9     entweder        einheitlich        aus          Ziegelschrotbeton        hergestealLt    werden oder in  der     Kombination        Zieg,elschrotbeton    für die       Platte    und     Normalbeton    für die Rippe.  



       Fig.    7     und    8 zeigen je     eine        andere        ohne          Schalung    mit. bzw. ohne Überbeton mittels       Gittersteihbalken        hergestellte        Decke.     



  Diese     Balkend-eeken    weisen einen gleich  mässig aus     Bachsteinen        gebildeten        Isolations-          sowie        statischen        Querschnitt    auf     und        eignen          sieh        vorzüglich    u. a. für     lau        dwirtseha.ftliche     Bauten,     insbesondere    für     Ställe.     



  Der durch     einheitliche        Deckenstruktur        ge-          währleiLstete        gleichmässige        Wäiinedurchga-ng     einerseits und     die        KapiU@aaivirlmng        ,des        Zie-          gelmaterials,    in Verbindung mit der vor  züglichen     -#NTärmeisolation,        verhindern    weitest  gehend die     irrangenehmen,    an der.

       Decken-          un'tersicht    auftretenden     Kon        densationserschei-          nungen,    wodurch die     rahmklimatischen        rund          biologischen        Verhültnisee    in den Ställen     ver-          bessert    werden können.  



  Die.     Bewehrung    isst hier     mittels        Eisen.    10  gebildet, welche Gitterlöcher am     untern    Rand  der Steine 5 bzw. 5     und    6     durchsetzen;

          dde          Gitterlochung        ist    im     Bereich    der durchgehen  den     Bewehrungseisen    10 mit Hilfe     eines    beson  deren Verfahrens     ausbetonim-t,.    Der     einzelne     Balken     ist    nach einem     besonderen    Verfahren       gebildet.,    und zwar gemäss     Fig.7    durch     ein-          heitliche    Steine,

   und gemäss     Fig.    8 durch in  geeigneten Abständen     abwechslungsweise        @an-          gcordnete,    in     der    Länge und     Breite    einheit-      liehe, in der Höhe aber     untersehiedliehe        Baelz-          steine.    Die     Draicl-,Übertragung        isst    gekennzeich  net in     Fig.    7 durch     Verteileis.en    und     über-          beton,

      in     Fig.8    durch einwandfreien     Beton-          querv        erband        und        Verteilarmiering.     



  Gegenüber der     Ausführun-    nach     Fig.    8       untersehei:det        sieh,die    ebenfalls ohne     Schalung-          hergestellte    Decke ohne     Überbeton    gemäss       Fig.    9     durch    die Verwendung von     CTitterstei-          nen    11     und-    7 2 andern     Formates        als        dasjenige     der     Gittersteine    ö     lind    6.

   Ausserdem     sind    die       Lagerfugen        lla        zwischen    den Steinen 11     und.     12 mit Mörtel     ausgefüllt.     



       Fic.    10 und 11 zeigen je eine weitere ohne       Schalung    mit. bzw. ohne Überbeton     hergestellte     Decke     aiis        vorfabrizierten        Balken,    deren     Baek-          steine    13 diagonal in     Riehtiing    der     Gittertei-          lung    verlaufende Stossflüchen 14     aufweisen,     mittels     wel.elien    die Steine     i:

  n.einandergreifen.     Beim Verlegen der     einzelnen    durch die Eisen  10     und    10u bewehrten Balken bilden deren  erwähnte Stossflächen     jeweiils        Auflage.fläehen     für die     anzufügenden    Balken. Die in der  Zug-     und        DrLiekzone        angeordneten.    Eisen 10  bzw.     10a        durchsetzen    die     Gitterlochung,    die  in     diesem    Bereich     aiisbeton.iert,    ist.

   Die seit:       lichen    Fugen in der     Druckzone    dienen der  Aufnahme einer     Zementmörtelfülliing.     



