CH355234A - Process for electrical resistance flash welding - Google Patents

Process for electrical resistance flash welding

Info

Publication number
CH355234A
CH355234A CH355234DA CH355234A CH 355234 A CH355234 A CH 355234A CH 355234D A CH355234D A CH 355234DA CH 355234 A CH355234 A CH 355234A
Authority
CH
Switzerland
Prior art keywords
welding
semi
plastic
liquid
burn
Prior art date
Application number
Other languages
German (de)
Inventor
A Schlatter Hans
Original Assignee
Schlatter Ag
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Schlatter Ag filed Critical Schlatter Ag
Publication of CH355234A publication Critical patent/CH355234A/en

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23KSOLDERING OR UNSOLDERING; WELDING; CLADDING OR PLATING BY SOLDERING OR WELDING; CUTTING BY APPLYING HEAT LOCALLY, e.g. FLAME CUTTING; WORKING BY LASER BEAM
    • B23K11/00Resistance welding; Severing by resistance heating
    • B23K11/04Flash butt welding

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Pressure Welding/Diffusion-Bonding (AREA)

Description

  

  Verfahren zum elektrischen Widerstands-Abbrennschweissen    Die     Erfindung    betrifft ein Verfahren zum elek  trischen Widerstands-Abbrennschweissen, insbeson  dere von Schienen, Trägern und ähnlichen Werk  stücken aus Stahl, beispielsweise Schienenstahl, legier  ten Baustählen, rostfreien Stählen und Leichtmetall.  Die Erfindung     eignet    sich insbesondere auch für das  Schweissen von Werkstücken mit grossem Querschnitt.  



  Beim Abbrennschweissen von Stahl werden die  an die Schweissstromquelle angeschlossenen Werk  stücke zunächst an den zu verschweissenden Enden  vorgewärmt, indem diese mehrfach miteinander in  Berührung gebracht werden. Dabei werden die  äussersten Teile dieser Enden weissglühend. Anschlie  ssend werden die Werkstückenden abgebrannt, indem  die Werkstücke zusammengeschoben werden, wobei  das Material an der Berührungsstelle verdampft und  der Vorschub während einer bestimmten Zeit auf  rechterhalten wird. Unmittelbar danach werden die  Werkstücke bei abgeschaltetem Schweissstrom zusam  mengestaucht, wodurch die eigentliche Schweissung  entsteht. Dabei wird Metall an der Schweissstelle  herausgequetscht, wodurch ein Wulst (Schweissgrat)  entsteht, der anschliessend entfernt wird.  



  Beim Abbrennschweissen von Aluminium wird  ohne vorheriges Vorwärmen abgebrannt und ge  staucht.  



  Beim Abbrennen nach dem bisherigen Verfahren  verschoben sich die Grenze zwischen dem halbflüssi  gen und dem plastischen Zustand und die Grenze  zwischen dem plastischen und dem festen Zustand  des Werkstückes infolge der Wärmeleitung in Rich  tung von der Schweissstelle weg mindestens mit der  Geschwindigkeit des Abbrennens. Die senkrecht zu  den zu verschweissenden     Flächen    gemessenen Dimen  sionen der plastischen und der     halbflüssigen    Zone  waren dementsprechend nach dem Abbrennen min  destens so gross wie vor dem Abbrennen. Bei dem    auf das Abbrennen folgenden Stauchvorgang wird  das zähflüssige Material aus der Schweissstelle heraus  gequetscht (es wird später entfernt), wobei bisher die  ganze plastische Zone der zusammengestauchten  Werkstücke bauchig verformt wurde.

   Im Bereiche  dieser bauchigen Zone musste in der Regel zwecks  Erzielung eines     guten    Gefüges nachgeglüht werden.  



  Nach der vorliegenden     Erfindung    können  Schweissungen erzielt werden, die ohne Nachglühen  ein dem Ausgangszustand sehr ähnliches Gefüge  vorzüglicher statischer und dynamischer Festigkeits  daten ergeben und nur wenig mechanische (spanab  hebende) Nachbearbeitung erfordern. Gemäss diesem  Verfahren wird nach dem Vorwärmen das Abbren  nen mit so grosser Vorschubgeschwindigkeit und  Stromstärke ausgeführt, dass der Abbrand und die       Grenzflächen    zwischen den plastischen und den halb  flüssigen Zonen rascher vordringen als die     Grenz-          flächen    zwischen den festen und den plastischen  Zonen.

