CN102700574A - Intelligent tracking system for enterprise railway plane shunting and working method of intelligent tracking system - Google Patents

Intelligent tracking system for enterprise railway plane shunting and working method of intelligent tracking system Download PDF

Info

Publication number
CN102700574A
CN102700574A CN201210138104XA CN201210138104A CN102700574A CN 102700574 A CN102700574 A CN 102700574A CN 201210138104X A CN201210138104X A CN 201210138104XA CN 201210138104 A CN201210138104 A CN 201210138104A CN 102700574 A CN102700574 A CN 102700574A
Authority
CN
China
Prior art keywords
locomotive
shunting
ground machine
station
car
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201210138104XA
Other languages
Chinese (zh)
Inventor
赵西蓉
任明强
陶永宏
靳红宇
唐水雄
霍俊杰
胡永焕
汪永刚
李大飞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jining Northern Mining Area Railway Transportation & Marketing Division Zibo M
Beijing Consen Traffic Technology Co Ltd
Original Assignee
Jining Northern Mining Area Railway Transportation & Marketing Division Zibo M
Beijing Consen Traffic Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jining Northern Mining Area Railway Transportation & Marketing Division Zibo M, Beijing Consen Traffic Technology Co Ltd filed Critical Jining Northern Mining Area Railway Transportation & Marketing Division Zibo M
Priority to CN201210138104XA priority Critical patent/CN102700574A/en
Publication of CN102700574A publication Critical patent/CN102700574A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Train Traffic Observation, Control, And Security (AREA)

Abstract

The invention discloses an intelligent tracking system for enterprise railway plane shunting and a working method of the intelligent tracking system. The intelligent tracking system is formed by three parts, wherein a first part comprises a tracking system ground machine and a radio station emission device which are mounted in a station signal floor generator room, a second part comprises vehicle-mounted equipment mounted on a locomotive, and a third part comprises a shunting work information system of a station driving room. With the adoption of the three parts, a station watchman not only can send a shunting work sheet to the locomotive in real time, but also a shunting working plan is removed, and the functions of automatically clearing the locomotive in real time, intelligently tracking a work procedure and the like are realized. The intelligent tracking system has important meanings of saving enterprise railway manpower and material resources and improving the working efficiency and the safety level.

Description

企业铁路平面调车智能跟踪系统及其工作方法Enterprise railway plane shunting intelligent tracking system and its working method

技术领域 technical field

本发明属于铁路智能调车技术领域。The invention belongs to the technical field of railway intelligent shunting.

背景技术 Background technique

铁路作为国民经济的大动脉、国家重要基础设施和大众化交通工具,尤其在煤矿企业货物运输中有着重要地位和作用。但是,列车在出发之前,都要在车站进行一定的编组,将运输货物相同、方向一致以及有其他相关特殊要求的车辆编成一列车,由于车站编组作业繁忙、进路均由人工确认、现车得不到及时整理等原因,带来列车编组错误、现车管理混乱等诸多问题,造成用人多、效率低、不安全等等现状。As the main artery of the national economy, the country's important infrastructure and popular means of transportation, the railway plays an important role in the transportation of goods for coal mining enterprises. However, before the train departs, a certain marshalling must be carried out at the station, and vehicles with the same cargo, the same direction, and other relevant special requirements should be marshaled into a train. The failure of the trains to be sorted out in time has brought about many problems such as train marshalling errors, chaotic management of existing trains, etc., resulting in the status quo of too many people, low efficiency, and unsafety.

目前,国家铁路在列车编组方面主要以“平面调车”和“驼峰调车”为主。“平面调车”是指机车车辆在相对水平的车站上进行一切有目的的移动;“驼峰调车”是将整列车推进至峰顶,借着坡度使车列逐个溜向不同股道,连结员负责跟车、摘车、提勾,完成编组任务。其中,“平面调车”是车站值班员和参加调车人员(包括机车司机、调车员)通过纸质调车计划作业单、轨道电路以及无线平面调车设备等途径来确认调车作业进度,并布置下一勾调车进路。由于车站值班员、司机、调车员三者之间仅仅通过无线对讲设备进行联系,相互之间缺乏有效的安全互控,经常出现挂错车、进路排列错误等问题,甚至出现冒进信号机、挤道岔等安全事故。At present, the national railways mainly use "plane shunting" and "hump shunting" in terms of train formation. "Plane shunting" refers to all purposeful movement of locomotives and vehicles on a relatively horizontal station; "hump shunting" means pushing the entire train to the top of the peak, and using the slope to make the trains slip one by one to different lanes to connect The clerk is responsible for following the car, picking up the car, lifting the hook, and completing the task of marshalling. Among them, "plane shunting" means that station attendants and shunting personnel (including locomotive drivers and shunting personnel) confirm the progress of shunting operations through paper shunting plan worksheets, track circuits, and wireless plane shunting equipment. , and arrange the next hook-tuning car approach. Since the station attendants, drivers, and shunters only communicate with each other through wireless intercom equipment, there is a lack of effective mutual safety control among them. There are often problems such as hanging the wrong car, wrong arrangement of routes, and even escalating traffic signals. , crowded turnouts and other safety accidents.

企业铁路具有行调车作业不分场、调车作业量大等行业特点,而且一般采用平面调车作业方式,其微机联锁、调度集中、机车信号等各应用系统分散孤立、数据共享能力差,在调车作业的安全预防方面仍停留在以人控为主的阶段,使企业铁路的本质安全保障水平仍处于较低的水平。Enterprise railways have industry characteristics such as no separation of shunting operations and a large amount of shunting operations, and generally adopt the plane shunting operation method. The application systems such as microcomputer interlocking, centralized dispatching, and locomotive signals are scattered and isolated, and the data sharing ability is poor. However, the safety prevention of shunting operations is still at the stage of human control, which makes the intrinsic safety guarantee level of enterprise railways still at a low level.

