CN103078286A - Current-circulating intelligent ice-melting device for hepta-bundled conductor power transmission line - Google Patents
Current-circulating intelligent ice-melting device for hepta-bundled conductor power transmission line Download PDFInfo
- Publication number
- CN103078286A CN103078286A CN2013100211510A CN201310021151A CN103078286A CN 103078286 A CN103078286 A CN 103078286A CN 2013100211510 A CN2013100211510 A CN 2013100211510A CN 201310021151 A CN201310021151 A CN 201310021151A CN 103078286 A CN103078286 A CN 103078286A
- Authority
- CN
- China
- Prior art keywords
- ice
- sub
- conductor
- current
- plate
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Landscapes
- Driving Mechanisms And Operating Circuits Of Arc-Extinguishing High-Tension Switches (AREA)
Abstract
Description
技术领域 technical field
本发明涉及电压输电技术领域,特别是一种用于七分裂导线的高压输电线路融冰装置。 The invention relates to the technical field of voltage transmission, in particular to a high-voltage transmission line ice-melting device for seven-split conductors.
背景技术 Background technique
在冬季低温度、高湿度的环境中,高压电力输电线路会发生覆冰现象,严重覆冰导致输电线路杆塔倒塌、导线断线等影响电力系统安全可靠运行的重大事故,引起电网大面积停电,严重影响工农业生产和人民生活,并造成巨大经济损失。 In the environment of low temperature and high humidity in winter, high-voltage power transmission lines will be covered with icing. Severe icing will lead to major accidents such as the collapse of transmission line towers and broken wires that affect the safe and reliable operation of the power system, causing large-scale power outages in the power grid. Seriously affect industrial and agricultural production and people's lives, and cause huge economic losses.
高压输电线路防冰、融冰和除冰一直是国内外关注的焦点。现有的高压输电线路除冰防冰技术尚不成熟,不能满足大面积防冰除冰的要求,部分除冰技术虽可在工程中应用,但需在外加设备或人工操作指导下进行。如公开号CN101527442A的中国发明专利公布说明书所公开的一种多根导线的防冰输电线路,它是在多根导线输电线路的两端增加融冰开关,不需要融冰时各导线均正常通电,覆冰后需要融冰时中断供电,采取手动操作开关的方式,使一根导线传输电流,其余导线断开,手动操作逐步使各导线的冰层融化。该方法需要增设开关装置,改变输电线路的结构,融冰过程必须中断供电,融冰存在安全隐患且操作极其不方便,融冰成本高,融冰启动和终止均需人为主观干预,不能区别对待不同程度的覆冰线段和实现实时防冰,对于超高压线路用开关闸分合导线不可行,特别是不能满足特高压分裂导线的防冰;又如公开号CN101459327的中国发明专利所公开的一种多分裂输电线路自动融冰方法及其专用开关,它是采用在覆冰输电线路两端变电站安装专用开关,然后人工遥控发出指令,使专用开关发生动作实现输电线路电流全部转移至待融冰的子导线,该子导线发热、融冰,该发明专利需要人工判断现场线路是否存在覆冰,并需电力调度部门配合调节线路负荷,最后在现场人工遥控发出融冰指令,无法实现根据覆冰程度的需要分区段和实时智能融冰,对于微气候微气象等局部覆冰区段技术人员很难赶到现场观测覆冰情况和发出融冰指令。 Anti-icing, melting and deicing of high-voltage transmission lines have always been the focus of attention at home and abroad. The existing deicing and anti-icing technology for high-voltage transmission lines is still immature and cannot meet the requirements of large-area anti-icing and deicing. Although some deicing technologies can be applied in engineering, they need to be carried out under the guidance of external equipment or manual operation. A kind of anti-icing power transmission line of multiple wires disclosed in the Chinese invention patent publication specification with publication number CN101527442A, it is to add ice-melting switches at both ends of the power transmission line of multiple wires, and each wire is normally energized when it does not need to melt ice , When the ice needs to be melted after the ice is covered, the power supply is interrupted, and the manual operation switch is adopted to make one wire transmit current, and the other wires are disconnected, and the manual operation gradually melts the ice layer of each wire. This method needs to add switchgear and change the structure of the transmission line. The power supply must be interrupted during the ice melting process. There are safety hazards in ice melting and extremely inconvenient operation. The cost of ice melting is high. Different degrees of ice-coated line sections and real-time anti-icing are not feasible for the switch breaker wires used in ultra-high voltage lines, especially the anti-icing of UHV split wires cannot be satisfied; A multi-split transmission line automatic melting ice method and its special switch, which is to install special switches in the substations at both ends of the ice-covered transmission line, and then manually remote control to issue instructions to make the special switch move to realize the transfer of all currents of the transmission line to ice-melting The sub-conductor of the sub-conductor, the sub-conductor generates heat and melts ice. This invention patent needs to manually judge whether the on-site line is covered with ice, and needs the power dispatching department to cooperate with the adjustment of the line load. It is difficult for technicians in local ice-covered sections such as micro-climate and micro-meteorology to rush to the scene to observe the ice-covered situation and issue ice-melting instructions.
