CN106948552A - Metal roof tile set - Google Patents

Metal roof tile set Download PDF

Info

Publication number
CN106948552A
CN106948552A CN201611007960.6A CN201611007960A CN106948552A CN 106948552 A CN106948552 A CN 106948552A CN 201611007960 A CN201611007960 A CN 201611007960A CN 106948552 A CN106948552 A CN 106948552A
Authority
CN
China
Prior art keywords
tile
metal
combination section
pan
combination
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201611007960.6A
Other languages
Chinese (zh)
Inventor
王荣贵
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Polynum Enterprise Co ltd
Original Assignee
Polynum Enterprise Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Priority claimed from TW104137771A external-priority patent/TWI579442B/en
Priority claimed from TW105212029U external-priority patent/TWM534209U/en
Application filed by Polynum Enterprise Co ltd filed Critical Polynum Enterprise Co ltd
Publication of CN106948552A publication Critical patent/CN106948552A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04DROOF COVERINGS; SKY-LIGHTS; GUTTERS; ROOF-WORKING TOOLS
    • E04D1/00Roof covering by making use of tiles, slates, shingles, or other small roofing elements
    • E04D1/02Grooved or vaulted roofing elements
    • E04D1/06Grooved or vaulted roofing elements of metal
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04DROOF COVERINGS; SKY-LIGHTS; GUTTERS; ROOF-WORKING TOOLS
    • E04D1/00Roof covering by making use of tiles, slates, shingles, or other small roofing elements
    • E04D1/34Fastenings for attaching roof-covering elements to the supporting elements

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Roof Covering Using Slabs Or Stiff Sheets (AREA)

Abstract

本发明揭露一种金属屋瓦组,其包含多个金属板瓦、第一支架及金属筒瓦。金属板瓦为U字型结构,第一支架及金属筒瓦为倒U字型结构。各金属板瓦的两侧设有第一组合部,第一支架的两侧设有第二组合部,且金属板瓦位于第一支架的两侧。第一支架的顶部设有第三组合部,金属筒瓦的顶部设有一第四组合部。其中,藉由固定组件使第一组合部与第二组合,且将第三组合部与第四组合部结合,以将多个金属板瓦、第一支架与金属筒瓦固定为金属屋瓦组。

The invention discloses a metal roof tile set, which includes a plurality of metal plate tiles, a first bracket and a metal tile. The metal plate tile has a U-shaped structure, and the first bracket and the metal tile have an inverted U-shaped structure. First combination parts are provided on both sides of each metal plate tile, second combination parts are provided on both sides of the first bracket, and the metal plate tiles are located on both sides of the first bracket. The top of the first bracket is provided with a third combination part, and the top of the metal tile is provided with a fourth combination part. Wherein, the first combination part is combined with the second combination part through the fixing component, and the third combination part is combined with the fourth combination part, so as to fix the plurality of metal plate tiles, the first bracket and the metal tile into a metal roof tile group.

Description

金属屋瓦组Metal roof tile group

技术领域technical field

本发明是有关于一种屋瓦,特别是有关于一种利用金属板瓦与金属筒瓦的金属屋瓦组。The present invention relates to a roof tile, in particular to a metal roof tile group utilizing metal plate tiles and metal cylinder tiles.

背景技术Background technique

由古至今,庙宇大多是使用屋瓦作为屋顶,且以中式或东方风格的一般民间住宅亦会选用屋瓦作为屋顶。然,因传统屋瓦的材料过于笨重,经过其长期累月的施压往往造成屋顶结构的损害变形,甚至损害到建筑物本身,因此目前许多庙宇已渐渐地改为采用由平瓦与筒瓦组合构成的金属瓦。From ancient times to the present, most temples use roof tiles as their roofs, and common folk houses with Chinese or oriental styles also use roof tiles as their roofs. However, because the material of traditional roof tiles is too bulky, the long-term pressure often causes damage to the roof structure, and even damages the building itself. Therefore, many temples have gradually changed to a combination of flat tiles and tube tiles Composed of metal tiles.

然而,现有技术中仍存有一些缺点极待改善。举例来说,现有的金属制的筒瓦与平瓦的组合,大多存有漏水的问题,因此须设置一防水层于筒瓦与平瓦的组合和屋顶结构面层之间。另外,筒瓦与平瓦在组合、组装时工序相当繁杂,从而造成时间及人力的耗费。However, there are still some shortcomings that need to be improved in the prior art. For example, most of the existing combinations of metal tiles and flat tiles have water leakage problems. Therefore, a waterproof layer must be provided between the combination of cylindrical tiles and flat tiles and the roof structure surface. In addition, the process of combining and assembling the tube tiles and the flat tiles is quite complicated, resulting in time and manpower consumption.

综观前所述,本发明的发明人经多年潜心研究,设计了一种金属屋瓦组,以针对现有技术的缺失加以改善,进而增进产业上的实施利用。In view of the foregoing, the inventor of the present invention has designed a metal roof tile assembly after years of painstaking research to improve the deficiencies of the existing technology and further enhance industrial implementation and utilization.

发明内容Contents of the invention

有鉴于上述现有技术的问题,本发明的目的就是在提供一种金属屋瓦组,以解决上述现有技术待改善的问题。In view of the above-mentioned problems in the prior art, the object of the present invention is to provide a metal roof tile assembly to solve the problems to be improved in the above-mentioned prior art.

根据本发明的目的,提供一种金属屋瓦组,其包含多个金属板瓦、第一支架及金属筒瓦。各金属板瓦由端部观时为U字型结构,各金属板瓦的两侧的边缘设有一第一组合部。第一支架为倒U字型结构,第一支架的两侧分别设置有一第二组合部,且第二组合部对应于第一组合部,第一支架的顶部设有一第三组合部;当多个金属板瓦并排设置时,第一支架位于多个金属板瓦之间。金属筒瓦为倒U字型结构,金属筒瓦的一端的顶部设有一第四组合部;当多个金属板瓦并排设置时,金属筒瓦设置于各金属板瓦的两侧的侧边及第一支架。其中,藉由固定组件使第一组合部与第二组合部组合,且第三组合部与第四组合部结合,以将多个金属板瓦、第一支架与金属筒瓦固定为金属屋瓦组。According to the object of the present invention, a metal roof tile set is provided, which includes a plurality of metal plate tiles, a first bracket and metal cylinder tiles. Each metal plate tile has a U-shaped structure when viewed from the end, and a first combination portion is provided on the edges of both sides of each metal plate tile. The first bracket is an inverted U-shaped structure, and a second combination part is respectively arranged on both sides of the first bracket, and the second combination part corresponds to the first combination part, and a third combination part is provided on the top of the first bracket; When two metal plate tiles are arranged side by side, the first bracket is located between the multiple metal plate tiles. The metal tile is an inverted U-shaped structure, and the top of one end of the metal tile is provided with a fourth combination part; when multiple metal tiles are arranged side by side, the metal tiles are arranged on the sides of each metal tile and the first bracket. Wherein, the first combination part is combined with the second combination part, and the third combination part is combined with the fourth combination part through the fixing component, so as to fix the plurality of metal plate tiles, the first bracket and the metal cylinder tiles into a metal roof tile group.

优选地,各金属板瓦的另一端具有一第一端部及各所述金属板瓦的一端具有一第二端部;第一端部具有一第一搭接边,第二端部具有相反于第一搭接边的一第二搭接边;其中多个金属板瓦沿端部方向搭接时,藉由第一搭接边与第二搭接边进行搭接,第二搭接边为往上弯折的折边,且第二搭接边连接金属板瓦的两内侧壁。Preferably, the other end of each metal tile has a first end and one end of each said metal tile has a second end; the first end has a first overlapping edge and the second end has a A second overlapping edge of an overlapping edge; when a plurality of metal plate tiles are overlapped along the end direction, the overlapping is performed by the first overlapping edge and the second overlapping edge, and the second overlapping edge is upward The folded edge is bent, and the second overlapping edge connects the two inner sidewalls of the metal plate tile.

优选地,第三组合部可包含一插销,第四组合部可为一孔状结构,藉由插销插入孔状结构,以使第三组合部与第四组合部结合;或者是,第三组合部及第四组合部可为圆孔,藉由固定组件穿过第三组合部及第四组合部,以使第三组合部与第四组合部结合。Preferably, the third combination part may include a pin, and the fourth combination part may be a hole-like structure, and the plug is inserted into the hole-like structure to combine the third combination part with the fourth combination part; or, the third combination part The third combining part and the fourth combining part can be circular holes, and the fixing component passes through the third combining part and the fourth combining part, so that the third combining part and the fourth combining part are combined.

