CN102242575A - Noise-reducing and dust-reducing partition wall system for construction site and installation and use method thereof - Google Patents

Noise-reducing and dust-reducing partition wall system for construction site and installation and use method thereof Download PDF

Info

Publication number
CN102242575A
CN102242575A CN2011101022019A CN201110102201A CN102242575A CN 102242575 A CN102242575 A CN 102242575A CN 2011101022019 A CN2011101022019 A CN 2011101022019A CN 201110102201 A CN201110102201 A CN 201110102201A CN 102242575 A CN102242575 A CN 102242575A
Authority
CN
China
Prior art keywords
partition wall
construction site
sound
dust
structure frame
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2011101022019A
Other languages
Chinese (zh)
Inventor
黄天祥
黄慧敏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Yau Lee Wah Concrete Precast Products Co ltd
Original Assignee
Yau Lee Wah Concrete Precast Products Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Yau Lee Wah Concrete Precast Products Co ltd filed Critical Yau Lee Wah Concrete Precast Products Co ltd
Priority to CN2011101022019A priority Critical patent/CN102242575A/en
Priority to SG2011059615A priority patent/SG185174A1/en
Publication of CN102242575A publication Critical patent/CN102242575A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Devices Affording Protection Of Roads Or Walls For Sound Insulation (AREA)
  • Building Environments (AREA)

Abstract

The invention discloses a noise-reducing and dust-reducing partition wall system for a construction site and an installation and use method thereof, wherein the partition wall system is formed by connecting more than one partition wall unit (10), and each partition wall unit (10) comprises a wall structure frame (1) and a sound-absorbing material layer (3) fixed on the wall structure frame (1); the sound-absorbing material layer (3) is clamped by a sound-absorbing material protection surface layer (5) and a sound-insulating metal plate (2), wherein the sound-absorbing material protection surface layer (5) is fixed on the wall structure frame (1) and is respectively positioned at the front and the back, and the sound-absorbing material protection surface layer (5) is provided with grid holes; the top of the partition wall unit (10) is provided with a water mist spraying device (6) for forming microclimate of a construction site. The noise-reducing and dust-reducing partition wall system for the building site simultaneously solves the problem of reducing construction noise and dust pollution to the surrounding environment, is flexible in combination, convenient to disassemble and recyclable, and can be applied to occasions with large noise and dust pollution, such as the building site, a quarry site, a highway and the like.

Description

建筑工地的降噪减尘隔墙系统及其安装使用方法Noise-reduction and dust-reduction partition wall system on construction site and its installation and use method

技术领域 technical field

本发明涉及一种临时隔墙系统,特别是涉及一种可降低施工工地噪音及减小施工灰尘的隔墙系统及其使用方法,本发明的隔墙系统及其使用方法适用于建筑工地、采石场工地、高速公路等噪声和灰尘较大的施工现场使用。 The present invention relates to a temporary partition wall system, in particular to a partition wall system capable of reducing construction site noise and construction dust and its use method. The partition wall system and its use method of the present invention are applicable to construction sites, mining It is used in construction sites with high noise and dust such as quarry construction sites and highways.

背景技术 Background technique

现有技术中,为了减小建筑工地、爆破现场、高速公路等场合产生的较大噪声对周边居民的干扰,通常会在工地周围或公路两旁固设一种隔音墙以降低噪音,如申请号为01275521的中国实用新型专利公开了一种“隔音墙”,这种隔音墙主要包括工字形立柱和固定在两立柱之间的矩形隔音板,用于解决城市交通沿线的噪音污染问题。但是现有的隔音墙仅仅具有降低噪音的功能,对于在建筑工地或爆破现场处的灰尘问题都无能为力,工地上漫起的灰尘随风扩散,影响了周边的环境卫生。此外,现有的隔音墙所采用的隔音板通常采用石棉或岩棉等吸音材料,这种吸音材料在经过一段时间的日晒雨淋后,就会变脆损坏,一块块地脱落,由此大大影响了隔音效果。 In the prior art, in order to reduce the interference of relatively large noise generated by construction sites, blasting sites, expressways, etc. The Chinese utility model patent No. 01275521 discloses a "sound insulation wall". This sound insulation wall mainly includes an I-shaped column and a rectangular sound insulation panel fixed between the two columns, and is used to solve the problem of noise pollution along urban traffic lines. However, the existing sound insulation walls only have the function of reducing noise, and are helpless to the dust problem at the construction site or blasting site. The dust on the construction site diffuses with the wind, affecting the surrounding environmental sanitation. In addition, the sound-insulating panels used in existing sound-insulating walls usually use sound-absorbing materials such as asbestos or rock wool. After a period of exposure to the sun and rain, this sound-absorbing material will become brittle and damaged, and will fall off piece by piece. Greatly affected the sound insulation effect.

发明内容 Contents of the invention

本发明针对现有技术的缺陷,提供一种兼具降低噪音和减小灰尘污染两种功能的隔墙系统及其使用方法。 Aiming at the defects of the prior art, the present invention provides a partition wall system with two functions of reducing noise and reducing dust pollution and its usage method.

本发明的技术方案如下:设计一种建筑工地的降噪减尘隔墙系统,由一个以上的隔墙单元连接而成,所述隔墙单元包括墙体结构框架和固定于所述墙体结构框架内的吸音材料层。   The technical solution of the present invention is as follows: design a noise-reducing and dust-reducing partition wall system on a construction site, which is formed by connecting more than one partition wall unit, and the partition wall unit includes a wall structure frame and is fixed to the wall structure Layers of sound-absorbing material within the frame. the

所述吸音材料层由固定在所述墙体结构框架且分别位于前面和背面的吸音材料保护面层和隔音金属板所夹持,所述吸音材料保护面层具有网格孔;所述隔墙单元的顶部设置有有利于施工灰尘沉降的水雾喷射装置,由此使隔墙系统同时实现降噪减尘的目的。 The sound-absorbing material layer is clamped by a sound-absorbing material protective surface layer and a sound-insulating metal plate fixed on the wall structure frame and located at the front and back respectively, and the sound-absorbing material protective surface layer has grid holes; the partition wall The top of the unit is equipped with a water mist spray device that is conducive to the settlement of construction dust, so that the partition wall system can simultaneously achieve the purpose of noise reduction and dust reduction.

