CN105888198A - Mounting structure of pipeline in pipeline shaft - Google Patents
Mounting structure of pipeline in pipeline shaft Download PDFInfo
- Publication number
- CN105888198A CN105888198A CN201510009177.2A CN201510009177A CN105888198A CN 105888198 A CN105888198 A CN 105888198A CN 201510009177 A CN201510009177 A CN 201510009177A CN 105888198 A CN105888198 A CN 105888198A
- Authority
- CN
- China
- Prior art keywords
- building
- pipeline
- pedestal
- piping shaft
- height
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- NJPPVKZQTLUDBO-UHFFFAOYSA-N novaluron Chemical compound C1=C(Cl)C(OC(F)(F)C(OC(F)(F)F)F)=CC=C1NC(=O)NC(=O)C1=C(F)C=CC=C1F NJPPVKZQTLUDBO-UHFFFAOYSA-N 0.000 claims description 25
- 238000010276 construction Methods 0.000 abstract description 9
- 238000000034 method Methods 0.000 abstract description 2
- 238000009435 building construction Methods 0.000 abstract 1
- 238000009434 installation Methods 0.000 description 7
- 238000010586 diagram Methods 0.000 description 2
- 230000003028 elevating effect Effects 0.000 description 2
- 239000000463 material Substances 0.000 description 2
- 238000009411 base construction Methods 0.000 description 1
- 230000005611 electricity Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 239000000203 mixture Substances 0.000 description 1
- 230000000630 rising effect Effects 0.000 description 1
- 239000000725 suspension Substances 0.000 description 1
Landscapes
- Supports For Pipes And Cables (AREA)
Abstract
The invention relates to a building pipeline mounting structure, in particular to a mounting structure of a pipeline in a pipeline shaft. Before the end of building construction and the completion of the pipeline shaft, the pipeline is lifted into the pipeline shaft by utilizing a crane, and the height of the crane is corresponding to that of a building; as the height of the building is increased in the construction process, the height of the crane is also increased. The mounting structure of the pipeline, provided by the invention, has the characteristics of being simple, lower in construction cost, smaller in potential safety hazards, shorter in mounting period, smaller in limit on pipeline mounting length, better in mounting efficiency and the like.
Description
Technical field
The present invention relates to a kind of building pipe mounting structure, especially relate to a kind of piping shaft Pipe installing
Structure.
Background technology
In modern building, a lot of Pipe installing are in piping shaft, and the piping shaft degree of depth is relatively big, and cross section is empty
Between the narrowest, the Pipe installing in piping shaft needs to spend more man power and material.Tradition is built
Build the piping shaft pipe installation method in thing by hoist engine as elevating mechanism, complete at architecture construction
After, pipeline is first divided into installing the length into piping shaft, is then transported to below the piping shaft of basement,
Suspension hook is set at piping shaft top, pipeline is pulled and installs after rising.This mounting means has three shortcomings,
Need to spend a large amount of manpower and materials by pipeline transportation to basement, need reserved corresponding engineering, need
Piping shaft is installed interim elevating mechanism, if interim fixing point, draws temporary electricity circuit, install
Dismounting equipment is needed after one-tenth, and the braking ability less stable of hoist engine, the most vertical operation
There is bigger potential safety hazard.
Summary of the invention
It is relatively big that the present invention is primarily directed to the potential safety hazard existing for prior art, and installation period is longer,
Pipe installing length limited is relatively big, the technical problem of the poor grade of installation effectiveness, it is provided that a kind of simple in construction,
Construction cost is relatively low, and potential safety hazard is less, and installation period is shorter, and Pipe installing length limited is less,
Installation effectiveness preferable piping shaft Pipe installing structure.
The above-mentioned technical problem of the present invention is mainly addressed by following technical proposals: in building
Before thing construction not yet terminates, piping shaft does not bind, and utilizes tower crane to hang in piping shaft by pipeline, builds
If building thing to be made up of subterranean layer and ground dried layer, Pipe installing, in the piping shaft of building, is built
Building and be provided with piping shaft in thing, building is outside equipped with tower crane, sets between each floor in building
Being equipped with pedestal, pedestal is fixed on piping shaft, and pedestal becomes round pie, two half identical cakes spell
Dress composition, pedestal is provided with hole for hoist, and pedestal is outside equipped with kayser, and lifting pipeline is inserted by tower crane
In pedestal.The height of the height correspondence building of tower crane, building increases at building course camber,
The height of tower crane is identical to be increased.