   Nach dem Abbrennen wird schlagartig mit  so grosser Kraft und     Geschwindigkeit    gestaucht, dass  das gesamte Material der halbflüssigen Phase an der  Schweissstelle herausgequetscht wird.  



  Bei diesem Verfahren ist also der Temperatur  gradient (Temperaturgefälle) senkrecht zu den zu  verschweissenden Flächen nach dem     Abbrennen    grö  sser als nach dem     Vorwärmen.    Dementsprechend  nimmt die senkrecht zu den zu verschweissenden Flä  chen erstreckte Dimension der vorgewärmten Zonen  an beiden Werkstückenden während des Abbrennens  ab. Dabei kann diese Dimension der plastisch ver  formbaren Zone während des     Abbrennens    beispiels  weise auf weniger als 10 mm abnehmen.

   Da beim  Stauchen die     Stauchkraft    und     -geschwindigkeit    so  hoch gewählt werden, dass das ganze halbflüssige  Material aus der Schweissstelle herausgequetscht wird,       bildet    dieses Material dann einen ringförmigen Wulst,      der nur an einem relativ schmalen Steg mit der  Schweissstelle verbunden ist. Dieser ringförmige Wulst  lässt sich leicht entfernen. Der hohe Stauchdruck be  wirkt, dass das ganze beim Abbrennen     thermisch     nachteilig veränderte Material nicht an der Schweiss  stelle verbleibt. Insbesondere wird aber unter der  Wirkung dieses hohen Stauchdruckes das an der  Schweissstelle zu vereinigende Material der Werk  stückenden gewissermassen zusammengeschmiedet.

    Dadurch entsteht ein dem Ausgangszustand sehr ähn  liches Gefüge der Schweissstelle mit vorzüglichen  Werten der statischen und dynamischen Festigkeit,  ohne dass ein Nachglühen erforderlich ist. Trotz der  Wirkung des hohen Stauchdruckes ist die Schweiss  stelle nach vollendeter Schweissung nicht nennenswert  deformiert, weil die plastische Zone relativ kurz und  das halbflüssige Material vollständig herausge  quetscht ist.  



  Das erfindungsgemässe Verfahren wird im folgen  den im Vergleich mit dem bekannten Verfahren an  Hand der Zeichnung beispielsweise beschrieben. Es  zeigen:  Fig. 1 die Temperaturverteilung beim     Abbrenn-          schweissen    von zwei Eisenbahnschienen, nach dem  Vorwärmen,  Fig. 2 und 3 die entsprechende Temperaturver  teilung nach dem Abbrennen und nach dem Stauchen  beim bisherigen Verfahren,  Fig. 4 und 5 den Fig. 2 und 3 entsprechenden  Stadien beim erfindungsgemässen Verfahren,  Fig. 6 ein Vorschub- und     Schweissstrom-          Diagramm    des erfindungsgemässen Verfahrens.  



  In Fig. 1 bis 5 sind mit R1 und R2 je eine im  Längsschnitt dargestellte Eisenbahnschiene bezeich  net. Die Fig. 1 bis 5 sind im gleichen Massstab ge  zeichnet, was insbesondere für die Abstände zwischen  den Linien T1 bis T3 gilt, welche zur Zeichenebene  senkrechte     Flächen    andeuten, denen bestimmte Tem  peraturen und entsprechende Grenzzustände des Ma  terials     zugeordnet    sind.  



  Zwischen den beiderseits der Berührungsfläche K  durch Linien     T3    angedeuteten Grenzen ist das Mate  rial flüssig, zwischen T1 und T3 ist es halbflüssig  (entsprechend dem Zustand des Gebietes, welches im  Eisen-Kohlenstoff-Diagramm durch die Solidus- und  die Liquiduslinie begrenzt ist). Zwischen T1 und T,.,  ist das Material plastisch.  