所述水雾喷射装置的进水管串接有电磁阀以及控制所述电磁阀打开或关闭的并可设定喷水时间和喷水量的时控开关装置。 The water inlet pipe of the water mist spraying device is connected in series with a solenoid valve and a time-controlled switch device that controls the opening or closing of the solenoid valve and can set the water spray time and water spray volume.

所述隔墙单元包括竖直放置的直立部和位于直立部之上并向建筑工地一侧弯折的前倾部,所述隔墙单元的直立部与前倾部之间的夹角为120度至150度,所述水雾喷射装置安装在所述前倾部的顶部。 The partition wall unit includes a vertically placed upright portion and a forward-inclined portion that is located on the upright portion and bent toward the construction site side, and the angle between the upright portion and the forward-incline portion of the partition wall unit is 120° degrees to 150 degrees, the water mist injection device is installed on the top of the forward slope.

所述墙体结构框架背面的上部和底部分别固设一斜撑杆和水平撑杆,所述斜撑杆、水平撑杆和墙体结构框架组成稳定的三角支撑结构。 A diagonal brace and a horizontal brace are respectively fixed on the upper part and the bottom of the back of the wall structure frame, and the diagonal brace, the horizontal brace and the wall structure frame form a stable triangular support structure.

所述墙体结构框架背面的上部和下部左右两侧分别固设两个带螺栓孔的上连接板和下连接板,所述斜撑杆的一端用螺栓固定在所述上连接板上,所述水平撑杆的一端用螺栓固定在所述下连接板上,所述斜撑杆和水平撑杆的另一端用螺栓连接于所述墙体结构框架的后方,两侧斜撑杆和水平撑杆的交接处通过一连接杆连接。采用此结构可方便地将支撑杆件从隔墙单元上拆除下来,便于运输和存放。 Two upper connecting plates and lower connecting plates with bolt holes are respectively fixed on the upper and lower left and right sides of the back of the wall structure frame, and one end of the diagonal brace is fixed on the upper connecting plate with bolts. One end of the horizontal brace is fixed on the lower connecting plate with a bolt, and the other end of the diagonal brace and the horizontal brace is connected to the rear of the wall structure frame with bolts, and the diagonal brace and the horizontal brace on both sides The joints of the rods are connected by a connecting rod. With this structure, the support bar can be easily removed from the partition wall unit, which is convenient for transportation and storage.

所述墙体结构框架底部前方用螺栓固定有一旨在增加稳定度的水平内撑杆。 The front of the bottom of the wall structure frame is bolted to a horizontal inner strut for increasing stability.

所述隔墙单元的直立部的长度为2.5米至3.5米,其前倾部的长度为0.7米至1.2米,所述隔墙单元的宽度为2米至3米。 The length of the upright part of the partition wall unit is 2.5 meters to 3.5 meters, the length of the forward part is 0.7 meters to 1.2 meters, and the width of the partition wall unit is 2 meters to 3 meters.

所述墙体结构框架由多条横向杆件和多条竖向杆件固接而成,所述横向杆件为L形角铁,所述竖向杆件为工字钢,所述水雾喷射装置的进水管安装固定在所述竖向杆件上。 The wall structure frame is formed by fixing a plurality of horizontal rods and a plurality of vertical rods, the horizontal rods are L-shaped angle irons, the vertical rods are I-shaped steel, and the water mist The water inlet pipe of the spraying device is installed and fixed on the vertical bar.

所述吸音材料层可采用玻纤700系统隔音材料,能经受长期的日晒雨淋而不会变脆损坏。 The sound-absorbing material layer can use glass fiber 700 system sound-insulating material, which can withstand long-term sun and rain without becoming brittle and damaged.

所述吸音材料保护面层为铁丝网,其网格的长度和宽度均为35毫米。 The protective surface layer of the sound-absorbing material is barbed wire, and the length and width of the grid are both 35 mm.

所述隔墙单元的上部固设有吊勾,方便吊装至工地。 The upper part of the partition wall unit is fixed with a hook, which is convenient for hoisting to the construction site.

相邻隔墙单元之间用隔音胶带密封连接,因而可根据需要灵活组合。 Adjacent partition wall units are sealed and connected with soundproof tape, so they can be combined flexibly according to needs.

本发明所采用的技术方案还包括上述建筑工地的降噪减尘隔墙系统的安装使用方法,该安装使用方法包括如下步骤: The technical solution adopted in the present invention also includes the installation and use method of the above-mentioned noise reduction and dust reduction partition wall system on the construction site. The installation and use method includes the following steps:

步骤A:清理平整建筑工地的外围,再沿建筑工地外围铺设水雾喷射装置的水管和电线; Step A: cleaning and leveling the periphery of the construction site, and then laying water pipes and electric wires of the water mist spraying device along the periphery of the construction site;

步骤B:把多个隔墙单元连接在一起形成包围建筑工地但留有出入口的围墙,由此构成限制所述建筑工地的施工噪音向外传播的噪音屏障,然后接通隔墙单元顶部的水雾喷射装置的电路和供水管道; Step B: connecting a plurality of partition wall units together to form a fence surrounding the construction site but leaving an entrance and exit, thereby constituting a noise barrier that restricts the construction noise of the construction site from spreading outward, and then connecting the water at the top of the partition wall units Electrical circuits and water supply pipes of fog spraying devices;

步骤C:让所述隔墙单元顶部的水雾喷射装置向建筑工地的方向喷射水雾,由此形成建筑工地上的湿润且气温比周边低的局部小气候,该局部小气候将形成有助施工灰尘沉降的湿润下沉气流。 Step C: Let the water mist spraying device on the top of the partition wall unit spray water mist towards the construction site, thereby forming a local microclimate on the construction site that is humid and lower in temperature than the surrounding area, and this local microclimate will form dust that is conducive to construction. A descending moist downdraft.

