CL2016001442A1 - Un método de planificación e implementación de un sistema de voladura que incluye una pluralidad de barrenos. - Google Patents
Un método de planificación e implementación de un sistema de voladura que incluye una pluralidad de barrenos.Info
- Publication number
- CL2016001442A1 CL2016001442A1 CL2016001442A CL2016001442A CL2016001442A1 CL 2016001442 A1 CL2016001442 A1 CL 2016001442A1 CL 2016001442 A CL2016001442 A CL 2016001442A CL 2016001442 A CL2016001442 A CL 2016001442A CL 2016001442 A1 CL2016001442 A1 CL 2016001442A1
- Authority
- CL
- Chile
- Prior art keywords
- barrene
- voladura
- processor
- planning
- location
- Prior art date
Links
- 238000000034 method Methods 0.000 title abstract 3
- 238000005422 blasting Methods 0.000 title 1
- 239000000839 emulsion Substances 0.000 abstract 2
- 239000003999 initiator Substances 0.000 abstract 1
Classifications
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F42—AMMUNITION; BLASTING
- F42D—BLASTING
- F42D3/00—Particular applications of blasting techniques
- F42D3/04—Particular applications of blasting techniques for rock blasting
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F42—AMMUNITION; BLASTING
- F42D—BLASTING
- F42D1/00—Blasting methods or apparatus, e.g. loading or tamping
- F42D1/04—Arrangements for ignition
- F42D1/045—Arrangements for electric ignition
- F42D1/05—Electric circuits for blasting
- F42D1/055—Electric circuits for blasting specially adapted for firing multiple charges with a time delay
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F42—AMMUNITION; BLASTING
- F42D—BLASTING
- F42D1/00—Blasting methods or apparatus, e.g. loading or tamping
Landscapes
- Engineering & Computer Science (AREA)
- General Engineering & Computer Science (AREA)
- Geophysics And Detection Of Objects (AREA)
- Earth Drilling (AREA)
- Drilling And Exploitation, And Mining Machines And Methods (AREA)
- Excavating Of Shafts Or Tunnels (AREA)
Abstract
METODO DE PLANIFICACION E IMPLEMENTACION DE UN SISTEMA DE VOLADURA QUE PRETENDE INCLUIR UNA PLURALIDAD DE BARRENOS, EL METODO QUE INCLUYE LAS ETAPAS DE: PROPORCIONAR UN DISPOSITIVO QUE GENERA INFORMACION POSICIONAL, PROPORCIONAR UN PROCESADOR, EMPLEAR EL DISPOSITIVO PARA DETERMINAR INFORMACION POSICIONAL RELATIVA A UN LIMITE DE UN SITIO DE VOLADURA, INGRESAR LOS PARAMETROS RELATIVOS AL SISTEMA DE VOLADURA Y LA INFORMACION POSICIONAL EN EL PROCESADOR, UTILIZAR EL PROCESADOR PARA GENERAR INFORMACION DE LOCALIZACION RELATIVA A LA UBICACION DE CADA BARRENO EN EL SITIO DE VOLADURA, Y UTILIZAR EL DISPOSITIVO PARA INDICAR LA UBICACION DE CADA BARRENO A UN OPERADOR, DONDE LA SIGUIENTE INFORMACION CON RESPECTO A CADA BARRENO ES INGRESADA AL PROCESADOR PARA REGISTRAR: SU UBICACION, SU PROFUNDIDAD, EL TIEMPO QUE TOMO COMPLETAR LA PERFORACION, INFORMACION ACERCA DE UNA MAQUINA O PERSONA REALIZANDO LA PERFORACION, EL TIPO Y NUMERO DE DETONADORES E INICIADORES COLOCADOS DENTRO DEL BARRENO, LA PROFUNDIDAD DENTRO DEL BARRENO DE CADA DETONADOR, EL TIEMPO REQUERIDO PARA BOMBEAR UNA EMULSION DENTRO DEL BARRENO, LA CANTIDAD DE EMULSION DENTRO DEL BARRENO, Y EL TIPO DE RETACADO COLOCADO EN EL BARRENO.
