CN105664458B - A kind of surfing simulator - Google Patents

A kind of surfing simulator Download PDF

Info

Publication number
CN105664458B
CN105664458B CN201610022762.0A CN201610022762A CN105664458B CN 105664458 B CN105664458 B CN 105664458B CN 201610022762 A CN201610022762 A CN 201610022762A CN 105664458 B CN105664458 B CN 105664458B
Authority
CN
China
Prior art keywords
plate
injector
blower
cylinder
water
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201610022762.0A
Other languages
Chinese (zh)
Other versions
CN105664458A (en
Inventor
王裕桂
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Ocean University ZJOU
Original Assignee
Zhejiang Ocean University ZJOU
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Ocean University ZJOU filed Critical Zhejiang Ocean University ZJOU
Priority to CN201610022762.0A priority Critical patent/CN105664458B/en
Publication of CN105664458A publication Critical patent/CN105664458A/en
Application granted granted Critical
Publication of CN105664458B publication Critical patent/CN105664458B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • AHUMAN NECESSITIES
    • A63SPORTS; GAMES; AMUSEMENTS
    • A63BAPPARATUS FOR PHYSICAL TRAINING, GYMNASTICS, SWIMMING, CLIMBING, OR FENCING; BALL GAMES; TRAINING EQUIPMENT
    • A63B69/00Training appliances or apparatus for special sports
    • A63B69/0066Training appliances or apparatus for special sports for wind-surfing
    • AHUMAN NECESSITIES
    • A63SPORTS; GAMES; AMUSEMENTS
    • A63GMERRY-GO-ROUNDS; SWINGS; ROCKING-HORSES; CHUTES; SWITCHBACKS; SIMILAR DEVICES FOR PUBLIC AMUSEMENT
    • A63G31/00Amusement arrangements
    • A63G31/007Amusement arrangements involving water
    • AHUMAN NECESSITIES
    • A63SPORTS; GAMES; AMUSEMENTS
    • A63GMERRY-GO-ROUNDS; SWINGS; ROCKING-HORSES; CHUTES; SWITCHBACKS; SIMILAR DEVICES FOR PUBLIC AMUSEMENT
    • A63G31/00Amusement arrangements
    • A63G31/02Amusement arrangements with moving substructures
    • A63G31/06Amusement arrangements with moving substructures with undulatory motion of the substructure
    • AHUMAN NECESSITIES
    • A63SPORTS; GAMES; AMUSEMENTS
    • A63BAPPARATUS FOR PHYSICAL TRAINING, GYMNASTICS, SWIMMING, CLIMBING, OR FENCING; BALL GAMES; TRAINING EQUIPMENT
    • A63B2208/00Characteristics or parameters related to the user or player
    • A63B2208/03Characteristics or parameters related to the user or player the user being in water
    • AHUMAN NECESSITIES
    • A63SPORTS; GAMES; AMUSEMENTS
    • A63BAPPARATUS FOR PHYSICAL TRAINING, GYMNASTICS, SWIMMING, CLIMBING, OR FENCING; BALL GAMES; TRAINING EQUIPMENT
    • A63B2225/00Miscellaneous features of sport apparatus, devices or equipment
    • A63B2225/60Apparatus used in water

Landscapes

  • Health & Medical Sciences (AREA)
  • General Health & Medical Sciences (AREA)
  • Physical Education & Sports Medicine (AREA)
  • Structures Of Non-Positive Displacement Pumps (AREA)
  • Aeration Devices For Treatment Of Activated Polluted Sludge (AREA)

Abstract

一种冲浪模拟器,包括排水阀、蓄水箱、第一鼓风机、第一注入器、滑轨、滑块、第一支板、控制器、第一气缸、第一销轴、第一镂空、机座、第二气缸、剪叉臂、架子、进水箱、抽水泵、滑板、第二注入器、第二鼓风机、连接块、第二支板、第二镂空、第二销轴、弧形板、弧形块、支柱、连接板、横板和排水口,所述架子上安装滑板,滑板右侧安装进水箱,进水箱右侧安装抽水泵,抽水泵的抽水管与进水箱相连,架子内安装第二鼓风机和第二注入器,第二鼓风机与第二注入器相连,第二注入器的排气口升向滑板外;本发明的优点是:高度可调。

