CN101928126B - Embankment rapid rescue reinforcement material and embankment rapid rescue reinforcement construction method - Google Patents

Embankment rapid rescue reinforcement material and embankment rapid rescue reinforcement construction method Download PDF

Info

Publication number
CN101928126B
CN101928126B CN2010102186149A CN201010218614A CN101928126B CN 101928126 B CN101928126 B CN 101928126B CN 2010102186149 A CN2010102186149 A CN 2010102186149A CN 201010218614 A CN201010218614 A CN 201010218614A CN 101928126 B CN101928126 B CN 101928126B
Authority
CN
China
Prior art keywords
embankment
rescue work
mass ratio
reinforcement material
out rescue
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN2010102186149A
Other languages
Chinese (zh)
Other versions
CN101928126A (en
Inventor
韦华
陈迅捷
鄢俊
张燕迟
季红飞
钱文勋
欧阳幼玲
陈擎宇
孙勇
王小东
贺永会
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Anhui R&d Hi-Tech Engineering Co Ltd
Original Assignee
Nanjing Hydraulic Research Institute of National Energy Administration Ministry of Transport Ministry of Water Resources
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nanjing Hydraulic Research Institute of National Energy Administration Ministry of Transport Ministry of Water Resources filed Critical Nanjing Hydraulic Research Institute of National Energy Administration Ministry of Transport Ministry of Water Resources
Priority to CN2010102186149A priority Critical patent/CN101928126B/en
Publication of CN101928126A publication Critical patent/CN101928126A/en
Application granted granted Critical
Publication of CN101928126B publication Critical patent/CN101928126B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)
  • Curing Cements, Concrete, And Artificial Stone (AREA)

Abstract

堤岸快速抢险加固材料和堤岸快速抢险加固施工方法。加固材料的成份是硅酸盐水泥与速凝固化剂;硅酸盐水泥占70~90;速凝固化剂占10~30;速凝固化剂的成分是:铝酸钠、氯化钠、氧化钙;三者的质量比,40~60:30~40:10~20。制备方法是先将铝酸钠、氯化钠、氧化钙搅拌均匀制成速凝固化剂;再与硅酸盐水泥一起制成快速抢险加固材料;将土、快速抢险加固材料、水按比例秤量;利用螺杆泵的泵送压力和出口端的透水模袋及拌和物自身重量把水分挤压出,降低水胶比,加快拌和物凝结硬化,用于堤岸的抢险、防渗堵漏、除险加固。本发明提高了抢险加固材料耐久性;可保护环境;对恶劣天气适应性较强;提高施工效率并降低成本。Rapid emergency reinforcement materials for embankments and construction methods for rapid emergency reinforcement of embankments. The composition of the reinforcement material is Portland cement and quick-setting curing agent; Portland cement accounts for 70-90%; quick-setting curing agent accounts for 10-30%; Calcium; the mass ratio of the three is 40~60:30~40:10~20. The preparation method is to first mix sodium aluminate, sodium chloride, and calcium oxide evenly to make a quick-setting curing agent; then make a quick-rescue reinforcement material together with Portland cement; weigh the soil, quick-rescue reinforcement material, and water in proportion ; Use the pumping pressure of the screw pump and the water-permeable mold bag at the outlet end and the weight of the mixture to squeeze out the water, reduce the water-binder ratio, and accelerate the condensation and hardening of the mixture. . The invention improves the durability of emergency reinforcement materials, can protect the environment, has strong adaptability to bad weather, improves construction efficiency and reduces costs.

Description

堤岸快速抢险加固材料和堤岸快速抢险加固施工方法Embankment rapid emergency reinforcement material and embankment rapid emergency reinforcement construction method

技术领域 technical field

本发明涉及一种工程材料和施工工艺,具体涉及一种堤岸快速抢险加固材料,以及使用该堤岸快速抢险加固材料的堤岸快速加固施工方法。主要应用于水利工程堤岸抢险加固领域,能够快速解决堤岸渗漏、管涌、边坡失稳等问题。 The invention relates to an engineering material and a construction process, in particular to a rapid embankment reinforcement material and a rapid embankment reinforcement construction method using the embankment rapid rescue reinforcement material. It is mainly used in the field of embankment emergency reinforcement in water conservancy projects, and can quickly solve problems such as embankment leakage, piping, and slope instability.

背景技术 Background technique

在此处键入技术领域描述段落。目前国内堤岸加固使用的材料主要为水泥混凝土、浆砌块石、土。用水泥混凝土、浆砌块石加固堤岸一方面受到天气的影响较大,在雨雪天气加固工作无法正常进行,特别是在抢险堵漏过程中,无法及时去除堤岸险情,存在安全隐患;其次水泥混凝土、浆砌块石加固堤岸后,原有的生态平衡被破坏,岸边植物和动物无法正常生存;再次水泥混凝土、浆砌块石加固堤岸施工方法较原始,浪费大量的人力物力,成本较高。 Type the technical field description paragraph here. At present, the materials used for embankment reinforcement in China are mainly cement concrete, masonry blocks, and soil. On the one hand, the use of cement concrete and mortar blocks to strengthen the embankment is greatly affected by the weather, and the reinforcement work cannot be carried out normally in rainy and snowy weather. Especially in the process of emergency plugging, the dangerous situation of the embankment cannot be removed in time, and there are potential safety hazards; secondly, cement After the embankment is reinforced with concrete and mortar block stones, the original ecological balance is destroyed, and the plants and animals on the shore cannot survive normally; again, the construction method of cement concrete and mortar block stone reinforcement embankment is relatively primitive, which wastes a lot of manpower and material resources, and the cost is relatively high. high.