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| ZA201309366 | 2013-12-12 |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CL2016001442A1 true CL2016001442A1 (es) | 2016-11-11 |
Family
ID=53267671
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CL2016001442A CL2016001442A1 (es) | 2013-12-12 | 2016-06-10 | Un método de planificación e implementación de un sistema de voladura que incluye una pluralidad de barrenos. |
Country Status (7)
| Country | Link |
|---|---|
| US (1) | US10006750B2 (es) |
| EP (1) | EP3080545A2 (es) |
| AP (1) | AP2016009252A0 (es) |
| AU (1) | AU2014361777B2 (es) |
| CA (1) | CA2932458C (es) |
| CL (1) | CL2016001442A1 (es) |
| WO (1) | WO2015089524A2 (es) |
Families Citing this family (11)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| WO2015168709A2 (en) * | 2014-04-22 | 2015-11-05 | Detnet South Africa (Pty) Limited | Blasting system control |
| US10101486B1 (en) | 2017-08-10 | 2018-10-16 | Datacloud International, Inc. | Seismic-while-drilling survey systems and methods |
| US10072919B1 (en) * | 2017-08-10 | 2018-09-11 | Datacloud International, Inc. | Efficient blast design facilitation systems and methods |
| EP3746631B1 (en) * | 2018-01-29 | 2023-11-29 | Dyno Nobel Inc. | Systems for automated loading of blastholes and methods related thereto |
| US10989828B2 (en) | 2018-02-17 | 2021-04-27 | Datacloud International, Inc. | Vibration while drilling acquisition and processing system |
| US10697294B2 (en) | 2018-02-17 | 2020-06-30 | Datacloud International, Inc | Vibration while drilling data processing methods |
| ES2725321A1 (es) * | 2018-03-21 | 2019-09-23 | Accenture Global Solutions Ltd | Sistema y metodo para controlar un evento de perforacion y voladura |
| EA039837B1 (ru) * | 2018-12-20 | 2022-03-18 | Дайно Нобел Инк. | Система для автоматической загрузки шпуров и связанный с ней способ |
| US11725920B2 (en) * | 2019-01-28 | 2023-08-15 | Detnet South Africa (Pty) Ltd | Detonator sensing arrangement |
| US11416645B2 (en) | 2019-02-05 | 2022-08-16 | Dyno Nobel Inc. | Systems for automated blast design planning and methods related thereto |
| CN117973074A (zh) | 2019-02-05 | 2024-05-03 | 戴诺·诺贝尔公司 | 用于自动化爆破设计规划的系统及其相关方法 |
Family Cites Families (7)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| GB9815533D0 (en) | 1998-07-17 | 1998-09-16 | Hatorex Ag | Setting of time delays in a sequence of explosive detonations |
| US6772105B1 (en) * | 1999-09-08 | 2004-08-03 | Live Oak Ministries | Blasting method |
| US6941870B2 (en) * | 2003-11-04 | 2005-09-13 | Advanced Initiation Systems, Inc. | Positional blasting system |
| CA2564832C (en) * | 2004-06-22 | 2011-09-06 | Orica Explosives Technology Pty Ltd | Method of blasting |
| AU2007335246B2 (en) * | 2006-12-18 | 2012-08-02 | Global Tracking Solutions Pty Ltd | Tracking system for blast holes |
| BR112012008609A2 (pt) * | 2009-10-13 | 2016-04-05 | Dyno Nobel Inc | dispositivo registrador para operações de detonação e método de uso |
| US20140026775A1 (en) * | 2012-03-13 | 2014-01-30 | Austin Power Company | Reader apparatus and methods for verifying electropnic detonator position locations at a blasting site |
-
2014
- 2014-12-09 AU AU2014361777A patent/AU2014361777B2/en active Active
- 2014-12-09 EP EP14866798.3A patent/EP3080545A2/en not_active Withdrawn
- 2014-12-09 AP AP2016009252A patent/AP2016009252A0/en unknown
- 2014-12-09 US US15/103,419 patent/US10006750B2/en active Active