A surfing simulator, comprising a drain valve, a water storage tank, a first blower, a first injector, a slide rail, a slider, a first support plate, a controller, a first cylinder, a first pin, a first hollow, Machine base, second cylinder, scissor arm, shelf, water inlet tank, water pump, slide plate, second injector, second blower, connecting block, second support plate, second hollow, second pin, arc Plates, arc-shaped blocks, pillars, connecting plates, horizontal plates and water outlets, slide plates are installed on the shelf, water inlet tanks are installed on the right side of the slide plates, suction pumps are installed on the right side of the water inlet tanks, and the suction pipes of the suction pumps and the water inlet tanks are installed A second blower and a second injector are installed in the rack, the second blower is connected to the second injector, and the exhaust port of the second injector rises to the outside of the slide plate; the advantages of the present invention are that the height is adjustable.

Description

一种冲浪模拟器a surfing simulator

技术领域technical field

本发明涉及一种冲浪模拟器,属于健身器械 技术领域。The invention relates to a surfing simulator, which belongs to the technical field of fitness equipment.

背景技术Background technique

冲浪是以海浪为动力,利用自身的高超技巧和平衡能力,搏击海浪的一项运动。越来越多的人进行冲浪运动,由于冲浪一般都是在海里进行,对于新手来说危险系数较高,为了保障安全,一般新手都是在冲浪模拟器上进行联系,现有技术的冲浪模拟器的高度都是固定结构,无法调节冲浪的难度。为了解决上述困难,需要开发一款高度可调的冲浪模拟器。Surfing is a sport that uses the waves as the driving force to fight against the waves by using one's own superb skills and balance. More and more people are surfing. Since surfing is generally carried out in the sea, the risk factor is high for novices. In order to ensure safety, generally novices communicate on surfing simulators. The height of the surfing machine is a fixed structure, and the difficulty of surfing cannot be adjusted. In order to solve the above difficulties, it is necessary to develop a height-adjustable surfing simulator.

发明内容SUMMARY OF THE INVENTION

本发明的目的是提供一种冲浪模拟器。The object of the present invention is to provide a surfing simulator.

本发明要解决的问题是现有技术的冲浪模拟器的高度都是固定结构的问题。The problem to be solved by the present invention is that the height of the surfing simulator in the prior art is the problem of the fixed structure.

为实现本发明的目的,本发明采用的技术方案是:For realizing the purpose of the present invention, the technical scheme adopted in the present invention is:

一种冲浪模拟器,包括排水阀、蓄水箱、第一鼓风机、第一注入器、滑轨、滑块、第一支板、控制器、第一气缸、第一销轴、第一镂空、机座、第二气缸、剪叉臂、架子、进水箱、抽水泵、滑板、第二注入器、第二鼓风机、连接块、第二支板、第二镂空、第二销轴、弧形板、弧形块、支柱、连接板、横板和排水口,所述架子上安装滑板,滑板右侧安装进水箱,进水箱右侧安装抽水泵,抽水泵的抽水管与进水箱相连,架子内安装第二鼓风机和第二注入器,第二鼓风机与第二注入器相连,第二注入器的排气口升向滑板外,架子左侧安装第一气缸,第一气缸的活塞杆上安装横板,横板安装在滑板下,第一气缸的活塞杆右侧安装支柱,支柱上安装弧形块,横板和弧形块之间安装连接板,第一气缸的右侧壁上安装机座,机座上安装第一支板,第一支板上安装第一镂空,第一镂空上安装两个第一销轴,剪叉臂下端左右两侧各安装在两个第一销轴上,剪叉臂上端左右两侧各安装在两个第二销轴上,第二销轴安装在第二镂空上,第二支板上设有第二镂空,第一支板右侧安装第二气缸,第二气缸的活塞杆安装在连接块上,连接块安装在第二支板右侧,第二支板上安装弧形板,弧形板和弧形块安装在滑板下,第一气缸的活塞杆左侧安装滑块,滑块安装在滑轨上,滑轨上安装第一注入器,第一注入器上安装第一鼓风机,第一鼓风机与第一注入器相连,第一鼓风机上安装蓄水箱,抽水泵的排水管与蓄水箱相连,蓄水箱右侧安装排水口,排水口上安装排水阀,控制器安装在滑轨上,控制器通过导线分别与排水阀、抽水泵、第一鼓风机、第一注入器、第二鼓风机和第二注入器相连。A surfing simulator, comprising a drain valve, a water storage tank, a first blower, a first injector, a slide rail, a slider, a first support plate, a controller, a first cylinder, a first pin, a first hollow, Machine base, second cylinder, scissor arm, shelf, water inlet tank, water pump, slide plate, second injector, second blower, connecting block, second support plate, second hollow, second pin, arc Plates, arc-shaped blocks, pillars, connecting plates, horizontal plates and water outlets, slide plates are installed on the shelf, water inlet tanks are installed on the right side of the slide plates, suction pumps are installed on the right side of the water inlet tanks, and the suction pipes of the suction pumps and the water inlet tanks are installed Connected, the second blower and the second injector are installed in the shelf, the second blower is connected to the second injector, the exhaust port of the second injector rises to the outside of the slide plate, the first cylinder is installed on the left side of the shelf, and the piston of the first cylinder The horizontal plate is installed on the rod, the horizontal plate is installed under the sliding plate, the right side of the piston rod of the first cylinder is installed with a pillar, an arc block is installed on the pillar, a connecting plate is installed between the horizontal plate and the arc block, and the right side wall of the first cylinder is installed The base is installed on the base, the first support plate is installed on the base, the first hollow is installed on the first support plate, the two first pins are installed on the first hollow, and the left and right sides of the lower end of the scissor arm are installed on the two first On the pin shaft, the left and right sides of the upper end of the scissor arm are respectively installed on two second pin shafts, the second pin shafts are installed on the second hollow, the second support plate is provided with a second hollow, and the right side of the first support plate is provided with a second hollow. Install the second air cylinder, the piston rod of the second air cylinder is installed on the connecting block, the connecting block is installed on the right side of the second support plate, the arc plate is installed on the second support plate, the arc plate and the arc block are installed under the sliding plate, The slider is installed on the left side of the piston rod of the first cylinder, the slider is installed on the slide rail, the first injector is installed on the slide rail, the first blower is installed on the first injector, the first blower is connected with the first injector, and the first injector is installed on the first injector. A water storage tank is installed on the blower, the drain pipe of the suction pump is connected with the water storage tank, a drain port is installed on the right side of the water tank, a drain valve is installed on the drain port, the controller is installed on the slide rail, and the controller is connected to the drain valve through wires respectively , the suction pump, the first blower, the first injector, the second blower and the second injector are connected.

所述第一气缸内置第一电磁阀,第一电磁阀通过导线与控制器相连。The first cylinder has a built-in first solenoid valve, and the first solenoid valve is connected with the controller through a wire.

所述第二气缸内置第二电磁阀,第二电磁阀通过导线与控制器相连。The second cylinder has a built-in second solenoid valve, and the second solenoid valve is connected with the controller through a wire.

所述进水箱顶部为筛板结构。The top of the water inlet tank is a sieve plate structure.

本发明的优点是:控制器控制第一电磁阀通电或断电,使第一气缸做伸缩运动,使横板和弧形块上下移动,使滑板上端向下移动,来调节滑板的高度;控制器控制第二气缸做伸缩运动,使剪叉臂伸展或收缩,使第二支板向右移动,使弧形板向右移动,使滑板向右移动,来调节滑板的弯曲度;控制器控制排水阀开启,使排水口排出水,水从滑板上向下流,流到进水箱上,抽水泵将进水箱内的水排到蓄水箱中;控制器控制第一鼓风机吸入空气后由第一注入器将空气气流注入到滑板上的水里,使滑板上端的水流形成浪花,实现海上冲浪的效果;控制器控制第二鼓风机吸入空气后由第二注入器将空气气流注入到滑板上的水里,使水流形成浪花,实现海上冲浪的效果。The advantages of the invention are as follows: the controller controls the first solenoid valve to be energized or de-energized, so that the first cylinder does telescopic motion, the horizontal plate and the arc block move up and down, and the upper end of the sliding plate moves downward to adjust the height of the sliding plate; The controller controls the second cylinder to do telescopic motion, so that the scissor arm extends or contracts, the second support plate moves to the right, the arc plate moves to the right, and the slide plate moves to the right to adjust the curvature of the slide plate; the controller controls The drain valve is opened to discharge water from the drain outlet, the water flows down from the slide plate and flows to the water inlet tank, and the water pump discharges the water in the water inlet tank to the water storage tank; the controller controls the first blower to inhale the air, The first injector injects the air flow into the water on the skateboard, so that the water flow on the upper end of the skateboard forms waves and realizes the effect of surfing at sea; the controller controls the second blower to inhale the air, and the second injector injects the air flow into the skateboard. In the water, the current forms waves and realizes the effect of surfing at sea.