所述水雾喷射装置的进水管串接有电磁阀以及控制所述电磁阀打开或关闭的并可设定喷水时间和喷水量的时控开关装置,由此可根据建筑工地的状况来设定水雾喷射装置的喷射时间和单位时间的喷水量。  The water inlet pipe of the water mist spray device is connected in series with a solenoid valve and a time-controlled switch device that controls the opening or closing of the solenoid valve and can set the spray time and water spray volume, so that it can be adjusted according to the conditions of the construction site. Set the spray time of the water mist spray device and the spray volume per unit time. the

与现有技术相比较,本发明的建筑工地的降噪减尘隔墙系统由于设有有利于施工灰尘沉降的水雾喷射装置,因此同时解决了降低施工噪音和灰尘对周边环境污染的问题;由于吸音材料层采用玻纤700系统的隔音材料,可经受长期的日晒雨淋而不会变脆损坏,因此隔墙系统能保持持久的降噪效果;由于采用模块化的隔墙单元,其支撑杆件均采用螺栓连接,方便拆卸,因此可循环使用,且组合灵活,多块隔墙单元可叠放在一起,减小了运输、存放的体积。 Compared with the prior art, the noise-reduction and dust-reduction partition wall system of the construction site of the present invention is equipped with a water mist spray device that is conducive to the settlement of construction dust, so it simultaneously solves the problems of reducing construction noise and dust pollution to the surrounding environment; Since the sound-absorbing material layer adopts the sound-insulating material of the glass fiber 700 system, it can withstand long-term sun and rain without becoming brittle and damaged, so the partition wall system can maintain a long-lasting noise reduction effect; due to the use of modular partition wall units, its The supporting rods are all connected by bolts, which are easy to disassemble, so they can be recycled and combined flexibly. Multiple partition wall units can be stacked together, reducing the volume of transportation and storage.

附图说明 Description of drawings

图1为本发明建筑工地的降噪减尘隔墙系统隔墙单元10的侧视图。 Fig. 1 is a side view of the partition wall unit 10 of the noise reduction and dust reduction partition wall system of the construction site of the present invention.

图2为所述隔墙单元10从背面看的立面图。 FIG. 2 is an elevation view of the partition wall unit 10 viewed from the back.

图3为所述隔墙单元10的水平局剖图。 FIG. 3 is a partial horizontal sectional view of the partition wall unit 10 .

图4为所述上连接板11处的放大图。 FIG. 4 is an enlarged view of the upper connecting plate 11 .

图5为所述下连接板12处的放大图。 FIG. 5 is an enlarged view of the lower connecting plate 12 .

图6为所述斜撑杆71和水平撑杆72的交接处的放大图。 FIG. 6 is an enlarged view of the intersection of the diagonal strut 71 and the horizontal strut 72 .

具体实施方式 Detailed ways

下面结合附图来说明本发明的一个实施例。 An embodiment of the present invention will be described below in conjunction with the accompanying drawings.

本发明建筑工地的降噪减尘隔墙系统由一个以上的隔墙单元10连接而成,如图1、图2和图3所示,所述隔墙单元10包括:墙体结构框架1,固定于所述墙体结构框架1的隔音金属板2、吸音材料层3和吸音材料保护面层5,水雾喷射装置6。其中,所述墙体结构框架1由多条横向杆件15和多条竖向杆件16固接而成,所述吸音材料层3被夹置于隔音金属板2和吸音材料保护面层5之间,并且吸音材料保护面层5朝向前面灰尘和噪声源的工地方向,隔音金属板2则位于背面方向。 The noise reduction and dust reduction partition wall system of the construction site of the present invention is formed by connecting more than one partition wall unit 10, as shown in Fig. 1, Fig. 2 and Fig. 3, the partition wall unit 10 includes: a wall structure frame 1, The sound-insulating metal plate 2 , the sound-absorbing material layer 3 , the sound-absorbing material protective surface layer 5 , and the water mist spraying device 6 are fixed on the wall structure frame 1 . Wherein, the wall structure frame 1 is formed by fixing a plurality of horizontal rods 15 and a plurality of vertical rods 16, and the sound-absorbing material layer 3 is sandwiched between the sound-insulating metal plate 2 and the sound-absorbing material protective surface layer 5 Between, and the sound-absorbing material protection surface layer 5 faces the construction site direction of the front dust and noise source, and the sound-insulating metal plate 2 is located in the back direction.

如图1和图2所示,所述隔墙单元10包括竖直放置的直立部101和位于直立部101之上并向建筑工地一侧弯折的前倾部102,所述隔墙单元10的直立部101与前倾部102之间的夹角为120度至150度,本实施例中夹角为135度,所述水雾喷射装置6安装在所述前倾部102的顶部。隔墙单元10的直立部101的长度为2.5米至3.5米,其前倾部102的长度为0.7米至1.2米,隔墙单元10的宽度为2米至3米。本发明的一个实施例中,隔墙单元10直立部101长3米,前倾部102长0.9米,隔墙单元10宽。相邻隔墙单元10之间可用隔音胶带密封连接,相邻隔墙单元10之间的夹角可根据需要而灵活设定,且可灵活组合。为了方便吊装,所述隔墙单元10的直立部101和前倾部102相接的上部固设有吊勾8,如图1所示。 As shown in FIGS. 1 and 2 , the partition wall unit 10 includes a vertically placed upright portion 101 and a forward slope portion 102 that is located on the upright portion 101 and bends toward the construction site side. The partition wall unit 10 The included angle between the upright portion 101 and the forward inclined portion 102 is 120° to 150°, in this embodiment the included angle is 135°, and the water mist spraying device 6 is installed on the top of the forward inclined portion 102 . The upright part 101 of the partition wall unit 10 has a length of 2.5 meters to 3.5 meters, the length of the forward inclined part 102 is 0.7 meters to 1.2 meters, and the width of the partition wall unit 10 is 2 meters to 3 meters. In one embodiment of the present invention, the upright part 101 of the partition wall unit 10 is 3 meters long, the forward slope part 102 is 0.9 meters long, and the partition wall unit 10 is wide. Adjacent partition wall units 10 can be sealed and connected with sound-proof tape, and the angle between adjacent partition wall units 10 can be flexibly set according to needs, and can be combined flexibly. In order to facilitate hoisting, the upper part where the upright part 101 and the forward part 102 of the partition wall unit 10 meet is fixed with a hook 8 , as shown in FIG. 1 .