优选地,第一组合部可包含长条状的缺口,第二组合部可包含长条状的缺口。Preferably, the first combination part may include a strip-shaped notch, and the second combination part may include a strip-shaped notch.

优选地,其更可包含一第二支架及一勾头件,第二支架为倒U字型结构,勾头件为圆罩状结构,勾头件位于金属筒瓦的另一端,且套设于第二支架。Preferably, it may further include a second bracket and a hook piece, the second bracket is an inverted U-shaped structure, the hook piece is a dome-shaped structure, the hook piece is located at the other end of the metal tile, and is sleeved on the second bracket.

优选地,第二支架的两侧分别具有一第五组合部,第二支架的顶部具有一第六组合部,勾头件的顶部具有一第七组合部,其中藉由固定组件使第一组合部与第五组合部组合,而将第六组合部与第七组合部结合。Preferably, both sides of the second bracket have a fifth combination part, the top of the second bracket has a sixth combination part, and the top of the hook piece has a seventh combination part, wherein the first combination is made by the fixing component. The fifth combination part is combined with the fifth combination part, and the sixth combination part is combined with the seventh combination part.

优选地,第六组合部可包含一插销,第七组合部可为一孔状结构,藉由插销插入孔状结构,以使第六组合部与第七组合部结合;或者是,第六组合部及第七组合部可为圆孔,藉由固定组件穿过第六组合部及第七组合部,以使第六组合部与第七组合部结合。Preferably, the sixth combination part may include a pin, and the seventh combination part may be a hole-like structure, and the plug is inserted into the hole-like structure to combine the sixth combination part with the seventh combination part; or, the sixth combination part The first and seventh combination parts can be round holes, and the fixing component passes through the sixth combination part and the seventh combination part, so that the sixth combination part and the seventh combination part are combined.

优选地,第五组合部可为长条状的缺口。Preferably, the fifth combination part may be a strip-shaped notch.

优选地,金属板瓦更包含二第一滑轨勾部,其分别设置于金属板瓦的两内侧壁,金属筒瓦更包含二第二滑轨勾部,其分别设置于金属筒瓦的两内侧壁,于组装时,金属筒瓦的二第二滑轨勾部分别滑动对勾于第一支架的两侧的二金属板瓦的其中一第一滑轨勾部。Preferably, the metal plate tile further includes two first slide rail hooks, which are respectively arranged on both inner side walls of the metal plate tile, and the metal drum tile further includes two second slide rail hook portions, which are respectively arranged on both inner side walls of the metal drum tile. When assembling, the two second slide rail hooks of the metal cylinder tile are respectively slid against one of the first slide rail hooks of the two metal plate tiles on both sides of the first bracket.

根据本发明的目的,另提供一种金属屋瓦组,其包含多个金属筒板瓦及至少一第一支架。多个金属筒板瓦分别包含金属板瓦及金属筒瓦。金属板瓦由端部观之为U字型结构,金属板瓦的一侧设有一第一滑轨勾部,而金属筒瓦为倒U字型结构,金属筒瓦的一侧一体成型的连接于金属板瓦的另一侧,且金属筒瓦的另一侧具有一第二滑轨勾部。至少一第一支架设置于金属筒瓦中以支撑金属筒瓦。其中,当多个金属筒板瓦并排连接时,其中一金属筒板瓦的金属筒瓦的第二滑轨勾部勾扣于另一金属筒板瓦的金属板瓦的第一滑轨勾部。According to the object of the present invention, a metal roof tile set is provided, which includes a plurality of metal tube tiles and at least one first bracket. The plurality of metal tube tiles respectively include metal plate tiles and metal tube tiles. The metal plate tile has a U-shaped structure viewed from the end. There is a first slide rail hook on one side of the metal plate tile, while the metal tube tile has an inverted U-shaped structure. One side of the metal tube tile is integrally formed and connected to the metal plate tile. The other side, and the other side of the metal tile has a second slide rail hook. At least one first bracket is arranged in the metal tile to support the metal tile. Wherein, when a plurality of metal tube plate tiles are connected side by side, the second slide rail hook portion of the metal tube plate tile of one metal tube plate tile is hooked with the first slide rail hook portion of the metal plate tile of the other metal tube plate tile.

优选地,金属板瓦的另一端具有一第一端部及金属板瓦的一端具有一第二端部,第一端部具有一第一搭接边,第二端部具有相反于第一搭接边的一第二搭接边,其中多个金属筒板瓦沿端部方向搭接时,藉由第一搭接边与第二搭接边进行搭接,第二搭接边为往上弯折的折边,且第二搭接边连接金属板瓦的两内侧壁。Preferably, the other end of the metal tile has a first end and one end of the metal tile has a second end, the first end has a first overlapping edge and the second end has a A second overlapping edge, wherein when a plurality of metal tube tiles are overlapped along the end direction, the overlapping is performed by the first overlapping edge and the second overlapping edge, and the second overlapping edge is bent upward The edge is folded, and the second overlapping edge connects the two inner sidewalls of the sheet metal tile.

优选地,第二搭接边连接金属板瓦的两内侧壁的一连接位置等于或高于金属板瓦与金属筒瓦的一体成型的连接的连接线。Preferably, a connection position where the second overlapping edge connects the two inner sidewalls of the metal plate tile is equal to or higher than the connection line of the integrally formed connection between the metal plate tile and the metal cylinder tile.

优选地,第一支架为倒U字型形状或Z字型形状,且第一支架的底部固定于屋顶,第一支架的顶部具有一第三组合部,金属筒瓦另相对两侧的其中一侧设有一第四组合部,藉由第三组合部结合至第四组合部以固定金属筒瓦于第一支架。Preferably, the first bracket is in the shape of an inverted U or Z, and the bottom of the first bracket is fixed to the roof, and the top of the first bracket has a third combined part, and one of the opposite sides of the metal tile A fourth combination part is provided, and the metal tile is fixed to the first bracket by combining the third combination part with the fourth combination part.

优选地,第三组合部包含一插销,第四组合部包含一孔状结构,第三组合部的插销插入第四组合部孔状结构;或者是,第三组合部及第四组合部为圆孔,其中藉由固定组件穿过第三组合部与第四组合部。Preferably, the third combination part includes a pin, the fourth combination part includes a hole structure, and the plug of the third combination part is inserted into the hole structure of the fourth combination part; or, the third combination part and the fourth combination part are round The hole, wherein the fixing component passes through the third combination part and the fourth combination part.

优选地,多个金属筒板瓦分别为一第一金属筒板瓦、一第二金属筒板瓦、一第三金属筒板瓦、一第四金属筒板瓦、一第五金属筒板瓦及一第六金属筒板瓦,于组装时依序地将第二金属筒板瓦连接于第一金属筒板瓦具有第四组合部的一侧,将第三金属筒板瓦连接于第一金属筒板瓦的金属板瓦的一侧,将第四金属筒板瓦连接于第二金属筒板瓦具有第四组合部的一侧,将第五金属筒板瓦连接于第二金属筒板瓦与第三金属筒板瓦之间,将第六金属筒板瓦连接于第三金属筒板瓦的金属板瓦的一侧。Preferably, the plurality of metal cylinder tiles are respectively a first metal cylinder tile, a second metal cylinder tile, a third metal cylinder tile, a fourth metal cylinder tile, a fifth metal cylinder tile and a sixth metal cylinder tile During assembly, sequentially connect the second metal tube plate tile to the side of the first metal tube plate tile having the fourth combination part, connect the third metal tube plate tile to the side of the metal plate tile of the first metal tube plate tile, Connect the fourth metal cylindrical tile to the side of the second metal cylindrical tile with the fourth combination part, connect the fifth metal cylindrical tile between the second metal cylindrical tile and the third metal cylindrical tile, and connect the sixth metal cylindrical tile One side of the metal plate connected to the third metal cylinder plate.

优选地,更包含一第二支架及一勾头件,第二支架为倒U字型结构,勾头件为圆罩状结合,勾头件位于金属筒瓦的另一端,且套设于第二支架。Preferably, it further includes a second bracket and a hook piece, the second bracket is an inverted U-shaped structure, the hook piece is combined in a dome shape, the hook piece is located at the other end of the metal tile, and is sleeved on the second stand.

