CN102995659A - Method for constructing from central area to periphery of ultra-large type underground engineering - Google Patents

Method for constructing from central area to periphery of ultra-large type underground engineering Download PDF

Info

Publication number
CN102995659A
CN102995659A CN201210516261XA CN201210516261A CN102995659A CN 102995659 A CN102995659 A CN 102995659A CN 201210516261X A CN201210516261X A CN 201210516261XA CN 201210516261 A CN201210516261 A CN 201210516261A CN 102995659 A CN102995659 A CN 102995659A
Authority
CN
China
Prior art keywords
construction
floor
underground
surrounding
central area
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201210516261XA
Other languages
Chinese (zh)
Other versions
CN102995659B (en
Inventor
严平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
HANGZHOU NANLIAN BASE FOUNDATION ENGINEERING CO LTD
Original Assignee
Hangzhou Nanlian Base Foundation Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hangzhou Nanlian Base Foundation Engineering Co Ltd filed Critical Hangzhou Nanlian Base Foundation Engineering Co Ltd
Priority to CN201210516261.XA priority Critical patent/CN102995659B/en
Publication of CN102995659A publication Critical patent/CN102995659A/en
Application granted granted Critical
Publication of CN102995659B publication Critical patent/CN102995659B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)

Abstract

The invention discloses a method for constructing from the central area to the periphery of an ultra-large type underground engineering, comprising the following steps of: firstly, sloping and excavating to the bottom of a pit in a middle area of the underground engineering; then, directly constructing a bottom plate of a basement in the middle area, and upwards constructing to finish a floorslab structure of the underground engineering; and establishing a peripheral bracing system by using the finished floorslab structure in the middle area as a bracing point to finally finish the construction for the peripheral basement. By utilizing the characteristic of large plane size of the underground engineering, the middle area is sufficiently utilized to slope for construction firstly, the underground engineering in the middle area is constructed upwards, and a peripheral area is provided with a permanent beam slab or temporary bracing as a bracing by taking a top beam slab of the underground engineering in the constructed middle area as the bracing point, so that the defects of causing difficulty in excavating and transporting soil in the peripheral area and controlling the stress direction of the peripheral diagonal bracing, affecting the engineering progress and improving the construction difficulty due to the adoption of the traditional central island construction method is foundationally overcome.