发明内容 Contents of the invention
本发明的目的是提供一种应用于七分裂导线输电线路的电流循环智能融冰装置,它根据环境条件和覆冰状态的测量结果,自动控制断路器开、合,将七分裂导线输电线路传输的负荷电流分别转移至单根子导线,增大子导线电流密度达到融冰目的。 The object of the present invention is to provide a current circulation intelligent ice-melting device applied to the seven-split wire transmission line, which automatically controls the opening and closing of the circuit breaker according to the measurement results of the environmental conditions and the ice-covered state, and transmits the seven-split wire transmission line The load current is transferred to a single sub-wire respectively, and the current density of the sub-wire is increased to achieve the purpose of melting ice.
本发明的目的是通过这样的技术方案实现的,它包括有七个电流输入端R、七个电流输出端S和设置在电流输入端与电流输出端之间的电流循环智能融冰装置主体,所述电流循环智能融冰装置主体包括有汇流导电板、分流导电板、隔离板、参考电压板和安装有电流输出端的电流输出板,七个电流输入端R固定在汇流导电板上,汇流导电板与分流导电板之间由作为取电互感器的一次线圈导电棒连接,在分流导电板上设置有七根导电杆,七根导电杆穿过隔离板连接到参考电压板上,在电流输出板和隔离板之间设置有七个带旁路开关的断路器,每个断路器的灭弧室一端均与电流输出板固定并连接到一个对应的电流输出端S,断路器的灭弧室另一端穿过参考电压板,并与一个断路器的执行机构连接,在分流导电板上还设置有智能控制器和内置覆冰参数监测单元,智能控制器和内置覆冰参数监测单元位于隔离板与分流导电板之间,智能控制器分别与内置覆冰参数监测单元和执行机构电连接。 The object of the present invention is achieved through such a technical solution, which includes seven current input terminals R, seven current output terminals S and a current circulation intelligent ice-melting device main body arranged between the current input terminals and the current output terminals, The main body of the current circulation intelligent ice-melting device includes a confluence conductive plate, a shunt conductive plate, an isolation plate, a reference voltage plate, and a current output plate equipped with current output terminals. The seven current input terminals R are fixed on the confluence conductive plate, and the confluence conduction The plate and the shunt conductive plate are connected by a primary coil conductive rod as a power-taking transformer. Seven conductive rods are arranged on the shunt conductive plate, and the seven conductive rods pass through the isolation plate and are connected to the reference voltage plate. There are seven circuit breakers with bypass switches between the board and the isolation board. One end of the arc extinguishing chamber of each circuit breaker is fixed with the current output board and connected to a corresponding current output terminal S. The arc extinguishing chamber of the circuit breaker The other end passes through the reference voltage board and is connected to an actuator of a circuit breaker. An intelligent controller and a built-in ice coating parameter monitoring unit are also arranged on the shunt conductive plate. The intelligent controller and the built-in ice coating parameter monitoring unit are located on the isolation board Between the shunt conductive plate, the intelligent controller is electrically connected with the built-in ice coating parameter monitoring unit and the actuator respectively.
进一步,所述智能控制器、执行机构和内置覆冰参数监测单元由以参考电压板为基准的取电互感器供电。 Further, the intelligent controller, the actuator and the built-in icing parameter monitoring unit are powered by a power-taking transformer based on the reference voltage board.
进一步,所述断路器和旁路开关均设置独立的执行机构。 Further, both the circuit breaker and the bypass switch are provided with independent actuators.
进一步,所述装置还包括有外置覆冰参数监测单元,外置覆冰参数监测单元用于监测环境参数、导线温度、导线电流和导线覆冰荷载状况,并将监测到的数据通过无线通信和有线连接两种方式发送至智能控制器。 Further, the device also includes an external icing parameter monitoring unit, which is used to monitor environmental parameters, conductor temperature, conductor current and conductor icing load status, and transmit the monitored data through wireless communication Send it to the intelligent controller in two ways: wired connection and wired connection.
进一步,所述分流导电板包括有绝缘子板和导电子板,导电子板嵌于绝缘子板的中心位置,导电子板上设置有七个用于穿过导电杆的孔和一个用于安装取电互感器的孔。 Further, the shunt conductive plate includes an insulator plate and a conductive sub-plate, the conductive sub-plate is embedded in the center of the insulator plate, and the conductive sub-plate is provided with seven holes for passing through the conductive rod and one for installing and taking electricity. hole for the transformer.
进一步,所述装置还包括有两根分别依次穿过汇流导电板、分流导电板、隔离板、参考电压板和电流输出板的绝缘杆。 Further, the device also includes two insulating rods which respectively pass through the busbar conductive plate, the shunt conductive plate, the isolation plate, the reference voltage plate and the current output plate in sequence.