综上所述,本发明的金属屋瓦组,其藉由上述的组合结构的配置,从而可有效的减少工序,而可减少时间跟人力。另外,藉由金属板瓦、各支架与金属筒瓦的配置,特别是金属板瓦具有特定的搭接边,从而可达到防止漏水的目的。To sum up, the metal roof tile set of the present invention, through the configuration of the above-mentioned combined structure, can effectively reduce the working procedures, thereby reducing time and manpower. In addition, the purpose of preventing water leakage can be achieved through the arrangement of the metal plate tiles, each bracket and the metal cylinder tile, especially the metal plate tiles have specific overlapping edges.

为让本发明的上述和其他目的、特征和优点能更明显易懂,下文特举优选实施例,并配合所附图式,作详细说明如下。In order to make the above and other objects, features and advantages of the present invention more comprehensible, preferred embodiments will be described in detail below together with the accompanying drawings.

附图说明Description of drawings

第1图为本发明的金属屋瓦组的第一实施例的爆炸示意图。Fig. 1 is an exploded schematic diagram of the first embodiment of the metal roof tile group of the present invention.

第2图为本发明的金属屋瓦组的第一实施例的组合示意图。Fig. 2 is a combined schematic diagram of the first embodiment of the metal roof tile group of the present invention.

第3图为本发明的金属屋瓦组的第一实施例的金属板瓦的示意图。Fig. 3 is a schematic view of the metal plate tile of the first embodiment of the metal roof tile group of the present invention.

第4图为本发明的金属屋瓦组的第一实施例的第一支架与金属筒瓦的一结合型态示意图。Fig. 4 is a schematic diagram of a combination of the first bracket and the metal drum tile of the first embodiment of the metal roof tile set of the present invention.

第5图为本发明的金属屋瓦组的第一实施例的第一支架与金属筒瓦的另一结合型态示意图。Fig. 5 is a schematic diagram of another combination of the first bracket and the metal drum tile of the first embodiment of the metal roof tile set of the present invention.

第6图为本发明的金属屋瓦组的第一实施例的第二支架、金属筒瓦与勾头件的组合示意图。Fig. 6 is a schematic diagram of the combination of the second bracket, the metal tile and the hook piece of the first embodiment of the metal roof tile group of the present invention.

第7图为本发明的金属屋瓦组的第二实施例的示意图。Fig. 7 is a schematic view of the second embodiment of the metal roof tile assembly of the present invention.

第8图为本发明的金属屋瓦组的第三实施例的示意图。Fig. 8 is a schematic view of the third embodiment of the metal roof tile set of the present invention.

第9图为本发明的金属屋瓦组的第四实施例的示意图。Fig. 9 is a schematic diagram of the fourth embodiment of the metal roof tile assembly of the present invention.

附图标记说明:Explanation of reference signs:

1:金属屋瓦组;A~F:金属筒板瓦;10:金属板瓦;11:第一组合部;12:第一搭接边;13:第二搭接边;121、131:反折边;14:第一滑轨勾部;20:第一支架;21:第二组合部;22:第三组合部;30:金属筒瓦;31:第四组合部;32:第二滑轨勾部;40:第二支架;41:第五组合部;42:第六组合部;50:勾头件;51:第七组合部;60:滴水瓦;9:固定组件。1: metal roof tile group; A~F: metal tube plate tile; 10: metal plate tile; 11: first assembly part; 12: first lap edge; 13: second lap edge; 121, 131: reversed edge ;14: the first slide rail hook; 20: the first bracket; 21: the second assembly; 22: the third assembly; 30: metal tile; 31: the fourth assembly; 32: the second slide rail hook ;40: second bracket; 41: fifth assembly part; 42: sixth assembly part; 50: hook head; 51: seventh assembly part; 60: drip tile;

具体实施方式detailed description

本发明的优点及特征以及达到其方法将参照例示性实施例及附图进行更详细地描述而更容易理解。然而,本发明可以不同形式来实现且不应该被理解仅限于此处所陈述的实施例。相反地,对本领域的技术人员而言,所提供的此些实施例将使本揭露更加透彻与全面且完整地传达本发明的范畴,且本发明将仅为所附加的权利要求书所定义。在图中,成分或组件的尺寸及相对尺寸为了清晰易懂而以夸示方法表示。整篇说明书中,相同的组件符号指的是相同的组件。如后文中所使用的,术语”及/或”包含任何及所有一或多相关所列对象的组合。The advantages and features of the present invention and methods for attaining the same will be more easily understood by being described in more detail with reference to exemplary embodiments and accompanying drawings. However, the invention may be embodied in different forms and should not be construed as limited to the embodiments set forth herein. Rather, for those skilled in the art, these embodiments are provided so that this disclosure will be thorough and complete and fully convey the scope of the present invention, and the present invention will only be defined by the appended claims. In the drawings, the dimensions and relative dimensions of components or components are exaggerated for the sake of clarity. Throughout the specification, the same reference symbols refer to the same components. As used hereinafter, the term "and/or" includes any and all combinations of one or more of the associated listed items.

除非另外定义,所有使用于后文的术语(包含科技及科学术语)具有与本领域的技术人员一般所理解相同的意思。将更可理解的是,例如于一般所使用的字典所定义的那些术语应被理解为具有与相关领域的内容一致的意思,且除非明显地定义于后文,将不以过度理想化或过度正式的意思理解。Unless otherwise defined, all terms (including technical and scientific terms) used hereinafter have the same meaning as commonly understood by one of ordinary skill in the art. It will be more understandable that, for example, those terms defined in commonly used dictionaries should be understood as having meanings consistent with the contents of the relevant fields, and unless clearly defined in the following, will not be excessively idealized or excessively Formal meaning comprehension.

以下将配合附图详细叙述例示实施例。然而,这些实施例可以包含于不同的形式中,且不应被解释为用以限制本发明的专利范围。这些实施例的提供使得本发明的揭露完整与明暸,熟知此技术的人将能经由这些实施例了解本发明的范畴。Exemplary embodiments will be described in detail below with reference to the accompanying drawings. However, these embodiments may be included in different forms, and should not be construed to limit the patent scope of the present invention. These embodiments are provided to make the disclosure of the present invention complete and clear, and those skilled in the art will be able to understand the scope of the present invention through these embodiments.

请参阅第1、2图,其为本发明的金属屋瓦组的第一实施例的爆炸示意图及组合示意图。如图所示,金属屋瓦组1包含了多个金属板瓦10、第一支架20及金属筒瓦30。其中各个金属板瓦10,其由端部观时大致上为U字型结构,且金属板瓦10的两侧的边缘可分别设有第一组合部11。金属板瓦10各侧的边缘的可第一组合部11可为在两端分别再往上延伸的片体,并于片体设置缺口或未设置缺口,或可为在金属板瓦10的两端的各侧的边缘直接设置缺口。其中所设置的缺口优选地可为长条状的缺口。Please refer to Figures 1 and 2, which are the exploded schematic diagram and the combined schematic diagram of the first embodiment of the metal roof tile set of the present invention. As shown in the figure, the metal roof tile group 1 includes a plurality of metal plate tiles 10 , a first bracket 20 and metal cylinder tiles 30 . Wherein each metal plate tile 10 has a substantially U-shaped structure when viewed from the end, and the edges of both sides of the metal plate tile 10 can be provided with first combination parts 11 respectively. The first combination part 11 on the edge of each side of the metal plate tile 10 can be a sheet body extending upwards at both ends respectively, and a gap or no gap is provided on the sheet body, or it can be each of the two ends of the metal plate tile 10. Notches are set directly on the edges of the sides. The notch provided therein may preferably be a strip-shaped notch.

另外,第一支架20可由金属材质一体弯折而制成,其可为倒U字型结构。其中,第一支架20的两侧分别设置有一第二组合部21,且第二组合部21的位置对应于第一组合部11的位置。优选地,第二组合部21可为缺口,且可为长条状的缺口。此外,第一支架20的顶部设有一第三组合部22。而金属筒瓦30为倒U字型结构,金属筒瓦30的一端的顶部设有一第四组合部31,且第四组合部31的位置对应于第三组合部22的位置。In addition, the first bracket 20 can be made by bending a metal material integrally, and it can be an inverted U-shaped structure. Wherein, two sides of the first bracket 20 are respectively provided with a second combination part 21 , and the position of the second combination part 21 corresponds to the position of the first combination part 11 . Preferably, the second combining portion 21 can be a notch, and can be a strip-shaped notch. In addition, a third assembly portion 22 is disposed on the top of the first bracket 20 . The metal tile 30 has an inverted U-shaped structure, and a fourth assembly part 31 is provided on the top of one end of the metal tile 30 , and the position of the fourth assembly part 31 corresponds to the position of the third assembly part 22 .