发明内容 Contents of the invention

本发明的目的是从车地无线联控的角度来解决企业铁路平面调车安全系数低、效率不高及易出现编组错误的问题。基于此,本发明提供一套基于车地无线联控技术的平面调车作业智能跟踪系统及其作业办法,在调车作业过程中,系统实时向车站值班员作出当前作业进度、下一步计划以及车站现车分布情况等提示,及时向司机提供当前作业计划、下一步计划以及前后方信号机状态等。同时,对每次调车作业执行情况、机车速度、甩挂车辆数、进路状态进行实时跟踪,便于车站值班员和司机按照提示进行排列进路与操控机车,从而达到安全、高效、准确无误编组列车的目的。The purpose of the present invention is to solve the problems of low safety factor, low efficiency and easy marshalling errors of railway plane shunting in enterprises from the perspective of train-ground wireless joint control. Based on this, the present invention provides a set of intelligent tracking system for plane shunting operation based on vehicle-ground wireless joint control technology and its operation methods. Provide prompts such as the distribution of existing vehicles at the station, and provide drivers with current operation plans, next-step plans, and the status of front and rear signals in a timely manner. At the same time, real-time tracking is carried out on the execution of each shunting operation, locomotive speed, number of dropped and pulled vehicles, and route status, so that station attendants and drivers can arrange routes and control locomotives according to the prompts, so as to achieve safety, efficiency and accuracy The purpose of marshalling trains.

为达到上述目的,本发明解决问题采取的技术方案是:In order to achieve the above object, the technical solution that the present invention solves the problem and takes is:

一种企业铁路平面调车智能跟踪系统,由以下三大部分组成:An intelligent tracking system for enterprise railway plane shunting, which consists of the following three parts:

第一部分,安装在车站信号楼机房的追踪系统地面机及电台发射装置;所述的追踪系统地面机由主控模块cpu、数据采集模块、追踪系统服务器组成,追踪系统地面机以下简称地面机;所述的电台发射装置以下简称电台;The first part is the tracking system ground machine and radio transmitter installed in the computer room of the station signal building; the tracking system ground machine is composed of a main control module cpu, a data acquisition module, and a tracking system server. The tracking system ground machine is hereinafter referred to as the ground machine; The radio transmitting device is hereinafter referred to as the radio station;

地面机的作用是将收到的调车信息通过电台发送到机车上,同时将机车回发的工况信息以及GPS坐标进行分析处理;The function of the ground machine is to send the received shunting information to the locomotive through the radio station, and at the same time analyze and process the working condition information and GPS coordinates sent back by the locomotive;

第二部分,安装在机车上的车载设备,该车载设备包括主控机、列控盒、车载终端、GPS接收机以及配线盒;主控机通过配线盒采集机车工况数据,分析后回发给信号楼机房的地面机,同时车载终端实时显示出工况数据;The second part is the on-board equipment installed on the locomotive. The on-board equipment includes the main control unit, train control box, on-board terminal, GPS receiver and distribution box; the main control unit collects the locomotive working condition data through the distribution box, and analyzes Send back to the ground machine in the computer room of the signal building, and at the same time, the vehicle terminal displays the working condition data in real time;

第三部分,车站行车室的调车作业信息系统,通过调车作业信息系统将车站值班员编写的调车作业计划单用局域网传输给地面机,地面机将调车作业计划单通过电台传送给车载设备,同时从地面机获得机车位置数据、工况数据一系列参数;The third part is the shunting operation information system in the station driving room. Through the shunting operation information system, the shunting operation plan written by the station attendant is transmitted to the ground machine through the local area network, and the ground machine transmits the shunting operation plan to the On-board equipment, at the same time obtain a series of parameters of locomotive position data and working condition data from the ground machine;

所述的机车工况数据中,包括机车车号、速度、柴油机转速、总风缸压力、制动缸压力、手柄位置;The locomotive working condition data includes locomotive number, speed, diesel engine speed, total air cylinder pressure, brake cylinder pressure, and handle position;

所述的机车位置数据中,包括机车所在股道、前后方信号机状态、名称、所在股道是否有车皮占压和机车GPS坐标。The locomotive position data includes the lane where the locomotive is located, the status and name of the front and rear signal machines, whether there is a wagon occupying the lane where the locomotive is located, and the GPS coordinates of the locomotive.

本发明的企业铁路平面调车智能跟踪系统是基于车地无线联控技术实现的,每当有机车工作时,系统自动将机车GPS坐标和工矿数据实时传输给追踪系统地面机,此时地面机通过取得的当前站场状态,将机车定位在相应股道,并把前后方信号灯开放状态回发给机车;同时,车站值班员应用调车作业信息系统将编写好的调车作业计划单通过追踪系统地面机及电台无线发送到机车终端,机车终端自动提示已接收到新调车作业任务;调车作业过程中,车载终端实时显示当前作业进度及下一勾计划,并以不同颜色提示每勾作业完成情况。The intelligent tracking system for enterprise railway plane shunting of the present invention is realized based on the vehicle-ground wireless joint control technology. Whenever the locomotive is working, the system automatically transmits the GPS coordinates of the locomotive and industrial and mining data to the ground machine of the tracking system in real time. At this time, the ground machine Based on the obtained current station status, locate the locomotive on the corresponding track, and send back the opening status of the front and rear signal lights to the locomotive; at the same time, the station attendant uses the shunting operation information system to track the prepared shunting operation plan The system ground machine and radio station wirelessly send to the locomotive terminal, and the locomotive terminal automatically prompts that the new shunting operation task has been received; during the shunting operation process, the on-board terminal displays the current operation progress and the next tick plan in real time, and prompts each tick in different colors Job completion.

上述铁路平面调车智能跟踪系统的详细工作方法是:The detailed working method of the above-mentioned railway level shunting intelligent tracking system is:

第一步:机车启动;车载设备自动将机车GPS坐标、速度、手柄位置、转速实时无线传到地面机的服务器;Step 1: The locomotive starts; the on-board equipment automatically transmits the GPS coordinates, speed, handle position, and rotational speed of the locomotive to the server of the ground machine wirelessly in real time;

第二步:传输调车作业计划;车站值班员将编写好的调车作业计划单应用地面机的操作平台和电台无线发到机车的车载设备上;The second step: transmit the shunting operation plan; the station attendant sends the prepared shunting operation plan to the on-board equipment of the locomotive by using the operation platform and radio of the ground machine;

第三步:动车前进路确认;机车将GPS坐标及速度、转速、手柄位置工矿数据传到地面机,经确认后,地面机的服务器将接收到的当前作业计划、股道占压、信号开放状态、机车距离信号机距离等信息复示给机车车载终端;Step 3: Confirm the forward path of the motor vehicle; the locomotive transmits the industrial and mining data of GPS coordinates, speed, speed, and handle position to the ground machine. After confirmation, the server of the ground machine will receive the current operation plan, track occupancy, and signal opening Status, locomotive distance from signal machine and other information are displayed to the locomotive on-board terminal;