进一步,所述装置还包括有绝缘外壳,汇流导电板、分流导电板、隔离板、参考电压板和电流输出板均安装在绝缘外壳内。 Further, the device also includes an insulating shell, and the converging conductive plate, the shunting conductive plate, the isolation plate, the reference voltage plate and the current output plate are all installed in the insulating shell.
由于采用了上述技术方案,本发明具有如下的优点: Owing to adopting above-mentioned technical scheme, the present invention has following advantage:
本发明可以通过内置和外置二种方式的覆冰参数监测单元检测到的外部环境条件判断是否出现覆冰现象,智能控制器控制断路器的开合,将七分裂导线输电线路传输的负荷电流转移至一部分子导线上,增大子导线电流密度达到融冰目的,智能控制器根据取电传感器测量的负荷电流和外部环境参数自动计算融冰时间,在该部分子导线完融冰后,控制断路器将电流依次转移至另一部分子导线上,直至七根子导线表面冰层全部融化脱落,然后恢复正常工作状态。本发明在工作过程中,由智能控制器整体控制,智能控制器工作的判断标准由取电互感器和内置和外置二种方式的覆冰参数监测单元提供,可以实现无人工干预的输电线路融冰工作。 In the present invention, the external environmental conditions detected by the built-in and external icing parameter monitoring units can be used to judge whether icing phenomenon occurs, and the intelligent controller controls the opening and closing of the circuit breaker to transfer the load current Transfer to a part of the sub-conductor, increase the current density of the sub-conductor to achieve the purpose of ice melting, the intelligent controller automatically calculates the ice-melting time according to the load current measured by the power-taking sensor and the external environment parameters, after the part of the sub-conductor completes the ice melting, the control The circuit breaker transfers the current to another sub-conductor in turn until the ice layer on the surface of the seven sub-conductors melts and falls off, and then returns to normal working condition. In the working process of the present invention, it is controlled by the intelligent controller as a whole, and the judgment standard of the intelligent controller is provided by the power transformer and the ice-covered parameter monitoring unit in two ways, the built-in and the external, which can realize the transmission line without manual intervention Melting works.
本发明的其他优点、目标和特征在某种程度上将在随后的说明书中进行阐述,并且在某种程度上,基于对下文的考察研究对本领域技术人员而言将是显而易见的,或者可以从本发明的实践中得到教导。本发明的目标和其他优点可以通过下面的说明书和权利要求书来实现和获得。 Other advantages, objects and features of the present invention will be set forth in the following description to some extent, and to some extent, will be obvious to those skilled in the art based on the investigation and research below, or can be obtained from It is taught in the practice of the present invention. The objects and other advantages of the invention will be realized and attained by the following description and claims.
附图说明 Description of drawings
本发明的附图说明如下。 The accompanying drawings of the present invention are described as follows.
图1为本发明的结构示意图; Fig. 1 is a structural representation of the present invention;
图2为本发明的工作流程图; Fig. 2 is a work flow chart of the present invention;
图3为智能控制器的程序控制框图; Fig. 3 is the program control block diagram of intelligent controller;
图4为分流导电板结构示意图。 Fig. 4 is a schematic diagram of the structure of the shunt conductive plate.
图中:1. 汇流导电板;2. 取电互感器;3. 分流导电板;4. 隔离板;5. 参考电压板;6. 绝缘输出板;7. 导电杆;8. 内置覆冰参数监测单元;9. 智能控制器;10. 断路器;11. 旁路开关;12. 执行机构;13. 导电子板;14. 绝缘子板;15. 绝缘外壳;16. 绝缘杆。 In the figure: 1. Convergence conductive plate; 2. Power transformer; 3. Shunt conductive plate; 4. Isolation plate; 5. Reference voltage plate; 6. Insulation output plate; 7. Conductive rod; Monitoring unit; 9. Intelligent controller; 10. Circuit breaker; 11. Bypass switch; 12. Executing agency; 13. Conductive electronic board; 14. Insulator board;
具体实施方式 Detailed ways
下面结合附图和实施例对本发明作进一步说明。 The present invention will be further described below in conjunction with drawings and embodiments.