附图说明Description of drawings

图1是本发明一种冲浪模拟器整体结构图;Fig. 1 is the overall structure diagram of a kind of surfing simulator of the present invention;

图中:1、排水阀 2、蓄水箱 3、第一鼓风机 4、第一注入器 5、滑轨 6、滑块 7、第一支板 8、控制器 9、第一气缸 10、第一销轴 11、第一镂空 12、机座 13、第二气缸 14、剪叉臂 15、架子 16、进水箱 17、抽水泵 18、滑板 19、第二注入器 20、第二鼓风机 21、连接块22、第二支板 23、第二镂空 24、第二销轴 25、弧形板 26、弧形块 27、支柱 28、连接板 29、横板 30、排水口。In the figure: 1. Drain valve 2, water storage tank 3, first blower 4, first injector 5, slide rail 6, slider 7, first support plate 8, controller 9, first cylinder 10, first Pin shaft 11, first hollow 12, machine base 13, second cylinder 14, scissor arm 15, shelf 16, water inlet tank 17, suction pump 18, slide plate 19, second injector 20, second blower 21, connection Block 22, second support plate 23, second hollow 24, second pin shaft 25, arc plate 26, arc block 27, pillar 28, connecting plate 29, horizontal plate 30, water outlet.

具体实施方式Detailed ways

下面结合附图及实施例对本发明作进一步的说明。The present invention will be further described below with reference to the accompanying drawings and embodiments.