  Beim Abbrenn-Schweissen ist am Ende des Vor  wärmprozesses etwa die in Fig. 1 dargestellte Tem  peraturverteilung erreicht. Während des anschliessen  den Abbrennens blieb beim bisherigen Verfahren die  Tiefe T1- T, der plastischen Zone und die Tiefe  T1- T3 der halbflüssigen Zone an beiden Seiten der  Schweissstelle entweder konstant oder nahm zu  (Fig. 2). Die Distanz T1-T2 betrug dabei am Schluss  des Abbrennprozesses z. B. 20-40 mm. Wurde  anschliessend in üblicher Weise gestaucht, so wurde  die Zone zwischen den beiden Grenzen T2 etwa nach  Art von Fig. 3 bauchig verformt und es entstand bei  starker Verkürzung der Schiene ein Schweisswulst G,    der später mühsam abgefräst oder abgeschliffen wer  den musste.  



  Bei dem an Hand der Fig. 4 bis 6 zu beschreiben  den Verfahren wird der Abbrenn-Prozess mit so hoher  Vorschubgeschwindigkeit und Stromstärke durchge  führt, dass der Abbrand schneller als die Erwärmung  vordringt, so dass auf beiden Seiten der Berührungs  stelle K die Distanzen T1 T, und T1- T3 fort  schreitend kleiner werden, beispielsweise auf etwa  10 mm oder weniger zusammenschrumpfen, so dass am  Ende des Abbrenn-Prozesses etwa die in Fig. 4 dar  gestellte Temperaturverteilung vorliegt. Anschliessend  wird der Stauchprozess eingeleitet, welcher schlag  artig mit so grosser Kraft und Geschwindigkeit durch  geführt wird, dass mindestens die ganze halbflüssige  Zone von T1 links bis T1 rechts aus der Schweiss  stelle herausgequetscht wird.

   Die Verschweissung  erfolgt also nicht im     halbflüssigen    Bereich, sondern  in den plastischen Zonen T1- T, bei relativ tiefen  Temperaturen. Die wulstige Verformung bleibt auf  den kleineren Abstand von     T,    links bis     T,    rechts  der Berührungsstelle K (Fig. 5) beschränkt. Diese  schmale Zone liegt dabei innerhalb eines glühenden  Ringes G, zu dem sich das Material der beiden  herausgequetschten halbflüssigen Zonen verformt.  Der Querschnitt dieses Ringes hat angenähert die  Querschnittsform eines Pilzes, so dass sich der Ring  leicht abschlagen lässt. Der dabei verbleibende kleine  Ringwulst kann in einem Zug abgehobelt werden,  wenn man den Hobel ansetzt, solange das Material  noch eine Temperatur von etwa 850  C hat.  



  Bei Schienenstahl beträgt beispielsweise die Tem  peratur der halbflüssigen Zone T1-T3 1150 bis  1250  C und die Temperatur der plastischen Zone  T1-T2 900 bis 1150  C.  



  Fig. 6 gibt über der Zeit als Abszisse im oberen  Feld das Diagramm des Vorschubes (mm) und im  unteren Feld das Diagramm des Schweissstromes  (Amp.) bei der Verschweissung von zwei Schienen  mit etwa 10 000 mm' Querschnitt wieder. Im Punkt A  ist die Vorwärmung beendet, welche in üblicher  Weise durch periodisches Berühren der Werkstücke  herbeigeführt wird. Im Punkt B setzt der     Abbrenn-          prozess    ein, der mit einer Vorschubgeschwindigkeit  von etwa 1,2 mm/sec längs eines Weges von etwa 15  bis 20 mm erfolgt. Von jedem Werkstück sind also  etwa 8 mm abgebrannt, wenn im Punkt C die schlag  artige Stauchung einsetzt. Bei dieser Stauchung steigt  die     Vorschubgeschwindigkeit    zunächst schlagartig  auf etwa 1,5-2 m/sec.

   Der bis zum Punkt D durch  laufene Weg beträgt etwa 5 mm. Durch diesen ersten  Teil des     Stauchvorgangs    werden die halbflüssigen  Zonen der beiden Werkstücke herausgequetscht. Es  folgt dann von D bis F der etwa 6-7 sec dauernde  zweite Teil des     Stauchvorgangs,    der die Schweiss  zone schmiedet, und bei dem die noch verform  baren schmalen Zonen auf beiden Seiten der  Schweissnaht     (Fig.5    von     T2    links bis<B>7</B>2 rechts)  unter einem Druck von 5-10     kg/mm2    zusammen-      geschmiedet und nur wenig verformt werden. Der  Strom wird bereits im Punkt E ausgeschaltet.