用土加固堤岸存在问题主要是:1、土体自身的固结强度较低,经不住水流长期的冲刷与侵蚀,材料耐久性较差;2、在抢险堵漏、雨雪等恶劣天气,单一的土体由于自身的缺陷不适合做抢险材料。 The main problems of embankment reinforcement with soil are: 1. The soil itself has low consolidation strength, cannot withstand the long-term erosion and erosion of water flow, and the durability of materials is poor; 2. In severe weather such as emergency plugging, rain and snow, a single Due to its own defects, the soil body is not suitable for emergency rescue materials.

目前国内有许多种土体固化剂,如北京科技大学岳涛、倪文等发明了一种称为SSK的土体固化剂,其主要成分是石灰和固体废弃物,这种土体固化剂加入土体后,其3d抗压强度可达到1.6MPa左右,7d抗压强度可达到3.0MPa左右;天津水利科学研究所的李刚、孙永军等对HAS土体固化剂、奥特塞特土壤固化剂的性能进行了研究,他们的研究结果显示:在土中加入HAS土体固化剂后,其7d、14d、28d抗压强度可达到:3.9MPa、4.5MPa、5.1MPa;在土中加入奥特塞特土壤固化剂后,其14d、28d抗压强度可达到4.3 MPa、5.0 MPa。从大量的研究文献看,目前土体固化剂对土体强度的促进作用主要是在3d以后才显现出来,对于堤岸渗漏、管涌等险情来说,凝结硬化时间太长,不能及时排除险情,这种土体固化剂对堤岸快速除险加固不适用,在近几年极端恶劣天气不断出现的情况下,有必要研发一种凝结硬化时间短,强度发展快的土体固化剂。 At present, there are many kinds of soil curing agents in China. For example, Yue Tao and Ni Wen of Beijing University of Science and Technology invented a soil curing agent called SSK. Its main components are lime and solid waste. This soil curing agent is added After soil mass, its 3d compressive strength can reach about 1.6MPa, and its 7d compressive strength can reach about 3.0MPa; The performance has been studied, and their research results show that: after adding HAS soil curing agent to the soil, its 7d, 14d, 28d compressive strength can reach: 3.9MPa, 4.5MPa, 5.1MPa; After adding special soil stabilizer, its 14d, 28d compressive strength can reach 4.3 MPa, 5.0 MPa. According to a large number of research literatures, at present, the promotion effect of soil curing agent on the soil strength is mainly manifested after 3 days. For dangerous situations such as embankment leakage and piping, the setting and hardening time is too long, and the dangerous situation cannot be eliminated in time. This kind of soil curing agent is not suitable for the quick relief and reinforcement of embankments. In the case of extreme bad weather in recent years, it is necessary to develop a soil curing agent with short setting and hardening time and fast strength development.

目前堤岸加固材料的输送主要有人工输送、传送带输送。人工输送耗时费力,工作效率太低;传送带输送要求土体为干硬性,且受天气影响较大,因此有必要研发一套能适应恶劣天气的输送装置,来快速解决在恶劣天气出现堤岸险情。 At present, the transportation of embankment reinforcement materials mainly includes manual transportation and conveyor belt transportation. Manual transportation is time-consuming and laborious, and the work efficiency is too low; conveyor belt transportation requires the soil to be dry and hard, and is greatly affected by the weather. Therefore, it is necessary to develop a conveying device that can adapt to bad weather to quickly solve the dangerous embankment in bad weather. .

发明内容 Contents of the invention

针对目前堤岸抢险加固材料和施工工艺的不足,本发明的目的是提供一种堤岸快速抢险加固材料,以及使用该堤岸快速抢险加固材料的堤岸快速加固施工方法;主要应用于水利工程堤岸抢险加固领域,能够快速解决堤岸渗漏、管涌、边坡失稳等问题,从而达到降低成本、提高施工效率,在抢险堵漏过程中快速可行,并能够保护堤岸周边环境。 In view of the deficiencies in current embankment emergency reinforcement materials and construction techniques, the purpose of the present invention is to provide a rapid embankment emergency reinforcement material and a rapid embankment reinforcement construction method using the embankment rapid emergency reinforcement material; it is mainly used in the field of water conservancy engineering embankment emergency reinforcement , can quickly solve problems such as embankment leakage, piping, and slope instability, so as to reduce costs and improve construction efficiency. It is fast and feasible in the process of emergency plugging, and can protect the surrounding environment of embankments.

完成上述发明任务的方案是,一种堤岸快速抢险加固材料,其主要成份如下: The scheme of finishing above-mentioned invention task is, a kind of embankment quick rescue reinforcement material, its main component is as follows:

硅酸盐水泥、速凝固化剂。其中硅酸盐水泥占总质量的70份-90份;速凝固化剂占总质量的10份-30份。本申请推荐,两者的最佳质量比为:硅酸盐水泥占总质量的80份;速凝固化剂占总质量的20份。 Portland cement, quick-setting curing agent. Among them, Portland cement accounts for 70-90 parts of the total mass; the quick-setting curing agent accounts for 10-30 parts of the total mass. The application recommends that the optimum mass ratio of the two is: portland cement accounts for 80 parts of the total mass; quick-setting curing agent accounts for 20 parts of the total mass.