本发明一种冲浪模拟器,包括排水阀1、蓄水箱2、第一鼓风机3、第一注入器4、滑轨5、滑块6、第一支板7、控制器8、第一气缸9、第一销轴10、第一镂空11、机座12、第二气缸13、剪叉臂14、架子15、进水箱16、抽水泵17、滑板18、第二注入器19、第二鼓风机20、连接块21、第二支板22、第二镂空23、第二销轴24、弧形板25、弧形块26、支柱27、连接板28、横板29和排水口30,所述架子15上安装滑板18,滑板18右侧安装进水箱16,进水箱16顶部为筛板结构,进水箱16右侧安装抽水泵17,抽水泵17的抽水管与进水箱16相连,架子15内安装第二鼓风机20和第二注入器19,第二鼓风机20与第二注入器19相连,控制器8控制第二鼓风机20吸入空气后由第二注入器19将空气气流注入到滑板18上的水里,使水流形成浪花,实现海上冲浪的效果,第二注入器19的排气口升向滑板18外,架子15左侧安装第一气缸9,第一气缸9内置第一电磁阀,第一电磁阀通过导线与控制器8相连,控制器8控制第一电磁阀通电或断电,使第一气缸9做伸缩运动,使横板29和弧形块26上下移动,使滑板18上端向下移动,来调节滑板18的高度;第一气缸9的活塞杆上安装横板29,横板29安装在滑板18下,第一气缸9的活塞杆右侧安装支柱27,支柱27上安装弧形块26,横板29和弧形块26之间安装连接板28,第一气缸9的右侧壁上安装机座12,机座12上安装第一支板7,第一支板7上安装第一镂空11,第一镂空11上安装两个第一销轴10,剪叉臂14下端左右两侧各安装在两个第一销轴10上,剪叉臂14上端左右两侧各安装在两个第二销轴24上,第二销轴24安装在第二镂空23上,第二支板22上设有第二镂空23,第一支板7右侧安装第二气缸13,第二气缸13内置第二电磁阀,第二电磁阀通过导线与控制器8相连,控制器8控制第二气缸13做伸缩运动,使剪叉臂14伸展或收缩,使第二支板22向右移动,使弧形板25向右移动,使滑板18向右移动,来调节滑板18的弯曲度;第二气缸13的活塞杆安装在连接块21上,连接块21安装在第二支板22右侧,第二支板22上安装弧形板25,弧形板25和弧形块26安装在滑板18下,第一气缸9的活塞杆左侧安装滑块6,滑块6安装在滑轨5上,滑轨5上安装第一注入器4,第一注入器4上安装第一鼓风机3,第一鼓风机3与第一注入器4相连,控制器8控制第一鼓风机3吸入空气后由第一注入器4将空气气流注入到滑板18上的水里,使滑板18上端的水流形成浪花,实现海上冲浪的效果;第一鼓风机3上安装蓄水箱2,抽水泵17的排水管与蓄水箱2相连,控制器8控制排水阀1开启,使排水口30排出水,水从滑板18上向下流,流到进水箱16上,抽水泵17将进水箱16内的水排到蓄水箱2中;蓄水箱2右侧安装排水口30,排水口30上安装排水阀1,控制器8安装在滑轨5上,控制器8通过导线分别与排水阀1、抽水泵17、第一鼓风机3、第一注入器4、第二鼓风机20和第二注入器19相连。A surfing simulator of the present invention includes a drain valve 1, a water storage tank 2, a first blower 3, a first injector 4, a slide rail 5, a slider 6, a first support plate 7, a controller 8, and a first cylinder 9. The first pin 10, the first hollow 11, the machine base 12, the second cylinder 13, the scissor arm 14, the shelf 15, the water inlet tank 16, the water pump 17, the slide plate 18, the second injector 19, the second The blower 20, the connecting block 21, the second supporting plate 22, the second hollow 23, the second pin shaft 24, the arc-shaped plate 25, the arc-shaped block 26, the pillar 27, the connecting plate 28, the horizontal plate 29 and the water outlet 30, so The sliding plate 18 is installed on the shelf 15, the water inlet tank 16 is installed on the right side of the sliding plate 18, the top of the water inlet tank 16 is a sieve plate structure, the suction pump 17 is installed on the right side of the water inlet tank 16, and the suction pipe of the suction pump 17 is connected to the water inlet tank 16. Connected, the second blower 20 and the second injector 19 are installed in the rack 15, the second blower 20 is connected with the second injector 19, the controller 8 controls the second blower 20 to inhale air after the second injector 19 injects the air flow into the water on the skateboard 18 to make the water flow form waves to achieve the effect of surfing at sea. A solenoid valve, the first solenoid valve is connected with the controller 8 through a wire, and the controller 8 controls the first solenoid valve to be energized or de-energized, so that the first air cylinder 9 does a telescopic motion, so that the horizontal plate 29 and the arc block 26 move up and down, The upper end of the sliding plate 18 is moved downward to adjust the height of the sliding plate 18; the horizontal plate 29 is installed on the piston rod of the first air cylinder 9, the horizontal plate 29 is installed under the sliding plate 18, and the right side of the piston rod of the first air cylinder 9 is installed with a strut 27, The arc block 26 is installed on the pillar 27, the connecting plate 28 is installed between the horizontal plate 29 and the arc block 26, the base 12 is installed on the right side wall of the first cylinder 9, the first support plate 7 is installed on the base 12, and the first support plate 7 is installed on the base 12. A first hollow 11 is installed on the support plate 7 , two first pins 10 are installed on the first hollow 11 , the left and right sides of the lower end of the scissor arm 14 are respectively installed on the two first pins 10 , and the upper end of the scissor arm 14 is installed on the two first pins 10 . The left and right sides are respectively installed on two second pins 24, the second pins 24 are installed on the second hollow 23, the second support plate 22 is provided with a second hollow 23, and the right side of the first support plate 7 is installed with the second hollow 23. Two cylinders 13, the second cylinder 13 has a built-in second solenoid valve, the second solenoid valve is connected to the controller 8 through a wire, and the controller 8 controls the second cylinder 13 to perform telescopic motion, so that the scissor arm 14 is stretched or contracted, so that the second The support plate 22 moves to the right, so that the arc plate 25 moves to the right, and the sliding plate 18 moves to the right to adjust the curvature of the sliding plate 18; the piston rod of the second cylinder 13 is installed on the connecting block 21, and the connecting block 21 is installed on the On the right side of the second support plate 22, the arc plate 25 is installed on the second support plate 22, the arc plate 25 and the arc block 26 are installed under the slide plate 18, the slider 6 is installed on the left side of the piston rod of the first cylinder 9, The block 6 is installed on the slide rail 5, the first injector 4 is installed on the slide rail 5, the first blower 3 is installed on the first injector 4, the first blower 3 is connected with the first injector 4, and the controller 8 controls After the first blower 3 inhales air, the air flow is injected into the water on the slide 18 by the first injector 4, so that the water flow on the upper end of the slide 18 forms a spray, and realizes the effect of surfing at sea; the first blower 3 is installed with a water storage tank 2 , the drain pipe of the water pump 17 is connected to the water storage tank 2, the controller 8 controls the drain valve 1 to open, so that the water outlet 30 discharges water, the water flows down from the slide plate 18, and flows to the water inlet tank 16, and the water pump 17 will The water in the water inlet tank 16 is drained into the water storage tank 2; the drain port 30 is installed on the right side of the water storage tank 2, the drain valve 1 is installed on the drain port 30, the controller 8 is installed on the slide rail 5, and the controller 8 is connected through a wire They are respectively connected with the drain valve 1 , the suction pump 17 , the first blower 3 , the first injector 4 , the second blower 20 and the second injector 19 .