  Die an Hand der     Fig.3    und 1 sowie 5       und    6     beschriebenen    Deckenbalken     gestatten     nach dien     gleichen    Verfahren die     Vo:

  rfabri-          kation    von     FensIer-        und!        Türstürzen.    Dabei  werden die     Steine,    die     sich    mit den     Längs-          fläehen    an die Betonrippe 7 links und     rechts     anschliessen, um 90  gedreht, so     da.ss    ihre Lage  genau mit dem.     Mauerwerkv        erband:    überein  stimmt.  



  Es     isl.    auch     möglich,    mit den vorerwähnten       konstruktiven        Ausführungen        Flachdächer    zu  erstellen. Ausserdem     können    die armierten  Balken auch für :die     Erstellung    von vertikalen  Wänden, z. B. bei Garagen, in     Verbindung     mit Decke oder Dach,     Anwendaul-    finden.



  Process for producing a ceiling and a ceiling produced by this process and containing concrete and reinforcing iron. The subject of the present patent is a process for producing a deeke.



       The purpose of this process is to use ordinary alu bricks made of clay, referred to as bricks, to create economical and structurally integrated ceilings that also meet the demands of mechanical and thermal engineering.

   This means that the Baekstein, which previously could only be used for load-bearing and: insulating, vertical walls, will become a new area of application in residential, domestic and industrial applications by taking on a third function in the horizontal (Deeke). and agricultural development.



  The method according to the invention eats through the fact that parallel rows of bricks are formed and bricks are concreted into the concrete into which the reinforcement pipes are concreted, and are mutually braced.



       The subject of the patent is also a D @ eeke produced by this method, containing concrete with reinforcing iron, which is characterized by the fact that it contains blocks arranged in rows of mutually braced bonds.



  The advantages of the process and the Deeke produced with it lie in the simplification given by the rationalization of the type, i. H. the possibility of using the same normalized brook stones not only for load-bearing, insulating, but also for ceiling structures.

   However, this also facilitates the disposition of materials and uses.



  The subject of the patent forming process should, for example, on the basis of the partially schematic drawing he explains in more detail. in which a number of examples of Deeken according to the invention are drawn in vertical cut and in part in a schematic representation:

         Fig. 1 and 2 each show a Deek .e produced on Sehalimg with aits concrete connection provided between the bricks, with a cross-wise iron reinforcement being embedded in the concrete mass.



  According to Figure 1 it is. an AZw lead with LTtb-erbet.on, according to Fig. 2 iun an execution without overconcrete.



  In Pig. 1 denotes 1 bricks, mostly lattice bricks, but other perforated and solid bricks are also possible.

    The intended bricks 1 are laid in rows at given intervals without mortar. As a result of their uniform cross-sectional structure, these bricks of the building ceiling shown fulfill the function of filling bodies better than any known hollow clay body;

      this applies. also for the sound and thermal issues. Dia made of fired clay rib plates 2 are used. At the same time both as a spacer for maintaining the rib width and also as insulation slats to achieve a uniform ceiling soffit or plaster support surface.



  Compared to the known hollow clay bodies, another advantage, which is particularly important with sloping ceilings and flat roofs, is that there are also holes for dowels on the underside of the ceiling: etc. can be sharpened without creating large holes which, according to experience, are only painstakingly cleaned up. can.

   Insofar as floor coverings such as cork, linoleum, glued parquet, asphalt cast iron are provided, the coast subsidence occurs because the necessary concrete smooth; coated during concreting, in contrast to the I4Tassivdeeke made of concrete, can be created in the same work step.



  The stat.isehe training for beams over two supports takes place in a known manner. When the ceiling is designed as a beam over several supports or as a balcony with cantilevers, in connection with the uniform cross-sectional structure, e.g.

   B. of the lattice stone, for the first time, the advantage of the elimination of "Drnekpaatten" or massive pressure belt strips, which are absolutely necessary for absorbing the negative stresses. The cross-section of this brook stone can thus be used fully statically.