速凝固化剂的主要成分是:铝酸钠、氯化钠、氧化钙;三者的质量比为:40-60:30-40:10-20。在大量试验的基础上,本申请推荐三者的最佳质量比为:50:35:15。 The main components of the quick-setting curing agent are: sodium aluminate, sodium chloride, and calcium oxide; the mass ratio of the three is: 40-60:30-40:10-20. On the basis of a large number of experiments, this application recommends that the best mass ratio of the three is: 50:35:15.

使用时,土、快速抢险加固材料和水按一定的比例秤量好,三者的质量比为:50-70:4-16:20-40,在大量试验的基础上,本申请推荐三者的最佳质量比为:65:10:25。 When in use, it is better to weigh the soil, fast emergency reinforcement materials and water according to a certain ratio. The mass ratio of the three is: 50-70:4-16:20-40. On the basis of a large number of tests, this application recommends the combination of the three The best mass ratio is: 65:10:25.

完成本申请第2个发明任务的方案是,一种使用上述堤岸快速抢险加固材料的堤岸快速抢险加固施工方法,步骤如下: The scheme for completing the 2nd invention task of the present application is a construction method for fast emergency reinforcement of embankments using the above-mentioned embankment rapid emergency reinforcement materials, and the steps are as follows:

⑴、按上述质量比秤量铝酸钠、氯化钠、氧化钙,搅拌均匀,制成速凝固化剂; ⑴. Weigh sodium aluminate, sodium chloride, and calcium oxide according to the above mass ratio, and stir evenly to make a quick-setting curing agent;

⑵、把硅酸盐水泥、速凝固化剂按上述质量比秤量好,搅拌均匀,制成快速加固材料; ⑵, Portland cement and quick-setting curing agent are weighed according to the above mass ratio, and stirred evenly to make a rapid reinforcement material;

⑶、将土、快速加固材料、水按一定的比例秤量好,三者的质量比为:50-70:4-16:20-40,在大量试验的基础上,本申请推荐三者的最佳质量比为:65:10:25。用强制试搅拌机搅拌3-5分钟; ⑶. Weigh the soil, rapid reinforcement material and water according to a certain ratio. The mass ratio of the three is: 50-70:4-16:20-40. On the basis of a large number of tests, this application recommends the best of the three. The best mass ratio is: 65:10:25. Stir with a forced mixer for 3-5 minutes;

⑷、将步骤⑶得到的材料,倒入螺杆泵中,通过螺杆泵挤压作用把拌和物运送到指定施工地点; (4) Pour the material obtained in step (3) into the screw pump, and transport the mixture to the designated construction site through the extrusion of the screw pump;

⑸、在螺杆泵的出口端用透水模袋承接螺杆泵输送出的拌和物; ⑸. Use a permeable mold bag at the outlet of the screw pump to accept the mixture delivered by the screw pump;

⑹、利用泵送压力和拌和物自身重量把拌和物中的水分挤压出来,降低水胶比,达到土体快速凝固,用于堤岸的抢险、防渗堵漏、除险加固。 ⑹. Use the pumping pressure and the weight of the mixture to squeeze out the water in the mixture, reduce the water-binder ratio, and achieve rapid solidification of the soil, which is used for embankment emergency rescue, seepage prevention and plugging, and danger relief and reinforcement.

上述方法的优化方案是, The optimization scheme of the above method is,

所述步骤⑴是在干燥搅拌器内,搅拌30min,制成速凝固化剂; Described step (1) is in dry mixer, stirs 30min, makes quick-setting curing agent;

所述步骤⑶是在在搅拌机内搅拌3 min -5min; Described step (3) is to stir 3min-5min in mixer;

所述步骤⑷,在通过螺杆泵挤压作用把拌和物运送到施工地点以前,增加以下步骤; In the step (4), before the mixture is transported to the construction site through the extrusion of the screw pump, the following steps are added;

⑷-1,通过振动筛过滤掉大于15mm的固体石子,通过振动筛的拌和物漏进螺杆泵进料口;然后再通过螺杆泵挤压作用把拌和物运送到施工地点; ⑷-1. Filter the solid stones larger than 15mm through the vibrating screen, and the mixture passing through the vibrating screen leaks into the feed port of the screw pump; then the mixture is transported to the construction site through the extrusion of the screw pump;

所述步骤⑸中的透水模袋,本申请推荐,其直径为30 cm~40cm、长为1.0 m~2.0m; The permeable mold bag in the step (5) is recommended by this application, and its diameter is 30 cm to 40 cm, and its length is 1.0 m to 2.0 m;

所述步骤⑹,利用泵送压力和拌和物自身重量把拌和物中的水分挤压出来后30min~120min,土体的无侧限抗压强度可达到0.8 MPa-2.5 MPa,可用于堤岸的防渗堵漏和除险加固。 The step (6) uses the pumping pressure and the weight of the mixture to squeeze out the water in the mixture for 30 minutes to 120 minutes, and the unconfined compressive strength of the soil can reach 0.8 MPa-2.5 MPa, which can be used for embankment protection. Seepage plugging and danger elimination reinforcement.