本发明使用方法:控制器8控制第一电磁阀通电或断电,使第一气缸9做伸缩运动,使横板29和弧形块26上下移动,使滑板18上端向下移动,来调节滑板18的高度;控制器8控制第二气缸13做伸缩运动,使剪叉臂14伸展或收缩,使第二支板22向右移动,使弧形板25向右移动,使滑板18向右移动,来调节滑板18的弯曲度;控制器8控制排水阀1开启,使排水口30排出水,水从滑板18上向下流,流到进水箱16上,抽水泵17将进水箱16内的水排到蓄水箱2中;控制器8控制第一鼓风机3吸入空气后由第一注入器4将空气气流注入到滑板18上的水里,使滑板18上端的水流形成浪花,实现海上冲浪的效果;控制器8控制第二鼓风机20吸入空气后由第二注入器19将空气气流注入到滑板18上的水里,使水流形成浪花,实现海上冲浪的效果。The method of use of the present invention: the controller 8 controls the first solenoid valve to be energized or de-energized, so that the first cylinder 9 does a telescopic motion, the horizontal plate 29 and the arc block 26 move up and down, and the upper end of the slide plate 18 moves downward to adjust the slide plate The height of 18; the controller 8 controls the second cylinder 13 to do telescopic motion, so that the scissor arm 14 is stretched or contracted, the second support plate 22 is moved to the right, the arc plate 25 is moved to the right, and the slide plate 18 is moved to the right , to adjust the curvature of the slide plate 18; the controller 8 controls the drain valve 1 to open, so that the water outlet 30 discharges water, the water flows down from the slide plate 18, and flows to the water inlet tank 16, and the water pump 17 pumps the water into the water inlet tank 16. After the controller 8 controls the first blower 3 to inhale the air, the first injector 4 injects the air flow into the water on the sliding plate 18, so that the water flow on the upper end of the sliding plate 18 forms a spray, and realizes the sea The effect of surfing; after the controller 8 controls the second blower 20 to inhale air, the second injector 19 injects the air flow into the water on the skateboard 18, so that the water current forms waves and realizes the effect of surfing at sea.

Claims (4)