第四步:机车运行;机车司机按照车载终端上的复示信息和调车作业计划操控机车运行;机车在运行过程中,地面机的服务器通过差分GPS坐标和轨道电压确认机车所在的区段及里程标,并将此信息实时反馈到车站值班员显示终端和车载终端;同时机车主控盒根据股道、速度、信号开放状态等信息,将闯信号报警、超速报警等信息向机车司机提示,并通过列控盒放风卸载处理。The fourth step: locomotive operation; the locomotive driver controls the locomotive operation according to the repeated information on the vehicle terminal and the shunting operation plan; during the operation of the locomotive, the server of the ground machine confirms the section and location of the locomotive through the differential GPS coordinates and track voltage. mileage mark, and feed this information back to the station attendant’s display terminal and vehicle-mounted terminal in real time; at the same time, the locomotive main control box will prompt the locomotive driver with the information such as breaking signal alarm, overspeed alarm, etc. And ventilate and unload through the train control box.

第五步:作业确认;机车带着车辆驶出当前轨道区段后,地面机的服务器通过统计车列经过轨道绝缘节的速度、时间来计算车列长度并换算车节数,并将该车节数自动与当前作业计划所挂车数进行核对,核对后直接发送给车站值班员和机车司机,车站值班员根据显示信息,安排下一勾作业进路,预防错排进路情况发生;Step 5: Confirmation of work; after the locomotive drives out of the current track section with the vehicle, the server of the ground machine calculates the length of the train by counting the speed and time of the train passing through the track insulation section, converts the number of train sections, and sends the train The number of sections is automatically checked with the number of trailers in the current operation plan, and after checking, it is directly sent to the station attendant and locomotive driver. The station attendant arranges the next operation route according to the displayed information to prevent the occurrence of wrong route;

第六步:返回第三步,执行下一勾作业。Step 6: Go back to Step 3 and execute the next operation.

本发明的积极效果是,应用该系统后,车站值班员不仅将调车作业单实时发送到机车上,而且实现了调车作业计划“勾勾清”、现车实时自动整理、智能跟踪作业进度等功能;尤其在调车作业自动执行方面,使当前作业进度与作业计划始终保持一致,并采用不同颜色的光带表示当前勾计划,用不同颜色的字体区分已经完成的和未完成的勾计划,给车站值班员和司机提供很直观的作业进度提示,对于节省企业铁路人力、物力及提高工作效率和安全水平具有重要意义。The positive effect of the present invention is that, after applying the system, the station attendant not only sends the shunting operation order to the locomotive in real time, but also realizes the "clearing" of the shunting operation plan, real-time automatic sorting of existing vehicles, and intelligent tracking of operation progress and other functions; especially in the automatic execution of shunting operations, the current work progress is always consistent with the work plan, and different color light bands are used to indicate the current tick plan, and different color fonts are used to distinguish completed and unfinished tick plans , to provide very intuitive operation progress prompts for station attendants and drivers, which is of great significance for saving enterprise railway manpower and material resources and improving work efficiency and safety level.

附图说明 Description of drawings

图1为本发明实施例系统框架图。Fig. 1 is a system frame diagram of an embodiment of the present invention.

图2为本发明实施例中信息交互及传输框图。Fig. 2 is a block diagram of information interaction and transmission in an embodiment of the present invention.

图3为本发明作业程序判断流程图。Fig. 3 is a flow chart for judging an operation program in the present invention.

图4是淄博矿业济北矿区铁运现场应用示意图。Figure 4 is a schematic diagram of the on-site application of iron transportation in the Jibei mining area of Zibo Mining.

具体实施方式 Detailed ways

参照附图对实施例进一步说明。The embodiment is further described with reference to the accompanying drawings.

如图1所示的企业铁路平面调车智能跟踪系统,由以下三大部分组成:As shown in Figure 1, the intelligent tracking system for enterprise railway level shunting consists of the following three parts:

1、地面系统:包括安装在车站信号楼机房的追踪系统地面机及电台发射装置;所述的追踪系统地面机由主控模块cpu、轨道数据采集模块、追踪系统服务器组成,追踪系统服务器与DGPS基准站和车站信息化服务器实现通讯,主控模块cpu与电台发射装置实现通讯;地面机的作用是将收到的车站信息化服务器的调车信息发送到机车上,同时将机车回发的工况信息以及GPS坐标进行分析处理;1. Ground system: including the tracking system ground machine and radio transmitter installed in the computer room of the station signal building; the tracking system ground machine is composed of the main control module cpu, track data acquisition module, tracking system server, tracking system server and DGPS The base station communicates with the station information server, and the main control module cpu communicates with the radio transmitting device; the function of the ground machine is to send the shunting information received from the station information server to the locomotive, and at the same time send back the working information of the locomotive. Analyze and process status information and GPS coordinates;

2、安装在机车上的车载设备,该车载设备包括车载主控机、列控盒、配线盒以及车载终端和DGPS接收机;主控机通过配线盒采集机车工况数据,分析后回发给信号楼机房的地面机,同时车载终端实时显示出工况数据;2. The on-board equipment installed on the locomotive, the on-board equipment includes on-board main control unit, train control box, distribution box, on-board terminal and DGPS receiver; the main control unit collects the locomotive working condition data through the distribution box, and returns Send it to the ground machine in the computer room of the signal building, and at the same time, the vehicle terminal displays the working condition data in real time;

3、车站行车室的调车作业信息系统,该系统通过车站信息化服务器将车站值班员编写的调车作业计划单通过局域网传输给地面机,地面机将调车作业计划单通过电台传送给车载设备,同时从地面机获得机车位置数据、工况数据一系列参数;所述的机车工况数据中,包括机车车号、速度、柴油机转速、总风缸压力、制动缸压力、手柄位置;所述的机车位置数据中,包括机车所在股道、前后方信号机状态、名称、所在股道是否有车皮占压、机车GPS坐标。3. The shunting operation information system in the station driving room. The system transmits the shunting operation plan written by the station attendant to the ground machine through the station information server through the local area network, and the ground machine transmits the shunting operation plan to the vehicle through the radio station. Equipment, at the same time obtain a series of parameters of locomotive position data and working condition data from the ground machine; the locomotive working condition data include locomotive number, speed, diesel engine speed, total air cylinder pressure, brake cylinder pressure, handle position; The location data of the locomotive includes the track where the locomotive is located, the status and name of the front and rear signal machines, whether there are wagons occupying the track where the locomotive is located, and the GPS coordinates of the locomotive.