Description

The first center of ultra-large type underground construction is in conjunction with the job practices of periphery
Technical field
The present invention relates to a kind of construction method of underground construction, relate in particular to that a kind of to be applicable to planar dimension large, excavate dark underground construction construction method.
Background technology
Along with the extensive development of infrastructure, more be becoming tight in the land for building, city, and to underground development, it is the inexorable trend of Future Development that developing utilizes the underground space.The underground constructions such as the basement of ultra-large type, high depth, underground store, parking lot are emerged in large numbers fast.Because in high depth, this underground engineering construction of planar dimension ultra-large type, adopt enclosure wall connecting inner Multi-layer supporting system way in length and breadth so that construction is gone along with sb. to guard him involves great expense by tradition, and construction speed, difficulty, risk etc. all increase, especially soft clay area, if do not establish inner support, possible hardly, and establish inner support, because planar dimension is too large, the support system expense is very high.
The excavation plan that underground construction is traditional, mainly contain and put slope excavation, central island-type excavation, basin excavation and contrary sequence method excavation, therefore how to overcome above-mentioned shortcoming and keep advantage, explore thus a kind of novel construction method, guaranteeing under the safe prerequisite, reduce cost, improving efficiency of construction is the direction of civil engineering technology research and development.
Summary of the invention
The present invention is directed to the underground construction that this planar dimension is large, excavation is dark, especially large-scale civilian underground building provides a kind of at the central region excavation construction of going ahead of the rest, and the perimeter zone utilizes the central region project completed as the construction method of the strong point.
A kind of first center of ultra-large type underground construction is in conjunction with the job practices of periphery, at first, put the slope excavation to the end, hole in the underground construction central region, then the central region basement bottom board of directly constructing, and upwards the underground construction floor slab structure is finished in construction, utilize the completed floor slab structure of central region to be the strong point, set up the perimeter support system, finish at last peripheral basement construction.
When the perimeter support system was the beam and slab structure of block construction or girder construction, construction sequence was as follows:
1), construction foundation pit enclosure wall, engineering pile, support and trestle supporting pile;
2), the foundation ditch peripheral upper portion soil body puts the slope or soil nail wall is gone along with sb. to guard him excavation, the control distortion anchor pole under the construction support replacement operating mode is built capping beam;
3), central region puts slope excavation on earth, central region basement bottom board and F3/B3 floor slab structure are finished in construction;
4), in conjunction with peripheral situation, upwards the underground two floor plated constructions of central region are finished in construction, block construction is finished underground two layer segment beam slab or the girder constructions in perimeter zone simultaneously, and is connected with the underground two floor plated constructions of central region, as support;
5), the interim trestle that is unearthed of peripheral trestle zone soil excavation construction;
6), peripheral soil excavation on earth, the soil body is sent foundation ditch by trestle;
7), remove trestle, construct peripheral basement bottom board and F3/B3, two floor plated constructions are so that itself and central region are linked to be integral body;
8), upwards construct and finish whole B1 structure, underground engineering construction is finished in construction outer wall of basement waterproof, basement backfill.
When the perimeter support system was the interim perimeter support of steel bar concrete or steel support, the Specific construction step was as follows:
3.1), by step 1,2,3 the construction, the underground two floor plated constructions of construction central region in the step 4, construct simultaneously waling beam and perimeter support make perimeter support and underground two floor plates be linked to be integral body, height is set should makes the operation of cutting the earth of normally driving a vehicle of digging machine and muck haulage car of perimeter support; Connect down by step 5,6 and construct;
3.2), remove trestle in the step 7, construction perimeter zone basement bottom board and F3/B3 floor slab structure make itself and central region base plate and floor be linked to be integral body;
3.3), remove perimeter support, upwards the underground two floor plated constructions in perimeter zone are finished in construction, make itself and the underground two floor plated constructions of central region be linked to be integral body; Connect down by step 8 and construct.
The strong point of perimeter support system is located in the ground on the two floor plated constructions, and reason is: one, the underground construction degree of depth is suitable, and the enough braced cuts walls of support system are in order to resist surrounding soil; Two, can make under these perimeter support systems, digging machine in underground construction periphery digging process and muck haulage car have enough space free walkings to dig the muck haulage operation, change traditional central island job practices periphery and established bearing diagonal in the way of central region base plate, solve the perimeter zone and dug the muck haulage difficulty, the problem of construction trouble has solved the not good problem of bearing diagonal stress simultaneously.
Put slope excavation in central region in the described step 3, wherein put the slope, can determine put according to soil nature situation, underground construction range size the gradient on slope, if soil nature is relatively poor or underground construction scope size is limit and need be added heavy grade, can be to the domatic reinforcement measure of taking.The method of reinforcing has traditional anti-side pile body, anchor pole soil nailing etc.
Block construction is finished underground two layer segment beam slab or the girder constructions in perimeter zone in the described step 4, these perimeter zone part beam slabs or girder construction are as the support system in Underground Engineering Excavation stage, when treating that underground construction is upwards constructed, can be used as again permanent structure keeps, adopt after-pouring vacancy perimeter zone beam and slab structure or build plated construction in built girder construction stack, form complete peripheral beam and slab structure.