换言之,最佳方法是按照以下具体步骤操作: In other words, the best approach is to follow these specific steps:

⑴、按上述质量比秤量铝酸钠、氯化钠、氧化钙,放入干燥搅拌器内,搅拌30min,制成速凝固化剂; (1) Weigh sodium aluminate, sodium chloride and calcium oxide according to the above mass ratio, put them into a dry mixer, and stir for 30 minutes to make a quick-setting curing agent;

⑵、把硅酸盐水泥、速凝固化剂按上述质量比秤量好,放入搅拌器内,搅拌均匀后,制成快速抢险加固材料; ⑵. Weigh Portland cement and quick-setting curing agent according to the above mass ratio, put them into the mixer, and stir them evenly to make fast emergency reinforcement materials;

在大量试验的基础上,本申请推荐三者的最佳质量比为:50:35:15。快速抢险加固材料、土、水按一定的比例秤量好,放入混凝土搅拌机内,在搅拌机内搅拌3 min -5min,将拌和物倒在振动筛上; On the basis of a large number of experiments, this application recommends that the best mass ratio of the three is: 50:35:15. Quick emergency reinforcement materials, soil and water are weighed according to a certain ratio, put into the concrete mixer, stir in the mixer for 3-5min, and pour the mixture on the vibrating screen;

⑷、通过振动筛过滤掉大于15mm的固体石子,通过振动筛的拌和物漏进螺杆泵进料口,通过螺杆泵挤压作用把拌和物运送到施工地点; ⑷. Filter the solid stones larger than 15mm through the vibrating screen, and the mixture through the vibrating screen leaks into the feed port of the screw pump, and the mixture is transported to the construction site through the extrusion of the screw pump;

⑸、在螺杆泵的出口端用直径为30cm~40cm、长为1.0m~2.0m的透水模袋承接螺杆泵输送出的拌和物; ⑸. At the outlet of the screw pump, use a water-permeable mold bag with a diameter of 30cm-40cm and a length of 1.0m-2.0m to accept the mixture delivered by the screw pump;

⑹、利用泵送压力和拌和物自身重量把拌和物中的水分挤压出来,30min~120min后,土体的无侧限抗压强度可达到0.8 MPa-2.5 MPa,即可用于堤岸的抢险、防渗堵漏、除险加固。 ⑹. Use the pumping pressure and the weight of the mixture to squeeze out the water in the mixture. After 30 minutes to 120 minutes, the unconfined compressive strength of the soil can reach 0.8 MPa-2.5 MPa, which can be used for embankment rescue, Seepage prevention and plugging, danger elimination and reinforcement.

堤岸快速抢险加固材料施工所使用的设备构成是:混凝土搅拌机、筛孔直径为15mm的振动筛,螺杆泵、透水膜袋。 The equipment used in the construction of embankment rapid emergency reinforcement materials is: concrete mixer, vibrating screen with a screen hole diameter of 15mm, screw pump, and water-permeable membrane bag.

本发明“堤岸快速抢险加固材料与堤岸快速抢险加固施工方法”与传统加固材料与施工工艺相比,具有以下优点: Compared with traditional reinforcement materials and construction techniques, the "rapid emergency reinforcement material for embankment and embankment rapid emergency reinforcement construction method" of the present invention has the following advantages:

1、凝结硬化时间短,强度发展快 1. The setting and hardening time is short and the strength develops quickly

目前国内土体固化剂无侧限抗压强度以3d、7d无侧限抗压强度在1.0 MPa -3.5MPa,凝结硬化时间较长,强度发展较慢,而使用本发明中的堤岸快速抢险加固材料30min-120min后,土体的无侧限抗压强度可达到0.8 MPa-2.5 MPa,可迅速用堤岸的抢险、防渗堵漏、除险加固。 At present, the unconfined compressive strength of domestic soil curing agent is between 1.0 MPa and 3.5 MPa in 3 days and 7 days. After 30min-120min of the material, the unconfined compressive strength of the soil can reach 0.8 MPa-2.5 MPa, which can be quickly used for embankment rescue, seepage prevention and plugging, and danger relief reinforcement.

2、对恶劣天气适应性较强 2. Strong adaptability to bad weather

目前用人工或输送带运送堤岸加固材料,一方面是耗时费力,另一方面是对材料的状态要求高,第三点是受天气的影响显著,而在抢险堵漏过程中,天气多在极端恶劣条件下,因此现行的输送方法受到一定的限制。 At present, the embankment reinforcement materials are transported manually or by conveyor belts. On the one hand, it is time-consuming and labor-intensive. On the other hand, the state of the materials is high. The third point is that it is significantly affected by the weather. Under extremely harsh conditions, the current delivery methods are therefore subject to certain restrictions.

本发明的施工工艺全部采用机械化,能根据工程需要,用螺杆泵把拌和物运送到指定的施工地点,运送过程中不受雨雪侵蚀,确保材料性能稳定。 The construction process of the present invention is all mechanized, and the mixture can be transported to the designated construction site with a screw pump according to the project requirements, and the transport process is not eroded by rain and snow to ensure stable material performance.