顺带一提的是,第一支架20可设置有补强肋,以增加其整体的结构强度,从而可适当地支撑金属筒瓦30。且,第一支架20可利用锁附或焊接等其他方与屋顶相固定,从而可使金属屋瓦组1适当地固定于屋顶。Incidentally, the first bracket 20 may be provided with reinforcing ribs to increase its overall structural strength, so as to properly support the metal tile 30 . Moreover, the first bracket 20 can be fixed to the roof by other methods such as locking or welding, so that the metal roof tile group 1 can be properly fixed on the roof.

如第2图所示,当将金属板瓦10、第一支架20及一金属筒瓦30三者进行组装置,二个金属板瓦10分别位于第一支架20的两侧。此时,作业人员可先藉由如拉钉或螺丝等固定组件9(固定组件9如第4图所绘示)使第一组合部11与第二组合部21结合。其中,第一组合部11可为具有缺口或未具有缺口,若第一组合部11为未具有缺口时,固定组件9可将金属板瓦10的壁面贯穿再使第一组合部11与第二组合部21结合。若当第一组合部11及/或第二组合部21为长条状的缺口时,此时第一组合部11与第二组合部21可部分地重迭或完全地重迭。因此可利于作业人员进行施工,尤其是针对屋顶结构具有一定曲线的庙宇的屋顶而可减少缺口对位等调整工序。接着,将金属筒瓦30设置于二个金属板瓦10与第一支架20之上,即金属筒瓦30设置于各金属板瓦10的两侧的侧边及第一支架20之上,并将第三组合部22与第四组合部31结合,从而金属筒瓦30将各金属板瓦10的两侧的侧边及第一支架20包覆。即,金属筒瓦30将覆盖住第一组合部11与第二组合部21。As shown in FIG. 2 , when the metal plate tile 10 , the first frame 20 and a metal cylinder tile 30 are assembled, the two metal plate tiles 10 are respectively located on both sides of the first frame 20 . At this time, the operator can first combine the first assembly part 11 with the second assembly part 21 by fixing the assembly 9 such as a pull nail or a screw (the fixing assembly 9 is shown in FIG. 4 ). Wherein, the first combination part 11 may have a gap or not. If the first combination part 11 does not have a gap, the fixing assembly 9 can penetrate the wall surface of the metal plate tile 10 and then make the first combination part 11 and the second combination Part 21 is combined. If the first combination part 11 and/or the second combination part 21 are elongated notches, the first combination part 11 and the second combination part 21 may overlap partially or completely. Therefore, it can be beneficial for operators to carry out construction, especially for the roof of a temple with a certain curve in the roof structure, and can reduce the gap alignment and other adjustment procedures. Next, the metal cylinder tile 30 is arranged on the two metal plate tiles 10 and the first support 20, that is, the metal cylinder tile 30 is arranged on the sides of each metal plate tile 10 and on the first support 20, and the third combination The part 22 is combined with the fourth combination part 31 , so that the metal cylindrical tile 30 covers the side edges of both sides of each metal plate tile 10 and the first bracket 20 . That is, the metal shell tile 30 will cover the first combination part 11 and the second combination part 21 .

值得一提的是,金属板瓦10的两内侧壁可设有一第一滑轨勾部14,于本实施例中,其设置于二个第一组合部11间,但并不以此为限。与之对应的,金属筒瓦30对应于第一滑轨勾部14而于其两侧壁可设有一第二滑轨勾部32。因此,在组装时,可利用滑动的方式,先使第一滑轨勾部14滑入第二滑轨勾部32,而使第一滑轨勾部14与第二滑轨勾部32对勾固定,接着再使第三组合部22与第四组合部31结合。其中,第一滑轨勾部14的一端(组装后邻近第四组合部31的一端)可具有倒角等结构,以便于第一滑轨勾部14滑入第二滑轨勾部32。It is worth mentioning that a first sliding rail hook portion 14 can be provided on both inner sidewalls of the metal plate tile 10 , and in this embodiment, it is disposed between the two first assembly portions 11 , but it is not limited thereto. Correspondingly, the metal cylinder tile 30 corresponds to the first slide rail hook portion 14 and a second slide rail hook portion 32 can be provided on the two side walls thereof. Therefore, when assembling, the first slide rail hook portion 14 can be slid into the second slide rail hook portion 32 by sliding, so that the first slide rail hook portion 14 and the second slide rail hook portion 32 are hooked together. Fix, and then combine the third combination part 22 with the fourth combination part 31. Wherein, one end of the first slide rail hook 14 (an end adjacent to the fourth assembly part 31 after assembly) may have a structure such as a chamfer, so that the first slide rail hook 14 slides into the second slide rail hook 32 .

须特别说明的是,各金属屋瓦组1可再利用额外的第一支架20及金属筒瓦30作并排连接,且各金属屋瓦组1可透过现有的金属板瓦10作串连连接。以下将对各金属屋瓦组1的串接连接作进一步说明。It should be noted that each metal roof tile group 1 can be connected side by side by using the additional first bracket 20 and metal cylinder tile 30 , and each metal roof tile group 1 can be connected in series through the existing metal plate tile 10 . The serial connection of each metal roof tile group 1 will be further described below.

如第3图所示,其中,各金属板瓦10的另一端具有一第一端部及各金属板瓦10的一端具有一第二端部,而第一端部具有一第一搭接边12,第二端部具有相反于第一搭接边12的一第二搭接边13。也就是说,第一搭接边12可为向下弯折的折边,而第二搭接边13可为向上弯折的折边,且第一搭接边12略突出于金属板瓦10的本体的外。因此,其中各金属屋瓦组1的串接连接时,即将金属板瓦10沿端部方向搭接;即,由第一搭接边12搭接至第二搭接边13。As shown in Fig. 3, wherein, the other end of each metal plate tile 10 has a first end portion and one end of each metal plate tile 10 has a second end portion, and the first end portion has a first overlapping edge 12, The second end portion has a second overlapping edge 13 opposite to the first overlapping edge 12 . That is to say, the first overlapping edge 12 can be a folded edge bent downward, and the second overlapping edge 13 can be an upward bent folded edge, and the first overlapping edge 12 slightly protrudes from the edge of the metal plate tile 10 outside of the body. Therefore, when the metal roof tile groups 1 are connected in series, the metal plate tiles 10 are overlapped along the end direction; that is, the first overlapping edge 12 is overlapped to the second overlapping edge 13 .

值得一提的是,第二搭接边13为往上弯折的折边,且第二搭接边13连接金属板瓦10的两内侧壁。因此,在下雨时,雨水会淋至金属板瓦10与金属筒瓦30。在金属筒瓦30方面,金属筒瓦30的雨水会顺着金属筒瓦30的外形流至金属板瓦10,而在金属板瓦10方面,由于第二搭接边13连接金属板瓦10的两内侧壁,因此金属板瓦10的雨水不会由搭接处流至房屋,可接续的流至下一个金属板瓦10。另外,第一搭接边12与第二搭接边13可分别具有一反折边121、131,以更进一步防止雨方由搭接处流至房屋。藉此,本发明的金属屋瓦组1可有效的达到防漏水的目的。It is worth mentioning that the second overlapping edge 13 is an upwardly bent edge, and the second overlapping edge 13 connects the two inner sidewalls of the metal plate tile 10 . Therefore, when it rains, the rainwater will pour onto the metal plate tile 10 and the metal tube tile 30 . In terms of the metal tile 30, the rainwater of the metal tile 30 will flow to the metal tile 10 along the shape of the metal tile 30, and in the metal tile 10, because the second lap edge 13 connects the two inner walls of the metal tile 10, so the metal The rainwater of the plate tile 10 will not flow to the house from the overlapping joint, but can flow to the next metal plate tile 10 continuously. In addition, the first overlapping edge 12 and the second overlapping edge 13 can respectively have a reverse folded edge 121, 131, so as to further prevent rainwater from flowing into the building from the overlapping edge. Thereby, the metal roof tile set 1 of the present invention can effectively achieve the purpose of preventing water leakage.