The interim trestle that is unearthed in the described step 5, the trestle face gradient and supporting capacity satisfy the walking of digging the muck haulage car, the plane distribution of trestle can be that straight line is domatic, curve is domatic or broken line is domatic, the quantity of trestle and position are by the amount of being unearthed and soil outlet determining positions, until the peripheral soil body all dig transport foundation ditch after, cut trestle.
The peripheral soil body should divide plate by layering in the described step 6, and the principle that retreats to the trestle direction of being unearthed while digging is excavated.
Remove trestle in the described step 3.2, should carry out behind construct peripheral basement bottom board and the F3/B3 floor slab structure and enclosure wall between support changing structure for use construction.
, excavation more when the underground engineering number of plies can be constructed first central region to the F3/B3 floor, with the strong point of F3/B3 floor as the perimeter support system when darker.Wherein the perimeter support system can be beam and slab structure or the girder construction of block construction, also can be the interim perimeter support of steel bar concrete or steel support.
Excavate when darker, it is larger that enclosure wall is subject to peripheral soil pressure, and in order to alleviate the pressure of perimeter support system, the displacement of enclosure wall and force controlled adopt and set the control of many row's anchor pole soil nailing ways; Also can establish interim angle steel bearing diagonal on central region F3/B3 floor, the way of after finishing underground two layers of periphery and central region floor, bearing diagonal being removed.
The present invention utilizes the large characteristics of underground construction planar dimension, take full advantage of central region and put first the slope construction, changing traditional central island construction utilizes base plate as the way of the diagonal brace fulcrum of perimeter zone excavation, with the upwards construction of central region underground construction, with the central region underground construction upper strata beam slab of having constructed as the strong point, permanent beam slab or interim perimeter support are set as support in the perimeter zone, the muck haulage operation of digging that so has enough spaces to carry out the perimeter zone under permanent beam slab or interim perimeter support is constructed, and by ad hoc temporary trestle bridge the soil body is transported foundation ditch, the muck haulage difficulty is dug in the perimeter zone that has fundamentally solved traditional central island construction method existence, the periphery bearing diagonal is subjected to force direction to be difficult to control, affects the shortcoming of programming and increase difficulty of construction.
Also solved simultaneously traditional large degree of depth underground engineering construction must be established inner support in length and breadth in foundation ditch method, significantly saved construction costs, improved the construction safety reliability, and saved the construction period.
Description of drawings
Fig. 1-the 9th, the construction sequence figure of ultra-large type underground engineering construction embodiment of the method 1 of the present invention;
Figure 10-the 18th, the construction sequence figure of the embodiment of the invention 2;
Figure 19 is the supporting construction figure of enclosure wall when the F3/B3 floor is the strong point among the present invention;
Figure 20 is the top view of trestle among the present invention;
Figure 21 is the lateral view of trestle among the present invention.
The specific embodiment
,, be described further take a certain underground construction as example embodiment involved in the present invention below in conjunction with accompanying drawing:
Embodiment 1
Shown in Fig. 1-9, a kind of first center of ultra-large type underground construction is in conjunction with the job practices of periphery, and the Specific construction step is as follows:
1), construction foundation pit enclosure wall 6, engineering pile 7, support and trestle supporting pile 8;
2), the foundation ditch peripheral upper portion soil body puts the slope or soil nail wall is gone along with sb. to guard him excavation, the control distortion anchor pole under the construction support replacement operating mode is built capping beam;
3), central region puts slope excavation on earth, central region basement bottom board 1 and F3/B3 2 floors 4 structures are finished in construction;
4), in conjunction with peripheral situation, upwards underground two layer of 3 floor slab structure of central region finished in construction, block construction is finished underground two layer segment beam slab 5 or the girder constructions in perimeter zone simultaneously, and is connected with the underground two floor plates of central region 4 structures, as support;
5), the interim trestle 9 that is unearthed of peripheral trestle zone soil excavation construction;
6), peripheral soil excavation on earth, the soil body is sent foundation ditch by trestle 9;
7), remove trestle, construct peripheral basement bottom board 1 and F3/B3, two floor plated constructions are so that itself and central region are linked to be integral body;
8), upwards construct and finish whole B1 12 structures, underground engineering construction is finished in construction outer wall of basement waterproof, basement backfill.
Bracing of foundation pit wall in the above-mentioned implementation step 1 should satisfy each excavation and the anti-side direction water pressure under the support replacement operating mode and the requirement of soil pressure in the basement work progress, and enclosure wall 6 should be inserted in the good soil layer of basement bottom board 1 following certain depth, walks around at the bottom of the wall piping or protuberance in the hole to stop underground water and soil.The way of enclosure wall can be that cement mixing pile (or rotary churning pile) water-stop curtain pours into campshed, interlock castinplace pile, the I-shaped campshed of prefabricated reinforced concrete or diaphragm wall in conjunction with conventional borehole routinely.
Control distortion anchor pole in the step 2 requires to determine whether set according to the force and deformation of enclosure wall in the support replacement process.
Central region in the step 3 is put sloping excavation and should be controlled the gradient of putting slope excavation and slope well and push up distance to enclosure wall.The Soil Parameters that report provides according to geotechnical investigation, sloping body is carried out necessary reinforcing, if necessity also can take to set the measures such as interim pine stake, steel sheet pile or employing bolt support, the control slope-mass slide displacement, guarantee the safety when sloping body bears various load in the work progress, domaticly should carry out necessary protection according to the middle part Underground Construction cycle, current scour impact construction when guaranteeing to rain.