利用本发明所生产出来的堤岸抢险加固材料装在透水模袋中,透水模袋一方面起到了透水作用,另一方面起到了保护新拌混合物作用,使新拌混合物不会因为雨雪而受到侵蚀,30min-120min后,土体的无侧限抗压强度可达到0.8 MPa-2.5 MPa,可迅速用堤岸的抢险、防渗堵漏、除险加固。 The embankment emergency reinforcement material produced by the present invention is packed in a water-permeable mold bag. On the one hand, the water-permeable mold bag plays a water-permeable role, and on the other hand, it plays a role in protecting the fresh mixture, so that the fresh mixture will not be damaged by rain and snow. After 30min-120min of erosion, the unconfined compressive strength of the soil can reach 0.8 MPa-2.5 MPa, which can be quickly used for embankment rescue, seepage prevention and plugging, and danger relief reinforcement.

3、提高了抢险加固材料耐久性 3. Improve the durability of emergency reinforcement materials

通过搅拌,把普通硅酸盐水泥、速凝固化剂均匀的分配到土中,利用速凝固化剂激发普通硅酸盐水泥和土中活性成份,通过普通硅酸盐水泥及土中活性成份的凝结硬化,增加了土体的固结强度;通过螺杆泵在输送过程中对拌和物的挤压作用,增加了土体的密实性。土的固结强度和密实性提高后,护岸土体抗水流冲刷、抗水体侵蚀能力明显提高。 Through stirring, the ordinary Portland cement and the quick-setting curing agent are evenly distributed into the soil, and the quick-setting curing agent is used to stimulate the active ingredients in the ordinary Portland cement and the soil, and through the ordinary Portland cement and the active ingredients in the soil Condensation and hardening increase the consolidation strength of the soil; the compaction of the soil is increased by the extrusion of the mixture during the conveying process by the screw pump. After the consolidation strength and compactness of the soil are improved, the ability of the revetment soil to resist water erosion and water erosion is significantly improved.

4、保护环境 4. Protect the environment

通过使用快速加固材料加固堤岸,能够维持原有生态平衡,有利于岸边植被的生长,为岸边动物的生存提供栖息环境。 By using rapid reinforcement materials to strengthen the embankment, the original ecological balance can be maintained, which is conducive to the growth of vegetation on the bank and provides a habitat for the survival of animals on the bank.

5、提高施工效率 5. Improve construction efficiency

本发明的施工工艺全部采用机械化,通过调整螺杆泵电机类型,可调节机器单位时间生产效率。单台机器最高每小时生产可生产200m3混合物,并能根据工程需要,把拌和物运送到指定的施工地点。 The construction process of the present invention is all mechanized, and the production efficiency per unit time of the machine can be adjusted by adjusting the motor type of the screw pump. A single machine can produce up to 200m 3 mixture per hour, and can transport the mixture to the designated construction site according to the engineering needs.

6、降低成本 6. Reduce costs

本发明所生产出来的堤岸加固混合物的主要成分为土、普通硅酸盐水泥、速凝固化剂,相对于水泥混凝土及浆砌块石而言,材料成本降低。 The main components of the embankment reinforcement mixture produced by the invention are soil, ordinary Portland cement and quick-setting curing agent, and compared with cement concrete and mortar block stones, the cost of materials is reduced.

本发明的施工工艺全部采用机械化,生产时需人工较少,可降低人工成本。 The construction technology of the present invention is all mechanized, requires less labor during production, and can reduce labor costs.

本发明的施工效率较高,可使缩短工期,提高资金周转。 The construction efficiency of the invention is high, the construction period can be shortened, and capital turnover can be improved.

具体实施方式 Detailed ways

实施例1, Example 1,

配制快速抢险加固材料与施工工艺具体实施步骤如下: The specific implementation steps for preparing fast emergency reinforcement materials and construction techniques are as follows:

1、按质量比为50:35:15的比例秤量一定量的铝酸钠、氯化钠、氧化钙,放入干燥搅拌器内,搅拌30min,制成速凝固化剂; 1. Weigh a certain amount of sodium aluminate, sodium chloride and calcium oxide according to the mass ratio of 50:35:15, put them into a dry mixer, and stir for 30 minutes to make a quick-setting curing agent;

2、把普通硅酸盐水泥、速凝固化剂按一定的质量比秤量好,放入搅拌器内,搅拌均匀后,制成快速抢险加固材料。其中,硅酸盐水泥占总质量的80;速凝固化剂占总质量的20。 2. Weigh ordinary portland cement and quick-setting curing agent according to a certain quality ratio, put them into the mixer, and stir them evenly to make a quick emergency reinforcement material. Among them, Portland cement accounts for 80% of the total mass; quick-setting curing agent accounts for 20% of the total mass.