   Die  Vorschubgeschwindigkeit zwischen D und F ist  durch die Fliessgeschwindigkeit des Materials in den  plastischen Zonen gegeben; sie nimmt daher mit  fortschreitender Verschmiedung und Abkühlung  rasch ab. Die vom herausgequetschten Ring G  (Fig. 5) umschlossene Schweissnaht erstarrt hierbei  natürlich zuletzt und unterliegt daher unmittelbar  vor der Erstarrung einem hohen Schmiede-Druck.  



  Das schnelle Abbrennen ist besonders auch bei  Aluminium-Legierungen, z. B. Anticorodal, von aus  schlaggebender Bedeutung. Dabei beträgt die     Ab-          brenngeschwindigkeit    beispielsweise bis 6 mm/sec  und der Abbrennweg erreicht beispielsweise 60 mm.  Bei dem auf das Abbrennen unmittelbar folgenden    Stauchen kommen Drücke von 20 bis 25 kg/mm2  zur Anwendung.



  Method for electrical resistance flash welding The invention relates to a method for electrical resistance flash welding, in particular of rails, beams and similar work pieces made of steel, for example rail steel, alloyed structural steels, stainless steels and light metals. The invention is particularly suitable for welding workpieces with a large cross section.



  When flash welding steel, the work pieces connected to the welding power source are first preheated at the ends to be welded by bringing them into contact with one another several times. The outermost parts of these ends become incandescent. The workpiece ends are then burned off by pushing the workpieces together, with the material evaporating at the point of contact and the feed being maintained for a certain time. Immediately afterwards, the workpieces are compressed together with the welding current switched off, whereby the actual weld occurs. In doing so, metal is squeezed out at the welding point, creating a bulge (welding burr) which is then removed.



  When flash-butt welding aluminum, it is burned off and compressed without prior preheating.



  When burning off according to the previous method, the boundary between the semi-liquid and the plastic state and the boundary between the plastic and the solid state of the workpiece due to the conduction of heat in the direction of the welding point away from at least the speed of burning off. The dimensions of the plastic and semi-liquid zones measured perpendicular to the surfaces to be welded were accordingly at least as large after burning as before burning. In the upsetting process following the burning off, the viscous material is squeezed out of the weld (it will be removed later), with the entire plastic zone of the compressed workpieces previously being deformed into a bulge.

   The area of this bulbous zone usually had to be re-annealed in order to achieve a good structure.



  According to the present invention, welds can be achieved which, without post-annealing, result in a structure of excellent static and dynamic strength data that is very similar to the initial state, and which require little mechanical (machining) post-processing. According to this method, after preheating, the burn-off is carried out with such a high advance speed and current strength that the burn-off and the interfaces between the plastic and semi-liquid zones penetrate faster than the interfaces between the solid and plastic zones.

   After the burn-off, it is suddenly compressed with such great force and speed that all of the material of the semi-liquid phase is squeezed out at the welding point.



  In this process, the temperature gradient perpendicular to the surfaces to be welded is greater after burning than after preheating. Accordingly, the dimension of the preheated zones extending perpendicular to the surfaces to be welded decreases at both workpiece ends during the burning process. This dimension of the plastically deformable zone can, for example, decrease to less than 10 mm during the burning process.

   Since when upsetting the upsetting force and speed are selected so high that the entire semi-liquid material is squeezed out of the welding point, this material then forms an annular bead that is only connected to the welding point on a relatively narrow web. This ring-shaped bead can be easily removed. The high upsetting pressure ensures that all of the material, which has been thermally disadvantageously changed when it is burned off, does not remain at the welding point. In particular, however, under the effect of this high compression pressure, the material of the work piece ends to be united at the welding point is to a certain extent forged together.

    This results in a weld joint structure that is very similar to the initial state, with excellent values for static and dynamic strength, without the need for post-annealing. Despite the effect of the high upsetting pressure, the welding point is not significantly deformed after the welding is complete, because the plastic zone is relatively short and the semi-liquid material is completely squeezed out.