Beam slab 5 in the step 4 or girder construction are different from the upper load that traditional beam and slab structure not only will be born traditional structure; also to as support system, bear the Water And Earth Pressures that bring the foundation ditch side; so will analyze the pipeline of knowing internal force during design, the support changing structure for use of between perimeter zone beam slab or girder construction and enclosure wall, constructing simultaneously.Be transmission and the construction that makes things convenient for power, floor 4 can take piecemeal partly to build with beam, and middle reserved opening is built at last.Should carry out the design in key node and cross section, guarantee the safe and reliable of structure.
Step 5, peripheral trestle district excavation construction temporary trestle bridge 9, trestle the position is set, moves towards and arranges the size that number should dig according to the peripheral soil body fortune side amount, the overall plan that digs muck haulage determines.The intensity of the width of trestle, the gradient and structure should pressure be made in the muck haulage turner and climbing capacity determines according to digging, trestle can distribute and dig the muck haulage work efficiency according to the place and be set to two-way traffic, also can be the bicycle road, the ramp form can be that the orthoscopic ramp also can be made as arc or turning fold-line-shaped according to the place restriction.
Step 6,7, the excavation of the peripheral soil body should divide plate by layering, and the principle that retreats to the trestle direction of being unearthed while digging is carried out.After the periphery excavation transported the earthwork on earth, digging machine retreated to trestle, withdraws from foundation ditch along trestle, cuts simultaneously trestle.
After finishing above-mentioned steps, construction B1 12 structures, outer wall of basement waterproof, basement backfill etc. are finished the construction of underground construction according to traditional approach, more than be that first center is in conjunction with the reversed construction method of peripheral beam slab as support.
Embodiment 2
Shown in Figure 10-18, a kind of first center of ultra-large type underground construction is in conjunction with the job practices of periphery, and the perimeter support system is the interim perimeter support 11 that steel bar concrete or steel support, and the Specific construction step is as follows:
2.1), press step 1,2 among the embodiment 1,3 the construction, underground two layer of 3 floor slab structure of construction central region in the step 4, construct simultaneously waling beam and perimeter support 11, make perimeter support 11 and underground two floor plates 4 be linked to be integral body, height is set makes the operation of cutting the earth of normally driving a vehicle of digging machine and muck haulage car of perimeter support 11; Connect down by step 5,6 and construct;
2.2), remove trestle 9 in the step 7, construction perimeter zone basement bottom board 1 and F3/B3 2 floor slab structures make itself and central region base plate and floor be linked to be integral body;
2.3), remove perimeter support 11, upwards the underground two floor plated constructions in perimeter zone are finished in construction, make itself and the underground two floor plated constructions of central region be linked to be integral body; Connect down by step 8 and construct.
The main distinction of job practices is among embodiment 1 and the embodiment 2: embodiment 1 uses beam slab 5 structures or the girder construction of block construction that foundation ditch is played support action, and embodiment 2 uses traditional steel bar concrete or 11 pairs of foundation ditches of the interim perimeter support of steel work to play support action.
Step 1,2 among the embodiment 2,3 with embodiment 1 in identical step require identical, waling beam and perimeter support 11 absolute altitudes of construction can flush with the underground two floor plated construction absolute altitudes of central region or exceed in the step 4, namely supporting can be to be horizontally disposed with, and also can leave certain gradient setting.Perimeter support can be built synchronously with the underground two floor plated constructions of central region, but also the central region floor is constructed first, and the perimeter support of constructing again 11 is connected with it.
Step 5,6 construction requirement are identical with embodiment 1, should note between enclosure wall and perimeter zone basement bottom board and F3/B3 floor during step 2.2 construction, carry out support changing structure for use and construct; Before the underground two floor plated constructions in construction perimeter zone, should remove first perimeter support.
After finishing above-mentioned steps, finish the construction of underground construction according to traditional approach, more than for first center in conjunction with interim perimeter support along making job practices.
Except according to the construction of the method among the embodiment 1,2, if Underground Engineering Excavation is darker, when surrounding enviroment and soil nature are better, the strong point of perimeter support system can be dropped to the F3/B3 floor.Because excavation is darker, the pressure that enclosure wall is subject to the peripheral soil body is larger, in order to alleviate the pressure of perimeter support system, the displacement of assurance enclosure wall and stressed controlled, strengthen the anti-side direction ability of enclosure wall, can adopt to set how row's anchor pole soil nailing (13) ways are controlled, the construction way as shown in figure 19.
The wherein construction of trestle, shown in Figure 20-21, the middle part is echelon reduction distribution to the supporting pile height from the foundation ditch periphery to foundation ditch, lays the steel bar concrete trestle at supporting pile, and engineering muck haulage needs are satisfied in the technical requirements of trestle.
It will be appreciated by those skilled in the art that; although the present invention describes according to the mode of a plurality of embodiment; but concrete invention thought is quite clear and definite; utilize the built engineering of central region as the strong point; carry out the foundation of perimeter support system; any those skilled in the art adopt the technical scheme that is equal to replacement or equivalent transformation formation under the prerequisite that does not break away from design of the present invention and principle, all drop within the claimed scope of the present invention.