In architecture construction often increases by one layer of piping shaft that pipeline can hang in each layer, minimizing is hung
Tower in the time of work high above the ground, simultaneously as pipeline by under hang in installation, not by space shadow
Ringing, it is not necessary to every segment pipe length reduced, the hole for hoist on pedestal can ensure that pipeline is in lifting simultaneously
Entering the perpendicularity after building, after having lifted, unclamp the kayser outside pedestal, pedestal can conveniently be removed.
Therefore, the present invention has simple in construction, and construction cost is relatively low, and potential safety hazard is less, erector
The features such as the phase is shorter, and Pipe installing length limited is less, and installation effectiveness is preferable.
Accompanying drawing explanation
Accompanying drawing 1 is the overall structure schematic diagram of the present invention;
Accompanying drawing 2 is the base construction schematic diagram of the present invention.
Detailed description of the invention
Below by embodiment, and combine accompanying drawing, technical scheme is made the most concrete
Explanation.
Embodiment 1: building 4, by subterranean layer and ground up of three layers, is provided with one in building 4
Individual piping shaft 5, building 4 is outside equipped with a tower crane 6, arranges between each floor in building 4
Having a pedestal 1, pedestal 1 is fixed on piping shaft 5, and pedestal 1 becomes round pie, by two identical half
Cake is assemblied to form, and pedestal 1 is provided with three holes for hoist 2, and hole for hoist 2 is along assembled line arrangement, base
Seat 1 is outside equipped with kayser 3, and pipeline 7 is lifted in the hole for hoist 2 inserted in pedestal 1 by tower crane 6, has lifted
Cheng Hou, opens kayser 3, removes pedestal 1 (as illustrated in fig. 1 and 2).
The height of building 4 is that three floors are high, and the height of tower crane 6 is that five floors are high, when building of building 4
Making when being highly raised to four floor height, the height of tower crane 6 is that six floors are high.
Claims (2)
1. a piping shaft Pipe installing structure, if building is made up of subterranean layer and ground dried layer,
Pipe installing is in the piping shaft of building, it is characterised in that arrange in described building (4)
Piping shaft (5), building (4) is had to be outside equipped with tower crane (6), every in building (4)
Being provided with pedestal (1) between individual floor, pedestal (1) is fixed on piping shaft (5), pedestal
(1) becoming round pie, two half identical cakes be assemblied to form, pedestal is provided with on (1)
Hole for hoist (2), pedestal (1) is outside equipped with kayser (3), and tower crane (6) is by pipeline (7)
Lifting is inserted in pedestal (1).