另一方面,就金属筒瓦30间的串接而言,金属筒瓦30的一端(具有第四组合部31的一端)可呈略为下陷状(或类似于阶梯状),插入另一个金属筒瓦30的另一端,且插入其第二滑轨勾部32,藉此可覆盖住第三组合部22与第四组合部31的结合处,并具有固定的作用。为便于组装,金属筒瓦30的一端可具有倒角等结构,以便于金属筒瓦30的一端插入另一金属筒瓦30的第二滑轨勾部32。On the other hand, as far as the series connection between the metal tiles 30 is concerned, one end of the metal tile 30 (the end with the fourth combination part 31 ) can be slightly sunken (or similar to a stepped shape), and inserted into the other metal tile 30 The other end is inserted into the second slide rail hook portion 32 , thereby covering the junction of the third assembly portion 22 and the fourth assembly portion 31 , and having a fixing effect. For ease of assembly, one end of the metal tile 30 may have a structure such as chamfering, so that one end of the metal tile 30 can be inserted into the second slide rail hook portion 32 of another metal tile 30 .

值得一提的是,第三组合部22与第四组合部31主要可以两种方式作为实施,以下将分别进行说明。It is worth mentioning that the third combination part 22 and the fourth combination part 31 can be implemented in two main ways, which will be described respectively below.

请参阅第4图,其为本发明的金属屋瓦组的第一实施例的第一支架与金属筒瓦的一结合型态示意图。如图所示,第一支架20的第三组合部22及金属筒瓦30的第四组合部31可为圆孔结构。因此,作业人员可简单的藉由固定组件9穿过第三组合部22及第四组合部31,即可使第三组合部22与第四组合部31结合。藉此简单的施工工序,可减少作业人员的作业时间及人力。Please refer to FIG. 4 , which is a schematic diagram of a combination of the first bracket and the metal roof tile of the first embodiment of the metal roof tile set of the present invention. As shown in the figure, the third combination part 22 of the first bracket 20 and the fourth combination part 31 of the metal tile 30 can be circular hole structures. Therefore, the operator can simply pass the fixing component 9 through the third combining part 22 and the fourth combining part 31 to combine the third combining part 22 and the fourth combining part 31 . With this simple construction process, the operating time and manpower of operators can be reduced.

请参阅第5图,其为本发明的金属屋瓦组的第一实施例的第一支架与金属筒瓦的另一结合型态示意图。如图所示,第一支架20的第三组合部22,其可为一插销,而金属筒瓦30的第四组合部31可为一孔状结构,且优选地为部分区域下凹的孔状结构。因此,作业人员仅须使由第三组合部22的插销插入第四组合部31的孔状结构,即可使第三组合部22与第四组合部31结合。藉此可更进一步的减少作业人员的工序,及固定组件9的使用,从而有效的减少作业时间、人力及相关材料(如固定组件9)的费用。Please refer to FIG. 5 , which is a schematic diagram of another combination of the first bracket and the metal roof tile of the first embodiment of the metal roof tile set of the present invention. As shown in the figure, the third combination part 22 of the first bracket 20 can be a pin, and the fourth combination part 31 of the metal tile 30 can be a hole-like structure, and is preferably a concave hole in some areas. structure. Therefore, the operator only needs to insert the pin of the third combining part 22 into the hole structure of the fourth combining part 31 to combine the third combining part 22 with the fourth combining part 31 . Thereby, the working procedures of operators and the use of the fixing component 9 can be further reduced, thereby effectively reducing the operating time, manpower and costs of related materials (such as the fixing component 9 ).

当金属屋瓦组1位于屋檐时,其可再包含一第二支架40、勾头件50与滴水瓦60。以下将作进一步说明。When the metal roof tile set 1 is located at the eaves, it may further include a second bracket 40 , hooks 50 and drip tiles 60 . This will be further explained below.

请参阅第6图,其为本发明的金属屋瓦组的第一实施例的第二支架、金属筒瓦与勾头件的组合示意图。如图所示,当金属屋瓦组1位于屋檐时,其可再包含一第二支架40、勾头件50与滴水瓦60。其中,第二支架40可为倒U字型结构,且优选地可向一端面方向进一步弯折,而形成近似于倒U字型的罩状结构,从而可增加其整体的结构强度。另外,第二支架40的两侧可分别具有一第五组合部41,而第二支架40的顶部可具有一第六组合部42。勾头件50可为圆形罩体,勾头件50的顶部对应第六组合部42具有第七组合部51。组合时,第二支架40位于金属筒瓦30的另一端,即屋檐突出的一端。组装时,作业人员可利用固定组件9使第二支架40的第五组合部41与金属板瓦10的第一组合部11组合,例如固定组件9贯穿金属板瓦10的第一组合部11处的壁面,并穿过第二支架40的第五组合部41,以将二者固定。接着,使第二支架40的第六组合部42与勾头件50的第七组合部51组合。而滴水瓦60设置于金属板瓦10的另一端(具有第一搭接边12的一端)。Please refer to FIG. 6 , which is a schematic diagram of the combination of the second bracket, the metal tile and the hook piece of the first embodiment of the metal roof tile set of the present invention. As shown in the figure, when the metal roof tile set 1 is located at the eaves, it may further include a second bracket 40 , a hook piece 50 and a drip tile 60 . Wherein, the second bracket 40 can be an inverted U-shaped structure, and preferably can be further bent toward one end surface to form a cover-like structure similar to an inverted U-shaped structure, thereby increasing its overall structural strength. In addition, both sides of the second bracket 40 may respectively have a fifth combination portion 41 , and the top of the second bracket 40 may have a sixth combination portion 42 . The hook piece 50 can be a circular cover, and the top of the hook piece 50 has a seventh combination portion 51 corresponding to the sixth combination portion 42 . When combined, the second bracket 40 is located at the other end of the metal tile 30, that is, the protruding end of the eaves. During assembly, the operator can use the fixing component 9 to combine the fifth combination part 41 of the second bracket 40 with the first combination part 11 of the metal plate tile 10, for example, the fixing component 9 penetrates the wall surface at the first combination part 11 of the metal plate tile 10 , and pass through the fifth combination part 41 of the second bracket 40 to fix the two. Next, the sixth combining portion 42 of the second bracket 40 is combined with the seventh combining portion 51 of the hook piece 50 . And the drip tile 60 is arranged at the other end of the metal plate tile 10 (the end with the first overlapping edge 12 ).

须特别说明的是,第五组合部41优选地可为长条状的缺口,以供作业人员简单地使固定组件9穿过并固定。此外,第六组合部42与第七组合部51结合,可如同第三组合部22与第四组合部31一般地主要可以两种方式作为实施。其一,即如第4图所示的,第六组合部42与第七组合部51皆可为圆孔,因此,作业人员可简单的藉由固定组件9穿过第六组合部42与第七组合部51,即可使第六组合部42与第七组合部51结合。藉此简单的施工工序,可减少作业人员的作业时间及人力。其另一,即如第5图所示的,第六组合部42可为插销,而第七组合部51可为一孔状结构,且优选地为部分区域下凹的孔状结构。因此,作业人员仅须使由第六组合部42的插销插入第七组合部51的孔状结构,即可使第六组合部42与第七组合部51结合,以减少作业人员的工序,及固定组件9的使用,从而有效的减少作业时间、人力及相关材料(如固定组件9)的费用。It should be noted that the fifth assembly part 41 is preferably a strip-shaped notch, so that the operator can simply pass and fix the fixing assembly 9 . In addition, the combination of the sixth combination part 42 and the seventh combination part 51 can be mainly implemented in two ways like the third combination part 22 and the fourth combination part 31 . One, as shown in FIG. 4, both the sixth combination part 42 and the seventh combination part 51 can be round holes, therefore, the operator can simply pass through the sixth combination part 42 and the second combination part 42 through the fixing component 9. Seven combining parts 51 , that is, combining the sixth combining part 42 and the seventh combining part 51 . With this simple construction process, the operating time and manpower of operators can be reduced. In addition, as shown in FIG. 5 , the sixth combination part 42 can be a pin, and the seventh combination part 51 can be a hole-like structure, preferably a hole-like structure with a partial area recessed. Therefore, the operator only needs to insert the plug pin of the sixth combination part 42 into the hole-like structure of the seventh combination part 51 to combine the sixth combination part 42 with the seventh combination part 51, so as to reduce the operator's procedures, and The use of the fixed component 9 effectively reduces the cost of operation time, manpower and related materials (such as the fixed component 9 ).

请参阅第7图及第4、5图;第7图为本发明的金属屋瓦组的第二实施例的示意图。如图所示,金属屋瓦组1包含了一或多个金属筒板瓦A、至少一第一支架20。于本实施例中,为了便于说明,金属筒板瓦A以一个作为示范态样,而多个金属筒板瓦A~F的应用,将于后续的实施例中作说明。Please refer to Figure 7 and Figures 4 and 5; Figure 7 is a schematic diagram of the second embodiment of the metal roof tile set of the present invention. As shown in the figure, the metal roof tile group 1 includes one or more metal tube tiles A and at least one first bracket 20 . In this embodiment, for the convenience of description, one metal tube tile A is used as an example, and the application of multiple metal tube tiles A-F will be described in subsequent embodiments.