Claims (8)

1.一种超大型地下工程的先中心区结合周边的施工方法,其特征在于:首先,在地下工程中部区域放坡开挖到坑底,然后直接施工中部区域地下室底板(1),并且向上施工完成地下工程楼板(4)结构,利用中部区域已完成的楼板(4)结构为支撑点,建立周边支撑体系,最后完成周边地下室施工。1. A construction method in which the central area of a super-large underground project is combined with the surrounding area, it is characterized in that: at first, excavate to the bottom of the pit by grading in the middle area of the underground engineering, then directly construct the basement floor (1) in the middle area, and upward The construction of the underground engineering floor (4) structure is completed, and the completed floor (4) structure in the central area is used as a support point to establish a surrounding support system, and finally complete the construction of the surrounding basement. 2.根据权利要求1所述的超大型地下工程的先中心区结合周边的施工方法,其特征在于:所述的周边支撑体系为分块施工的梁板(5)结构或梁结构,施工步骤如下:2. the first central area of the ultra-large underground project according to claim 1 combines the surrounding construction method, it is characterized in that: described peripheral support system is the beam-slab (5) structure or the beam structure of sub-block construction, construction steps as follows: 1)、施工基坑围护墙(6)、工程桩(7)、支撑及栈桥支撑桩(8);1), construction foundation pit enclosure wall (6), engineering pile (7), support and trestle support pile (8); 2)、基坑周边上部土体放坡或土钉墙围护开挖,施工换撑工况下的控制变形锚杆,浇筑压顶梁;2) grading of the upper soil around the foundation pit or excavation of soil nailing wall enclosure, control deformation anchor rods under construction and support conditions, and pouring top beams; 3)、中部区域放坡开挖到底,施工完成中部区域地下室底板(1)以及地下三层(2)楼板结构;3) The central area is sloped and excavated to the bottom, and the construction of the basement floor (1) and the three-story underground (2) floor structure in the central area is completed; 4)、结合周边情况,向上施工完成中部区域地下二层(3)楼板结构,同时分块施工完成周边区域地下二层(3)部分梁板(5)或梁结构,并与中部区域地下二层楼板结构连接,作为支撑;4) Combining the surrounding conditions, the upward construction completes the floor structure of the second underground floor (3) in the central area, and at the same time completes the beam-slab (5) or beam structure of the second underground floor (3) in the surrounding area by block construction, and connects with the second underground floor in the central area. The floor-to-floor structure is connected as a support; 5)、周边栈桥区域土体开挖施工临时出土栈桥(9);5), the trestle bridge (9) was temporarily unearthed during the soil excavation construction in the surrounding trestle bridge area; 6)、周边土体开挖到底,将土体通过栈桥(9)送出基坑;6), the surrounding soil is excavated to the bottom, and the soil is sent out of the foundation pit through the trestle bridge (9); 7)、拆除栈桥(9),施工周边地下室底板和地下三层、二层楼板结构,以使其与中部区域连成整体;7), remove the trestle bridge (9), and construct the surrounding basement floor and the third-floor and second-floor floor structures underground, so that it can be integrated with the central area; 8)、向上施工完成整个地下一层(12)结构,施工地下室外墙防水、地下室回填,完成地下工程施工。8), upward construction completes the structure of the whole basement floor (12), construction of basement exterior wall waterproofing, basement backfilling, and completion of underground engineering construction. 3.根据权利要求1所述的超大型地下工程的先中心区结合周边的施工方法,其特征在于:所述的周边支撑体系为钢筋砼或钢支撑的临时周边支撑(11),具体步骤如下:3. the first central area of the ultra-large underground project according to claim 1 is characterized in that: described peripheral support system is the temporary peripheral support (11) of reinforced concrete or steel support, and concrete steps are as follows : 3.1)、按步骤1、2、3施工,步骤4中施工中部区域地下二层楼板结构,同时施工围囹梁及周边支撑(11),使周边支撑(11)与地下二层楼板连成整体,周边支撑的设置高度应使挖机和运土车能正常行车进行挖土操作;接下按步骤5、6进行施工;3.1), construct according to steps 1, 2, and 3. In step 4, construct the second-story underground floor structure in the central area, and construct the fence beams and surrounding supports (11) at the same time, so that the surrounding supports (11) and the second-story underground floor are connected as a whole , the setting height of the surrounding support should be such that the excavator and earth moving vehicle can drive normally for excavation operation; then follow steps 5 and 6 for construction; 3.2)、步骤7中拆除栈桥(9),施工周边区域地下室底板(1)和地下三层楼板结构,使其与中部区域底板和楼板连成整体;3.2), remove the trestle (9) in step 7, construct the basement floor (1) in the surrounding area and the three-story underground floor structure, so that it is integrated with the floor and floor in the central area; 3.3)、拆除周边支撑(11),向上施工完成周边区域地下二层楼板结构,使其与中部区域地下二层楼板结构连成整体;接下按步骤8施工。