本发明的企业铁路平面调车智能跟踪系统是基于车地无线联控技术实现的,图2示出了系统信息交互及传输情况。每当有机车工作时,系统自动将机车GPS坐标和工矿数据实时传输给追踪系统地面机,此时地面机通过取得的当前站场状态,将机车定位在相应股道,并把前后方信号灯开放状态回发给机车;同时,车站值班员应用调车作业信息系统将编写好的调车作业计划单通过追踪系统地面机及电台无线发送到机车终端,机车终端自动提示已接收到新调车作业任务;调车作业过程中,车载终端实时显示当前作业进度及下一勾计划,并以不同颜色提示每勾作业完成情况。The enterprise railway plane shunting intelligent tracking system of the present invention is realized based on the train-ground wireless joint control technology, and Fig. 2 shows the information interaction and transmission of the system. Whenever the locomotive is working, the system automatically transmits the GPS coordinates and industrial and mining data of the locomotive to the ground machine of the tracking system in real time. At this time, the ground machine locates the locomotive in the corresponding lane through the obtained current station status, and opens the front and rear signal lights The status is sent back to the locomotive; at the same time, the station attendant uses the shunting operation information system to send the prepared shunting operation plan to the locomotive terminal through the tracking system ground machine and radio wirelessly, and the locomotive terminal automatically prompts that the new shunting operation has been received Task: During the shunting operation, the vehicle-mounted terminal displays the current operation progress and the next tick plan in real time, and prompts the completion status of each tick in different colors.

图4是淄博矿业济北矿区铁运现场应用上述系统的示意图。该现场有三个车站货场统一指挥调度,根据图4对现场某一批调车作业计划执行情况描述如下:Figure 4 is a schematic diagram of the application of the above-mentioned system at the railway transportation site in the Jibei mining area of Zibo Mining. There are three station freight yards on the site for unified command and dispatch. According to Figure 4, the implementation of a certain batch of shunting operation plans on the site is described as follows:

假如东庄站要进行以下一批调车作业,计划单为:If the following batch of shunting operations are to be carried out at Dongzhuang Station, the plan is:

第一勾:机车2股东出;The first tick: locomotive 2 shareholders out;

第二勾:4股+15(辆);The second tick: 4 shares + 15 (vehicle);

第三勾:3股-3(辆);The third hook: 3 shares - 3 (vehicles);

第四勾:4股-6(辆);The fourth hook: 4 shares - 6 (vehicles);

第五勾:8股-2(辆);The fifth tick: 8 shares - 2 (vehicles);

第六勾:4股-1(辆);Sixth hook: 4 shares - 1 (vehicle);

第七勾:3股-2(辆);The seventh hook: 3 shares - 2 (vehicles);

第八勾:4股-1(辆);The eighth hook: 4 shares - 1 (vehicle);

第九勾:机车2股待机。The ninth tick: 2 shares of locomotives are on standby.

具体作业办法:Specific work method:

第一步:准备作业;车站值班员根据调度计划,准备对需要编组的列车编制了上述调车计划作业单,通过无线对讲机呼叫机车;The first step: preparation work; the station attendant prepares the above-mentioned shunting plan work sheet for the trains that need to be organized according to the dispatching plan, and calls the locomotive through the wireless interphone;

第二步:机车启动。司机听到车站值班员呼叫后,及时启机,车载设备自动将机车GPS坐标、速度、手柄位置、转速实时无线传到地面机的服务器;The second step: the locomotive starts. After the driver hears the call from the station attendant, he starts the engine in time, and the on-board equipment automatically transmits the GPS coordinates, speed, handle position, and rotational speed of the locomotive to the server of the ground machine wirelessly in real time;

第三步:传输调车作业计划;车站值班员将上述调车作业计划单应用地面机的操作平台和电台无线发到机车的车载设备上;Step 3: Transmit the shunting operation plan; the station attendant sends the above shunting operation plan to the on-board equipment of the locomotive by using the operation platform and radio station of the ground machine;

第四步:作业计划确认。司机看到车载终端显示的调车作业计划后,通过无线对讲机向车站值班员复诵作业内容,双方确认正确后,司机开始动车;Step 4: Confirm the work plan. After seeing the shunting operation plan displayed on the on-board terminal, the driver repeats the operation content to the station attendant through the wireless intercom. After both parties confirm that it is correct, the driver starts to move the car;

第五步:动车前进路确认;机车将GPS坐标及速度、转速、手柄位置工矿数据传到地面机,经确认后,地面机的服务器将接收到的当前作业计划、股道占压、信号开放状态、机车距离信号机距离等信息复示给机车车载终端。此时,司机看到车载终端显示一切正常,且“调车作业单中‘第一勾:机车2股东出’变为绿色光带、机车停留的当前2股道东头信号复示为地面的白色调车信号”,说明调车计划、进路情况、系统运行一切正常,机车可以从2股东头出去。同时,车站值班员终端和车载终端的“4股+15(辆)”变为黄光带,表明下一勾作业计划。Step 5: Confirm the forward path of the motor vehicle; the locomotive transmits the industrial and mining data of GPS coordinates, speed, speed, and handle position to the ground machine. After confirmation, the server of the ground machine will receive the current operation plan, track occupancy, and signal opening Information such as the status, distance from the locomotive to the signal machine, etc. are redisplayed to the on-board terminal of the locomotive. At this time, the driver sees that the on-board terminal shows that everything is normal, and "the first tick in the shunting operation form: locomotive 2 shareholders exit" turns into a green light strip, and the current 2-share road east signal where the locomotive stays is repeated as the ground signal. White shunting signal", indicating that the shunting plan, route conditions, and system operation are all normal, and the locomotive can go out from the 2nd shareholder. At the same time, the "4 units + 15 (vehicles)" on the terminal of the station attendant and the vehicle terminal turned into a yellow light band, indicating the next operation plan.