其中,金属筒板瓦A包含金属板瓦10及金属筒瓦30。金属板瓦10由端部观之为U字型结构,金属板瓦10的一侧设有一第一滑轨勾部14,而金属筒瓦30为倒U字型结构,金属筒瓦30之一侧一体成型的连接于金属板瓦10的另一侧,且金属筒瓦30的另一侧具有一第二滑轨勾部32。第一支架20设置于金属筒瓦30中以支撑金属筒瓦30,其亦可说是支撑金属筒板瓦A。Wherein, the metal tube tile A includes a metal tube tile 10 and a metal tube tile 30 . The metal plate tile 10 has a U-shaped structure viewed from the end, and a first slide rail hook 14 is provided on one side of the metal plate tile 10, while the metal tube tile 30 has an inverted U-shaped structure, and one side of the metal tube tile 30 is integrally formed. It is connected to the other side of the metal tile 10 , and the other side of the metal tile 30 has a second slide rail hook portion 32 . The first bracket 20 is disposed in the metal cylinder tile 30 to support the metal cylinder tile 30 , which can also be said to support the metal cylinder tile A.

当于并排组装时,可利用滑动方式使其中一金属筒板瓦A的金属筒瓦30的第二滑轨勾部32勾扣于另一金属筒板瓦A的金属板瓦10的第一滑轨勾部14。藉此,即可使两个金属筒板瓦A稳定地固定于一起。When assembled side by side, the second slide rail hook 32 of the metal cylinder tile 30 of one metal cylinder tile A can be hooked to the first slide rail hook 14 of the metal cylinder tile 10 of the other metal cylinder tile A by sliding . In this way, the two metal cylinder tiles A can be stably fixed together.

更进一步来说,第一支架20可由金属材质一体弯折而成的倒U字型形状结构或Z字型形状结构。第一支架20的底部固定于屋顶,第一支架20的顶部具有一第三组合部22,金属筒瓦30另相对两侧的其中一侧可对应地设有一第四组合部31,藉由第三组合部22结合至第四组合部31以固定金属筒瓦30于第一支架20,或可称为固定金属筒板瓦A于第一支架20。Furthermore, the first bracket 20 can be formed of an inverted U-shaped structure or a Z-shaped structure formed by integrally bending a metal material. The bottom of the first bracket 20 is fixed on the roof, and the top of the first bracket 20 has a third combination part 22, and one of the opposite sides of the metal tile 30 can be provided with a fourth combination part 31 correspondingly, by the third The combination part 22 is combined with the fourth combination part 31 to fix the metal tube tile 30 on the first bracket 20 , or it can be called fixing the metal tube tile A to the first bracket 20 .

顺带一提的是,第一支架20可设置有补强肋,以增加其整体的结构强度,从而可适当地支撑金属筒板瓦A。且,第一支架20可利用锁附或焊接等其他方与屋顶相固定,从而可使金属屋瓦组1适当地固定于屋顶。Incidentally, the first bracket 20 may be provided with reinforcing ribs to increase its overall structural strength, so as to properly support the metal cylinder tile A. Moreover, the first bracket 20 can be fixed to the roof by other methods such as locking or welding, so that the metal roof tile group 1 can be properly fixed on the roof.

如第4图所示的,第三组合部22及第四组合部31可为圆孔。因此,作业人员可简单的藉由拉钉或螺丝等固定组件9穿过第三组合部22及第四组合部31,即可使第三组合部22与第四组合部31结合。藉此简单的施工工序,可减少作业人员的作业时间及人力。As shown in FIG. 4 , the third combining portion 22 and the fourth combining portion 31 can be circular holes. Therefore, the operator can simply pass the fixing component 9 through the third combining part 22 and the fourth combining part 31 by pulling nails or screws, so as to combine the third combining part 22 and the fourth combining part 31 . With this simple construction process, the operating time and manpower of operators can be reduced.

如第5图所示的,第三组合部22可为一插销,而第四组合部31与之对应地可为一孔状结构,且优选地为部分区域下凹的孔状结构。因此,作业人员仅须使由第三组合部22的插销插入第四组合部31的孔状结构,即可使第三组合部22与第四组合部31结合。藉此可更进一步的减少作业人员的工序,及固定组件9的使用,从而有效的减少作业时间、人力及相关材料(如固定组件9)的费用。As shown in FIG. 5 , the third combination part 22 can be a pin, and the fourth combination part 31 can be a hole-like structure correspondingly, and preferably a part of the hole-like structure is recessed. Therefore, the operator only needs to insert the pin of the third combining part 22 into the hole structure of the fourth combining part 31 to combine the third combining part 22 with the fourth combining part 31 . Thereby, the working procedures of operators and the use of the fixing component 9 can be further reduced, thereby effectively reducing the operating time, manpower and costs of related materials (such as the fixing component 9 ).

值得特别说明的是,金属筒瓦30具有第四组合部31的一端可呈略下陷状(或类似阶梯状),以供一金属筒板瓦A的金属筒瓦30插入另一金属筒板瓦A的金属筒瓦30,从而另一金属筒板瓦A的金属筒瓦30可覆盖住金属筒板瓦A的金属筒瓦30与第一支架20的结合处,以达到防止漏水的目的。It is worth noting that one end of the metal cylinder tile 30 with the fourth combination part 31 can be slightly sunken (or similar to a stepped shape), so that the metal cylinder tile 30 of one metal cylinder tile A can be inserted into the metal cylinder tile of another metal cylinder tile A 30, so that the metal cylinder tile 30 of another metal cylinder tile A can cover the junction of the metal cylinder tile 30 of the metal cylinder tile A and the first bracket 20, so as to prevent water leakage.

再请参阅第7图。另一方面,金属板瓦10的另一端具有一第一端部,其具有一第一搭接边12,而金属板瓦10的一端具有一第二端部,其具有相反于第一搭接边12的一第二搭接边13。因此,当多个金属筒板瓦A沿端部方向搭接时,藉由第一搭接边12与第二搭接边13进行搭接。也就是说,第一搭接边12可为向下弯折的折边,而第二搭接边13可为向上弯折的折边,且第一搭接边12略突出于金属板瓦10的本体的外。因此,其中各金属筒板瓦A的串接连接时,即将金属板瓦10沿端部方向搭接;即,由第一搭接边12搭接至第二搭接边13。Please refer to Figure 7 again. On the other hand, the other end of the metal plate tile 10 has a first end portion with a first overlapping edge 12, and one end of the metal plate tile 10 has a second end portion with an opposite first overlapping edge 12. A second overlapping edge 13 of. Therefore, when a plurality of metal tube tiles A are overlapped along the end direction, the overlapping is performed by the first overlapping edge 12 and the second overlapping edge 13 . That is to say, the first overlapping edge 12 can be a folded edge bent downward, and the second overlapping edge 13 can be an upward bent folded edge, and the first overlapping edge 12 slightly protrudes from the edge of the metal plate tile 10 outside of the body. Therefore, in the series connection of the metal cylinder tiles A, the metal tiles 10 are overlapped along the end direction; that is, from the first overlapping edge 12 to the second overlapping edge 13 .

须特别说明的是,第二搭接边13为往上弯折的折边,且第二搭接边13连接金属板瓦10的两内侧壁。优选地,第二搭接边13连接金属板瓦10的两内侧壁的一连接位置等于或高于金属板瓦10与金属筒瓦30的一体成型的连接的连接线;其中,连接线为假想线。因此,在下雨时,雨水会淋至金属板瓦10与金属筒瓦30。在金属筒瓦30方面,金属筒瓦30的雨水会顺着金属筒瓦30的外形流至金属板瓦10,而在金属板瓦10方面,由于第二搭接边13连接金属板瓦10的两内侧壁,因此金属板瓦10的雨水不会由搭接处流至房屋,可接续的流至下一个金属板瓦10。另外,第一搭接边12与第二搭接边13可分别具有一反折边,以更进一步防止雨方由搭接处流至房屋。It should be noted that the second overlapping edge 13 is an upwardly bent edge, and the second overlapping edge 13 connects the two inner sidewalls of the metal plate tile 10 . Preferably, a connection position where the second overlapping edge 13 connects the two inner sidewalls of the metal plate tile 10 is equal to or higher than the integrally formed connecting line between the metal plate tile 10 and the metal cylinder tile 30; wherein, the connecting line is an imaginary line. Therefore, when it rains, the rainwater will pour onto the metal plate tile 10 and the metal tube tile 30 . In terms of the metal tile 30, the rainwater of the metal tile 30 will flow to the metal tile 10 along the shape of the metal tile 30, and in the metal tile 10, because the second lap edge 13 connects the two inner walls of the metal tile 10, so the metal The rainwater of the plate tile 10 will not flow to the house from the overlapping joint, but can flow to the next metal plate tile 10 continuously. In addition, the first overlapping edge 12 and the second overlapping edge 13 can respectively have a reverse folded edge, so as to further prevent rain from flowing from the overlapping edge to the house.