3.3), remove the peripheral supports (11), and complete the second-floor floor structure in the surrounding area by upward construction, so that it can be integrated with the second-floor floor structure in the central area; then proceed to step 8 for construction. 4.根据权利要求2、3所述的超大型地下工程的先中心区结合周边的施工方法,其特征在于:所述的栈桥(9)数量及位置由出土量和出土口位置决定,待周边土体全部挖运出基坑后,拆除栈桥。4. according to claim 2, the construction method that the central area of super-large underground engineering described in 3 combines the surrounding areas, it is characterized in that: the quantity and position of the trestle bridge (9) are determined by the excavation amount and the position of the excavation opening, and the surrounding After all the soil has been excavated out of the foundation pit, the trestle bridge will be dismantled. 5.根据权利要求2、3所述的超大型地下工程的先中心区结合周边的施工方法,其特征在于:所述的步骤6中周边土体应按分层分板,边挖边向出土栈桥方向后退的原则进行开挖。5. according to claim 2, the construction method of combining the central area of the super large underground project with the surrounding area first, it is characterized in that: in the described step 6, the surrounding soil should be divided into layers, and excavated while digging Excavation is carried out on the principle of retreating in the direction of the trestle bridge. 6.根据权利要求3所述的超大型地下工程的先中心区结合周边的施工方法,其特征在于:所述的步骤3.2中拆除栈桥,施工周边地下室底板及地下三层楼板结构后应做好与围护墙之间的换撑(10)结构施工。6. according to claim 3, the first central area of the ultra-large underground project is combined with the surrounding construction method, which is characterized in that: the trestle bridge is removed in the described step 3.2, and it should be done well after the construction of the surrounding basement floor and the underground three-story floor structure Change the support (10) structure construction between the retaining wall. 7.根据权利要求1所述的超大型地下工程的先中心区结合周边的施工方法,其特征在于:当地下工程层数较多、开挖较深时,可将中部区域先施工至地下三层楼板,将其作为周边支撑体系的支撑点。7. The construction method of combining the central area with the surrounding areas of the ultra-large underground engineering according to claim 1, characterized in that: when the underground engineering has more layers and the excavation is deeper, the central area can be constructed to the third underground first. One-story floor slabs are used as support points for the surrounding support system. 8.根据权利要求7所述的超大型地下工程的先中心区结合周边的施工方法,其特征在于:开挖较深时,围护墙受到周边土体压力较大,为了减轻周边支撑体系的压力,围护墙的变位和受力控制采用打设多排锚杆土钉(13)做法控制;也可以设临时的角钢斜支撑在中部区域地下三层楼板上,待完成地下二层周边和中部区域楼板后将斜支撑拆除的做法。8. The construction method of combining the central area with the surrounding area of the super-large underground project according to claim 7, characterized in that: when the excavation is deep, the enclosure wall is subject to a relatively large pressure from the surrounding soil, in order to reduce the pressure on the surrounding support system The pressure, displacement and force control of the retaining wall are controlled by laying multiple rows of anchor rods and soil nails (13); temporary angle steel diagonal supports can also be set up on the third floor of the underground in the central area, and the surrounding area of the second underground floor is to be completed. The practice of removing the oblique support behind the floor slab in the middle area.
CN201210516261.XA 2012-12-03 2012-12-03 Method for constructing from central area to periphery of ultra-large type underground engineering Expired - Fee Related CN102995659B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210516261.XA CN102995659B (en) 2012-12-03 2012-12-03 Method for constructing from central area to periphery of ultra-large type underground engineering