       As a result of the evenness of the plaster edge, the known disadvantageous plaster discolorations, such as those that occur specifically in the formation of ballions, are gone.



  Also: architecture is open to a number of design possibilities, as in the case of exposed masonry, exposed ceilings combined with facing bricks can be created using various bond arrangements, which is particularly important for cellars, hallways, halls and. the like advantageous. is.



  If necessary, concrete cross-bracings and lockings can be provided at any point in @ np.asaung for special load cases.



  Based on experiences made with. Hollow body ceilings, which are made up of ceiling stones with specially arranged pressure plates, may be determined. be that see Baclü¯eine from: the reasons already given are ideally suited for the direct reception of Di@iekkrä.fte.



       Dureh the z. B. in the sense of the figure? before seen alternate use z. B. of lattices 1 and 3 of unequal height, but the same standard length and width, ent stand vertically, to the existing reinforced concrete existing support rib 4 corresponding Einsehnitte, which ribs at the same time with the Eiststellung the support 4 a.nsbetoniert.

   This ensures that 1. a good bond is created for perfect pressure transfer, '?. the joints between the stones are closed, avoiding going ribs, 3. after the reinforcement has been inserted, a perfect cross connection is formed by means of the concrete ribs, 4. the cavity between the stone layers for the insertion of pipes, conduit pipes, fastening dowels, etc. . can be used, 5.

   on the higher stones the pour-out concrete can be easily peeled off, and 6. the ceilings in connection with the solid surface formed by the stones 3 hurry up immediately. can be walked on after casting, so that work can continue without interrupting work.



  A real advantage of such ceilings compared to the execution with overconcrete is the lower weight. (3 cm concrete = _ 75 kg / m2 weight) and the resulting savings in Armicrun Council irons. The advantage . the @ruckguutivegfalles also applies here. Otherwise apply. also the remarks already made with regard to a.rchitelktonic concerns.



       Fig. 3 and 4 each show one without formwork by means of stone beams, z. B. from lattice stones, hergeste @ llte ceiling, with. or without overconcrete.



  The beams are made in suitable rooms (brickworks or the building contractor's warehouse) in such a way that rows of bricks 5 and 6 in the longitudinal direction, while maintaining the Rippenabst.and'es, which is given by the inlay of the rib plate 2, without or if necessary with.

   Graze mortar butt against each other at the front until the intended beam length is reached. is. The reinforcement of the concrete rib 7 takes place. in a known way. In the Lä.nagossriclitiung of the bar hercorkragende brackets 8, which serve as fastening hooks for the transport and lifting movements (crane), are cast in concrete.



  The ribbed concrete is poured in using the Tuss method. Depending on the cross-section of the holes and the number of holes in the bricks, the concrete can also be vibrated, evacuated, or at least poured in, so that a perfect bond or

       Adhesive strength. between the supporting R.i.ppen and dien stone longitudinal cuts.



       Fig.4 shows. one of the different Aas Führangsmögliehk eiten with prefabricated prefabricated beams without -überbeton, with z. B. the bar on one half, right the concrete rib 7 is composed of butted Bricks NEN 5 of the same height, while .die other half of the bar partly higher bricks 6, which are mutually provided at suitable intervals.

         qeilxstverstän.dlieh higher bricks 6 can be provided alternately on both sides of the concrete rib 7. The gaps created as a result of the difference in height serve to accommodate the distribution frame and the glass-out concrete, which creates a cross brace that is effective for the transmission of compressive forces.

   The ceiling is. Immediately accessible and especially suitable for buildings where quick and trouble-free construction progress is desired. A uniform underside view is also guaranteed here.