第六步:机车运行;机车在运行过程中,地面机的服务器通过差分GPS坐标和轨道电压确认机车所在的区段及里程标,并将此信息实时反馈到车站值班员显示终端和车载终端;当机车运行过程中司机听到车载终端发出“超速危险或闯信号危险”时,说明机车速度太高或地面信号没有开放,司机应立即减速或停车,否则,机车将自动停车。Step 6: Locomotive running; during the running of the locomotive, the server of the ground machine confirms the section and milepost where the locomotive is located through differential GPS coordinates and track voltage, and feeds back this information to the display terminal of the station attendant and the on-board terminal in real time; When the driver hears "danger of overspeeding or danger of crossing the signal" from the on-board terminal during the operation of the locomotive, it means that the speed of the locomotive is too high or the ground signal is not open. The driver should slow down or stop immediately, otherwise, the locomotive will stop automatically.

第七步:第1勾作业完成,即机车从2股东头出来停车后,车站值班员终端和车载终端的调车作业计划单“机车2股东出”变为红光带,“4股+15(辆)”变为黄光带。Step 7: The first hook operation is completed, that is, after the locomotive comes out from the 2nd stock and stops, the shunting operation plan sheet "locomotive 2 stock" on the terminal on duty at the station and the vehicle terminal turns into a red light belt, "4 stock + 15 (vehicle)" turns into a yellow band.

第八步:开始“第2勾作业”。完成上述的第1勾作业后,值班员根据调车作业计划单和光带所提示的信息,布置第2勾作业进路,车载终端实时显示进入4股的调车信号;Step 8: Start the "No. 2 hook operation". After the above-mentioned first hook operation is completed, the on-duty officer arranges the second hook operation route according to the information prompted by the shunting operation plan sheet and the light belt, and the on-board terminal displays the shunting signal entering the 4 strands in real time;

第九步:司机按照车载终端显示的调车信号、计划单完成进度进入4股挂车。此时,车站值班员终端和车载终端的调车作业计划单“机车2股东出”变为红光带,“4股+15(辆)”变为绿光带,“3股-3(辆)”变为黄光带,说明第1勾作业已经执行完毕,正在执行第2勾作业,下一勾准备作业第3勾;Step 9: The driver enters the 4 trailers according to the shunting signal displayed on the vehicle terminal and the completion progress of the plan sheet. At this time, the shunting operation plan sheet of the terminal on duty at the station and the vehicle-mounted terminal "locomotive 2 shareholders out" turns into a red light belt, "4 shares + 15 (vehicles)" turns into a green light belt, "3 shares - 3 (vehicles) )" turns into a yellow light band, indicating that the first hook operation has been completed, the second hook operation is being executed, and the next hook preparation operation is the third tick;

第十步:机车挂车后牵出。司机按照现场调车人员的指挥带着4股15辆车牵出时,重复按照上述“第五步”到“第九步”作业程序进行对计划单、信号、进路等确认后完成第2勾作业内容。在这里的第七步作业过程中有所不同的是车站值班员终端的现车变化和车载终端的系统提示:其一是车站值班员终端,当机车从4股带着15辆车出去后,车站值班员终端显示出4股减少了15辆车,实时提示给车站值班员,表明机车带车数与计划单一致,否则,车站值班员应和现场调车员及时联系,确认带车数;其二是车载终端,当机车带着15辆车从4股出去后,车载系统如果发出“车辆数错误”的报警提示,说明带车数与计划单不一致,司机应及时与车站联系,车载系统无报警提示,表明带车数正确。Step 10: Pull out the locomotive trailer. When the driver takes 4 strands of 15 vehicles out according to the command of the on-site shunting personnel, he repeats the above-mentioned "step 5" to "step 9" to confirm the plan sheet, signal, route, etc., and then completes the second step. Tick the job content. What is different in the operation process of the seventh step here is the change of the current vehicle at the station attendant terminal and the system prompt of the on-board terminal: one is the station attendant terminal, when the locomotive leaves with 15 cars from 4 shares The terminal of the station attendant shows that 4 strands have decreased by 15 vehicles, and the station attendant is reminded in real time that the number of locomotives is consistent with the plan. Otherwise, the station attendant should contact the on-site shunter in time to confirm the number of locomotives; The second is the vehicle-mounted terminal. When the locomotive takes 15 vehicles out of the 4th section, if the vehicle-mounted system issues an alarm prompt of "the number of vehicles is wrong", it means that the number of vehicles brought is inconsistent with the plan, and the driver should contact the station in time. There is no alarm prompt, indicating that the number of vehicles is correct.

第十一步:开始第3勾作业。依次按照“第八步”、“第九步”和“第十步”程序进行第3勾作业。此时有所不同的是车站值班员终端的现车整理部分,当机车带着15辆车进入3股后,3股的现车立即增加了15辆,在执行完“3股-3(辆)”这一勾作业后,3股的现车增加数由15辆变为3辆,表明现场作业情况与调车计划单一致,否则,说明列车编组出现错误。Step 11: Start the 3rd hook operation. Follow the "eighth step", "ninth step" and "tenth step" procedures in order to carry out the third hook operation. What is different at this time is the existing car sorting part of the terminal on duty at the station. When the locomotive brought 15 cars into the 3rd stock, the 3rd stock immediately increased by 15 cars. )" After the hook operation, the number of existing trains increased from 15 to 3 for the 3 shares, indicating that the on-site operation is consistent with the shunting plan;

本批调车作业的剩余部分依次按照“第五步”、……、“第十一步”程序进行完毕后,一是车站值班员和车载终端的调车作业计划单全部变为红光带,说明调车作业全部完成;二是车站值班员可以及时确认整个车站现车分布情况与调度下达的计划是否一致,为下一列列车的编组工作提供了详细的制定依据。After the rest of this batch of shunting operations are completed in accordance with the procedures of "step five", ..., and "step eleven", first, the shunting operation plan sheets of the station attendants and vehicle terminals all turn into red bands , indicating that the shunting operation has been completed; second, the station attendant can confirm in time whether the distribution of existing trains in the entire station is consistent with the plan issued by the dispatcher, which provides a detailed basis for the marshalling of the next train.

参照图3所示的作业程序判断流程图,对上述铁路平面调车智能跟踪系统的详细工作方法再进行说明。With reference to the operation program judgment flow chart shown in Fig. 3, the detailed working method of the above-mentioned railway level shunting intelligent tracking system will be described again.