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210516261.XA CN102995659B (en) 2012-12-03 2012-12-03 Method for constructing from central area to periphery of ultra-large type underground engineering

Publications (2)

Publication Number Publication Date
CN102995659A true CN102995659A (en) 2013-03-27
CN102995659B CN102995659B (en) 2015-04-08

Family

ID=47924715

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210516261.XA Expired - Fee Related CN102995659B (en) 2012-12-03 2012-12-03 Method for constructing from central area to periphery of ultra-large type underground engineering

Country Status (1)

Country Link
CN (1) CN102995659B (en)

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103541364A (en) * 2013-10-10 2014-01-29 上海申元岩土工程有限公司 Design and construction method of large area foundation pit deformation control with roundabout method
CN104099935A (en) * 2014-04-01 2014-10-15 浙江省建筑设计研究院 Column reinforcement method after foundation pit deepening
CN104963344A (en) * 2015-07-17 2015-10-07 江苏江都建设集团有限公司 Deep foundation pit underground construction method allowing concrete support removal and structure construction to be conducted simultaneously
CN105951843A (en) * 2016-06-17 2016-09-21 中建八局第建设有限公司 Construction method of deep foundation pit
CN106013164A (en) * 2016-06-23 2016-10-12 程华清 Construction method for multifunctional trestle of foundation pit
CN108301332A (en) * 2018-04-10 2018-07-20 安徽宝翔建设集团有限责任公司 The detachable steel trestle construction method of beret slice
CN108442406A (en) * 2018-03-29 2018-08-24 中冶成都勘察研究总院有限公司 A kind of semi-inverse method internal support of foundation pit structure and its construction method
CN115094905A (en) * 2022-08-01 2022-09-23 上海建工一建集团有限公司 Construction method for large-scale foundation pit underground engineering center-to-periphery prefabricated assembly structure
CN115506405A (en) * 2022-10-18 2022-12-23 中国建筑第八工程局有限公司 Semi-inverse construction method for basement structure of ultra-large deep foundation pit
CN116005718A (en) * 2023-02-06 2023-04-25 中国建筑第八工程局有限公司 Construction method for reverse construction engineering subsurface earth structure staggered-layer running water

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1055214A (en) * 1991-05-25 1991-10-09 北京市城建设计研究院 Build the method for the large-scale underground space
JPH05230846A (en) * 1992-02-19 1993-09-07 Fujita Corp Construction method of underground structure by reverse-placing construction method
CN1461857A (en) * 2002-05-30 2003-12-17 吕怀民 Construction method and its use
CN101117805A (en) * 2007-08-22 2008-02-06 浙江大学 A method of multi-purpose semi-upside down method for one pile in underground engineering

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1055214A (en) * 1991-05-25 1991-10-09 北京市城建设计研究院 Build the method for the large-scale underground space
JPH05230846A (en) * 1992-02-19 1993-09-07 Fujita Corp Construction method of underground structure by reverse-placing construction method
CN1461857A (en) * 2002-05-30 2003-12-17 吕怀民 Construction method and its use
CN101117805A (en) * 2007-08-22 2008-02-06 浙江大学 A method of multi-purpose semi-upside down method for one pile in underground engineering

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
徐军: "集合"顺作"与"逆作"优点的"半逆作法"工艺设计及施工探索", 《建筑施工》 *
钱建固等: "SSS法在软土地基基坑围护工程中的应用", 《施工技术》 *