所述墙体结构框架1的横向杆件15采用75×75×6的L形角铁,所述竖向杆件16采用100×55的工字钢,且竖向杆件16在前面,横向杆件15在背面,两者之间通过焊接固定。如图3所示,所述隔音金属板2、吸音材料层3和吸音材料保护面层5被夹固于相邻两竖向杆件16之间的凹位内。 The horizontal member 15 of the wall structure frame 1 adopts an L-shaped angle iron of 75×75×6, and the vertical member 16 adopts an I-beam of 100×55, and the vertical member 16 is in the front, and the horizontal Rod 15 is on the back side, and is fixed by welding between the two. As shown in FIG. 3 , the sound-insulating metal plate 2 , the sound-absorbing material layer 3 and the sound-absorbing material protective surface layer 5 are clamped in the recess between two adjacent vertical rods 16 .

所述水雾喷射装置6设置在隔墙单元10的顶部,并通过安装固定在所述竖向杆件16上的进水管61连接外部水源,所述水雾喷射装置6的进水管61串接有电磁阀以及控制所述电磁阀打开或关闭的并可设定喷水时间和喷水量的时控开关装置(图略),可以根据建筑工地的状况来设定水雾喷射装置6的喷射时间和喷水量,由此形成建筑工地周边湿润且气温比周边低的局部小气候,该局部小气候能有效减少灰尘污染向周边扩散。每个隔墙单元10上可设置一个或多个水雾喷射装置6。使用电磁阀及其时控开关装置来控制所述水雾喷射装置6的喷水时间和喷水量属于本领域的成熟现有技术,本专利申请不对其作进一步的展开。 The water mist spraying device 6 is arranged on the top of the partition wall unit 10, and is connected to an external water source through a water inlet pipe 61 installed and fixed on the vertical bar 16, and the water inlet pipe 61 of the water mist spraying device 6 is connected in series There is a solenoid valve and a time-controlled switch device (not shown) that controls the opening or closing of the solenoid valve and can set the spraying time and water spraying volume, and the spraying of the water mist spraying device 6 can be set according to the conditions of the construction site. The time and amount of spraying water, thus forming a local microclimate around the construction site that is humid and the temperature is lower than that of the surrounding area. This local microclimate can effectively reduce the spread of dust pollution to the surrounding area. One or more water mist spraying devices 6 can be arranged on each partition wall unit 10 . Using a solenoid valve and its time-controlled switch device to control the water spraying time and water spraying amount of the water mist spraying device 6 belongs to the mature prior art in this field, and this patent application will not further develop it.

所述吸音材料层3可以采用美国欧文斯科宁公司(OWENS CORNING)生产的玻纤700系统隔音材料(Fiberglas 700 Series),符合ASTM标准,在阳光下十分稳定,即使在烈日下暴晒也不易分解,可经受长期的日晒雨淋也不易损坏,更加耐用,其降噪性能更持久。当然,吸音材料层3也可以采用其他符合ASTM标准的隔音材料。 The sound-absorbing material layer 3 can use fiberglass 700 system sound-insulating material (Fiberglass 700 Series) produced by Owens Corning (OWENS CORNING), which complies with ASTM standards, is very stable in sunlight, and is not easy to decompose even in the hot sun , can withstand long-term sun and rain and is not easy to damage, more durable, and its noise reduction performance is longer. Of course, the sound-absorbing material layer 3 can also use other sound-insulating materials that meet ASTM standards.

所述吸音材料保护面层5具有网格孔,可以采用铁丝网,其网格的长度和宽度均为35毫米,这样既可以夹持及保护吸音材料层3,也可以让噪声声波从网格通过并由吸音材料层3所吸收。 The sound-absorbing material protective surface layer 5 has grid holes, and barbed wire can be used. The length and width of the grid are 35 mm, so that the sound-absorbing material layer 3 can be clamped and protected, and noise waves can pass through the grid. And absorbed by the sound-absorbing material layer 3.

为了将隔墙单元10立起来,需要安装支撑结构,支撑结构可采用多种形式,在本发明的实施例中,支撑结构包括:斜撑杆71、水平撑杆72、连接杆73和水平内撑杆74,如图1和图2所示。所述墙体结构框架1上部和下部左右两侧分别焊接固定有带螺栓孔的上连接板11和下连接板12,所述斜撑杆71和水平撑杆72的一端分别用螺栓固定在所述上连接板11和下连接板12处,所述斜撑杆71和水平撑杆72的另一端用螺栓连接于所述墙体结构框架1的后方,两侧斜撑杆71和水平撑杆72的交接处通过一连接杆73连接。所述水平内撑杆74则固定在墙体结构框架1底部前方。安装好支撑结构后,再在连接杆73上压一重物,如大石块,就可以稳固地将隔墙单元10立在地面上。上述支撑结构的各杆件均采用螺栓连接,可以方便地从隔墙单元10上拆卸下来,便于隔墙单元10的存放和运输,因而也方便多次循环利用。 In order to erect the partition wall unit 10, a support structure needs to be installed, and the support structure can adopt various forms. The strut 74 is as shown in FIG. 1 and FIG. 2 . The upper and lower left and right sides of the wall structure frame 1 are respectively welded and fixed with an upper connecting plate 11 and a lower connecting plate 12 with bolt holes, and one end of the diagonal strut 71 and the horizontal strut 72 is respectively fixed on the At the upper connecting plate 11 and the lower connecting plate 12, the other ends of the diagonal braces 71 and the horizontal braces 72 are connected to the rear of the wall structure frame 1 with bolts, and the diagonal braces 71 and the horizontal braces on both sides 72 are connected by a connecting rod 73 . The horizontal inner struts 74 are fixed in front of the bottom of the wall structure frame 1 . After the supporting structure is installed, press a heavy object, such as a large rock, on the connecting rod 73 to firmly stand the partition wall unit 10 on the ground. All the rods of the above supporting structure are connected by bolts, which can be easily disassembled from the partition wall unit 10, which facilitates storage and transportation of the partition wall unit 10, and thus facilitates multiple recycling.