如图1所示,电流输入端R经汇流导电板1将七分裂导线各子导线的传输电流集中,利用取电互感器2测量七分裂导线输电线路传输电流总值,经分流导电板3和导电杆7传输至参考电压板5,参考电压板5连接着所有断路器10和并联旁路开关11的一端,断路器10和旁路开关11的另一端分别连接着固定于绝缘输出板6的子导线电流输出端子S,且每一根子导线对应连接着一个断路器10和一个并联旁路开关11,七个断路器10初始状态为闭合状态,七个并联旁路开关11初始状态处于开断状态。智能控制器9根据外置覆冰参数监测单元和内置覆冰参数监测单元8测量结果和内置的控制程序,发出是否启动融冰指令。隔离板4用于将执行机构12与智能控制器9、内置覆冰参数监测单元8进行隔离和保护。参考电压板5是取电互感器的电源电压参考点,取电互感器为执行机构12、内置覆冰参数监测单元8和智能控制器9提供工作电源。旁路开关11在断路器10失效时提供电流通道。绝缘杆16分别连接着汇流导电板1、分流导电板3、隔离板4、参考电压板5和绝缘输出板6,用于机械固定和安装定位。
As shown in Figure 1, the current input terminal R concentrates the transmission current of each sub-conductor of the seven-split wire through the confluence conductive plate 1, and uses the power-taking transformer 2 to measure the total value of the transmission current of the seven-split wire transmission line, and passes through the shunt conductive plate 3 and The
如图4所示,分流导电板3包括有绝缘子板14和导电子板13,导电子板13嵌于绝缘子板3的中心位置,导电子板13上设置有七个用于穿过导电杆7的孔,并在其中心设置一个用于安装取电互感器2一次导电棒的孔。
As shown in Figure 4, the shunt conductive plate 3 includes an insulator plate 14 and a conductive sub-plate 13, the conductive sub-plate 13 is embedded in the center of the insulator plate 3, and the conductive sub-plate 13 is provided with seven for passing through the
若智能控制器9判断不需要启动融冰,则智能控制器9发出指令至执行机构12,执行机构确定断路器10和旁路开关11保持在初始状态,使七分裂各子导线按正常传输电流状态下运行。
If the
当智能控制器9判断需要启动融冰时,通过控制相应断路器的开关,可以执行以下融冰方式:
When the
融冰方式一 Melting method one
1) 根据装置内置和外置的环境参数、覆冰状态和取电传感器测量的负荷电流的测量结果,利用七分裂导线输电线路电流循环智能融冰装置将输电线路传输电流自动转移至其中子导线Ⅰ、子导线Ⅱ和子导线Ⅲ上,使该三根子导线电流增大、发热,根据覆冰状态和取电传感器测量的负荷电流自动计算融冰时间,在自动计算的时间内融化该子导线的冰层。智能控制器9发出指令至执行机构12,然后由执行机构12确定子导线Ⅳ、子导线Ⅴ、子导线Ⅵ、子导线Ⅶ所连接的断路器10动作“开断”使七分裂导线输电线路传输电流转移至子导线Ⅰ、子导线Ⅱ、子导线Ⅲ上,使子导线Ⅰ、子导线Ⅱ、子导线Ⅲ发热、融冰,由智能控制器9确定融冰时间。
1) According to the measurement results of the built-in and external environmental parameters of the device, the icing state and the load current measured by the power-taking sensor, the transmission current of the transmission line is automatically transferred to the neutron wire by using the seven-split wire transmission line current circulation intelligent ice-melting device Ⅰ. On the sub-conductor II and sub-conductor III, the current of the three sub-conductors is increased and heated, and the ice-melting time is automatically calculated according to the ice-covered state and the load current measured by the power-taking sensor, and the ice of the sub-conductor is melted within the automatically calculated time layer. The
2) 子导线Ⅰ、子导线Ⅱ和子导线Ⅲ的冰层融化结束,七分裂导线输电线路电流循环融冰装置自动将输电线路传输电流智能转移至子导线Ⅳ、子导线Ⅴ、子导线Ⅵ、子导线Ⅶ,使该四根子导线电流增大、发热,根据覆冰状态和取电传感器测量的负荷电流自动计算融冰时间,在自动计算的时间内融化该子导线的冰层。步骤1)中,如果子导线Ⅰ、子导线Ⅱ、子导线Ⅲ融冰结束,由智能控制器9发出指令至执行机构12,首先使子导线Ⅳ、子导线Ⅴ、子导线Ⅵ、子导线Ⅶ所连接的断路器10动作“闭合”,然后子导线Ⅰ、子导线Ⅱ、子导线Ⅲ所连接的断路器10动作“开断”,则七分裂导线输电线路传输电流转移至子导线Ⅳ、子导线Ⅴ、子导线Ⅵ、子导线Ⅶ上,使子导线Ⅳ、子导线Ⅴ、子导线Ⅵ、子导线Ⅶ发热、融冰,由智能控制器9确定融冰时间。
2) After the ice melting of the sub-conductor I, sub-conductor II and sub-conductor III ends, the seven-split conductor transmission line current circulation ice melting device automatically and intelligently transfers the transmission current of the transmission line to the sub-conductor IV, sub-conductor V, sub-conductor VI, sub-conductor Conductor VII increases the current of the four sub-conductors and generates heat, automatically calculates the ice-melting time according to the icing state and the load current measured by the power-taking sensor, and melts the ice layer of the sub-conductors within the automatically calculated time. In step 1), if sub-conductor I, sub-conductor II, and sub-conductor III are thawed, the
3) 当7根子导线的冰层全部融冰结束,智能装置恢复正常传输电流的导通状态,等待下一个覆冰过程和启动下一次融冰过程,以这种方法达到循环除冰的目的。 3) When the ice layer of the 7 sub-conductors is completely melted, the smart device returns to the conduction state of the normal transmission current, waits for the next ice coating process and starts the next ice melting process, and achieves the purpose of cyclic deicing in this way.