  The inventive method is described in the following in comparison with the known method with reference to the drawing, for example. 1 shows the temperature distribution during flash welding of two railroad tracks after preheating, FIGS. 2 and 3 the corresponding temperature distribution after burning and after upsetting in the previous method, FIGS. 4 and 5, FIGS 3 corresponding stages in the method according to the invention, FIG. 6 shows a feed and welding current diagram of the method according to the invention.



  In Fig. 1 to 5, R1 and R2 are each a railroad track shown in longitudinal section designated net. 1 to 5 are drawn to the same scale, which applies in particular to the distances between the lines T1 to T3, which indicate surfaces perpendicular to the plane of the drawing, to which certain temperatures and corresponding limit states of the Ma material are assigned.



  The material is liquid between the boundaries indicated by lines T3 on both sides of the contact surface K, and semi-liquid between T1 and T3 (corresponding to the state of the area which is delimited in the iron-carbon diagram by the solidus and liquidus lines). Between T1 and T,., The material is plastic.



  When flash-welding is reached at the end of the pre-heating process about the temperature distribution shown in Fig. 1. During the subsequent burn-off, with the previous method, the depth T1-T, the plastic zone and the depth T1-T3 of the semi-liquid zone on both sides of the welding point either remained constant or increased (FIG. 2). The distance T1-T2 was at the end of the burning process z. B. 20-40 mm. If the compression was then carried out in the usual way, the zone between the two boundaries T2 was deformed in the manner of FIG. 3, and when the rail was shortened, a weld bead G was created, which later had to be painstakingly milled off or ground off.



  In the method to be described with reference to FIGS. 4 to 6, the burn-off process is carried out with such a high feed rate and current strength that the burn-off advances faster than the heating, so that the distances T1 T on both sides of the contact point K , and T1-T3 become progressively smaller, for example shrink to about 10 mm or less, so that at the end of the burn-off process there is approximately the temperature distribution shown in FIG. 4. The upsetting process is then initiated, which is carried out suddenly with such great force and speed that at least the entire semi-liquid zone from T1 on the left to T1 on the right is squeezed out of the welding point.

   The welding does not take place in the semi-liquid area, but in the plastic zones T1-T, at relatively low temperatures. The bulging deformation remains limited to the smaller distance from T, left to T, right of the contact point K (FIG. 5). This narrow zone lies within a glowing ring G, to which the material of the two squeezed out semi-liquid zones is deformed. The cross-section of this ring has approximately the cross-sectional shape of a mushroom, so that the ring can be easily knocked off. The small annular bead that remains can be planed off in one go if the planer is used while the material is still at a temperature of around 850 C.



  In the case of rail steel, for example, the temperature of the semi-liquid zone T1-T3 is 1150 to 1250 C and the temperature of the plastic zone T1-T2 is 900 to 1150 C.



  6 shows the diagram of the advance (mm) over time as the abscissa in the upper field and the diagram of the welding current (amp.) In the lower field when two rails with a cross-section of approximately 10,000 mm are welded together. At point A, the preheating is completed, which is brought about in the usual way by periodically touching the workpieces. At point B, the burning process begins, which takes place at a feed rate of around 1.2 mm / sec along a path of around 15 to 20 mm. So about 8 mm have burned off from each workpiece when the sudden upsetting starts at point C. With this compression, the feed speed rises suddenly to around 1.5-2 m / sec.

   The path taken to point D is about 5 mm. This first part of the upsetting process squeezes out the semi-liquid zones of the two workpieces. From D to F the second part of the upsetting process, lasting about 6-7 seconds, follows, which forges the welding zone, and in which the still deformable narrow zones on both sides of the weld seam (Fig. 5 from T2 left to <B> 7 </B> 2 right) can be forged together under a pressure of 5-10 kg / mm2 and only slightly deformed. The current is already switched off at point E.

   The feed rate between D and F is given by the flow rate of the material in the plastic zones; it therefore decreases rapidly with progressive forging and cooling. The weld seam enclosed by the squeezed out ring G (FIG. 5) naturally solidifies last and is therefore subject to a high forging pressure immediately before solidification.



  The rapid burn-off is particularly important for aluminum alloys, e.g. B. Anticorodal, of crucial importance. The burning speed is, for example, up to 6 mm / sec and the burning path reaches 60 mm, for example. In the compression immediately following the burning, pressures of 20 to 25 kg / mm2 are used.