值得特别一提的是,金属筒板瓦A可进一步使用一吊子70,以更稳固地固定于屋顶,其中吊子70固定于屋顶,而吊子70的一勾部勾扣于第二搭接边13或第一滑轨勾部14,于本实施例中,吊子70以勾扣于第二搭接边13作为示范态样,但不以此为限。It is worth mentioning that metal cylinder tile A can further use a hanger 70 to be more firmly fixed on the roof, wherein the hanger 70 is fixed on the roof, and a hook part of the hanger 70 is hooked to the second lap The edge 13 or the hook portion 14 of the first slide rail. In this embodiment, the hanger 70 is hooked to the second overlapping edge 13 as an example, but it is not limited thereto.

以下将对多个金属筒板瓦A~F进行组装时作进一步说明。Further description will be given below when assembling a plurality of metal tube tiles A-F.

请参阅第8图,其为本发明的金属屋瓦组的第二实施例的示意图。本实施例中,多个金属筒板瓦以第一至第六金属筒板瓦A~F作为示范态样,但其数量并不以此为限。Please refer to FIG. 8, which is a schematic view of the second embodiment of the metal roof tile set of the present invention. In this embodiment, the first to sixth metal tubular tiles A to F are used as exemplary examples of the plurality of metal tubular tiles, but the number is not limited thereto.

如图所示,于组装时,优选地应依序将第一至第六金属筒板瓦A~F进行组装,而其中当然包含第一支架20的组装,而第一支架20的组装说明,即如上所述,于此便不再加以赘述。同样地,金属筒板瓦之间的细部组装说明亦如上所述,于此便不再加以赘述。As shown in the figure, during assembly, the first to sixth metal tube tiles A to F should preferably be assembled in sequence, which of course includes the assembly of the first bracket 20, and the assembly description of the first bracket 20 is, As mentioned above, it will not be repeated here. Similarly, the detailed assembly instructions between the metal tube and plate tiles are also described above, and will not be repeated here.

首先,将第二金属筒板瓦B连接于第一金属筒板瓦A具有第四组合部31的一侧;接着,将第三金属筒板瓦C连接于第一金属筒板瓦A的金属板瓦10的一侧;再接着,将第四金属筒板瓦D连接于第二金属筒板瓦B具有第四组合部31的一侧;然后,将第五金属筒板瓦E连接于第二金属筒板瓦B与第三金属筒板瓦C之间,将第六金属筒板瓦F连接于第三金属筒板瓦C的金属板瓦10的一侧。Firstly, connect the second metal cylindrical tile B to the side of the first metal cylindrical tile A with the fourth combination part 31; then, connect the third metal cylindrical tile C to one side of the metal tile 10 of the first metal cylindrical tile A Next, connect the fourth metal tube tile D to the side of the second metal tube tile B with the fourth combination part 31; then, connect the fifth metal tube tile E to the second metal tube tile B and the third Between the metal tube tiles C, the sixth metal tube tile F is connected to one side of the metal tube tile 10 of the third metal tube tile C.

简单来说,当多个金属筒板瓦A~F进行组装时,其主要为类似于斜线方式依序地进行组装,而此方式的组装可便于使用者进行施工。To put it simply, when a plurality of metal cylinder tiles A-F are assembled, they are mainly assembled sequentially in a manner similar to oblique lines, and this manner of assembly is convenient for users to carry out construction.

当金属屋瓦组1位于屋檐时,其可再包含一第二支架40、勾头件50与滴水瓦60。以下将作进一步说明。When the metal roof tile set 1 is located at the eaves, it may further include a second bracket 40 , hooks 50 and drip tiles 60 . This will be further explained below.

请参阅第9图,其为本发明的金属屋瓦组的第三实施例的示意图。如图所示,当金属屋瓦组1位于屋檐时,其可再包含一第二支架40、勾头件50与滴水瓦60。其中,第二支架40可为倒U字型结构,且优选地可向一端面方向进一步弯折,而形成近似于倒U字型的罩状结构,从而可增加其整体的结构强度。另外,第二支架40的两侧可分别具有一第五组合部41,而第二支架40的顶部可具有一第六组合部42。勾头件50可为圆形罩体,勾头件50的顶部对应第六组合部42具有第七组合部51。组合时,第二支架40位于金属筒瓦30的另一端,即屋檐突出的一端。组装时,作业人员可利用固定组件9使金属筒瓦30与第二支架40的第五组合部41组合,例如固定组件9贯穿勾头件50或金属筒瓦30的的壁面以将二者固定。接着,使第二支架40的第六组合部42与勾头件50的第七组合部51组合。而滴水瓦60设置于金属板瓦10的另一端(具有第一搭接边12的一端)。Please refer to FIG. 9, which is a schematic view of the third embodiment of the metal roof tile assembly of the present invention. As shown in the figure, when the metal roof tile set 1 is located at the eaves, it may further include a second bracket 40 , a hook piece 50 and a drip tile 60 . Wherein, the second bracket 40 can be an inverted U-shaped structure, and preferably can be further bent toward one end surface to form a cover-like structure similar to an inverted U-shaped structure, thereby increasing its overall structural strength. In addition, both sides of the second bracket 40 may respectively have a fifth combination portion 41 , and the top of the second bracket 40 may have a sixth combination portion 42 . The hook piece 50 can be a circular cover, and the top of the hook piece 50 has a seventh combination portion 51 corresponding to the sixth combination portion 42 . When combined, the second bracket 40 is located at the other end of the metal tile 30, that is, the protruding end of the eaves. During assembly, the operator can use the fixing assembly 9 to combine the metal tile 30 with the fifth combination part 41 of the second bracket 40 , for example, the fixing assembly 9 penetrates the wall surface of the hook piece 50 or the metal tile 30 to fix the two. Next, the sixth combining portion 42 of the second bracket 40 is combined with the seventh combining portion 51 of the hook piece 50 . And the drip tile 60 is arranged at the other end of the metal plate tile 10 (the end with the first overlapping edge 12 ).

须特别说明的是,第五组合部41优选地可为长条状的缺口,以供作业人员简单地使固定组件9穿过并固定。It should be noted that the fifth assembly part 41 is preferably a strip-shaped notch, so that the operator can simply pass and fix the fixing assembly 9 .

另外,第六组合部42与第七组合部51的组合,可如同第三组合部22与第四组合部31一般地主要可以两种方式作为实施。其一,即如第4图所示的,第六组合部42与第七组合部51皆可为圆孔,因此,作业人员可简单的藉由固定组件9穿过第六组合部42与第七组合部51,即可使第六组合部42与第七组合部51结合。藉此简单的施工工序,可减少作业人员的作业时间及人力。其另一,即如第5图所示的,第六组合部42可为插销,而第七组合部51可为一孔状结构。因此,作业人员仅须使由第六组合部42的插销插入第七组合部51的孔状结构,即可使第六组合部42与第七组合部51结合,以减少作业人员的工序,及固定组件9的使用,从而有效的减少作业时间、人力及相关材料(如固定组件9)的费用。于上述两种方式中,金属筒瓦30的另一端可覆盖于勾头件50外,即,覆盖住第六组合部42与第七组合部51的结合处,以进一步防止漏水。In addition, the combination of the sixth combination part 42 and the seventh combination part 51 can be mainly implemented in two ways like the third combination part 22 and the fourth combination part 31 . One, as shown in FIG. 4, both the sixth combination part 42 and the seventh combination part 51 can be round holes, therefore, the operator can simply pass through the sixth combination part 42 and the second combination part 42 through the fixing component 9. Seven combining parts 51 , that is, combining the sixth combining part 42 and the seventh combining part 51 . With this simple construction process, the operating time and manpower of operators can be reduced. In addition, as shown in FIG. 5 , the sixth combination part 42 can be a pin, and the seventh combination part 51 can be a hole-like structure. Therefore, the operator only needs to insert the plug pin of the sixth combination part 42 into the hole-like structure of the seventh combination part 51 to combine the sixth combination part 42 with the seventh combination part 51, so as to reduce the operator's procedures, and The use of the fixed component 9 effectively reduces the cost of operation time, manpower and related materials (such as the fixed component 9 ). In the above two methods, the other end of the metal tile 30 can cover the outside of the hook piece 50 , that is, cover the junction of the sixth combination part 42 and the seventh combination part 51 to further prevent water leakage.