融冰方式二 Melting method two
1) 根据装置内置和外置的环境参数、覆冰状态和取电传感器测量的负荷电流的测量结果,利用七分裂导线输电线路电流循环智能融冰装置将输电线路传输电流自动转移至其中子导线Ⅰ和子导线Ⅱ上,使该二根子导线电流增大、发热,根据覆冰状态和取电传感器测量的负荷电流自动计算融冰时间,在自动计算的时间内融化该子导线的冰层。智能控制器9发出指令至执行机构12,然后由执行机构12确定子导线Ⅲ、子导线Ⅳ、子导线Ⅴ、子导线Ⅵ、子导线Ⅶ所连接的断路器10动作“开断”使七分裂导线输电线路传输电流转移至子导线Ⅰ和子导线Ⅱ上,使子导线Ⅰ和子导线Ⅱ发热、融冰,由智能控制器9确定融冰时间
1) According to the measurement results of the built-in and external environmental parameters of the device, the icing state and the load current measured by the power-taking sensor, the transmission current of the transmission line is automatically transferred to the neutron wire by using the seven-split wire transmission line current circulation intelligent ice-melting device On I and sub-conductor II, the current of the two sub-conductors is increased and heated, and the ice-melting time is automatically calculated according to the ice-covered state and the load current measured by the power-taking sensor, and the ice layer of the sub-conductor is melted within the automatically calculated time. The
2) 子导线Ⅰ和子导线Ⅱ的冰层融化结束,根据装置内置和外置的环境参数、覆冰状态和取电传感器测量的负荷电流的测量结果,利用七分裂导线输电线路电流循环智能融冰装置将输电线路传输电流自动转移至其中子导线Ⅲ和子导线Ⅳ上,使该二根子导线电流增大、发热,根据覆冰状态和取电传感器测量的负荷电流自动计算融冰时间,在自动计算的时间内融化该子导线的冰层。步骤1)中,如果子导线Ⅰ和子导线Ⅱ融冰结束,由智能控制器9发出指令至执行机构12,首先使子导线Ⅲ和子导线Ⅳ所连接的断路器10动作“闭合”,然后子导线Ⅰ和子导线Ⅱ所连接的断路器10动作“开断”,则七分裂导线输电线路传输电流转移至子导线Ⅲ和子导线Ⅳ上,使子导线Ⅲ和子导线Ⅳ发热、融冰,由智能控制器9确定融冰时间。
2) After the melting of the ice layer of sub-conductor Ⅰ and sub-conductor Ⅱ is completed, according to the measurement results of the built-in and external environmental parameters of the device, the ice-covered state and the load current measured by the power-taking sensor, the current circulation of the seven-split conductor transmission line is used to intelligently melt the ice The device automatically transfers the transmission current of the transmission line to its sub-conductor III and sub-conductor IV, so that the current of the two sub-conductors increases and heats up, and the ice-melting time is automatically calculated according to the icing state and the load current measured by the power-taking sensor. Melt the ice layer of the sub-conductor within the time. In step 1), if the sub-conductor I and sub-conductor II are completely thawed, the
3) 如果子导线Ⅲ和子导线Ⅳ的冰层融化结束,根据装置内置和外置的环境参数、覆冰状态和取电传感器测量的负荷电流的测量结果,利用七分裂导线输电线路电流循环智能融冰装置将输电线路传输电流自动转移至其中子导线Ⅴ和子导线Ⅵ上,使该二根子导线电流增大、发热,根据覆冰状态和取电传感器测量的负荷电流自动计算融冰时间,在自动计算的时间内融化该子导线的冰层。步骤2)中,如果子导线Ⅲ和子导线Ⅳ融冰结束,由智能控制器9发出指令至执行机构12,首先使子导线Ⅴ和子导线Ⅵ所连接的断路器10动作“闭合”,然后子导线Ⅲ和子导线Ⅳ所连接的断路器10动作“开断”,则七分裂导线输电线路传输电流转移至子导线Ⅴ和子导线Ⅵ上,使子导线Ⅴ和子导线Ⅵ发热、融冰,由智能控制器9确定融冰时间。
3) If the ice melting of the sub-conductor III and sub-conductor IV ends, according to the built-in and external environmental parameters of the device, the icing state and the measurement results of the load current measured by the power-taking sensor, use the seven-split conductor transmission line current cycle intelligent melting The ice device automatically transfers the transmission current of the transmission line to its sub-conductor V and sub-conductor VI, so that the current of the two sub-conductors increases and heats up, and the ice-melting time is automatically calculated according to the icing state and the load current measured by the power-taking sensor. Melt the ice layer of the sub-conductor within the calculated time. In step 2), if the sub-conductor III and sub-conductor IV are completely thawed, the
4) 子导线Ⅴ和子导线Ⅵ的冰层融化结束,根据装置内置和外置的环境参数、覆冰状态和取电传感器测量的负荷电流的测量结果,利用七分裂导线输电线路电流循环智能融冰装置将输电线路传输电流自动转移至其中子导线Ⅰ和子导线Ⅶ上,使该二根子导线电流增大、发热,根据覆冰状态和取电传感器测量的负荷电流自动计算融冰时间,在自动计算的时间内融化该子导线的冰层。步骤3)中,如果子导线Ⅴ和子导线Ⅵ融冰结束,由智能控制器9发出指令至执行机构12,首先使子导线Ⅰ和子导线Ⅶ所连接的断路器10动作“闭合”,然后子导线Ⅴ和子导线Ⅵ所连接的断路器10动作“开断”,则七分裂导线输电线路传输电流转移至子导线Ⅰ和子导线Ⅶ上,使子导线Ⅰ和子导线Ⅶ发热、融冰,由智能控制器9确定融冰时间。
4) After the melting of the ice layer of sub-conductor Ⅴ and sub-conductor Ⅵ is over, according to the built-in and external environmental parameters of the device, the icing state and the measurement results of the load current measured by the power-taking sensor, the current circulation of the seven-split conductor transmission line is used to intelligently melt the ice The device automatically transfers the transmission current of the transmission line to the sub-conductor I and sub-conductor VII, so that the current of the two sub-conductors increases and heats up, and the ice-melting time is automatically calculated according to the icing state and the load current measured by the power-taking sensor. Melt the ice layer of the sub-conductor within the time. In step 3), if the sub-conductor V and sub-conductor VI are completely thawed, the
5) 当7根子导线的冰层全部融冰结束,智能装置恢复正常传输电流的导通状态,等待下一个覆冰过程和启动下一次融冰过程,以这种方法达到循环除冰的目的。 5) When the ice layer of the 7 sub-conductors is completely melted, the smart device returns to the conduction state of the normal transmission current, waits for the next ice coating process and starts the next ice melting process, and achieves the purpose of cyclic deicing in this way.
融冰方式三 Melting method three
1) 根据装置内置和外置的环境参数、覆冰状态和取电传感器测量的负荷电流的测量结果,利用七分裂导线输电线路电流循环智能融冰装置将输电线路传输电流自动转移至其中子导线Ⅰ、子导线Ⅱ和子导线Ⅲ上,使该三根子导线电流增大、发热,根据覆冰状态和取电传感器测量的负荷电流自动计算融冰时间,在自动计算的时间内融化该子导线的冰层。智能控制器9发出指令至执行机构12,然后由执行机构12确定子导线Ⅳ、子导线Ⅴ、子导线Ⅵ、子导线Ⅶ所连接的断路器10动作“开断”使七分裂导线输电线路传输电流转移至子导线Ⅰ、子导线Ⅱ和子导线Ⅲ上,使子导线Ⅰ、子导线Ⅱ和子导线Ⅲ发热、融冰,由智能控制器9确定融冰时间
1) According to the measurement results of the built-in and external environmental parameters of the device, the icing state and the load current measured by the power-taking sensor, the transmission current of the transmission line is automatically transferred to the neutron wire by using the seven-split wire transmission line current circulation intelligent ice-melting device Ⅰ. On the sub-conductor II and sub-conductor III, the current of the three sub-conductors is increased and heated, and the ice-melting time is automatically calculated according to the ice-covered state and the load current measured by the power-taking sensor, and the ice of the sub-conductor is melted within the automatically calculated time layer. The
2) 导线Ⅰ、子导线Ⅱ和子导线Ⅲ的冰层融化结束,根据装置内置和外置的环境参数、覆冰状态和取电传感器测量的负荷电流的测量结果,利用七分裂导线输电线路电流循环智能融冰装置将输电线路传输电流自动转移至其中子导线Ⅳ、子导线Ⅴ和子导线Ⅵ上,使该三根子导线电流增大、发热,根据覆冰状态和取电传感器测量的负荷电流自动计算融冰时间,在自动计算的时间内融化该子导线的冰层。步骤1)中,导线Ⅰ、子导线Ⅱ和子导线Ⅲ融冰结束,由智能控制器9发出指令至执行机构12,首先使子导线Ⅳ、子导线Ⅴ和子导线Ⅵ所连接的断路器10动作“闭合”,然后导线Ⅰ、子导线Ⅱ和子导线Ⅲ所连接的断路器10动作“开断”,则七分裂导线输电线路传输电流转移至子导线Ⅳ、子导线Ⅴ和子导线Ⅵ上,使子导线Ⅳ、子导线Ⅴ和子导线Ⅵ发热、融冰,由智能控制器9确定融冰时间。
2) After the melting of the ice layer of conductor I, sub-conductor II and sub-conductor III is completed, according to the measurement results of the built-in and external environmental parameters of the device, the ice-covered state and the load current measured by the power-taking sensor, the current circulation of the transmission line using the seven-split conductor The intelligent ice-melting device automatically transfers the transmission current of the transmission line to the sub-conductor IV, sub-conductor V and sub-conductor VI, so that the current of the three sub-conductors increases and generates heat, and the melting is automatically calculated according to the icing state and the load current measured by the power sensor. Ice time, to melt the ice layer of the sub-wire within the automatically calculated time. In step 1), the melting of wire I, sub-wire II and sub-wire III is completed, and the
3) 子导线Ⅳ、子导线Ⅴ和子导线Ⅵ的冰层融化结束,根据装置内置和外置的环境参数、覆冰状态和取电传感器测量的负荷电流的测量结果,利用七分裂导线输电线路电流循环智能融冰装置将输电线路传输电流自动转移至其中子导线Ⅰ、子导线Ⅱ和子导线Ⅶ上,使该三根子导线电流增大、发热,根据覆冰状态和取电传感器测量的负荷电流自动计算融冰时间,在自动计算的时间内融化该子导线的冰层。步骤2)中,如果子导线Ⅳ、子导线Ⅴ和子导线Ⅵ融冰结束,由智能控制器9发出指令至执行机构12,首先使子导线Ⅰ、子导线Ⅱ和子导线Ⅶ所连接的断路器10动作“闭合”,然后子导线Ⅳ、子导线Ⅴ和子导线Ⅵ所连接的断路器10动作“开断”,则七分裂导线输电线路传输电流转移至子导线Ⅰ、子导线Ⅱ和子导线Ⅶ上,使子导线Ⅰ、子导线Ⅱ和子导线Ⅶ发热、融冰,由智能控制器9确定融冰时间
3) After the melting of the ice layer of the sub-conductor IV, sub-conductor V and sub-conductor VI is completed, according to the measurement results of the built-in and external environmental parameters of the device, the ice-covered state and the load current measured by the power-taking sensor, the transmission line current of the seven-split conductor is used to The circulating intelligent ice-melting device automatically transfers the transmission current of the transmission line to the sub-conductor I, sub-conductor II and sub-conductor VII, so that the current of the three sub-conductors increases and heats up, and is automatically calculated according to the icing state and the load current measured by the power-taking sensor Ice melting time, to melt the ice layer of the sub-conductor within the automatically calculated time. In step 2), if sub-conductor IV, sub-conductor V and sub-conductor VI are thawed, the
4) 当7根子导线的冰层全部融冰结束,智能装置恢复正常传输电流的导通状态,等待下一个覆冰过程和启动下一次融冰过程,以这种方法达到循环除冰的目的 4) When all the ice layers of the 7 sub-conductors are completely thawed, the smart device returns to the conduction state of the normal transmission current, waits for the next icing process and starts the next icing process, and achieves the purpose of cyclic deicing in this way
如图2所示,外置覆冰参数监测单元实时监测环境参数、导线温度、导线电流和导线覆冰荷载状况,并将上述参数通过无线方式实时传输给智能控制器9,内置覆冰参数监测单元8实时监测环境参数、导线温度、导线电流和导线覆冰荷载状况,并将上述参数通过有线方式实时传输给智能控制器9,智能控制器9根据外置覆冰参数监测单元、内置覆冰参数监测单元8和取电互感器2所提供的数据,根据内置的控制程序发出指令至执行机构12决定断路器10和并联旁路开关11的工作状态。
As shown in Figure 2, the external icing parameter monitoring unit monitors the environmental parameters, wire temperature, wire current and wire icing load in real time, and transmits the above parameters to the
最后说明的是,以上实施例仅用以说明本发明的技术方案而非限制,尽管参照较佳实施例对本发明进行了详细说明,本领域的普通技术人员应当理解,可以对本发明的技术方案进行修改或者等同替换,而不脱离本技术方案的宗旨和范围,其均应涵盖在本发明的权利要求范围当中。 Finally, it is noted that the above embodiments are only used to illustrate the technical solutions of the present invention without limitation. Although the present invention has been described in detail with reference to the preferred embodiments, those of ordinary skill in the art should understand that the technical solutions of the present invention can be carried out Modifications or equivalent replacements, without departing from the spirit and scope of the technical solution, should be included in the scope of the claims of the present invention.