如图4所示,所述上连接板11呈方形并焊接在竖向杆件16背面,所述斜撑杆71采用75×75×6的L形角铁,两者通过螺栓连接。如图5所示,所述竖向杆件16底部的前后两侧均焊接固定有直角梯形的下连接板12和13,该下连接板12和13上均开有两个螺孔,所述水平撑杆72用两个螺栓固定在所述竖向杆件16背部下连接板12处,水平内撑杆74则用两个螺栓固定在所述竖向杆件16前部下连接板13处,所述水平撑杆72和水平内撑杆74均采用100×48的槽铁。如图6所示,在所述斜撑杆71和水平撑杆72的交接处,所述水平撑杆72的外端焊接固定有一个带螺孔的方形连接板75,所述斜撑杆71的下端用螺栓固定在方形连接板75处。 As shown in FIG. 4 , the upper connecting plate 11 is square and welded on the back of the vertical bar 16 , the diagonal brace 71 is an L-shaped angle iron of 75×75×6, and the two are connected by bolts. As shown in Figure 5, the front and rear sides of the bottom of the vertical rod 16 are welded and fixed with right-angled trapezoidal lower connecting plates 12 and 13, and two screw holes are respectively opened on the lower connecting plates 12 and 13. The horizontal strut 72 is fixed on the lower connecting plate 12 at the back of the vertical rod 16 with two bolts, and the horizontal inner strut 74 is fixed on the lower connecting plate 13 at the front of the vertical rod 16 with two bolts. Both the horizontal strut 72 and the horizontal inner strut 74 are made of 100×48 channel iron. As shown in Figure 6, at the junction of the diagonal strut 71 and the horizontal strut 72, the outer end of the horizontal strut 72 is welded and fixed with a square connecting plate 75 with a screw hole, the diagonal strut 71 The lower end of the bolt is fixed on the square connecting plate 75 places.

本发明的建筑工地的降噪减尘隔墙系统的安装使用方法包括如下步骤: The installation and use method of the noise reduction and dust reduction partition wall system of the construction site of the present invention comprises the following steps:

步骤A:清理平整建筑工地的外围,沿建筑工地外围铺设水雾喷射装置6的水管和电线; Step A: clean up the periphery of the construction site, and lay the water pipes and electric wires of the water mist injection device 6 along the periphery of the construction site;

步骤B:使用连接在一起的多个隔墙单元10包围建筑工地,由此构成限制所述建筑工地的施工噪音向外传播的噪音屏障,然后接通隔墙单元10顶部的水雾喷射装置6的电路和供水管道; Step B: Use a plurality of partition wall units 10 connected together to enclose the construction site, thereby constituting a noise barrier that restricts the construction noise of the construction site from spreading outward, and then connect the water mist spraying device 6 on the top of the partition wall unit 10 electrical circuits and water supply pipes;

步骤C:在施工时段让所述隔墙单元10顶部的水雾喷射装置6向建筑工地的方向喷射水雾,根据气象学原理,向建筑工地上空喷射水雾将使建筑工地的空气非常湿润且气温比周边低,由此形成了具有下沉气流的局部小气候,该局部小气候显然有利于施工灰尘的沉降。  Step C: During the construction period, let the water mist spraying device 6 on the top of the partition wall unit 10 spray water mist towards the construction site. According to meteorological principles, spraying water mist over the construction site will make the air at the construction site very humid and The air temperature is lower than the surrounding area, thus forming a local microclimate with downdraft, which is obviously conducive to the settlement of construction dust. the

上述步骤C中,可以在所述水雾喷射装置6的进水管61串接有电磁阀以及控制所述电磁阀打开或关闭的并可设定喷水时间和喷水量的时控开关装置,由此可根据建筑工地的状况来设定水雾喷射装置6的喷射时间和喷水量。 In the above step C, the water inlet pipe 61 of the water mist spraying device 6 can be connected in series with a solenoid valve and a time-controlled switch device that controls the opening or closing of the solenoid valve and can set the spray time and water spray volume, Thus, the spraying time and water spraying amount of the water mist spraying device 6 can be set according to the conditions of the construction site.

以上所述仅为本发明的优选实施例而已,并不用于限制本发明,对于本领域的技术人员来说,本发明可以有各种更改和变化。凡在本发明的精神和原则之内,所作的任何修改、等同替换、改进等,均应包含在本发明的保护范围之内。 The above descriptions are only preferred embodiments of the present invention, and are not intended to limit the present invention. For those skilled in the art, the present invention may have various modifications and changes. Any modifications, equivalent replacements, improvements, etc. made within the spirit and principles of the present invention shall be included within the protection scope of the present invention.

Claims (13)

