CL2020003055A1 - Método y sistema de planificación de minas - Google Patents
Método y sistema de planificación de minasInfo
- Publication number
- CL2020003055A1 CL2020003055A1 CL2020003055A CL2020003055A CL2020003055A1 CL 2020003055 A1 CL2020003055 A1 CL 2020003055A1 CL 2020003055 A CL2020003055 A CL 2020003055A CL 2020003055 A CL2020003055 A CL 2020003055A CL 2020003055 A1 CL2020003055 A1 CL 2020003055A1
- Authority
- CL
- Chile
- Prior art keywords
- geometric elements
- mathematical modeling
- mine
- planning method
- mine planning
- Prior art date
Links
Classifications
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01V—GEOPHYSICS; GRAVITATIONAL MEASUREMENTS; DETECTING MASSES OR OBJECTS; TAGS
- G01V20/00—Geomodelling in general
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21C—MINING OR QUARRYING
- E21C41/00—Methods of underground or surface mining; Layouts therefor
- E21C41/16—Methods of underground mining; Layouts therefor
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21C—MINING OR QUARRYING
- E21C41/00—Methods of underground or surface mining; Layouts therefor
- E21C41/26—Methods of surface mining; Layouts therefor
-
- G—PHYSICS
- G06—COMPUTING OR CALCULATING; COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F30/00—Computer-aided design [CAD]
- G06F30/20—Design optimisation, verification or simulation
-
- G—PHYSICS
- G06—COMPUTING OR CALCULATING; COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0631—Resource planning, allocation, distributing or scheduling for enterprises or organisations
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21C—MINING OR QUARRYING
- E21C41/00—Methods of underground or surface mining; Layouts therefor
-
- G—PHYSICS
- G06—COMPUTING OR CALCULATING; COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F2111/00—Details relating to CAD techniques
- G06F2111/04—Constraint-based CAD
-
- G—PHYSICS
- G06—COMPUTING OR CALCULATING; COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F2111/00—Details relating to CAD techniques
- G06F2111/10—Numerical modelling
-
- G—PHYSICS
- G06—COMPUTING OR CALCULATING; COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0633—Workflow analysis
-
- G—PHYSICS
- G06—COMPUTING OR CALCULATING; COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
- G06Q50/02—Agriculture; Fishing; Forestry; Mining
Landscapes
- Engineering & Computer Science (AREA)
- Business, Economics & Management (AREA)
- Mining & Mineral Resources (AREA)
- Human Resources & Organizations (AREA)
- Life Sciences & Earth Sciences (AREA)
- Physics & Mathematics (AREA)
- General Life Sciences & Earth Sciences (AREA)
- General Physics & Mathematics (AREA)
- Theoretical Computer Science (AREA)
- Remote Sensing (AREA)
- Strategic Management (AREA)
- Geochemistry & Mineralogy (AREA)
- Geology (AREA)
- Economics (AREA)
- Entrepreneurship & Innovation (AREA)
- General Business, Economics & Management (AREA)
- Tourism & Hospitality (AREA)
- Marketing (AREA)
- Quality & Reliability (AREA)
- Operations Research (AREA)
- Game Theory and Decision Science (AREA)
- Educational Administration (AREA)
- Development Economics (AREA)
- Geophysics (AREA)
- Evolutionary Computation (AREA)
- General Engineering & Computer Science (AREA)
- Geometry (AREA)
- Computer Hardware Design (AREA)
- Agronomy & Crop Science (AREA)
- Animal Husbandry (AREA)
- Marine Sciences & Fisheries (AREA)
- Health & Medical Sciences (AREA)
- General Health & Medical Sciences (AREA)
- Primary Health Care (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
- Geophysics And Detection Of Objects (AREA)
Abstract
Un método y sistema para el diseño de minas que usa modelado matemático y optimización basados en el modelado matemático de burbujas conectadas. Se aplica un modelo matemático, basado en el modelado matemático del comportamiento de las burbujas conectadas, al modelo de bloques 3D de una mina para conglomerar elementos geométricos del modelo de bloques 3D según la ubicación física y las propiedades del material físico para cada uno de los elementos geométricos y seleccionar al menos un conjunto de una pluralidad de elementos geométricos contiguos para la extracción basado en el conglomerado. Cada conjunto de una pluralidad de bloques contiguos puede asociarse con una fase de un proceso de minería.