  The rib 7 can also be made wholly or partly from shot-brick concrete, which has the disadvantage of the inferior heat transfer between the support rib and the insulating filler body and thus the disadvantage. Plastering can be prevented. With both basement and screed ceilings, there is the option of adding the over-concrete or

           Make a Qa @ er connection with brick chippings, so there, l @ it a better insulation. is achieved.



       5 and 6 each show a further ceiling made without formwork, with or without overconcrete by means of lattice bars.

       These two blankets differ from those shown in Fig. 3 and. 4 insofar as here it is not the brick or insulation slats that form the ceiling ianterafef, but rather the very red brick or normal concrete,

         iron-reinforced plates 9, which are preferably formed with a groove and a comb. The advantage achieved in this way lies in a material-sensitive ceiling underside or plastering grandi.



  The support tri @ ppien 7 together with the face plates 9 can either be made uniformly from crushed brick concrete or in a combination of goat, crushed concrete for the plate and normal concrete for the rib.



       7 and 8 each show a different one without formwork. or ceiling made without over-concrete using steel lattice beams.



  These Balkend-eeken have an insulation and static cross-section evenly formed from brook stones and look excellent u. a. for commercial buildings, especially for stables.



  The uniform passage of heat guaranteed by the uniform ceiling structure on the one hand and the capiU @ aaivirlmng, the brick material, in conjunction with the excellent heat insulation, largely prevent the unpleasant from the.

       The appearance of condensation under the ceiling, which can improve the natural, natural, natural environment in the stables.



  The. Reinforcement eats here by means of iron. 10 formed, which grid holes penetrate the lower edge of the stones 5 or 5 and 6;

          The grid perforation is reinforced with concrete in the area of the reinforcing iron 10 using a special method. The individual bar is formed according to a special process, namely according to Fig. 7 by uniform stones,

   and according to FIG. 8 by alternately arranged at suitable intervals, uniform in length and width, but different in height. The Draicl, transmission eats marked in Fig. 7 by distributing ice and concrete,

      in Fig. 8 through perfect concrete cross-bracing and distribution reinforcement ring.



  Compared to the embodiment according to FIG. 8, see the ceiling, likewise produced without formwork, without overconcrete according to FIG.

   In addition, the bed joints lla between the stones 11 and. 12 filled with mortar.



       Fic. 10 and 11 each show a further one without formwork. or ceiling made without overconcrete aiis prefabricated beams, the bricks 13 of which have abutting surfaces 14 running diagonally in the direction of the lattice division, by means of which the bricks i:

  n. interlock. When laying the individual beams reinforced by the bars 10 and 10u, the abovementioned abutment surfaces each form support surfaces for the beams to be attached. Those arranged in the pull and pull zone. Iron 10 or 10a penetrate the grid perforation, which is aiisbeton.iert in this area.

   The lateral joints in the pressure zone serve to hold a cement mortar filling.



  The ceiling beams described with reference to Figures 3 and 1 as well as 5 and 6 allow the following using the same procedure:

  rfabrication of window and! Lintels. The stones, which are connected to the concrete rib 7 on the left and right with their longitudinal surfaces, are rotated by 90 so that their position exactly matches the. Masonry Association: Corresponds.



  It isl. It is also possible to create flat roofs with the structural designs mentioned above. The reinforced beams can also be used for: the construction of vertical walls, e.g. B. in garages, in connection with ceiling or roof, applicable.

 

Claims (1)