1.一种建筑工地的降噪减尘隔墙系统,由一个以上的隔墙单元(10)连接而成,所述隔墙单元(10)包括墙体结构框架(1)和固定于所述墙体结构框架(1)内的吸音材料层(3),其特征在于:   1. A noise reduction and dust reduction partition wall system on a construction site, which is formed by connecting more than one partition wall unit (10), and the partition wall unit (10) includes a wall structure frame (1) and is fixed on the The sound-absorbing material layer (3) in the wall structure frame (1) is characterized in that:  所述吸音材料层(3)由固定在所述墙体结构框架(1)且分别位于前面和背面的吸音材料保护面层(5)和隔音金属板(2)所夹持,所述吸音材料保护面层(5)具有网格孔;所述隔墙单元(10)的顶部设置有有利于施工灰尘沉降的水雾喷射装置(6)。 The sound-absorbing material layer (3) is clamped by the sound-absorbing material protective surface layer (5) and the sound-insulating metal plate (2) fixed on the wall structure frame (1) and located on the front and back respectively, and the sound-absorbing material The protective surface layer (5) has grid holes; the top of the partition wall unit (10) is provided with a water mist spraying device (6) which facilitates the settlement of construction dust. 2.根据权利要求1所述的建筑工地的降噪减尘隔墙系统,其特征在于:所述水雾喷射装置(6)的进水管串接有电磁阀以及控制所述电磁阀打开或关闭的并可设定喷水时间和喷水量的时控开关装置。 2. The noise reduction and dust reduction partition wall system for a construction site according to claim 1, characterized in that: the water inlet pipe of the water mist injection device (6) is connected in series with a solenoid valve to control the opening or closing of the solenoid valve A time-controlled switch device that can set the water spray time and water spray volume. 3.根据权利要求2所述的建筑工地的降噪减尘隔墙系统,其特征在于:所述隔墙单元(10)包括竖直放置的直立部(101)和位于直立部(101)之上并向建筑工地一侧弯折的前倾部(102),所述隔墙单元(10)的直立部(101)与前倾部(102)之间的夹角为120度至150度,所述水雾喷射装置(6)安装在所述前倾部(102)的顶部。 3. The noise reduction and dust reduction partition wall system for a construction site according to claim 2, characterized in that: the partition wall unit (10) includes a vertically placed upright portion (101) and an upright portion (101) located between The forward tilting part (102) is bent upward and towards the side of the construction site, the angle between the upright part (101) and the forward tilting part (102) of the partition wall unit (10) is 120 degrees to 150 degrees, The water mist injection device (6) is installed on the top of the forward slope (102). 4.根据权利要求1、2或3所述的建筑工地的降噪减尘隔墙系统,其特征在于:所述墙体结构框架(1)背面的上部和底部分别固设一斜撑杆(71)和水平撑杆(72),所述斜撑杆(71)、水平撑杆(72)和墙体结构框架(1)组成稳定的三角支撑结构。 4. The noise reduction and dust reduction partition wall system for a construction site according to claim 1, 2 or 3, characterized in that: the upper part and the bottom of the back of the wall structure frame (1) are respectively fixed with a diagonal brace ( 71) and horizontal struts (72), the diagonal struts (71), horizontal struts (72) and the wall structure frame (1) form a stable triangular support structure. 5.根据权利要求4所述的建筑工地的降噪减尘隔墙系统,其特征在于:所述墙体结构框架(1)背面的上部和下部左右两侧分别固设两个带螺栓孔的上连接板(11)和下连接板(12),所述斜撑杆(71)的一端用螺栓固定在所述上连接板(11)上,所述水平撑杆(72)的一端用螺栓固定在所述下连接板(12)上,所述斜撑杆(71)和水平撑杆(72)的另一端用螺栓连接于所述墙体结构框架(1)的后方,两侧斜撑杆(71)和水平撑杆(72)的交接处通过一连接杆(73)连接。 5. The noise reduction and dust reduction partition wall system for a construction site according to claim 4, characterized in that two walls with bolt holes are respectively fixed on the upper and lower left and right sides of the back of the wall structure frame (1). The upper connecting plate (11) and the lower connecting plate (12), one end of the diagonal strut (71) is fixed on the upper connecting plate (11) with a bolt, and one end of the horizontal strut (72) is bolted Fixed on the lower connecting plate (12), the other ends of the diagonal braces (71) and horizontal braces (72) are bolted to the rear of the wall structure frame (1), and the diagonal braces on both sides The intersection of the rod (71) and the horizontal strut (72) is connected by a connecting rod (73). 6.根据权利要求5所述的建筑工地的降噪减尘隔墙系统,其特征在于:所述墙体结构框架(1)底部前方用螺栓固定有一旨在增加稳定度的水平内撑杆(74)。 6. The noise reduction and dust reduction partition wall system for a construction site according to claim 5, characterized in that: the front of the bottom of the wall structure frame (1) is bolted to a horizontal inner strut ( 74). 7.根据权利要求3所述的建筑工地的降噪减尘隔墙系统,其特征在于:所述隔墙单元(10)的直立部(101)的长度为2.5米至3.5米,其前倾部(102)的长度为0.7米至1.2米,所述隔墙单元(10)的宽度为2米至3米。 7. The noise reduction and dust reduction partition wall system for a construction site according to claim 3, characterized in that: the length of the upright part (101) of the partition wall unit (10) is 2.5 meters to 3.5 meters, and its forward inclination The length of the part (102) is 0.7 meters to 1.2 meters, and the width of the partition wall unit (10) is 2 meters to 3 meters. 8.根据权利要求1、2或3所述的建筑工地的降噪减尘隔墙系统,其特征在于:所述墙体结构框架(1)由多条横向杆件(15)和多条竖向杆件(16)固接而成,所述横向杆件(15)为L形角铁,所述竖向杆件(16)为工字钢,所述水雾喷射装置(6)的进水管(61)安装固定在所述竖向杆件(16)上。 8. The noise reduction and dust reduction partition wall system for a construction site according to claim 1, 2 or 3, characterized in that: the wall structure frame (1) is composed of a plurality of horizontal rods (15) and a plurality of vertical The horizontal rod (15) is L-shaped angle iron, the vertical rod (16) is I-shaped steel, and the inlet of the water mist spraying device (6) The water pipe (61) is installed and fixed on the vertical bar (16). 9.根据权利要求1、2或3所述的建筑工地的降噪减尘隔墙系统,其特征在于:所述吸音材料层(3)采用玻纤700系统隔音材料。 9. The noise reduction and dust reduction partition wall system for a construction site according to claim 1, 2 or 3, characterized in that: the sound-absorbing material layer (3) adopts glass fiber 700 system sound-insulating materials. 10.根据权利要求1、2或3所述的建筑工地的降噪减尘隔墙系统,其特征在于:所述吸音材料保护面层(5)为铁丝网,其网格的长度和宽度均为35毫米,所述隔墙单元(10)的上部固设有吊勾(8)。 10. The noise reduction and dust reduction partition wall system for a construction site according to claim 1, 2 or 3, characterized in that: the sound-absorbing material protective surface layer (5) is barbed wire, and the length and width of the grid are 35 mm, the upper part of the partition wall unit (10) is fixed with a hook (8). 11.根据权利要求1、2或3所述的建筑工地的降噪减尘隔墙系统,其特征在于:相邻隔墙单元(10)之间用隔音胶带密封连接。 11. The noise reduction and dust reduction partition wall system for a construction site according to claim 1, 2 or 3, characterized in that: adjacent partition wall units (10) are sealed and connected with sound insulation tape. 12.一种建筑工地的降噪减尘隔墙系统的安装使用方法,其特征在于:该方法基于由多个隔墙单元(10)连接而成的降噪减尘隔墙系统,所述隔墙单元(10)包括墙体结构框架(1)和固定于所述墙体结构框架(1)的吸音材料层(3),所述隔墙单元(10)的顶部设置有水雾喷射装置(6),所述安装使用方法包括如下步骤: 12. A method for installing and using a noise reduction and dust reduction partition wall system on a construction site, characterized in that: the method is based on a noise reduction and dust reduction partition wall system formed by connecting multiple partition wall units (10), the partition The wall unit (10) includes a wall structure frame (1) and a sound-absorbing material layer (3) fixed to the wall structure frame (1), and the top of the partition wall unit (10) is provided with a water mist spraying device ( 6), the installation and use method includes the following steps: 步骤A:清理平整建筑工地的外围,再沿建筑工地外围铺设水雾喷射装置(6)的水管和电线; Step A: cleaning and leveling the periphery of the construction site, and then laying water pipes and electric wires of the water mist injection device (6) along the periphery of the construction site; 步骤B:把多个隔墙单元(10)连接在一起形成包围建筑工地但留有出入口的围墙,由此构成限制所述建筑工地施工噪音向外传播的噪音屏障,然后接通隔墙单元(10)顶部的水雾喷射装置(6)的电路和供水管道; Step B: connecting a plurality of partition wall units (10) together to form a wall surrounding the construction site but leaving entrances and exits, thereby forming a noise barrier that restricts the construction noise of the construction site from spreading outward, and then connecting the partition wall units ( 10) The circuit and water supply pipeline of the water mist spraying device (6) on the top; 步骤C:在施工时间让所述隔墙单元(10)顶部的水雾喷射装置(6)向建筑工地的方向喷射水雾,由此形成建筑工地上的湿润且气温比周边低的局部小气候,该局部小气候将形成有助施工灰尘沉降的潮湿下沉气流。 Step C: During the construction period, let the water mist spraying device (6) on the top of the partition wall unit (10) spray water mist towards the direction of the construction site, thereby forming a local microclimate on the construction site that is humid and has a lower temperature than the surrounding area, This local microclimate will create moist downdrafts that help settle construction dust. 13.根据权利要求12所述的建筑工地的降噪减尘隔墙系统的安装使用方法,其特征在于:所述水雾喷射装置(6)的进水管串接有电磁阀以及控制所述电磁阀打开或关闭的并可设定喷水时间和喷水量的时控开关装置,由此可根据建筑工地的状况来设定水雾喷射装置(6)的喷射时间和单位时间的喷水量。 13. The method for installing and using the noise reduction and dust reduction partition wall system on a construction site according to claim 12, characterized in that: the water inlet pipe of the water mist injection device (6) is connected in series with a solenoid valve and controls the electromagnetic valve A time-controlled switch device that opens or closes the valve and can set the water spray time and water spray volume, so that the spray time of the water mist spray device (6) and the water spray volume per unit time can be set according to the conditions of the construction site .
CN2011101022019A 2011-04-22 2011-04-22 Noise-reducing and dust-reducing partition wall system for construction site and installation and use method thereof Pending CN102242575A (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
CN2011101022019A CN102242575A (en) 2011-04-22 2011-04-22 Noise-reducing and dust-reducing partition wall system for construction site and installation and use method thereof
SG2011059615A SG185174A1 (en) 2011-04-22 2011-08-18 A hoarding system for mitigating noise and dust at building site and a method of using and installing the same