3、将土、快速加固材料、水按一定的比例秤量好,放入混凝土搅拌机内,在搅拌机内搅拌3min -5min,将拌和物倒在振动筛上;  3. Weigh the soil, fast reinforcement materials and water according to a certain ratio, put them into the concrete mixer, stir in the mixer for 3min -5min, and pour the mixture on the vibrating screen;

4、通过振动筛过滤大于15mm的固体石子,通过振动筛的拌和物漏进螺杆泵进料口,通过螺杆泵挤压作用把拌和物运送到施工地点; 4. Filter the solid stones larger than 15mm through the vibrating screen, the mixture through the vibrating screen leaks into the feed port of the screw pump, and the mixture is transported to the construction site through the extrusion of the screw pump;

5、在螺杆泵的出口端用直径为30cm~40cm、长为1.0m~2.0m的透水模袋承接螺杆泵输送出的拌和物; 5. At the outlet of the screw pump, use a permeable mold bag with a diameter of 30cm-40cm and a length of 1.0m-2.0m to accept the mixture delivered by the screw pump;

6、利用泵送压力和拌和物自身重量把拌和物中的水分挤压出来,30min~120min后,土体的无侧限抗压强度可达到0.8MPa-2.5MPa,可迅速用堤岸的抢险、防渗堵漏、除险加固。 6. Use the pumping pressure and the weight of the mixture to squeeze out the water in the mixture. After 30 minutes to 120 minutes, the unconfined compressive strength of the soil can reach 0.8MPa-2.5MPa, which can be quickly used for embankment rescue, Seepage prevention and plugging, danger elimination and reinforcement.

实施例2,与实施例1基本相同,但有以下改变:其中,硅酸盐水泥的质量占总质量的70;速凝固化剂的质量占总质量的30;铝酸钠、氯化钠、氧化钙;三者的质量比为:40:40:20。 Embodiment 2 is basically the same as Embodiment 1, but has the following changes: wherein, the quality of Portland cement accounts for 70% of the total mass; the quality of the quick-setting curing agent accounts for 30% of the total mass; sodium aluminate, sodium chloride, Calcium oxide; the mass ratio of the three is: 40:40:20.

土、快速抢险加固材料和水的质量比为,65:10:25。 The mass ratio of soil, rapid rescue reinforcement materials and water is 65:10:25.

实施例3,与实施例1基本相同,但有以下改变:其中,硅酸盐水泥的质量占总质量的90;速凝固化剂的质量占总质量的10;铝酸钠、氯化钠、氧化钙;三者的质量比为:50:30:20。 Embodiment 3 is basically the same as Embodiment 1, but has the following changes: wherein, the quality of Portland cement accounts for 90% of the total mass; the quality of the quick-setting curing agent accounts for 10% of the total mass; sodium aluminate, sodium chloride, Calcium oxide; the mass ratio of the three is: 50:30:20.

土、快速抢险加固材料和水的质量比为,50:4:20。 The mass ratio of soil, rapid rescue reinforcement materials and water is 50:4:20.

实施例4,与实施例1基本相同,但有以下改变:其中,硅酸盐水泥的质量占总质量的80;速凝固化剂的质量占总质量的20;铝酸钠、氯化钠、氧化钙;三者的质量比为:60:30:10。 Embodiment 4 is basically the same as Embodiment 1, but has the following changes: wherein, the quality of Portland cement accounts for 80% of the total mass; the quality of the quick-setting curing agent accounts for 20% of the total mass; sodium aluminate, sodium chloride, Calcium oxide; the mass ratio of the three is: 60:30:10.

土、快速抢险加固材料和水的质量比为,70: 16:40。 The mass ratio of soil, fast rescue reinforcement material and water is 70:16:40.

实施例5,与实施例1基本相同,但有以下改变:其中,硅酸盐水泥的质量占总质量的85;速凝固化剂的质量比占总质量的15;铝酸钠、氯化钠、氧化钙;三者的质量比为:40:30:30。 Embodiment 5 is basically the same as Embodiment 1, but has the following changes: wherein, the quality of Portland cement accounts for 85% of the total mass; the mass ratio of the quick-setting curing agent accounts for 15% of the total mass; sodium aluminate, sodium chloride , calcium oxide; the mass ratio of the three is: 40:30:30.

土、快速抢险加固材料和水的质量比为,50:16:20。 The mass ratio of soil, fast rescue reinforcement materials and water is 50:16:20.

实施例6,与实施例1基本相同,但有以下改变:其中,铝酸钠、氯化钠、氧化钙;三者的质量比为:55:30:15。 Example 6 is basically the same as Example 1, but with the following changes: among them, sodium aluminate, sodium chloride, and calcium oxide; the mass ratio of the three is: 55:30:15.

土、快速抢险加固材料和水的质量比为, 70:4: 40。 The mass ratio of soil, rapid rescue reinforcement material and water is 70:4:40.

实施例7,与实施例1基本相同,但有以下改变:其中,铝酸钠、氯化钠、氧化钙;三者的质量比为:40:40:20。 Example 7 is basically the same as Example 1, but with the following changes: among them, sodium aluminate, sodium chloride, and calcium oxide; the mass ratio of the three is: 40:40:20.

土、快速抢险加固材料和水的质量比为,50:4:40。 The mass ratio of soil, rapid rescue reinforcement materials and water is 50:4:40.

实施例8,与实施例1基本相同,但有以下改变:其中,铝酸钠、氯化钠、氧化钙;三者的质量比为:50:40:10。 Example 8 is basically the same as Example 1, but with the following changes: among them, sodium aluminate, sodium chloride, and calcium oxide; the mass ratio of the three is: 50:40:10.

Claims (9)

1. embankment reinforcement material of speedily carrying out rescue work fast is characterized in that, forms as follows:
Silicate cement and quick solidifying agent; Wherein the quality of silicate cement accounts for the 70-90 of total mass; The quality of quick solidifying agent accounts for the 10-30 of total mass;
The composition of quick solidifying agent is: sodium aluminate, sodium-chlor, quicklime; Three's mass ratio is 40-60:30-40:10-20.
2. the embankment according to claim 1 reinforcement material of speedily carrying out rescue work fast is characterized in that the mass ratio of said silicate cement accounts for 80 of total mass; The mass ratio of said quick solidifying agent accounts for 20 of total mass.
3. the embankment according to claim 1 and 2 reinforcement material of speedily carrying out rescue work fast is characterized in that said sodium aluminate, sodium-chlor, quicklime three's mass ratio is: 50:35:15.
4. the embankment according to claim 3 reinforcement material of speedily carrying out rescue work fast is characterized in that described embankment is speedily carried out rescue work reinforcement material in use fast, and soil, the speedily carry out rescue work mass ratio of reinforcement material and water is 50-70:4-16:20-40 fast.
5. the embankment according to claim 4 reinforcement material of speedily carrying out rescue work fast is characterized in that, soil, the speedily carry out rescue work mass ratio of reinforcement material and water is 65:10:25 fast.
6. one kind is used the described embankment of claim 1 embankment of the reinforcement material reinforced construction method of speedily carrying out rescue work fast of speedily carrying out rescue work fast, it is characterized in that step is following:
⑴., stir than weighing sodium aluminate, sodium-chlor, quicklime by quality, process the quick solidifying agent;
⑵. better than weighing silicate cement, quick solidifying agent by quality, stir, process the reinforcement material of speedily carrying out rescue work fast;
⑶. with soil, speedily carry out rescue work that weighing is good according to a certain percentage for reinforcement material and water fast, three's mass ratio is 50-70:4-16:20-40; With forcing the examination stirrer to stir 3-5 minute;
⑷. the material with step ⑶ obtains is transported to the job location to mix through the spiral pump squeezing action;
⑸. the exit end at spiral pump is accepted the mix that spiral pump transfers out with permeable mould bag;
⑹. utilize pumping pressure and mix own wt to push the moisture in the mix out, be used for the speedily carrying out rescue work of embankment, impervious leakage-stopping, reinforcement;
Wherein the quality of silicate cement accounts for the 70-90 of total mass; The quality of quick solidifying agent accounts for the 10-30 of total mass;
The staple of quick solidifying agent is: sodium aluminate, sodium-chlor, quicklime; Three's mass ratio is: 40-60:30-40:10-20.
7. the embankment according to claim 6 reinforced construction method of speedily carrying out rescue work fast is characterized in that,
Said step ⑴ is in dry whisking appliance, stirs 30min, processes the quick solidifying agent;
Said step ⑶ stirs 3min-5min in stirrer;
Said step ⑷ is being transported to mix through the spiral pump squeezing action before the job location, and increasing has following steps;
⑷-1 filters out the solid stone greater than 15mm through vibratory screening apparatus, and the mix through vibratory screening apparatus leaks into spiral pump opening for feed; And then be transported to the job location to mix through the spiral pump squeezing action;
The diameter of the permeable mould bag among the said step ⑸ is 30cm~40cm, the long 1.0cm~2.0m of being;
" being used for the speedily carrying out rescue work of embankment, impervious leakage-stopping, reinforcement " among the said step ⑹ is to utilize the 30min~120min after pumping pressure and mix own wt push the moisture in the mix out to carry out.
8. the embankment according to claim 6 reinforced construction method of speedily carrying out rescue work fast is characterized in that the mass ratio of said silicate cement accounts for 80 of total mass; The mass ratio of said quick solidifying agent accounts for 20 of total mass; Said sodium aluminate, sodium-chlor, quicklime; Three's mass ratio is: 50:35:15.
9. according to the described embankment of one of the claim 6-8 reinforced construction method of speedily carrying out rescue work fast, it is characterized in that described soil, the speedily carry out rescue work mass ratio of reinforcement material and water is 65:10:25 fast.
CN2010102186149A 2010-07-06 2010-07-06 Embankment rapid rescue reinforcement material and embankment rapid rescue reinforcement construction method Active CN101928126B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010102186149A CN101928126B (en) 2010-07-06 2010-07-06 Embankment rapid rescue reinforcement material and embankment rapid rescue reinforcement construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010102186149A CN101928126B (en) 2010-07-06 2010-07-06 Embankment rapid rescue reinforcement material and embankment rapid rescue reinforcement construction method

Publications (2)

Publication Number Publication Date
CN101928126A CN101928126A (en) 2010-12-29
CN101928126B true CN101928126B (en) 2012-09-26

Family

ID=43367614

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010102186149A Active CN101928126B (en) 2010-07-06 2010-07-06 Embankment rapid rescue reinforcement material and embankment rapid rescue reinforcement construction method

Country Status (1)

Country Link
CN (1) CN101928126B (en)

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102691276B (en) * 2012-04-26 2014-12-31 中国人民解放军总参谋部工程兵科研三所 Combined piping guide filtering device
CN103979888B (en) * 2014-05-07 2016-05-18 水利部交通运输部国家能源局南京水利科学研究院 A kind of soil quick curing agent and preparation method thereof
CN110080166B (en) * 2019-03-29 2021-01-26 河海大学 Geotextile bag dam reinforcing method
CN111976229B (en) * 2020-09-02 2025-02-07 邓鑫荣 A quick-setting concrete prefabricated hollow composite panel and its application method in flood control and rescue
CN113200720A (en) * 2021-05-14 2021-08-03 广西鑫和建材科技产业开发有限公司 Low-cost concrete material special for flood fighting, disaster relief and emergency rescue and preparation method thereof

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1146980A (en) * 1996-08-21 1997-04-09 吴振杰 Gelatinizer for impervious sand consolidation
CN1489557A (en) * 2000-12-15 2004-04-14 ӡ�����Ƽ��ɷ����޹�˾ Compositions for use as cement additives
CN101579683A (en) * 2009-05-27 2009-11-18 河海大学 Phosphogypsum-sludge combined curing treatment method

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1146980A (en) * 1996-08-21 1997-04-09 吴振杰 Gelatinizer for impervious sand consolidation
CN1489557A (en) * 2000-12-15 2004-04-14 ӡ�����Ƽ��ɷ����޹�˾ Compositions for use as cement additives
CN101579683A (en) * 2009-05-27 2009-11-18 河海大学 Phosphogypsum-sludge combined curing treatment method

Also Published As

Publication number Publication date
CN101928126A (en) 2010-12-29

Similar Documents

Publication Publication Date Title
CN103951353B (en) Grouting material for road reinforcement and preparation method thereof
CN101698590B (en) Repairing material for concrete and preparation method thereof
CN103979914A (en) Curing agent for reinforcing and treating soft soil foundation constructed at low temperature and preparation method thereof
CN101928126B (en) Embankment rapid rescue reinforcement material and embankment rapid rescue reinforcement construction method
CN107879681B (en) Concrete slurry, alkali-activated light rubber recycled concrete and preparation method thereof
CN107244822B (en) Method for preparation of rich slurry vibrating cemented sand and gravel and its use in anti-seepage protection structure construction
CN109095823A (en) A kind of preparation method for the permeable durable regeneration concrete of lightweight that assorted fibre is modified
CN107098661A (en) It is a kind of to resist scattered fast repairing material and preparation method thereof under water
CN107671106A (en) Contaminated soil heterotopic solidifies repairing construction apparatus system and construction method
CN108821683A (en) A kind of tunnel wet shot high-performance concrete material
CN104591587A (en) Additive for spraying plastering mortar
CN105969367B (en) A kind of premixing high strength cement soil
CN103979888B (en) A kind of soil quick curing agent and preparation method thereof
CN107572913A (en) A kind of composite aggregate water storage concrete and preparation method thereof
CN101362641A (en) Water-proof mortar
CN108863147B (en) Grouting material additive and application thereof
CN116639946A (en) Sludge solidifying agent and sludge in-situ solidification method
CN107699217A (en) A kind of high swollen discharge drilling sealing material of lightweight based on drilling debris and preparation method
CN104211339B (en) Anti-seepage ready-mixed mortar and production method thereof
CN111470837A (en) Collapsible loess composite grouting material and preparation method and application thereof
CN108249852A (en) A kind of very-high performance underground waterproof concrete material and preparation method thereof
CN104086070A (en) Sludge curing agent with high water content
KR100830437B1 (en) Grout composition
CN108911568B (en) Grouting material additive and application thereof
CN106747098A (en) A kind of light high strength concrete and its construction method for being adapted to pumping construction

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: NANJING R+D CONSTRUCTION TECHNOLOGY CO., LTD.

Free format text: FORMER OWNER: NANJING HYDRAULIC RESEARCH INSTITUTE, MINISTRY OF WATER RESOURCES + MINISTRY OF TRANSPORT + NATIONAL

Effective date: 20131009

C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20131009

Address after: 210029 No. 225, Guangzhou Road, Gulou District, Jiangsu, Nanjing

Patentee after: Nanjing R & D Tech Group Co., Ltd.

Address before: 210029 Guangzhou Road, Jiangsu, China, No. 223, No.

Patentee before: Nanjing Hydraulic Research Institute, Ministry of Water Resources & Ministry of Transport & National

ASS Succession or assignment of patent right

Owner name: ANHUI RUIDI ENGINEERING TECHNOLOGY CO., LTD.

Free format text: FORMER OWNER: NANJING R+D CONSTRUCTION TECHNOLOGY CO., LTD.

Effective date: 20141114

C41 Transfer of patent application or patent right or utility model
COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 210029 NANJING, JIANGSU PROVINCE TO: 243100 MAANSHAN, ANHUI PROVINCE

TR01 Transfer of patent right

Effective date of registration: 20141114

Address after: 243100 Anhui city of Ma'anshan province Dangtu Dangtu Economic Development Zone

Patentee after: ANHUI R&D HI-TECH ENGINEERING CO., LTD.

Address before: 210029 No. 225, Guangzhou Road, Gulou District, Jiangsu, Nanjing

Patentee before: Nanjing R & D Tech Group Co., Ltd.