 

Claims (1)

PATENTANSPRUCH Verfahren zum elektrischen Widerstands-Ab- brennschweissen, dadurch gekennzeichnet, dass nach dem Vorwärmen das Abbrennen mit so grosser Vor schubgeschwindigkeit und so grosser Stromstärke ausgeführt wird, dass der Abbrand und die Grenz- flächen zwischen den plastischen und den halb flüssigen Zonen rascher vordringen als die Grenz- flächen zwischen den festen und den plastischen Zonen und dass danach schlagartig mit so grosser Kraft und Geschwindigkeit gestaucht wird, dass das gesamte Material der halbflüssigen Phase an der Schweissstelle herausgequetscht wird. PATENT CLAIM Process for electrical resistance flash welding, characterized in that, after preheating, the burn-off is carried out at such a high feed rate and so high current that the burn-off and the interfaces between the plastic and semi-liquid zones advance faster than the interfaces between the solid and the plastic zones and that suddenly it is compressed with such great force and speed that all of the material of the semi-liquid phase is squeezed out at the welding point.
CH355234D 1957-10-11 1957-10-11 Process for electrical resistance flash welding CH355234A (en)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CH355234T 1957-10-11

Publications (1)

Publication Number Publication Date
CH355234A true CH355234A (en) 1961-06-30

Family

ID=4510771

Family Applications (1)

Application Number Title Priority Date Filing Date
CH355234D CH355234A (en) 1957-10-11 1957-10-11 Process for electrical resistance flash welding

Country Status (1)

Country Link
CH (1) CH355234A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2024108919A1 (en) * 2022-11-24 2024-05-30 攀钢集团攀枝花钢铁研究院有限公司 Method for improving quality of medium-carbon low-alloy steel rail flash welding joints

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2024108919A1 (en) * 2022-11-24 2024-05-30 攀钢集团攀枝花钢铁研究院有限公司 Method for improving quality of medium-carbon low-alloy steel rail flash welding joints

Similar Documents

Publication Publication Date Title
DE2433648C2 (en) Projection welding process
DE2657294A1 (en) FRICTION WELDING PROCESS
DE3100677C2 (en)
DE19927369A1 (en) Embossed welding element
DE2324423A1 (en) PROCESS FOR THE REPAIR OF STEEL FACTORY CHILLINGS, CHILLING PLATES AND OTHER CAST-IRON OBJECTS
CH645563A5 (en) Projection welding method for sheet or other thin-walled parts of light metal, in particular aluminium
DE690630C (en) Process for welding thin-walled pipes to thick-walled containers, collecting chambers or the like.
DE3628246A1 (en) Process and apparatus for joining workpiece parts
DE102017201872A1 (en) Method for the thermal joining of a component assembly and component assembly
DE2208859B1 (en) PROCESS FOR PLATING METAL PROFILES AND EXTRUSION DIE FOR CARRYING OUT THE PROCESS
CH500878A (en) Plastic tubes production
DE3706316C2 (en) Process for flash butt welding of parts to be butted together
DE3446262A1 (en) Method of producing machine components assembled from individual parts, in particular crankshafts
DE813625C (en) Process for autogenous pressure welding of hollow bodies
DE1046984B (en) Method for producing a connecting wall between two hollow, elongated metal bodies arranged at a distance from one another
AT164280B (en) Process for welding sheet metal, rolled rods, pipes and the like like
CH649485A5 (en) Projection for electric resistance welding
DE914169C (en) Butt welding process
DE656809C (en) Process for the manufacture of runners for rotary piston engines and machines as well as similar cylindrical workpieces
DE2648007C3 (en) Process for diffusion welding of metallic workpieces and use of the process
DE594706C (en) Process for the manufacture of rings or other bodies with a closed circumference, in particular rings of large diameter, from fused quartz
DE806307C (en) Process for electrical resistance welding of thin-walled pipes
DE488905C (en) Process for the aluminothermic welding of a workpiece with a small cross section to a large area of a heavy workpiece
DE712963C (en) Electrical flash welding process for joining workpieces whose cross-sectional properties differ in places due to the design or the type of material
AT222466B (en) Method and device for pressure welding joining of pipes