1.一种冲浪模拟器,包括排水阀(1)、蓄水箱(2)、第一鼓风机(3)、第一注入器(4)、滑轨(5)、滑块(6)、第一支板(7)、控制器(8)、第一气缸(9)、第一销轴(10)、第一镂空(11)、机座(12)、第二气缸(13)、剪叉臂(14)、架子(15)、进水箱(16)、抽水泵(17)、滑板(18)、第二注入器(19)、第二鼓风机(20)、连接块(21)、第二支板(22)、第二镂空(23)、第二销轴(24)、弧形板(25)、弧形块(26)、支柱(27)、连接板(28)、横板(29)和排水口(30),其特征是:所述架子(15)上安装滑板(18),滑板(18)右侧安装进水箱(16),进水箱(16)右侧安装抽水泵(17),抽水泵(17)的抽水管与进水箱(16)相连,架子(15)内安装第二鼓风机(20)和第二注入器(19),第二鼓风机(20)与第二注入器(19)相连,第二注入器(19)的排气口升向滑板(18)外,架子(15)左侧安装第一气缸(9),第一气缸(9)的活塞杆上安装横板(29),横板(29)安装在滑板(18)下,第一气缸(9)的活塞杆右侧安装支柱(27),支柱(27)上安装弧形块(26),横板(29)和弧形块(26)之间安装连接板(28),第一气缸(9)的右侧壁上安装机座(12),机座(12)上安装第一支板(7),第一支板(7)上安装第一镂空(11),第一镂空(11)上安装两个第一销轴(10),剪叉臂(14)下端左右两侧各安装在两个第一销轴(10)上,剪叉臂(14)上端左右两侧各安装在两个第二销轴(24)上,第二销轴(24)安装在第二镂空(23)上,第二支板(22)上设有第二镂空(23),第一支板(7)右侧安装第二气缸(13),第二气缸(13)的活塞杆安装在连接块(21)上,连接块(21)安装在第二支板(22)右侧,第二支板(22)上安装弧形板(25),弧形板(25)和弧形块(26)安装在滑板(18)下,第一气缸(9)的活塞杆左侧安装滑块(6),滑块(6)安装在滑轨(5)上,滑轨(5)上安装第一注入器(4),第一注入器(4)上安装第一鼓风机(3),第一鼓风机(3)与第一注入器(4)相连,第一鼓风机(3)上安装蓄水箱(2),抽水泵(17)的排水管与蓄水箱(2)相连,蓄水箱(2)右侧安装排水口(30),排水口(30)上安装排水阀(1),控制器(8)安装在滑轨(5)上,控制器(8)通过导线分别与排水阀(1)、抽水泵(17)、第一鼓风机(3)、第一注入器(4)、第二鼓风机(20)和第二注入器(19)相连。1. A surfing simulator, comprising a drain valve (1), a water storage tank (2), a first blower (3), a first injector (4), a slide rail (5), a slider (6), a first A plate (7), controller (8), first cylinder (9), first pin (10), first hollow (11), machine base (12), second cylinder (13), scissors Arm (14), shelf (15), water inlet tank (16), suction pump (17), slide plate (18), second injector (19), second blower (20), connecting block (21), first Two supporting plates (22), a second hollow (23), a second pin (24), an arc-shaped plate (25), an arc-shaped block (26), a pillar (27), a connecting plate (28), a horizontal plate ( 29) and a water outlet (30), characterized in that: a slide plate (18) is installed on the shelf (15), a water inlet tank (16) is installed on the right side of the slide plate (18), and a pump is installed on the right side of the water inlet box (16). The water pump (17), the suction pipe of the water pump (17) is connected with the water inlet tank (16), the second blower (20) and the second injector (19) are installed in the frame (15), and the second blower (20) is connected with The second injector (19) is connected, the exhaust port of the second injector (19) rises to the outside of the slide plate (18), the first cylinder (9) is installed on the left side of the shelf (15), and the piston of the first cylinder (9) Install the horizontal plate (29) on the rod, install the horizontal plate (29) under the slide plate (18), install the strut (27) on the right side of the piston rod of the first cylinder (9), and install the arc block (26) on the strut (27). ), a connecting plate (28) is installed between the horizontal plate (29) and the arc-shaped block (26), a frame (12) is installed on the right side wall of the first cylinder (9), and a first cylinder (12) is installed on the frame (12). A support plate (7), a first hollow (11) is installed on the first support plate (7), two first pins (10) are installed on the first hollow (11), and the left and right sides of the lower end of the scissor arm (14) Each of the two first pins (10) is installed on the two first pins (10), the left and right sides of the upper end of the scissor arm (14) are respectively installed on the two second pins (24), and the second pins (24) are installed in the second hollow (23), the second support plate (22) is provided with a second hollow (23), the second cylinder (13) is installed on the right side of the first support plate (7), and the piston rod of the second cylinder (13) is installed on the right side of the first support plate (7). On the connecting block (21), the connecting block (21) is installed on the right side of the second support plate (22), and the arc plate (25), the arc plate (25) and the arc block are installed on the second support plate (22). (26) is installed under the slide plate (18), the slider (6) is installed on the left side of the piston rod of the first cylinder (9), the slider (6) is installed on the slide rail (5), and the slide rail (5) is installed A first injector (4), a first blower (3) is installed on the first injector (4), the first blower (3) is connected to the first injector (4), and a water storage is installed on the first blower (3) Tank (2), the drain pipe of the suction pump (17) is connected to the water storage tank (2), the drain port (30) is installed on the right side of the water storage tank (2), and the drain valve (1) is installed on the drain port (30). The controller (8) is mounted on the slide rail (5), The controller (8) is respectively connected with the drain valve (1), the suction pump (17), the first blower (3), the first injector (4), the second blower (20) and the second injector (19) through wires connected. 2.根据权利要求1所述的一种冲浪模拟器,其特征是:所述第一气缸(9)内置第一电磁阀,第一电磁阀通过导线与控制器(8)相连。2 . The surfing simulator according to claim 1 , wherein the first air cylinder ( 9 ) has a built-in first solenoid valve, and the first solenoid valve is connected to the controller ( 8 ) through wires. 3 . 3.根据权利要求1所述的一种冲浪模拟器,其特征是:所述第二气缸(13)内置第二电磁阀,第二电磁阀通过导线与控制器(8)相连。3 . The surfing simulator according to claim 1 , wherein the second air cylinder ( 13 ) has a built-in second solenoid valve, and the second solenoid valve is connected to the controller ( 8 ) through wires. 4 . 4.根据权利要求1所述的一种冲浪模拟器,其特征是:所述进水箱(16)顶部为筛板结构。4 . The surfing simulator according to claim 1 , wherein the top of the water inlet box ( 16 ) is a sieve plate structure. 5 .
CN201610022762.0A 2016-01-14 2016-01-14 A kind of surfing simulator Active CN105664458B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610022762.0A CN105664458B (en) 2016-01-14 2016-01-14 A kind of surfing simulator