Piping shaft Pipe installing structure the most according to claim 1, it is characterised in that described tower crane (6)
The height of height correspondence building (4), building (4) increases at building course camber,
The height of tower crane (6) is identical to be increased.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201510009177.2A CN105888198A (en) | 2015-01-02 | 2015-01-02 | Mounting structure of pipeline in pipeline shaft |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201510009177.2A CN105888198A (en) | 2015-01-02 | 2015-01-02 | Mounting structure of pipeline in pipeline shaft |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN105888198A true CN105888198A (en) | 2016-08-24 |
Family
ID=56999295
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201510009177.2A Pending CN105888198A (en) | 2015-01-02 | 2015-01-02 | Mounting structure of pipeline in pipeline shaft |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN105888198A (en) |
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN110107737A (en) * | 2019-05-10 | 2019-08-09 | 中国建筑第八工程局有限公司 | The pipe installation method and its mounting device for the pipe well being connected to basement |
| CN113137033A (en) * | 2021-04-06 | 2021-07-20 | 北京中科中电电力工程管理有限公司 | Power pipe well and construction process thereof |
Citations (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPH0762884A (en) * | 1993-08-31 | 1995-03-07 | Mitsui Eng & Shipbuild Co Ltd | Building prefabricated shaft unit |
| JP2000230272A (en) * | 1999-02-10 | 2000-08-22 | Mk:Kk | Pre-assembling method for kitchen and sanitary room for building |
| CN103243926A (en) * | 2013-05-13 | 2013-08-14 | 中建五局第三建设有限公司 | Construction method for hoisting pipe well vertical pipe in high-rise building engineering |
| CN103603504A (en) * | 2013-11-26 | 2014-02-26 | 中建二局第三建筑工程有限公司 | Method of hoisting super high-rise building electrochemical large-diameter rises along with progress of main structure |
| CN103692195A (en) * | 2013-12-20 | 2014-04-02 | 中国五冶集团有限公司 | Pipe installation method |
-
2015
- 2015-01-02 CN CN201510009177.2A patent/CN105888198A/en active Pending
Patent Citations (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPH0762884A (en) * | 1993-08-31 | 1995-03-07 | Mitsui Eng & Shipbuild Co Ltd | Building prefabricated shaft unit |
| JP2000230272A (en) * | 1999-02-10 | 2000-08-22 | Mk:Kk | Pre-assembling method for kitchen and sanitary room for building |
| CN103243926A (en) * | 2013-05-13 | 2013-08-14 | 中建五局第三建设有限公司 | Construction method for hoisting pipe well vertical pipe in high-rise building engineering |
| CN103603504A (en) * | 2013-11-26 | 2014-02-26 | 中建二局第三建筑工程有限公司 | Method of hoisting super high-rise building electrochemical large-diameter rises along with progress of main structure |
| CN103692195A (en) * | 2013-12-20 | 2014-04-02 | 中国五冶集团有限公司 | Pipe installation method |
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN110107737A (en) * | 2019-05-10 | 2019-08-09 | 中国建筑第八工程局有限公司 | The pipe installation method and its mounting device for the pipe well being connected to basement |
| CN113137033A (en) * | 2021-04-06 | 2021-07-20 | 北京中科中电电力工程管理有限公司 | Power pipe well and construction process thereof |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN203064994U (en) | Lifting device for disassembling negative ring segments | |
| CN105836640B (en) | Climbing tower-crane is from climbing fixing device and method | |
| CN105888198A (en) | Mounting structure of pipeline in pipeline shaft | |
| CN205077878U (en) | Unit type curtain plate hoisting device | |
| CN203889942U (en) | Lifting device | |
| CN202882376U (en) | Elevator shaft template support platform | |
| CN202220435U (en) | Reverse construction underground concrete structure formwork descending equipment | |
| CN203461720U (en) | Simple cantilever hoisting machine | |
| CN101660660A (en) | Novel installing method of gas cabinet | |
| CN203998724U (en) | A kind of tower machine attached wall assembling and disassembling stand | |
| CN204592635U (en) | A kind of flange with pile body mounting hole mould | |
| CN209890068U (en) | Temporary fixing device for hoisting reinforcement cage and placing grouting pipe | |
| CN204435856U (en) | A kind of special steel concrete sliding formwork | |
| CN203187370U (en) | Inner mast hoisting device | |
| CN203361662U (en) | Large net rack short-distance lifting device | |
| CN103121629B (en) | Hoisting method of large support equipment for basement | |
| CN201942529U (en) | Alumina decomposition tank | |
| CN204626263U (en) | A kind of outrigger structure for installing steel box-girder | |
| CN202007087U (en) | Ultralow gantry crane with electric hoist | |
| CN202744172U (en) | Ground-to-air transfer frame for separable colorful steel plates | |
| CN205099232U (en) | Hanging flower basket formula hoisting apparatus | |
| CN206188271U (en) | Tower crane chassis supports ballast structure | |
| CN202124413U (en) | Self-discharging brick hoisting cage | |
| CN204626459U (en) | Electric power communication cable active well | |
| CN203903876U (en) | Convenient embedded part lifting adjusting device |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C06 | Publication | ||
| PB01 | Publication | ||
| C10 | Entry into substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| C10 | Entry into substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20160824 |
|
| WD01 | Invention patent application deemed withdrawn after publication |