Cited By (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103541364A (en) * 2013-10-10 2014-01-29 上海申元岩土工程有限公司 Design and construction method of large area foundation pit deformation control with roundabout method
CN104099935A (en) * 2014-04-01 2014-10-15 浙江省建筑设计研究院 Column reinforcement method after foundation pit deepening
CN104099935B (en) * 2014-04-01 2015-10-21 浙江省建筑设计研究院 Column reinforcement means after a kind of foundation pit deepened
CN104963344A (en) * 2015-07-17 2015-10-07 江苏江都建设集团有限公司 Deep foundation pit underground construction method allowing concrete support removal and structure construction to be conducted simultaneously
CN105951843B (en) * 2016-06-17 2019-02-15 中建八局第一建设有限公司 A kind of deep foundation pit construction method
CN105951843A (en) * 2016-06-17 2016-09-21 中建八局第建设有限公司 Construction method of deep foundation pit
CN106013164A (en) * 2016-06-23 2016-10-12 程华清 Construction method for multifunctional trestle of foundation pit
CN108442406B (en) * 2018-03-29 2020-10-13 中冶成都勘察研究总院有限公司 Semi-reverse construction method foundation pit inner supporting structure and construction method thereof
CN108442406A (en) * 2018-03-29 2018-08-24 中冶成都勘察研究总院有限公司 A kind of semi-inverse method internal support of foundation pit structure and its construction method
CN108301332A (en) * 2018-04-10 2018-07-20 安徽宝翔建设集团有限责任公司 The detachable steel trestle construction method of beret slice
CN115094905A (en) * 2022-08-01 2022-09-23 上海建工一建集团有限公司 Construction method for large-scale foundation pit underground engineering center-to-periphery prefabricated assembly structure
CN115506405A (en) * 2022-10-18 2022-12-23 中国建筑第八工程局有限公司 Semi-inverse construction method for basement structure of ultra-large deep foundation pit
CN116005718A (en) * 2023-02-06 2023-04-25 中国建筑第八工程局有限公司 Construction method for reverse construction engineering subsurface earth structure staggered-layer running water

Also Published As

Publication number Publication date
CN102995659B (en) 2015-04-08

Similar Documents

Publication Publication Date Title
CN102995659A (en) Method for constructing from central area to periphery of ultra-large type underground engineering
CN104879144B (en) The excavating construction method of the underground space is built with array push pipe in soft clay area
CN102182325A (en) Storey adding method for existing building basement with frame structure and independent foundation
CN110593308B (en) Open excavation back pressure construction method for foundation pit of overhead operation subway underground comprehensive pipe gallery
CN206545215U (en) A kind of precast spliced sinking type garage parking
CN101418577B (en) Construction Method of Covering and Excavating Underground Space Pavement in Soft Soil Area
CN111456081A (en) Pile foundation retaining wall structure and construction method
CN109750571A (en) A road collapse emergency and permanent support integrated structure and construction method
CN220927477U (en) Assembled under-bridge small box girder is as supporting pile to propping construction structure concurrently
CN1958966A (en) Underground consecutive sinking well type openweb wall body, and construction method
CN115450221B (en) A construction method for subway crossing a river
CN102777066B (en) Spiral-tunneling reverse construction method of bucket-shaped screw-type underground garage
CN111335263A (en) Method for building artificial island
CN115012947A (en) Reverse method prefabricated shaft and its construction method
CN213476893U (en) Supporting structure for spanning large underground pipeline foundation pit
KR102021496B1 (en) Retaining wall construction method and retaining wall structure by the method
CN105986830B (en) The tunneling method of construction of roadside strip underground garage
CN113026816A (en) Underpinning reverse-acting open caisson supporting structure for grouting reinforced soil body and construction method
CN104480945A (en) Inversed construction method for foundation pit
CN110939139A (en) Pile slab wall structure based on rigid contact of post-pile special-shaped retaining wall and construction method thereof
CN118029405A (en) Flexible wall partition structure for controlling deformation of long and narrow foundation pit in soft soil area and construction method
CN111305220A (en) Concrete support and structural top plate combined building system based on permanent and temporary combination and construction method thereof
CN112962534B (en) Large-area dredging dredger fill foundation structure and treatment method thereof
CN115262567A (en) An ultra-narrow full hard rock deep foundation pit excavation method
CN103510525A (en) Cascade support method of foundation trench of gravity type cement cob wall combined single-row piles

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20210308

Address after: 310000 16, B block, Rubo International Building, 673, Xihu District, Hangzhou, Zhejiang.

Patentee after: HANGZHOU NANLIAN BASE FOUNDATION ENGINEERING Co.,Ltd.

Address before: 310000 16, B block, Rubo International Building, 673, Xihu District, Hangzhou, Zhejiang.

Patentee before: HANGZHOU NANLIAN BASE FOUNDATION ENGINEERING Co.,Ltd.

Patentee before: Yan Ping

TR01 Transfer of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150408

CF01 Termination of patent right due to non-payment of annual fee