第一步:机车启动;车载设备自动将机车GPS坐标、速度、手柄位置、转速实时无线传到地面机的服务器;Step 1: The locomotive starts; the on-board equipment automatically transmits the GPS coordinates, speed, handle position, and rotational speed of the locomotive to the server of the ground machine wirelessly in real time;

第二步:传输调车作业计划;车站值班员将编写好的调车作业计划单应用地面机的操作平台和电台无线发到机车的车载设备上;The second step: transmit the shunting operation plan; the station attendant sends the prepared shunting operation plan to the on-board equipment of the locomotive by using the operation platform and radio of the ground machine;

第三步:动车前进路确认;机车将GPS坐标及速度、转速、手柄位置工矿数据传到地面机,经确认后,地面机的服务器将接收到的当前作业计划、股道占压、信号开放状态、机车距离信号机距离等信息复示给机车车载终端;Step 3: Confirm the forward path of the motor vehicle; the locomotive transmits the industrial and mining data of GPS coordinates, speed, speed, and handle position to the ground machine. After confirmation, the server of the ground machine will receive the current operation plan, track occupancy, and signal opening Status, locomotive distance from signal machine and other information are displayed to the locomotive on-board terminal;

第四步:机车运行;机车司机按照车载终端上的复示信息和调车作业计划操控机车运行;机车在运行过程中,地面机的服务器通过差分GPS坐标和轨道电压确认机车所在的区段及里程标,并将此信息实时反馈到车站值班员显示终端和车载终端;同时机车主控盒根据股道、速度、信号开放状态等信息,将闯信号报警、超速报警等信息向机车司机提示,并通过列控盒放风卸载处理。The fourth step: locomotive operation; the locomotive driver controls the locomotive operation according to the repeated information on the vehicle terminal and the shunting operation plan; during the operation of the locomotive, the server of the ground machine confirms the section and location of the locomotive through the differential GPS coordinates and track voltage. mileage mark, and feed this information back to the station attendant’s display terminal and vehicle-mounted terminal in real time; at the same time, the locomotive main control box will prompt the locomotive driver with the information such as breaking signal alarm, overspeed alarm, etc. And ventilate and unload through the train control box.

第五步:作业确认;机车带拖着车辆驶出当前轨道区段后,地面机的服务器通过统计车列经过轨道绝缘节的速度、时间来计算车列长度并换算车节数,并将该车节数自动与当前作业计划所挂车数进行核对,核对后直接发送给车站值班员和机车司机,车站值班员根据显示信息,安排下一勾作业进路,预防错排进路情况发生;Step 5: Operation confirmation; after the locomotive belt drags the vehicle out of the current track section, the server of the ground machine calculates the length of the train by counting the speed and time of the train passing through the track insulation section, and converts the number of train sections, and converts the The number of car sections is automatically checked with the number of trailers in the current operation plan. After checking, it is directly sent to the station attendant and locomotive driver. The station attendant will arrange the next operation route according to the displayed information to prevent the occurrence of wrong route;

第六步:返回第三步,执行下一勾作业。Step 6: Go back to Step 3 and execute the next operation.

Claims (3)

1. enterprise railway flat shunting intelligent tracking system is characterized in that it is made up of following three parts:
First is installed in the follow-up system ground machine and the radio station feedway of signaling at stations building machine room; Described follow-up system ground machine is made up of main control module cpu, data acquisition module and follow-up system server;
The effect of ground machine is that the information of receiving of shunting is sent on the locomotive through the radio station feedway, and the work information and the gps coordinate that simultaneously locomotive are postbacked carry out analyzing and processing;
Second portion is installed in the mobile unit on the locomotive, and this mobile unit comprises main control computer, row control box, car-mounted terminal, GPS receiver and distributing box; Main control computer postbacks the ground machine to the signal tower machine room through distributing box harvester turner condition data after the analysis, car-mounted terminal demonstrates floor data in real time simultaneously;
Third part; The shunting service information system of driving chamber, station; The shunting operation plan list of Platform attendant being write through the shunting service information system is transferred to the ground machine with local area network; The ground machine is crossed the radio station feedway with the shunting operation plan single-pass and is sent mobile unit to, and machine obtains locomotive position data and floor data series of parameters from ground simultaneously;
In the described locomotive floor data, comprise locomotive identification, speed, diesel engine speed, total reservoir pressure, brake-cylinder pressure and handle position;
In the described locomotive position data, comprise whether station track, locomotive place, front and back signal state, title, station track, place have railway carriage to account for pressure and locomotive gps coordinate.
2. the method for work of a track channel as claimed in claim 1; It is characterized in that it is based on car-ground radio and joins that control techniques realizes, when locomotive work is arranged; System is transferred to follow-up system ground machine with locomotive gps coordinate and industrial and mineral data in real time automatically; This moment the ground machine through obtain when a state of setting out in advance to make arrangements, locomotive positioning in corresponding station track, and is postbacked front and back signal lamp open state to locomotive; Simultaneously, the shunting operation plan single-pass that writes is crossed follow-up system ground machine to Platform attendant application shunting service information system and the radio station is wirelessly transmitted to the locomotive terminal, and the automatic prompting in locomotive terminal has received new shunting service task; In the shunting service process, car-mounted terminal shows that in real time current job scheduling and next collude plan, and whenever colludes the operation performance with the different colours prompting.
3. method of work as claimed in claim 2 is characterized in that detailed step is following:
The first step: locomotive starts
Mobile unit passes to locomotive gps coordinate, speed, handle position and rotating speed real-time radio the server of ground machine automatically;
Second step: transmission shunting operation plan
Platform attendant is used the shunting operation plan list that writes on the wireless mobile unit that is dealt into locomotive in service platform and the radio station of ground machine;
The 3rd step: the motor-car anterior approach is confirmed
Locomotive passes to the ground machine with gps coordinate and speed, rotating speed, handle position industrial and mineral data; After confirming, current production plan, the station track that the server of ground machine will receive accounts for pressure, signal at clear state and locomotive range signal machine range information and shows again to the locomotive vehicle-mounted terminal;
The 4th step: locomotive operation
The trainman shows that according to answering on the car-mounted terminal information and shunting operation plan control locomotive operation; Locomotive is in operational process, and the server of ground machine is confirmed section and the milepost that locomotive belongs to through differential GPS coordinate and railway voltage, and this information real-time is fed back to Platform attendant display terminal and car-mounted terminal; Simultaneously the locomotive primary control box will be rushed signal alarm with overspeed alarming information is pointed out to the trainman according to station track, speed and signal at clear status information, and through the unloading processing of leaking informaton of row control box;
The 5th step: operation is confirmed
After the locomotive band vehicle and is rolled current track section away from; The server of ground machine calculates car row length and converts the car joint number through the speed and the time of track insulation joint through the statistics car team; And this car joint number automatically checked with current production plan institute trailer number, directly sending to Platform attendant and trainman after checking, Platform attendant is according to demonstration information; Arrange next to collude the operation route, the wrong row of prevention route situation takes place;
The 6th step: returned for the 3rd step, carry out next and collude operation.
CN201210138104XA 2012-05-04 2012-05-04 Intelligent tracking system for enterprise railway plane shunting and working method of intelligent tracking system Pending CN102700574A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210138104XA CN102700574A (en) 2012-05-04 2012-05-04 Intelligent tracking system for enterprise railway plane shunting and working method of intelligent tracking system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210138104XA CN102700574A (en) 2012-05-04 2012-05-04 Intelligent tracking system for enterprise railway plane shunting and working method of intelligent tracking system