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011101022019A CN102242575A (en) 2011-04-22 2011-04-22 Noise-reducing and dust-reducing partition wall system for construction site and installation and use method thereof

Publications (1)

Publication Number Publication Date
CN102242575A true CN102242575A (en) 2011-11-16

Family

ID=44960800

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011101022019A Pending CN102242575A (en) 2011-04-22 2011-04-22 Noise-reducing and dust-reducing partition wall system for construction site and installation and use method thereof

Country Status (2)

Country Link
CN (1) CN102242575A (en)
SG (1) SG185174A1 (en)

Cited By (16)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102733502A (en) * 2012-06-19 2012-10-17 上海市基础工程有限公司 Movable lift-type acoustic barrier
CN106284135A (en) * 2016-10-14 2017-01-04 张家港集优特防护设施有限公司 A kind of city intersection guard rail
CN106320201A (en) * 2015-06-29 2017-01-11 宜兴市昊诚环保科技有限公司 Hollow back board type noise insulation screen
CN106320200A (en) * 2015-06-29 2017-01-11 宜兴市昊诚环保科技有限公司 Noise insulation screen
WO2017106991A1 (en) * 2015-12-20 2017-06-29 陈礼全 Rapid assembly and disassembly soundproof barrier
WO2017106992A1 (en) * 2015-12-20 2017-06-29 陈礼全 Rapid assembly and disassembly ring-shaped soundproof barrier
CN107165478A (en) * 2017-07-05 2017-09-15 福建博那德科技园开发有限公司 A kind of reusable assembling type enclosing shield unit
CN107524338A (en) * 2017-10-02 2017-12-29 叶雨玲 A kind of construction isolated wall plate
CN107882416A (en) * 2017-11-17 2018-04-06 葛君 A kind of construction protection net of foldable telescopic
CN109025475A (en) * 2018-08-29 2018-12-18 温州博旺联科建筑工程有限公司 A kind of construction site enclosure wall
CN109441219A (en) * 2018-12-12 2019-03-08 王智博 A kind of road construction warning isolating device
CN111779161A (en) * 2020-07-23 2020-10-16 杨阳 Ventilative concrete plants living isolation wall
CN111877861A (en) * 2020-08-25 2020-11-03 临沂市政集团有限公司 Safety isolation fence is used in road and bridge construction
CN112211483A (en) * 2020-10-12 2021-01-12 赵燕虎 Assembled safety barrier for construction with supplementary dust fall function
CN113530360A (en) * 2020-04-18 2021-10-22 南京环达装饰工程有限公司 Noise-reducing and dust-reducing partition wall system for construction site and installation and use method thereof
CN113685075A (en) * 2021-08-20 2021-11-23 南京国豪装饰安装工程股份有限公司 Partition wall construction method and noise reduction method