PATENTANSPR.U CH I Verfahren zur Herstellung einer Decke, dadurch gekennzeichnet, dass mittels Backstei nen parallele Reihen gebildet, werden und Baekteine mittels Beton, in den Armierungs- eisen einbetoniert werden, gegenseitig in festen Verband gebracht werden. UNTERANSPR.Ü CIIE 1. PATENTANSPR.U CH I A method for producing a ceiling, characterized in that parallel rows are formed by means of bricks, and building stones are set in a solid bond with each other by means of concrete in which the reinforcing iron is concreted. SUB-CLAIMÜ CIIE 1. Verfahren nach Patent.ansprueh I, zur -Herstellung von Decken auf Schalung, da durch gekennzeichnet, dass Bachsteine in Rei hen auf der Schalung verlegt werden, wobei z,#visehen den einzelnen Reihen als Distanz halter für die Einhaltung der Rippenbreite dienende Rippenplatten angeordbet. werden, Method according to Patent.ansprueh I, for the production of ceilings on formwork, characterized in that brook stones are laid in rows on the formwork, where rib plates serving as spacers for maintaining the rib width are arranged for the individual rows. will, durch welche zugleich eine ebene Putzt.räger- fläehe erreileht wird, und d.ass die gebildeten Zwischenräume unter Einlage kreuzweise ver legter Eisenbewehrungen mit Beton ausgegos- sen -erden. through which at the same time a level plaster support surface is reached, and that the gaps formed are filled with concrete under the inlay of cross-wise iron reinforcements. \. Verfahren nach Patentanspruch I, zur Herstellung von Decken ohne Seh alung, da durch gekennzeichnet, dass aus je zwei Reihen Baeh,#teine unter Zwischenlage von als Di stanzhaltern dienenden und, \. Method according to patent claim I, for the production of ceilings without cladding, characterized in that each two rows of building blocks with the interposition of spacers and zugleich eine ebene Putzträ-ei@fläehe bildenden Rippenplat ten durch Ausgiessen der Zwischenräume mit Beton unter F'inla-e von Armierungseisen vor fabrizierte Balken erzeugt. werden, wobei zur Bildung der Decke mehrere solcher Balken an Ort und Stelle in festen Ver band gebracht werden. 3. At the same time, ribbed panels forming a flat plaster strip were created by pouring the spaces in between with concrete under the reinforcement bars in front of fabricated beams. be, with several such beams in place in fixed Ver band to form the ceiling. 3. Verfahren nach Unteranspruch \_', da durch gekennzeichnet, dass die Backsteine in Längsriehtung cineis Balkens mit Mörtel an der Stirnseite aneinandergeistossen werden und in den Zwi < seheriraum zwischen den BaelLstein- reihen eines BalkenNhervorkragende,Bügel ein betoniert werden, an welchen die Ballen auf gehängt v,erden können, A method according to the dependent claim, characterized in that the bricks are butted against each other in the longitudinal direction of a beam with mortar on the front side and in the space between the rows of bricks of a beam protruding stirrups are concreted, on which the bales are hung v, can earth, uin an ihren Bestini- niungsort. transportiert zu werden. 4. Verfahren na,eh Unteraausprueh 3, zur Herstellung einer Decke aus vorfabrizierten Fertigbalken ohne t berbeton, dadurch ge- kennzeiehnet, dlass in mindestens eine der Bacl-ust, uin to their destination. to be transported. 4. Procedure na, eh Unteraausprueh 3, for the production of a ceiling from prefabricated prefabricated beams without concrete, characterized by the fact that in at least one of the Bacl-ust, einireihen jedes Balkens in Abständen voneinander höhere Bael#steine angeordnet. werden Lind in die infolge der Höhendifferenz entstand@.enen Zwischenräume zur Herstellun; eines Querverbande3 Verteilarmierlrngen und Ausgussbeton gebracht werden. 5. row each beam at a distance from each other higher building stones arranged. are and in the spaces created as a result of the height difference for manufacture; a cross connection 3 distribution reinforcement lengths and poured concrete are brought. 5. Verfahren nach Patentanspruch I, zur Herstellung von Decken ohne Schalung, da- d@irch gekennzeichnet, dass je zwei Reihen an cinanderliegender Backsteine mit. Method according to claim I, for the production of ceilings without formwork, da- d @ irch characterized in that two rows of bricks lying in one another with each other. Zwischen- rauni auf einer eisenbewehrten Platte verlegt und der Zwischenraum zwischen den beiden Reihen unter Einlage von Armierungseisen mit Beton ausgegossen wird und die derart vorfabrizierten Balken zu einer Decke zusam mengefügt werden. 6. Intermediate rauni are laid on an iron-reinforced slab and the space between the two rows is filled with concrete with reinforcement iron inlay and the beams prefabricated in this way are joined together to form a ceiling. 6th Verfahren nach Unteransprueh 5, da durch gekennzeichnet., dass in die Zwischen räume zwischen den Backsteinreihen eines Balkens hervorkragende Bügel einbetoniert werden, an welchen die Balken aufgehängt erden können, um an ihren Bestimmungsort transportiert und dort verlegt zu werden. Method according to sub-claim 5, characterized in that in the spaces between the rows of bricks of a beam protruding stirrups are concreted in, on which the beams can be suspended in order to be transported to their destination and laid there. 7. Verfahren nach Patentansprwcli I, d@a- durch gekennzeichnet, dess die Backsteinreihen ohne Zwischenraum zwischen den Heiken ver legt werden Lind in Öffnungen der Backsteine durchgehende Bewehrungeneingefügt Lind die Öffnungen ausbetoniert werden. 7. The method according to patent claim I, d @ a- characterized in that the rows of bricks are laid without a gap between the heiken and continuous reinforcements are inserted into openings in the bricks and the openings are concreted. PATENTANSPRUCH 1I Nach dem Verfahren gemäss Patentar, spruch I hergesteHte, Beton mit Armierungs, eisen enthaltende Decke, dadurch gekennzeich- net., dass sie in Reihen angeordnete, gegenseitig in festen Verband gebrachte Backsteine ent hält. UNTERANSPRÜCHE S. PATENT CLAIM 1I Concrete with reinforcement, iron-containing ceiling produced according to the method according to patent claim I, characterized in that it contains bricks that are arranged in rows and mutually bonded. SUBCLAIMS S. Decke nach Patentanspruch II, dadurch gekennzeichnet, dass zwischen den parallelen Backsteinreihen al's Distanzhalter hippenplat- ten angeordnet sind, deren untere Fläche bündig ist mit der untern Fläche der Baek- st.eine und, oberhalb, Ceiling according to patent claim II, characterized in that between the parallel rows of bricks, hip plates are arranged as spacers, the lower surface of which is flush with the lower surface of the brick and, above, welchen die Zwischen- räume zwischen den Backsteinreihen mit Be ton ausgegossen sind, in w#,lichen kreuzweise verlaufende Armierungseisen verlegt sind. 9. which the spaces between the rows of bricks are filled with concrete, in w #, crosswise reinforcing irons are laid. 9. Decke nach Patent.amspruch II, da.duTeh gekennzeichnet, dass sie eis vorfahrizierten Balken zusammengesetzt ist, Ceiling according to Patent.amspruch II, because duTeh is characterized by the fact that it is composed of beams that are driven forward, .deren jeder aus zwei Reihen Backsteinen und einer .dazwischen angeordneten Rippe aus Eisenbeton und einer mit der -untern Fläche des Backsteine bündigen Rippenp@@a.tte besteht. 10. Each of which consists of two rows of bricks and a reinforced concrete rib arranged in between and a rib flush with the lower surface of the brick. 10. Decke nach Unteranspruch 9, da,dureli gekennzeichnet, d'a.ss in dhe genannte Rippe jedes Balkens hervorkragende Bügel einbeto- irier't sind. 1.1. Ceiling according to dependent claim 9, characterized by the fact that, in the said rib of each beam, protruding stirrups are embedded in concrete. 1.1. Decke nach P,atentansp@ruch 1I, da durch gek eennzeichnet, dass mindestens eine Backsteinreihe jedes vorfabrizierten Balkens in Abständen zwischen niedrigeren Backstei nen solche mit grösserer Höhe, aufweist., wobei die durch die Höhendifferenz entstandenen Zwischenräume mit Beton ausgegoasen sind, Ceiling according to P, atentansp @ ruch 1I, as it is characterized by the fact that at least one row of bricks of each prefabricated beam has gaps between lower bricks of greater height. The gaps created by the difference in height are gassed with concrete, in welchen Verteilarinierungen angeordnet sind, so dass ein Querbund besteht. 12. Decke nach Patentanspruch II, da durch gekennzeichnet, da.ss sie aus vorfabri- zi: in which distributors are arranged so that there is a transverse collar. 12. Ceiling according to patent claim II, characterized in that it is made from prefabrication: emten Balken zusammengefügt ist, deren jeder aus zwei Ba.clsteinreihen besteht, die auf armierte Platten aufgebracht sind. emten beam is joined, each of which consists of two rows of Ba.clstein, which are attached to reinforced plates.
CH324574D 1954-02-10 1954-02-10 Process for the production of a ceiling and ceiling containing concrete and reinforcing iron produced by this process CH324574A (en)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CH324574T 1954-02-10

Publications (1)

Publication Number Publication Date
CH324574A true CH324574A (en) 1957-10-15

Family

ID=4499579

Family Applications (1)

Application Number Title Priority Date Filing Date
CH324574D CH324574A (en) 1954-02-10 1954-02-10 Process for the production of a ceiling and ceiling containing concrete and reinforcing iron produced by this process

Country Status (1)

Country Link
CH (1) CH324574A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE1267819B (en) * 1965-02-05 1968-05-09 Ernst Booss Steel stone ceiling, reinforced concrete rib ceiling or the like.

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE1267819B (en) * 1965-02-05 1968-05-09 Ernst Booss Steel stone ceiling, reinforced concrete rib ceiling or the like.

Similar Documents

Publication Publication Date Title
DE19801123B4 (en) Foundation structure and base element for use therein
DE2700022A1 (en) Large prefabricated wall element - has vertical concrete pillars extending through holes to link top and bottom concreted chords
DE2436515A1 (en) Prefabricated concrete ceiling or roof support element - embedded in beam of styropor concrete or other light material
DE102015200661B4 (en) Composite prefabrication element
EP0015444B1 (en) Building construction with plate girders
DE69910846T2 (en) FLEXIBLE BRICK TRACK AND METHOD FOR THE ARCHIVING OF ARCHES BY THIS TRACK
CH324574A (en) Process for the production of a ceiling and ceiling containing concrete and reinforcing iron produced by this process
DE19708689B4 (en) Kit of wall elements for buildings
DE1484067A1 (en) Reinforced masonry
DE812596C (en) Ceiling construction
DE4447520A1 (en) Building shuttering element for concrete casting
DE856215C (en) Process for the production of structures from prefabricated parts and prefabricated parts for the implementation of the process
DE2406951A1 (en) Spaced hollow-block ceiling prefabricated fillets - with main reinforcing irons in strips between intervening serrated carrier beams
DE726753C (en) Ceiling made from previously manufactured hollow stone beams
DE804471C (en) Ceiling made of prefabricated reinforced concrete beams without intermediate components
DE810302C (en) Ceiling construction
DE859667C (en) Formworkless steel stone or reinforced concrete ribbed ceiling
AT352958B (en) PREFABRICATED CEILING ELEMENT
AT319544B (en) Prefabricated strips, preferably for ceilings and methods for producing a prefabricated strip
DE20009425U1 (en) Edge formwork for concrete slabs and concrete ceilings
DE808981C (en) Wall made of shaped stones and concrete or reinforced concrete supports enclosed by them
DE810301C (en) Prefabricated ceiling
DE815688C (en) Production of the load-bearing walls, especially of multi-storey houses, and brick for this
DE809602C (en) Process for erecting buildings from prefabricated components
DE883198C (en) Process for the production of ceilings and roofs with T-beams and ceiling panels arranged between these