Publications (1)

Publication Number Publication Date
CN102700574A true CN102700574A (en) 2012-10-03

Family

ID=46893732

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210138104XA Pending CN102700574A (en) 2012-05-04 2012-05-04 Intelligent tracking system for enterprise railway plane shunting and working method of intelligent tracking system

Country Status (1)

Country Link
CN (1) CN102700574A (en)

Cited By (20)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103407464A (en) * 2013-08-14 2013-11-27 中国神华能源股份有限公司 Electronic locomotive brake building equipment based on video image recognition
CN104318418A (en) * 2014-11-08 2015-01-28 马钢(集团)控股有限公司 Enterprise railway logistics control system and calculation method thereof
CN104724144A (en) * 2015-01-28 2015-06-24 卡斯柯信号有限公司 Automatic calculation and calibration method for parking in shunting operation process
CN106553664A (en) * 2016-11-24 2017-04-05 卡斯柯信号有限公司 The method and apparatus of shunting route control is implemented in combination with using STP and CTC
CN107792121A (en) * 2017-10-24 2018-03-13 卡斯柯信号有限公司 The method for hooking plan execution state of being shunt using TDCS tune machine number tracking judgements
CN107820053A (en) * 2017-11-10 2018-03-20 北京远光瑞为软件技术有限公司 A kind of railway intelligence shunting service system
CN108001486A (en) * 2017-11-29 2018-05-08 中国铁道科学研究院通信信号研究所 Car team is close to early warning system
CN108189868A (en) * 2017-12-25 2018-06-22 中国铁道科学研究院通信信号研究所 A kind of wheel movement special equipment shunting monitoring method and system certainly
CN109677464A (en) * 2018-12-28 2019-04-26 卡斯柯信号有限公司 A kind of shunting operation plan Transmission system
CN109808740A (en) * 2019-02-14 2019-05-28 内蒙古伊泰准东铁路有限责任公司 Train scheduling method, apparatus and system
CN110654430A (en) * 2019-10-28 2020-01-07 天津七一二通信广播股份有限公司 Intelligent analysis system and implementation method for plane shunting operation records
CN110667657A (en) * 2019-09-04 2020-01-10 成都九壹通智能科技股份有限公司 Remote monitoring and safety management system for train operation
CN111516729A (en) * 2020-05-08 2020-08-11 卡斯柯信号有限公司 Centralized processing method for locomotive shunting operation list
CN112572550A (en) * 2021-01-12 2021-03-30 成都劳杰斯信息技术有限公司 Integrated automation system for enterprise railway station yard
CN113715881A (en) * 2021-09-17 2021-11-30 交控科技股份有限公司 Train shunting and marshalling method and device, electronic equipment and storage medium
CN113954916A (en) * 2021-11-18 2022-01-21 山西太钢不锈钢股份有限公司 Early warning method for errors of number of picked locomotives and number of trailers of railway locomotive
CN114407982A (en) * 2021-12-13 2022-04-29 昆明聚讯科技有限公司 Method for completing shunting operation plan transmission based on shunting operation plan transmission system
CN114750805A (en) * 2022-06-16 2022-07-15 天津七一二移动通信有限公司 NFC high-precision positioning method for wireless flat shunting system
CN116373958A (en) * 2023-03-03 2023-07-04 北京全路通信信号研究设计院集团有限公司 Control method and system applied to railway shunting
CN116750042A (en) * 2023-06-19 2023-09-15 北京京天威科技发展有限公司 Intelligent shunting safety operation management platform for railway vehicle and implementation method thereof

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5533695A (en) * 1994-08-19 1996-07-09 Harmon Industries, Inc. Incremental train control system
CN1559847A (en) * 2004-03-02 2005-01-05 北京全路通信信号研究设计院 Automatization system for marshalling station pispatching train
CN101254791A (en) * 2008-03-31 2008-09-03 北京和利时系统工程有限公司 Rail transit train automatic monitoring system based on communication
CN202657056U (en) * 2012-05-04 2013-01-09 北京康吉森交通技术有限公司 Intelligent tracking system for flat shunting of enterprise railway

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5533695A (en) * 1994-08-19 1996-07-09 Harmon Industries, Inc. Incremental train control system
CN1559847A (en) * 2004-03-02 2005-01-05 北京全路通信信号研究设计院 Automatization system for marshalling station pispatching train
CN101254791A (en) * 2008-03-31 2008-09-03 北京和利时系统工程有限公司 Rail transit train automatic monitoring system based on communication
CN202657056U (en) * 2012-05-04 2013-01-09 北京康吉森交通技术有限公司 Intelligent tracking system for flat shunting of enterprise railway

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
陶永宏等: "矿区铁路智能运输信息系统建设研究", 《山东煤炭科技》, no. 5, 31 October 2011 (2011-10-31), pages 91 *