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| AU2018901873A AU2018901873A0 (en) | 2018-05-28 | Mine planning method and system |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CL2020003055A1 true CL2020003055A1 (es) | 2021-05-24 |
Family
ID=68696609
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CL2020003055A CL2020003055A1 (es) | 2018-05-28 | 2020-11-25 | Método y sistema de planificación de minas |
Country Status (7)
| Country | Link |
|---|---|
| US (2) | US20210208305A1 (es) |
| AU (1) | AU2019277196B2 (es) |
| BR (1) | BR112020024085A2 (es) |
| CA (1) | CA3100082A1 (es) |
| CL (1) | CL2020003055A1 (es) |
| PE (1) | PE20201442A1 (es) |
| WO (1) | WO2019227147A1 (es) |
Families Citing this family (18)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| AU2020220233A1 (en) | 2019-02-11 | 2021-09-30 | The National Vision Research Institute of Australia, Australian College of Optometry | A method of forming a diamond coating on a carbon material |
| CN111583401B (zh) * | 2020-03-21 | 2023-06-09 | 长沙迪迈数码科技股份有限公司 | 露天矿山计划开采边界线的处理方法、装置及存储介质 |
| CN113780698B (zh) * | 2020-06-09 | 2024-06-25 | 中国石油化工股份有限公司 | 适用于油气区的砂岩型铀矿资源潜力评价方法及电子设备 |
| US20210398157A1 (en) * | 2020-06-18 | 2021-12-23 | Colorado School Of Mines | Systems and methods for maximizing mine production scheduling |
| CN111611728B (zh) * | 2020-06-29 | 2023-03-28 | 中国有色金属工业昆明勘察设计研究院有限公司 | 昔格达地层岩质边坡后缘滑裂面位置的稳定性计算方法 |
| CA3123401A1 (en) * | 2021-06-28 | 2022-12-28 | Pristine Mining Inc. | Method of trading in minerals |
| CN113807004B (zh) * | 2021-06-30 | 2024-08-06 | 北京交通大学 | 基于数据挖掘的刀具寿命预测方法、装置及系统 |
| CN113705916B (zh) * | 2021-09-01 | 2024-03-26 | 东北大学 | 一种露天矿铁矿多源多目标配矿方法 |
| CN114154109A (zh) * | 2021-11-11 | 2022-03-08 | 神华北电胜利能源有限公司 | 平行推进采剥模式下露天矿开采计划编制方法和装置 |
| CN114676468A (zh) * | 2021-12-13 | 2022-06-28 | 东北大学 | 一种金属露天矿最终境界优化方法和系统 |
| CN114810084B (zh) * | 2022-05-07 | 2023-07-25 | 东北大学 | 一种四要素整体优化的露天煤矿开采方法及系统 |
| CN115146447B (zh) * | 2022-06-10 | 2024-07-16 | 济南轨道交通集团有限公司 | 一种岩溶含水层连通性判别方法及系统、设备及介质 |
| CN116337012B (zh) * | 2023-03-20 | 2023-10-20 | 重庆地质矿产研究院 | 基于倾斜摄影测量技术的露天矿山界桩位置布设优化方法 |
| CN117035157A (zh) * | 2023-07-03 | 2023-11-10 | 中国地质大学(武汉) | 一种基于铜价格时序预测的露天矿生产计划优化方法 |
| CN117874890B (zh) * | 2024-01-19 | 2025-07-01 | 沈阳森普矿山工程设计有限公司 | 露天矿采坑最优境界建立和开采计划制定方法 |
| CN117759245B (zh) * | 2024-01-25 | 2024-07-23 | 河南建筑材料研究设计院有限责任公司 | 利用三维智能设计的露天矿山开采系统及方法 |
| CN118607248A (zh) * | 2024-06-21 | 2024-09-06 | 青海省第二地质勘查院 | 一种矿山开采前后地形变化与储量动态计算方法 |
| CN119915350B (zh) * | 2025-04-02 | 2025-07-04 | 赣南科技学院 | 一种矿山安全监测信息采集系统及方法 |
Family Cites Families (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| AU2002951892A0 (en) * | 2002-10-09 | 2002-10-24 | Bhp Billiton Innovation Pty Ltd | Mining process and design |
| BRPI0315237B1 (pt) * | 2002-10-09 | 2015-10-20 | Bhp Billiton Innovation Pty | método e aparelho de determinação de extração de material a partir de uma mina tendo pelo menos uma cava |
| US20130262045A1 (en) * | 2012-03-28 | 2013-10-03 | Trimble Navigation Limited | Open pit mine designer |
| US9773075B2 (en) * | 2013-12-19 | 2017-09-26 | Dassault Systemes Canada Inc. | Underground tactical optimization |
-
2019
- 2019-05-28 WO PCT/AU2019/050529 patent/WO2019227147A1/en not_active Ceased
- 2019-05-28 AU AU2019277196A patent/AU2019277196B2/en active Active
- 2019-05-28 CA CA3100082A patent/CA3100082A1/en active Pending
- 2019-05-28 PE PE2020001915A patent/PE20201442A1/es unknown
- 2019-05-28 US US17/058,536 patent/US20210208305A1/en not_active Abandoned
- 2019-05-28 BR BR112020024085-0A patent/BR112020024085A2/pt unknown
-
2020
- 2020-11-25 CL CL2020003055A patent/CL2020003055A1/es unknown
-
2024
- 2024-08-28 US US18/818,515 patent/US20250208314A1/en active Pending
Also Published As
| Publication number | Publication date |
|---|---|
| US20250208314A1 (en) | 2025-06-26 |
| AU2019277196A1 (en) | 2020-12-03 |
| WO2019227147A1 (en) | 2019-12-05 |
| US20210208305A1 (en) | 2021-07-08 |
| PE20201442A1 (es) | 2020-12-09 |
| AU2019277196B2 (en) | 2025-04-17 |
| BR112020024085A2 (pt) | 2021-02-09 |
| CA3100082A1 (en) | 2019-12-05 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CL2020003055A1 (es) | Método y sistema de planificación de minas | |
| AR104404A1 (es) | Control de flujo en pozos subterráneos | |
| CO2018001525A2 (es) | Método para determinar la porosidad asociada a la materia orgánica en un pozo o formación | |
| EA201690486A1 (ru) | Способ ведения разработки месторождений | |
| AR102682A1 (es) | Sistemas y métodos para optimizar operaciones de fracturación en una formación | |
| BR112017000489A2 (pt) | método de canhoneio de um furo de poço e método para formar pelo menos um canhoneio no revestimento de um furo de poço | |
| CL2016002099A1 (es) | Método de demolición de roca y sistema para ajustar un plan de voladura en tiempo real. | |
| MX2018009876A (es) | Encapsulamiento y desencapsulamiento de medios. | |
| MX2017011021A (es) | Procesamiento coordinado de datos por medio de recursos de computación interconectados. | |
| MX360256B (es) | Sistemas para suministrar explosivos y metodos relacionados con estos. | |
| AR094579A1 (es) | Desplazamiento de cuña expandible para el anclaje de herramientas de fondo de pozo | |
| AR101947A1 (es) | Optimización de fracturación hidráulica en una formación subterránea | |
| MX2016003567A (es) | Automatizacion de la perforacion utilizando control optimo estocastico. | |
| GB2526499A (en) | Irrigation system and method | |
| AR101511A1 (es) | Sistema y método para crear un pliegue en una porción de material expandible | |
| WO2015019112A3 (en) | Methods and apparatus for well productivity | |
| CO2017011816A2 (es) | Sistema direccionable de creación de túneles mediante ácido en tiempo real | |
| BR102014012028A8 (pt) | linha de produção de remoção de minério, rampas gêmeas e método de instalação de ground support | |
| MX2016003044A (es) | Sistema de revestimiento resistente al desgaste y método. | |
| MX2016010886A (es) | Personalizacion del diseño de una herramienta de adquisicion de regristros de pozo y fabricacion utilizando impresion 3d y modelado fisico. | |
| TW201614491A (en) | Virtual machine migration method | |
| AR101979A1 (es) | Sistema de control de orientación de herramientas no lineal para una herramienta de perforación dirigible rotativa | |
| CL2019000789A1 (es) | Techo de hormigón, juego para hacer de un techo de hormigón y método para la producción de un techo de hormigón. | |
| HUE045770T2 (hu) | Eljárás ásványi kõzet kalcinálására párhuzamos áramlású, függõleges, regeneratív, aknás kemencében és az erre használt kemence | |
| MX2019000189A (es) | Sistema de sujetador y costillas estabilizadoras. |