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105928107A (en) * 2016-05-09 2016-09-07 无锡昊瑜节能环保设备有限公司 Road guardrail water spraying control device based on temperature sensing

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100606258B1 (en) * 2005-12-31 2006-08-01 (주)경일종합건축사사무소 Soundproofing facility of eco-friendly building complex
KR100864005B1 (en) * 2008-05-07 2008-10-17 주식회사 상진기연 Eco-Friendly Road Wave Carbon Soundproof Board
KR20100101858A (en) * 2009-03-10 2010-09-20 주식회사동일기술공사 Environment friendly sound proof wall system
CN201588440U (en) * 2010-01-21 2010-09-22 湖南省第六工程有限公司 Energy-saving environmental protection packaged type construction fence
CN202055618U (en) * 2011-04-22 2011-11-30 有利华建筑预制件有限公司 Noise reduction and dust reduction partition wall system on construction site

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100606258B1 (en) * 2005-12-31 2006-08-01 (주)경일종합건축사사무소 Soundproofing facility of eco-friendly building complex
KR100864005B1 (en) * 2008-05-07 2008-10-17 주식회사 상진기연 Eco-Friendly Road Wave Carbon Soundproof Board
KR20100101858A (en) * 2009-03-10 2010-09-20 주식회사동일기술공사 Environment friendly sound proof wall system
CN201588440U (en) * 2010-01-21 2010-09-22 湖南省第六工程有限公司 Energy-saving environmental protection packaged type construction fence
CN202055618U (en) * 2011-04-22 2011-11-30 有利华建筑预制件有限公司 Noise reduction and dust reduction partition wall system on construction site

Cited By (17)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102733502A (en) * 2012-06-19 2012-10-17 上海市基础工程有限公司 Movable lift-type acoustic barrier
CN106320201A (en) * 2015-06-29 2017-01-11 宜兴市昊诚环保科技有限公司 Hollow back board type noise insulation screen
CN106320200A (en) * 2015-06-29 2017-01-11 宜兴市昊诚环保科技有限公司 Noise insulation screen
WO2017106991A1 (en) * 2015-12-20 2017-06-29 陈礼全 Rapid assembly and disassembly soundproof barrier
WO2017106992A1 (en) * 2015-12-20 2017-06-29 陈礼全 Rapid assembly and disassembly ring-shaped soundproof barrier
CN106284135A (en) * 2016-10-14 2017-01-04 张家港集优特防护设施有限公司 A kind of city intersection guard rail
CN107165478A (en) * 2017-07-05 2017-09-15 福建博那德科技园开发有限公司 A kind of reusable assembling type enclosing shield unit
CN107524338A (en) * 2017-10-02 2017-12-29 叶雨玲 A kind of construction isolated wall plate
CN107882416A (en) * 2017-11-17 2018-04-06 葛君 A kind of construction protection net of foldable telescopic
CN109025475A (en) * 2018-08-29 2018-12-18 温州博旺联科建筑工程有限公司 A kind of construction site enclosure wall
CN109441219A (en) * 2018-12-12 2019-03-08 王智博 A kind of road construction warning isolating device
CN109441219B (en) * 2018-12-12 2020-12-22 嘉兴市金辉建设有限公司 Road construction warning isolating device
CN113530360A (en) * 2020-04-18 2021-10-22 南京环达装饰工程有限公司 Noise-reducing and dust-reducing partition wall system for construction site and installation and use method thereof
CN111779161A (en) * 2020-07-23 2020-10-16 杨阳 Ventilative concrete plants living isolation wall
CN111877861A (en) * 2020-08-25 2020-11-03 临沂市政集团有限公司 Safety isolation fence is used in road and bridge construction
CN112211483A (en) * 2020-10-12 2021-01-12 赵燕虎 Assembled safety barrier for construction with supplementary dust fall function
CN113685075A (en) * 2021-08-20 2021-11-23 南京国豪装饰安装工程股份有限公司 Partition wall construction method and noise reduction method

Also Published As

Publication number Publication date
SG185174A1 (en) 2012-11-29

Similar Documents

Publication Publication Date Title
SG185174A1 (en) A hoarding system for mitigating noise and dust at building site and a method of using and installing the same
CN102182152B (en) Whole image sound barrier for urban quick lane and tunnel portal
CN207348267U (en) A kind of lightgage steel joist irrigates internal partition wall structure
CN206737452U (en) One kind building hole ballistic support device
CN202055618U (en) Noise reduction and dust reduction partition wall system on construction site
CN107769141A (en) Overhead type comprehensive wiring piping lane
CN107268839A (en) Assembly type semi-embedded semi-hung external wall panel heat insulation structure
CN202248958U (en) Anti-seismic reinforcing structure of brick-concrete structure building
CN111379354A (en) A light-weight steel mesh wall and a building body constructed therefrom
CN209602988U (en) A kind of movable type sound barrier
CN109296230B (en) Assembled transformer substation complete machine structure
CN208415993U (en) A kind of old building reconstruction structure
CN212224292U (en) Light steel mesh wall and building house body built by same
CN209817602U (en) Three-dimensional assembled sound absorption and insulation firewall module enclosure structure
CN206737233U (en) A kind of roof structure of anechoic room
CN207017300U (en) A kind of corrugated steel retaining wall
CN207245599U (en) A kind of regularization assembled gate
CN215331360U (en) An adjustable simple and safe operation platform
CN214515150U (en) Remove sound-proof housing for breaker
CN211320824U (en) A bridge support for overhead protection of cables
CN211396776U (en) Shockproof and dampproof assembled module moving environment-friendly public toilet
HK1164397A (en) A hoarding system for mitigating noise and dust at building site and a method of using and installing the same
CN207759079U (en) A GRE device for aircraft on-wing proving ground
CN216921612U (en) Assembly type enclosure easy for temporary pipeline installation
CN112076882A (en) A soundproof cover for a mobile crusher

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
REG Reference to a national code

Ref country code: HK

Ref legal event code: DE

Ref document number: 1164397

Country of ref document: HK

WD01 Invention patent application deemed withdrawn after publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20111116

REG Reference to a national code

Ref country code: HK

Ref legal event code: WD

Ref document number: 1164397

Country of ref document: HK