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610022762.0A CN105664458B (en) 2016-01-14 2016-01-14 A kind of surfing simulator

Publications (2)

Publication Number Publication Date
CN105664458A CN105664458A (en) 2016-06-15
CN105664458B true CN105664458B (en) 2019-07-02

Family

ID=56300597

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610022762.0A Active CN105664458B (en) 2016-01-14 2016-01-14 A kind of surfing simulator

Country Status (1)

Country Link
CN (1) CN105664458B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107961542B (en) * 2017-11-21 2023-09-08 华强方特(芜湖)文化科技有限公司 Automatic water wave cutting system with double-layer blocking mechanism
CN111921178A (en) * 2020-08-21 2020-11-13 杨晓雷 A surfing simulation device

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4749180A (en) * 1987-06-04 1988-06-07 Ted Boomer Mechanical surf board
EP2929108B1 (en) * 2012-11-07 2020-01-01 LOCHTEFELD, Thomas J. Method and apparatus for producing waves suitable for surfing using staggered wave generators extended along a curved stagger line
FR3007732B1 (en) * 2013-07-01 2016-08-12 Univ D'angers FLOATING PLATFORM COMPRISING A MOBILE RAMP BETWEEN A TRANSPORT POSITION AND A TREMPLINING POSITION
CN204699350U (en) * 2015-04-10 2015-10-14 强连生 Magnetic suspension simulating surfing device

Also Published As

Publication number Publication date
CN105664458A (en) 2016-06-15

Similar Documents

Publication Publication Date Title
CN108331971B (en) A kind of highway bridge pipeline support equipment
CN105664458B (en) A kind of surfing simulator
CN100562736C (en) A sway and tilt test device for marine equipment and its control method
CN205628370U (en) Building site removes dust and uses high -efficient water jet equipment
CN206492675U (en) A kind of pcb board glue spreading apparatus
CN107088493A (en) A kind of mobile landscape fountain apparatus
CN105271076B (en) A kind of truss-like maritime platform spud leg aerial work platform
CN108216585A (en) A kind of jet-propelled undercarriage of civil small-scale unmanned plane
CN104209212A (en) Automatic spray nozzle
CN105139746B (en) A kind of pumping plant intake pool whirlpool experimental bench
CN205095425U (en) Aquatic dolphin performance device
CN106501072B (en) The imitative experimental appliance of degree of injury under a kind of photovoltaic glass use state
CN206215398U (en) A kind of hydraulic pressure auto-steering water injector
CN204628760U (en) A mechanical floating rod type water level control device
CN107882367A (en) A kind of stadiums movable stand
CN207025401U (en) A kind of physical chemistry experimental device
CN106492552A (en) A kind of haze absorbing and purifying device
CN205496242U (en) Building dust treatment device
CN207480854U (en) A kind of integrated hydraulic formula template applied to prefabricated box -beam
CN205320931U (en) Variable fluidic device
CN106362378B (en) A kind of luminous rock-climbing fulcrum for rock-climbing
CN206056941U (en) A kind of gas spring elongation test device
CN107442322A (en) A kind of spraying equipment with switching mechanism
CN207517254U (en) A kind of mobile hydraulic actual training device
CN207457021U (en) A kind of water-permeable brick water permeability simulation test device

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant