CN103473447A - Method of estimating performance degradation of motor actuator - Google Patents

Method of estimating performance degradation of motor actuator Download PDF

Info

Publication number
CN103473447A
CN103473447A CN2013103868045A CN201310386804A CN103473447A CN 103473447 A CN103473447 A CN 103473447A CN 2013103868045 A CN2013103868045 A CN 2013103868045A CN 201310386804 A CN201310386804 A CN 201310386804A CN 103473447 A CN103473447 A CN 103473447A
Authority
CN
China
Prior art keywords
topworks
motor
data
ageing
appraisal procedure
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2013103868045A
Other languages
Chinese (zh)
Inventor
申景双
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHANGHAI HAIWEI INDUSTRY CONTROL Co Ltd
Original Assignee
SHANGHAI HAIWEI INDUSTRY CONTROL Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHANGHAI HAIWEI INDUSTRY CONTROL Co Ltd filed Critical SHANGHAI HAIWEI INDUSTRY CONTROL Co Ltd
Priority to CN2013103868045A priority Critical patent/CN103473447A/en
Publication of CN103473447A publication Critical patent/CN103473447A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Testing Of Devices, Machine Parts, Or Other Structures Thereof (AREA)

Abstract

A method of estimating performance degradation of a motor actuator includes: acquiring operational data of the motor actuator, and simulating the operational data to acquire performance data of the motor actuator. The method has the advantages that the problem that failure in effectively predicting degradation degree of the motor actuator in the prior art makes technicians unable to timely and effectively maintain the motor actuator is solved; degradation and failure process of devices is simulated to be approximate to life distribution, the performance degradation process of the motor actuator is estimated, and accordingly residual life is predicted and basis for intelligent maintenance of actuators is provided.

Description

Motor topworks ageing of performance appraisal procedure
Technical field
The present invention relates to a kind of motor appraisal procedure, relate in particular to a kind of motor topworks ageing of performance method.
Background technology
After the electric operator installation and operation, As time goes on, the continuous variation of operation conditions, topworks's mechanical part can occur aging, such as worm and gear weares and teares, senile abrasion in various degree all occurs in propeller shaft sleeve, main shaft, counting gear wheel, counting pinion wheel, counting bar, middle copper envelope etc.Can't effectively predict the degree of degeneration of motor topworks in prior art, make the technician can't carry out in time motor topworks, effectively safeguard.
Summary of the invention
The invention discloses a kind of electric operator ageing of performance appraisal procedure, can't effectively predict to the degree of degeneration of motor topworks the problem that makes the technician can't carry out in time motor topworks, effectively safeguard in order to solve in prior art.
Above-mentioned purpose of the present invention is achieved through the following technical solutions:
A kind of electric operator ageing of performance appraisal procedure, wherein, obtain the service data of motor topworks, and service data is simulated, and obtains the performance data of motor topworks.
Motor as above topworks ageing of performance appraisal procedure, wherein, the data of obtaining motor topworks specifically comprise: the lubricating oil spectrum iron particle concentration data that obtains motor topworks.
Motor as above topworks ageing of performance appraisal procedure, wherein, motor topworks specifically comprises: worm and gear, propeller shaft sleeve, main shaft, counting gear wheel, counting pinion wheel, counting bar, middle copper envelope.
Motor as above topworks ageing of performance appraisal procedure, wherein, obtain multiple motors topworks lubricating oil spectrum iron particle concentration data, multiple motors topworks lubricating oil spectrum iron particle concentration evolutional path is carried out to the Multi simulation running sampling, obtain many sampling samples.
Motor as above topworks ageing of performance appraisal procedure, wherein, existing criterion data in many sampling samples and database are contrasted, obtained a plurality of inefficacy sample datas, and a plurality of truncation sample data, finally obtain the performance data of motor topworks.
Motor as above topworks ageing of performance appraisal procedure, wherein, the performance data of obtaining motor topworks specifically comprises: obtain a motor topworks wear out failure time data distributed along time shaft.
Motor as above topworks ageing of performance appraisal procedure, wherein, according to motor topworks wear out failure time data, by a display device, the running status to motor topworks is shown.
In sum, owing to having adopted technique scheme, motor of the present invention topworks ageing of performance appraisal procedure has solved in the prior art and can't effectively predict the degree of degeneration of motor topworks, the problem that makes the technician can't carry out in time motor topworks, effectively safeguard, by degradation failure process and the life-span distribution that simulates these components and parts, approach, evaluate electric operator ageing of performance process, thereby dope the life-span residual value, for topworks's intelligent maintenance provides foundation.
The accompanying drawing explanation
Fig. 1 is the schematic diagram of the relation curve of the gaussian kernel clustering validity measure of motor of the present invention topworks ageing of performance appraisal procedure and cluster number.
Embodiment
Below in conjunction with drawings and Examples, the present invention is described further:
A kind of electric operator ageing of performance appraisal procedure, wherein, obtain the service data of motor topworks, and service data is simulated, and obtains the performance data of motor topworks.
The data that the present invention obtains motor topworks specifically comprise: the lubricating oil spectrum iron particle concentration data that obtains motor topworks.
Motor of the present invention topworks specifically comprises: worm and gear, propeller shaft sleeve, main shaft, counting gear wheel, counting pinion wheel, counting bar, middle copper envelope.
The present invention obtains multiple motors topworks lubricating oil spectrum iron particle concentration data, and multiple motors topworks lubricating oil spectrum iron particle concentration evolutional path is carried out to the Multi simulation running sampling, obtains many sampling samples.
The present invention is contrasted existing criterion data in many sampling samples and database, obtains a plurality of inefficacy sample datas, and a plurality of truncation sample data, finally obtains the performance data of motor topworks.
The performance data that the present invention obtains motor topworks specifically comprises: obtain a motor topworks wear out failure time data distributed along time shaft.
According to motor topworks wear out failure time data, by a display device, the running status to motor topworks is shown in the present invention.
In one embodiment of the invention: the present invention adopts dynamic analysis electric operator degradation failure process to obtain the state evolution rule in electric operator degradation failure process, is also state transition probability, and the life-span distributes.Estimate state transitions and Failure life distribution that electric operator is degenerated, must solve two problems, divide and maybe determine the degenerate state that electric operator degradation failure process is gone through, and estimate the transition probability on these states.
The present invention's index definite according to some carried out automatic cluster to topworks's part aging rate of change information, makes the cluster number of index the best can think best state division.If there is no a large amount of condition monitoring data, the kinetics equation that can utilize identification the to obtain emulation of being sampled, so can obtain the rate of change information of following the physical parameter that electric operator degenerates.
The present invention adopts Data Clustering Algorithm, two kinds of this having levels of algorithm and cutting apart: the output of hierarchical clustering is a tree, and the limb of tree has represented a cluster, means that of raw data set is cut apart; Cut apart clustering algorithm and directly raw data set cut apart, by optimizing certain cluster index, square error function for example, thus by cluster scatter to the summit of probability density function.If
Figure 2013103868045100002DEST_PATH_IMAGE001
be
Figure 121340DEST_PATH_IMAGE002
individual do not have a markd data set, and given such data set, cut apart clustering algorithm and attempt to find one to cut apart
Figure 2013103868045100002DEST_PATH_IMAGE003
thereby, make similarity maximum between the data in same class and the otherness maximum of data between inhomogeneity.Cut apart and meet following attribute:
Figure 137838DEST_PATH_IMAGE004
,
Figure 2013103868045100002DEST_PATH_IMAGE005
,
Figure 72033DEST_PATH_IMAGE006
;
Figure 2013103868045100002DEST_PATH_IMAGE007
,
Figure 781363DEST_PATH_IMAGE008
.
The definition gaussian kernel is
Figure DEST_PATH_IMAGE009
.The barycenter of each cluster means by the average of data in such,
Figure 669685DEST_PATH_IMAGE010
.Any two data
Figure DEST_PATH_IMAGE011
between distance be
Figure 489873DEST_PATH_IMAGE012
so the clustering validity measure of definable based on gaussian kernel is:
Figure DEST_PATH_IMAGE013
。
In all possible cluster number in, make the value minimum
Figure 164666DEST_PATH_IMAGE014
it is optimal segmentation.
Apply the above-mentioned clustering validity measure based on gaussian kernel, adopt classical K means clustering algorithm, can determine best electric operator degenerate state number, also can confirm the average rate of change of the condition monitoring data on each degenerate state simultaneously.
Usually, if can obtain complete degradation failure path data, the state that can obtain according to cluster is divided, and the transition frequency calculated on these states obtains matrix in the PH distribution thus asymptotic expansion.But in the situation that the condition monitoring data are imperfect and fragment, can't the above-mentioned state transitions frequency of statistical computation.However, if these incomplete condition monitoring packets have contained the temporal information of condition monitoring, based on these to condition monitoring electric operator information service time till constantly, likely obtain the estimation that electric operator lost efficacy and distributes.If data acquisition electric operator service time that can be based on truncation loses efficacy, the PH that distributes distributed and meaned, had also just obtained the state evolution rule of electric operator degradation failure simultaneously.
In fact, estimate that from incomplete censored data the PH distribution means that large quantity research [194] has been arranged, its classical way is the parameter that adopts expectation maximization (Expectation Maximization-EM) algorithm to distribute in meaning to PH
Figure DEST_PATH_IMAGE017
with
Figure 898584DEST_PATH_IMAGE016
estimated.
The EM algorithm is to find the conventional method of parameter maximal possibility estimation under the deficiency of data collection, and the general type of deficiency of data means two sample spaces of existence
Figure 371154DEST_PATH_IMAGE018
with , and will
Figure 920822DEST_PATH_IMAGE019
be mapped as
Figure 783735DEST_PATH_IMAGE018
many-one mapping.The data that are observed
Figure 8043DEST_PATH_IMAGE020
be from
Figure 7223DEST_PATH_IMAGE018
a reality.Corresponding
Figure 291574DEST_PATH_IMAGE019
in
Figure DEST_PATH_IMAGE021
can not directly observe, but can pass through
Figure 641784DEST_PATH_IMAGE020
indirect observation.More generally, suppose to have one mapping make
Figure 287584DEST_PATH_IMAGE019
be mapped to
Figure 414940DEST_PATH_IMAGE018
, and
Figure 314763DEST_PATH_IMAGE021
can only pass through
Figure DEST_PATH_IMAGE023
know,
Figure 818556DEST_PATH_IMAGE019
subset can pass through equation
Figure 57908DEST_PATH_IMAGE024
determine.
For the problems referred to above, the key idea of EM is to introduce hidden variable
Figure DEST_PATH_IMAGE025
, its probability density function is about unknown parameter
Figure 854700DEST_PATH_IMAGE026
there is following character, maximize
Figure DEST_PATH_IMAGE027
than maximization
Figure 179502DEST_PATH_IMAGE028
want easily.In brief, thus can strengthen deficiency of data by some additional useful information of guess.It is technical, can be aleatory variable, such as
Figure DEST_PATH_IMAGE029
thereby form a Markov chain, i.e. hypothesis
Figure 315266DEST_PATH_IMAGE028
be independent of
Figure 112320DEST_PATH_IMAGE026
thereby, can produce the Chapman-Kolmogorov equation
Figure 151515DEST_PATH_IMAGE030
.It is conceptive,
Figure 325007DEST_PATH_IMAGE025
the partial data space, in some sense, if it is all observable, so observation just than being easier to.
Get back to unknown parameter in the PH distribution
Figure 241328DEST_PATH_IMAGE017
with
Figure 275143DEST_PATH_IMAGE016
estimation, when
Figure DEST_PATH_IMAGE031
during the complete Observable of absorbing Markov decision processes of individual transfering state, its PH family of distributions can be regarded the exponential family of distributions of multiparameter as.Although the out-of-service time data of complete observation should be independent identically distributed, but when having right truncation observation, can suppose that its out-of-service time exists, thereby regard the estimation problem of the PH distribution parameter under censored data as Parameter Estimation Problem under the deficiency of data collection, so can apply classical EM algorithm iteration, obtain its maximal possibility estimation.
The present invention, when concrete calculating, supposes
Figure 924430DEST_PATH_IMAGE032
mean that algorithm is in process
Figure DEST_PATH_IMAGE033
parameter after inferior iteration
Figure 225836DEST_PATH_IMAGE034
value, next iteration need complete following two steps:
Figure DEST_PATH_IMAGE035
in the E stage, estimate the sufficient statistic of partial data
Figure 302377DEST_PATH_IMAGE036
:
Figure DEST_PATH_IMAGE037
;
Figure 823488DEST_PATH_IMAGE038
in the M stage, determine
Figure DEST_PATH_IMAGE039
as equation solution.
The concrete steps of EM algorithm can be offered with reference to literary composition is relevant, at application EM algorithm, according to the imperfect time data of truncation, PH are distributed while meaning to be approached, and can utilize ready-made C Language Program EMpht to be calculated.
Fig. 1 is the schematic diagram of the relation curve of the gaussian kernel clustering validity measure of motor of the present invention topworks ageing of performance appraisal procedure and cluster number, refer to Fig. 1, in another embodiment of the present invention, the present invention has adopted following steps to obtain final motor topworks performance data: to every electric operator lubricating oil spectrum iron particle concentration evolutional path emulation sampling 100 times, obtain altogether 3000 sampling samples, wherein according to existing criterion, be judged to be 1901, the sample of inefficacy, 1099 of truncated samples.Consider that in lubricating oil, the variation of particle concentration is actually the result that affected by the unobservable electric operator mechanical part cumulative attrition of bottom, therefore can think that new pattern of the every appearance of particle concentration has been corresponding electric operator wear cumulation to a new stage, these stages have formed the different conditions in electric operator wearing and tearing degenerative process, and the transfer process between these states is the cumulative attrition process of electric operator.The state of judging electric operator generation wear out failure is referred to as absorbing state, transfering state before this is called transient state, thereby the out-of-service time of electric operator wearing and tearing distributes and can portray by the character that the residence time on these states distributes, it is exactly the distribution of in wearing and tearing, degenerating and entering the residence time on the transient state between absorbing state that the life-span of electric operator wear out failure distributes.
In sum, owing to having adopted technique scheme, motor of the present invention topworks ageing of performance appraisal procedure has solved in the prior art and can't effectively predict the degree of degeneration of motor topworks, the problem that makes the technician can't carry out in time motor topworks, effectively safeguard, by degradation failure process and the life-span distribution that simulates these components and parts, approach, evaluate electric operator ageing of performance process, thereby dope the life-span residual value, for topworks's intelligent maintenance provides foundation.

Claims (7)

1. an electric operator ageing of performance appraisal procedure, is characterized in that, obtains the service data of motor topworks, and service data is simulated, and obtains the performance data of motor topworks.
2. motor according to claim 1 topworks ageing of performance appraisal procedure, is characterized in that, the data of obtaining motor topworks specifically comprise: the lubricating oil spectrum iron particle concentration data that obtains motor topworks.
3. motor according to claim 2 topworks ageing of performance appraisal procedure, is characterized in that, motor topworks specifically comprises: worm and gear, propeller shaft sleeve, main shaft, counting gear wheel, counting pinion wheel, counting bar, middle copper envelope.
4. motor according to claim 2 topworks ageing of performance appraisal procedure, it is characterized in that, obtain multiple motors topworks lubricating oil spectrum iron particle concentration data, multiple motors topworks lubricating oil spectrum iron particle concentration evolutional path is carried out to the Multi simulation running sampling, obtain many sampling samples.
5. motor according to claim 4 topworks ageing of performance appraisal procedure, it is characterized in that, existing criterion data in many sampling samples and database are contrasted, obtain a plurality of inefficacy sample datas, and a plurality of truncation sample data, finally obtain the performance data of motor topworks.
6. motor according to claim 5 topworks ageing of performance appraisal procedure, is characterized in that, the performance data of obtaining motor topworks specifically comprises: obtain a motor topworks wear out failure time data distributed along time shaft.
7. motor according to claim 6 topworks ageing of performance appraisal procedure, is characterized in that, according to motor topworks wear out failure time data, by a display device, the running status to motor topworks is shown.
CN2013103868045A 2013-08-30 2013-08-30 Method of estimating performance degradation of motor actuator Pending CN103473447A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2013103868045A CN103473447A (en) 2013-08-30 2013-08-30 Method of estimating performance degradation of motor actuator

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2013103868045A CN103473447A (en) 2013-08-30 2013-08-30 Method of estimating performance degradation of motor actuator

Publications (1)

Publication Number Publication Date
CN103473447A true CN103473447A (en) 2013-12-25

Family

ID=49798294

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2013103868045A Pending CN103473447A (en) 2013-08-30 2013-08-30 Method of estimating performance degradation of motor actuator

Country Status (1)

Country Link
CN (1) CN103473447A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110998152A (en) * 2017-06-09 2020-04-10 波克兰液压工业设备公司 Controlling hydraulic transmissions as transmission fluid ages

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1934433A (en) * 2004-03-31 2007-03-21 中国电力股份有限公司 Method and device for assessing remaining life of rolling bearing
CN101261190A (en) * 2007-12-27 2008-09-10 奇瑞汽车股份有限公司 A hybrid electric vehicle controller life testing system and testing method
CN102509023A (en) * 2011-11-24 2012-06-20 北京航空航天大学 Modeling method for combined stress accelerated life test damage accumulation model of space driving assembly
CN203084167U (en) * 2013-01-11 2013-07-24 上海海维工业控制有限公司 A counter capable of predicting the service life of an electric actuating mechanism

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1934433A (en) * 2004-03-31 2007-03-21 中国电力股份有限公司 Method and device for assessing remaining life of rolling bearing
CN101261190A (en) * 2007-12-27 2008-09-10 奇瑞汽车股份有限公司 A hybrid electric vehicle controller life testing system and testing method
CN102509023A (en) * 2011-11-24 2012-06-20 北京航空航天大学 Modeling method for combined stress accelerated life test damage accumulation model of space driving assembly
CN203084167U (en) * 2013-01-11 2013-07-24 上海海维工业控制有限公司 A counter capable of predicting the service life of an electric actuating mechanism

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
尹晓虎: "《装备维修系统的动力学分析技术研究》", 《中国博士学位论文全文数据库 基础科学辑》 *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110998152A (en) * 2017-06-09 2020-04-10 波克兰液压工业设备公司 Controlling hydraulic transmissions as transmission fluid ages

Similar Documents

Publication Publication Date Title
Wang et al. A hybrid prognostics approach for estimating remaining useful life of wind turbine bearings
CN111582392B (en) An on-line monitoring method for multi-condition health status of key components of wind turbines
de Bessa et al. Data-driven fault detection and isolation scheme for a wind turbine benchmark
CN115796059B (en) A method and system for life prediction of electrical equipment based on deep learning
CN107423495B (en) A Method of Degradation Modeling and Life Prediction under Dynamic Conditions
CN117667495A (en) An application system fault prediction method based on association rules and deep learning integrated model
CN114565004A (en) Method and device for eliminating abnormal scattered points of power curve of wind turbine generator
CN118536410A (en) Big data driven modeling-based energy consumption optimization decision analysis method and system
CN112598144A (en) CNN-LSTM burst fault early warning method based on correlation analysis
CN108846511A (en) A kind of defect of transformer equipment trend analysis based on regulation big data platform
CN116862081B (en) Operation and maintenance method and system for pollution treatment equipment
CN108280131A (en) A kind of atmosphere pollution under meteorological effect changes relationship quantitative estimation method
CN117952321A (en) Soil erosion intelligent monitoring and early warning method and system based on land engineering
CN110990788A (en) Bearing residual life prediction method based on ternary wiener process
CN116542375A (en) Electric power channel mountain fire spreading index prediction method and device
CN117332246A (en) Rotating equipment health assessment method integrating expert experience and AI algorithm
CN120298858A (en) A real-time monitoring method and system for shield machine cutter wear
CN110895625A (en) Method for simulating reliability confidence interval estimation value of performance degradation product
Bette et al. Nonstationarity in correlation matrices for wind turbine SCADA‐data
CN120951739A (en) A method and system for predicting the lifespan of transmission line conductors based on twin simulation
CN118644144A (en) Method for identifying and evaluating the operating status of wind power structures using monitoring data
CN1752958A (en) Evaluation system of electrical network operation state and dispatch decision system
CN118607150B (en) Edge optimization method and system for digital twin space modeling of power distribution network
CN119543458B (en) Intelligent monitoring-based power distribution network switch cabinet control method and system
CN118228089B (en) Improved fault diagnosis method for dissolved gas in transformer oil

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20131225

RJ01 Rejection of invention patent application after publication