Cited By (29)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103407464B (en) * 2013-08-14 2016-06-15 中国神华能源股份有限公司 Electronic locomotive lock building equipment based on video image identification
CN103407464A (en) * 2013-08-14 2013-11-27 中国神华能源股份有限公司 Electronic locomotive brake building equipment based on video image recognition
CN104318418A (en) * 2014-11-08 2015-01-28 马钢(集团)控股有限公司 Enterprise railway logistics control system and calculation method thereof
CN104318418B (en) * 2014-11-08 2017-11-03 马钢(集团)控股有限公司 A kind of enterprise railway logistics control system and its computational methods
CN104724144A (en) * 2015-01-28 2015-06-24 卡斯柯信号有限公司 Automatic calculation and calibration method for parking in shunting operation process
CN104724144B (en) * 2015-01-28 2016-11-30 卡斯柯信号有限公司 During shunting service, bicycle parking calculates calibration steps automatically
CN106553664B (en) * 2016-11-24 2018-08-28 卡斯柯信号有限公司 The method and apparatus of shunting route control is implemented in combination with using STP and CTC
CN106553664A (en) * 2016-11-24 2017-04-05 卡斯柯信号有限公司 The method and apparatus of shunting route control is implemented in combination with using STP and CTC
CN107792121A (en) * 2017-10-24 2018-03-13 卡斯柯信号有限公司 The method for hooking plan execution state of being shunt using TDCS tune machine number tracking judgements
CN107820053A (en) * 2017-11-10 2018-03-20 北京远光瑞为软件技术有限公司 A kind of railway intelligence shunting service system
CN108001486A (en) * 2017-11-29 2018-05-08 中国铁道科学研究院通信信号研究所 Car team is close to early warning system
CN108189868A (en) * 2017-12-25 2018-06-22 中国铁道科学研究院通信信号研究所 A kind of wheel movement special equipment shunting monitoring method and system certainly
CN108189868B (en) * 2017-12-25 2020-05-26 中国铁道科学研究院通信信号研究所 Shunting monitoring method and system for self-wheel running special equipment
CN109677464A (en) * 2018-12-28 2019-04-26 卡斯柯信号有限公司 A kind of shunting operation plan Transmission system
CN109808740A (en) * 2019-02-14 2019-05-28 内蒙古伊泰准东铁路有限责任公司 Train scheduling method, apparatus and system
CN110667657A (en) * 2019-09-04 2020-01-10 成都九壹通智能科技股份有限公司 Remote monitoring and safety management system for train operation
CN110654430A (en) * 2019-10-28 2020-01-07 天津七一二通信广播股份有限公司 Intelligent analysis system and implementation method for plane shunting operation records
CN111516729A (en) * 2020-05-08 2020-08-11 卡斯柯信号有限公司 Centralized processing method for locomotive shunting operation list
CN111516729B (en) * 2020-05-08 2022-03-29 卡斯柯信号有限公司 Centralized processing method for locomotive shunting operation list
CN112572550A (en) * 2021-01-12 2021-03-30 成都劳杰斯信息技术有限公司 Integrated automation system for enterprise railway station yard
CN113715881A (en) * 2021-09-17 2021-11-30 交控科技股份有限公司 Train shunting and marshalling method and device, electronic equipment and storage medium
CN113954916A (en) * 2021-11-18 2022-01-21 山西太钢不锈钢股份有限公司 Early warning method for errors of number of picked locomotives and number of trailers of railway locomotive
CN113954916B (en) * 2021-11-18 2024-09-24 山西太钢不锈钢股份有限公司 A method for early warning of errors in the number of locomotive unloading and trailer numbers
CN114407982A (en) * 2021-12-13 2022-04-29 昆明聚讯科技有限公司 Method for completing shunting operation plan transmission based on shunting operation plan transmission system
CN114407982B (en) * 2021-12-13 2024-04-26 昆明聚讯科技有限公司 Method for completing shunting operation plan transmission based on shunting operation plan transmission system
CN114750805A (en) * 2022-06-16 2022-07-15 天津七一二移动通信有限公司 NFC high-precision positioning method for wireless flat shunting system
CN116373958A (en) * 2023-03-03 2023-07-04 北京全路通信信号研究设计院集团有限公司 Control method and system applied to railway shunting
CN116750042A (en) * 2023-06-19 2023-09-15 北京京天威科技发展有限公司 Intelligent shunting safety operation management platform for railway vehicle and implementation method thereof
CN116750042B (en) * 2023-06-19 2024-04-02 北京京天威科技发展有限公司 Intelligent shunting safety operation management platform for railway vehicle and implementation method thereof

Similar Documents

Publication Publication Date Title
CN102700574A (en) Intelligent tracking system for enterprise railway plane shunting and working method of intelligent tracking system
CN101544233B (en) Marshalling station comprehensive automatic system
CN101117128B (en) Automatic driving system for station dispatching machine
CN102514601B (en) Train tracking interval real-time early warning system based on CTC (central traffic control) and early warning method
CN112572550B (en) Integrated automation system for enterprise railway station yard
CN107323485B (en) Passenger dedicated railway line station receiving signal control system
CN111874047B (en) A system and method for organizing cross-area shunting operations at railway transitions
CN103538602B (en) The manual dispatching working pipe Ore-controlling Role that rail transit train runs
CN107161179A (en) Suitable for the running control system of general fast railway
CN109719288A (en) Molten Iron Transportation control method, rear end and front end
CN101941451A (en) Intermittent train control system
CN105620518A (en) Train control system adapting to existing line reconstruction and train control method
CN114194259A (en) Control system for flexible marshalling
CN105235714A (en) A driver-less goods transport system and transport method
CN108189868B (en) Shunting monitoring method and system for self-wheel running special equipment
CN208978874U (en) Train operation control system based on Big Dipper short message
CN104309652B (en) A kind of intelligent tramcar signal system
CN107792121B (en) Method of Tracking and Judging Execution Status of Shunting Coupler Plan by Using TDCS Shunting Machine Number
CN101186216B (en) Switching locomotive operation safety monitoring apparatus
CN102602435B (en) Automatic blocking control system and method
CN114407982B (en) Method for completing shunting operation plan transmission based on shunting operation plan transmission system
CN117775029A (en) A group train group departure method in a station
CN202657056U (en) Intelligent tracking system for flat shunting of enterprise railway
CN105644593B (en) A kind of hump remote control suitable for HXN5B type high-power locomotives pushes away peak control system
CN2870054Y (en) Passenger guide apparatus for railway station

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20121003