- 2014-12-09 CA CA2932458A patent/CA2932458C/en active Active
- 2014-12-09 WO PCT/ZA2014/000071 patent/WO2015089524A2/en not_active Ceased
-
2016
- 2016-06-10 CL CL2016001442A patent/CL2016001442A1/es unknown
Also Published As
| Publication number | Publication date |
|---|---|
| US10006750B2 (en) | 2018-06-26 |
| AP2016009252A0 (en) | 2016-06-30 |
| AU2014361777A1 (en) | 2016-07-28 |
| EP3080545A2 (en) | 2016-10-19 |
| CA2932458C (en) | 2021-02-16 |
| WO2015089524A3 (en) | 2015-09-03 |
| AU2014361777B2 (en) | 2019-05-16 |
| US20160313107A1 (en) | 2016-10-27 |
| CA2932458A1 (en) | 2015-06-18 |
| WO2015089524A2 (en) | 2015-06-18 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CL2016001442A1 (es) | Un método de planificación e implementación de un sistema de voladura que incluye una pluralidad de barrenos. | |
| MX2016009746A (es) | Acelerador de cemento pasivado. | |
| CL2016000996A1 (es) | Método de monitoreo de un taladro de minería y sistema monitor de máquina minera. | |
| AR103528A1 (es) | Método para reducir al mínimo la vibración en un sistema de bombas múltiples | |
| AR104409A1 (es) | Despliegue de dispositivo de obturación en pozos subterráneos | |
| CL2016002831A1 (es) | Un método para determinar una posición de un dispositivo de procesamiento móvil, y dispositivo de procesamiento móvil. | |
| MX2015017673A (es) | Sistema y metodo para seleccionar una trayectoria de perforacion con base en el costo. | |
| PE20221231A1 (es) | Sistema de inspeccion de equipos de mineria, metodo de inspeccion de equipos de mineria y dispositivo de inspeccion de equipos de mineria | |
| MX392578B (es) | Sistema de control de perforación integrado y método asociado. | |
| MX2017006208A (es) | Dispositivo de ejercicio portátil para barra de ballet. | |
| MX2016014149A (es) | Control de condición ambiental basado en condiciones detectadas y métodos relacionados. | |
| MX2016003567A (es) | Automatizacion de la perforacion utilizando control optimo estocastico. | |
| AR104654A1 (es) | Método para insertar sensores en un espacio anular formado entre la tubería de revestimiento y una formación en la que penetra un pozo para adquirir datos del fluido | |
| AR097725A1 (es) | Operaciones de perforaciones de pozos que involucran métodos computacionales que producen perfiles de depresión | |
| CL2016001211A1 (es) | Aparato y método de registro de hoyo. | |
| CO2017008980A2 (es) | Sistema de informacion de detonador | |
| BR112017021526A2 (pt) | ?aparelho, método e sistema de pistola perfurante? | |
| AR098169A1 (es) | Generador de mapas de trayectorias con análisis de ingeniería de perforación para el modelado de reservorios de hidrocarburos | |
| AR099947A1 (es) | Análisis isotópico de la salida de un extractor controlado en comunicación con un sistema de fluido en un equipo de perforación | |
| MX2018001426A (es) | Motor de reglas para dispositivos conectados. | |
| CL2016001322A1 (es) | Un me´todo para controlar la operacio´n de un sistema de voladura | |
| MX2015010070A (es) | Sistemas y metodos para optimizacion de analisis de pozos y fluidos subterraneos con gases nobles. | |
| MX373082B (es) | Uso de un vehículo a control remoto en una operación de detonación. | |
| AR102587A1 (es) | Analizador de rendimiento en tiempo real para operaciones de perforación | |
| AR105390A1 (es) | Pronosticador del tiempo para terminar una simulación |