Claims (7)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201310021151.0A CN103078286B (en) | 2013-02-16 | 2013-02-16 | Current-circulating intelligent ice-melting device for hepta-bundled conductor power transmission line |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201310021151.0A CN103078286B (en) | 2013-02-16 | 2013-02-16 | Current-circulating intelligent ice-melting device for hepta-bundled conductor power transmission line |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| CN103078286A true CN103078286A (en) | 2013-05-01 |
| CN103078286B CN103078286B (en) | 2015-05-13 |
Family
ID=48154735
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201310021151.0A Active CN103078286B (en) | 2013-02-16 | 2013-02-16 | Current-circulating intelligent ice-melting device for hepta-bundled conductor power transmission line |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN103078286B (en) |
Citations (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPH01202110A (en) * | 1988-02-05 | 1989-08-15 | Hitachi Ltd | Ice and snow removing method for transmission line and its device |
| CN101409438A (en) * | 2008-07-25 | 2009-04-15 | 中国电力工程顾问集团西北电力设计院 | Ice-melting method suitable for transmission line with multiple fission conductor |
| CN101459327A (en) * | 2009-01-07 | 2009-06-17 | 何彪 | Automatic ice melting method for multiple division electricity transmission line and special switch thereof |
| CN101710683A (en) * | 2009-12-25 | 2010-05-19 | 重庆大学 | Intelligent circulation anti-icing method for transmitting current by split lead |
-
2013
- 2013-02-16 CN CN201310021151.0A patent/CN103078286B/en active Active
Patent Citations (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPH01202110A (en) * | 1988-02-05 | 1989-08-15 | Hitachi Ltd | Ice and snow removing method for transmission line and its device |
| CN101409438A (en) * | 2008-07-25 | 2009-04-15 | 中国电力工程顾问集团西北电力设计院 | Ice-melting method suitable for transmission line with multiple fission conductor |
| CN101459327A (en) * | 2009-01-07 | 2009-06-17 | 何彪 | Automatic ice melting method for multiple division electricity transmission line and special switch thereof |
| CN101710683A (en) * | 2009-12-25 | 2010-05-19 | 重庆大学 | Intelligent circulation anti-icing method for transmitting current by split lead |
Non-Patent Citations (1)
| Title |
|---|
| 舒立春等: "智能循环电流融冰方法及其临界融冰电流研究", 《电工技术学报》, vol. 27, no. 10, 31 October 2012 (2012-10-31), pages 26 - 34 * |
Also Published As
| Publication number | Publication date |
|---|---|
| CN103078286B (en) | 2015-05-13 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN101710683A (en) | Intelligent circulation anti-icing method for transmitting current by split lead | |
| CN101409438B (en) | Ice-melting method suitable for transmission line with multiple fission conductor | |
| CN103050917B (en) | Intelligent device for circularly melting ice on power transmission line with twelve split sub-conductors by current | |
| CN103094869B (en) | Electric transmission line current circulation intelligent ice melting device of five divided conductors | |
| CN103050918B (en) | Intelligent device for circularly melting ice on power transmission line with four split sub-conductors by current | |
| CN103701080A (en) | Method for melting ice by utilizing power transmission circuit load current | |
| CN103050920B (en) | Binary fission wire transmission line current cycle intelligence deicing device | |
| CN107727254A (en) | A wireless real-time monitoring device for reactor operating temperature | |
| CN103050923B (en) | Intelligent device for circularly melting ice on power transmission line with eight split sub-conductors by current | |
| CN104124077A (en) | Electric switching-on device and switch inversing system of electrical equipment | |
| CN103050921B (en) | Intelligent device for circularly melting ice on power transmission line with six split sub-conductors by current | |
| CN103066543B (en) | Current circulating smart ice melting device of three-bundle-conductor electric transmission line | |
| CN201178294Y (en) | Automation apparatus of composite distribution network | |
| CN101295863A (en) | Automatic heating ice and snow resistant overhead power line capable of ensuring stable operation of power grid without power outage | |
| CN103078286B (en) | Current-circulating intelligent ice-melting device for hepta-bundled conductor power transmission line | |
| CN103078285B (en) | Nine-bundle conductor transmission line current circulation intelligent ice-melting device | |
| CN103050919B (en) | Intelligent device for circularly melting ice on power transmission line with ten split sub-conductors by current | |
| CN103050922B (en) | Intelligent device for circularly melting ice on power transmission line with eleven split sub-conductors by current | |
| CN113078603A (en) | Ice melting device for power line | |
| CN114421402A (en) | Ground wire ice melting operation one-key sequence control system based on OPGW communication | |
| CN204044652U (en) | Terminal box intelligent heater | |
| CN104158137A (en) | Control system for current circulating ice melting apparatus | |
| CN205945214U (en) | 380V uses power spare power automatic switching system in station | |
| CN215120054U (en) | Ice melting device for power line | |
| CN204205517U (en) | A kind of automatic defrosting snow device of transmission system |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C06 | Publication | ||
| PB01 | Publication | ||
| C10 | Entry into substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| C14 | Grant of patent or utility model | ||
| GR01 | Patent grant | ||
| CP01 | Change in the name or title of a patent holder | ||
| CP01 | Change in the name or title of a patent holder |
Address after: No. 6 Fengqi Road, Caijiagang Town, Beibei District, Chongqing, 400707 Patentee after: Chongqing Guangren Iron Tower Manufacture Co.,Ltd. Patentee after: Chongqing University Address before: No. 6 Fengqi Road, Caijiagang Town, Beibei District, Chongqing, 400707 Patentee before: CHONGQING GUANGREN TOWER MANUFACTURING Co.,Ltd. Patentee before: Chongqing University |