由上述的说明可知,本发明的金属屋瓦组,其藉由预定配置的金属板瓦、支架及金属筒瓦的组合,从而可有效的减少工序,而可减少时间跟人力。并且,藉由金属板瓦、各支架与金属筒瓦的配置,特别是金属板瓦具有特定的搭接边,从而可达到防止漏水的目的。It can be seen from the above description that the metal roof tile set of the present invention can effectively reduce the process by combining the predetermined configuration of metal plate tiles, brackets and metal cylinder tiles, thereby reducing time and manpower. Moreover, through the arrangement of the metal plate tiles, each bracket and the metal cylinder tile, especially the metal plate tiles have specific overlapping edges, the purpose of preventing water leakage can be achieved.

综观上述,可见本发明在突破先前的技术下,确实已达到所欲增进的功效,且也非熟悉此项技艺者所能轻易思及,其所具的创造性、实用性。Looking at the above, it can be seen that the present invention has indeed achieved the desired effect after breaking through the previous technology, and it is not easy for those familiar with this technology to think about its creativity and practicability.

Claims (16)

1. a kind of metal roofing tile group, it is characterised in that include:
Multiple metal pan tiles, each metal pan tile by end see be U-shaped structure, the side of the both sides of each metal pan tile Edge is provided with the first combination section;
First support, is inverted u-shaped structure, and the both sides of the first support are respectively arranged with the second combination section, and described second Combination section corresponds to first combination section, and the top of the first support is provided with the 3rd combination section, when the multiple metallic plate When watt being arranged side by side, the first support is located between the multiple metal pan tile;And
Metal semicircular tile, is inverted u-shaped structure, and the top of one end of the metal semicircular tile is provided with the 4th combination section, when the multiple When metal pan tile is arranged side by side, the metal semicircular tile is arranged at the sides of the both sides of each metal pan tile and described first Frame;
Wherein, first combination section is combined with second combination section by fixation kit, and the 3rd combination section with 4th combination section is combined, and the multiple metal pan tile, the first support is fixed as with the metal semicircular tile described Metal roofing tile group.
2. metal roofing tile group as claimed in claim 1, it is characterised in that the other end of each metal pan tile has first end Portion and one end of each metal pan tile have the second end, and the first end has the first overlap edge, the second end The second overlap edge with contrast to first overlap edge, wherein the multiple metal pan tile along end direction overlap when, by Overlapped by first overlap edge with second overlap edge, second overlap edge is the flanging that up bends, and institute State two madial walls that the second overlap edge connects the metal pan tile.
3. metal roofing tile group as claimed in claim 1, it is characterised in that the 3rd combination section includes latch, the described 4th Combination section is cavernous structure, and the cavernous structure is inserted by the latch, so that the 3rd combination section and described 4th group Conjunction portion is combined;Either,
3rd combination section and the 4th combination section are circular hole, and the 3rd combination section is passed through and described by fixation kit 4th combination section, so that the 3rd combination section is combined with the 4th combination section.
4. metal roofing tile group as claimed in claim 1, it is characterised in that first combination section includes the breach of strip, Second combination section includes the breach of strip.
5. metal roofing tile group as claimed in claim 1, it is characterised in that further include second support and eave tile part, described second Support is inverted u-shaped structure, and the eave tile part combines for dome shape, and the eave tile part is located at the other end of the metal semicircular tile, And it is sheathed on the second support.
6. metal roofing tile group as claimed in claim 5, it is characterised in that the both sides of the second support have the 5th group respectively Conjunction portion, the top of the second support has the 6th combination section, and the top of the eave tile part has the 7th combination section, wherein by Fixation kit makes first combination section be combined with the 5th combination section, and the 6th combination section and the 7th combination section It is assembled.
7. metal roofing tile group as claimed in claim 6, it is characterised in that the 6th combination section includes latch, the described 7th Combination section is cavernous structure, and the cavernous structure is inserted by the latch, so that the 6th combination section and described 7th group Conjunction portion is combined;Either,
6th combination section and the 7th combination section are circular hole, and the 6th combination section is passed through and described by fixation kit 7th combination section, so that the 6th combination section is combined with the 7th combination section.
8. the metal roofing tile group as described in claim 6, it is characterised in that the 5th combination section is the breach of strip.
9. metal roofing tile group as claimed in claim 1, it is characterised in that the metal pan tile further includes 2 first slide rails hook Portion, it is respectively arranged at two madial walls of the metal pan tile, and the metal semicircular tile further includes 2 second slide rail hook parts, and it is distinguished Two madial walls of the metal semicircular tile are arranged at, when assembling, the 2 second slide rail hook part of the metal semicircular tile is slided respectively Move to hooking in the first slide rail hook part wherein described in one of metal pan tile described in the two of the both sides of the first support.
10. a kind of metal roofing tile group, it is characterised in that include:
Multiple metal cylinder pan tiles, it is included respectively:
Metal pan tile, what it was seen by end is U-shaped structure, and the side of the metal pan tile is provided with the first slide rail hook part;
Metal semicircular tile, is inverted u-shaped structure, and the side of the metal semicircular tile is integrally formed to be connected to the another of the metal pan tile Side, and the opposite side of the metal semicircular tile has the second slide rail hook part;And
An at least first support, is arranged in the metal semicircular tile to support the metal semicircular tile;
Wherein, when multiple metal cylinder pan tiles are connected side by side, wherein the metal semicircular tile of metal cylinder pan tile described in one The second slide rail hook part hook is in the first slide rail hook part of the metal pan tile of another metal cylinder pan tile.
11. metal roofing tile group as claimed in claim 10, it is characterised in that the other end of the metal pan tile has first end Portion and one end of the metal pan tile have the second end, and the first end has the first overlap edge, the second end tool Have the second overlap edge in contrast to first overlap edge, wherein the multiple metal cylinder pan tile along end direction overlap when, by Overlapped by first overlap edge with second overlap edge, second overlap edge is the flanging that up bends, and institute State two madial walls that the second overlap edge connects the metal pan tile.
12. metal roofing tile group as claimed in claim 11, it is characterised in that second overlap edge connects the metal pan tile Two madial walls link position be equal to or higher than the metal pan tile and the metal semicircular tile integrally formed connection company Wiring.
13. metal roofing tile group as claimed in claim 10, it is characterised in that the first support is inverted u-shaped shape or Z-shaped Type shape, and roof is fixed in the bottom of the first support, the top of the first support has the 3rd combination section, the gold The wherein side for belonging to the another opposite sides of semicircular tile is provided with the 4th combination section, and the 4th combination is bound to by the 3rd combination section Portion is with the fixed metal semicircular tile in the first support.
14. metal roofing tile group as claimed in claim 13, it is characterised in that the 3rd combination section includes latch, described the Four combination sections include cavernous structure, and the latch of the 3rd combination section inserts the cavernous structure of the 4th combination section;Either,
3rd combination section and the 4th combination section be circular hole, wherein by fixation kit through the 3rd combination section with 4th combination section.
15. the metal roofing tile group as described in claim 13 or 14, it is characterised in that the multiple metal cylinder pan tile is respectively One metal cylinder pan tile, the second metal cylinder pan tile, the 3rd metal cylinder pan tile, the 4th metal cylinder pan tile, fifth metal cylinder pan tile and the Six metal cylinder pan tiles, are connected to the first metal cylinder pan tile by the second metal cylinder pan tile in order and have institute when assembling The side of the 4th combination section is stated, the 3rd metal cylinder pan tile is connected to the metal pan tile of the first metal cylinder pan tile Side, the 4th metal cylinder pan tile is connected into the second metal cylinder pan tile has the side of the 4th combination section, Fifth metal cylinder pan tile is connected between the second metal cylinder pan tile and the 3rd metal cylinder pan tile, by described the Six metal cylinder pan tiles are connected to the side of the metal pan tile of the 3rd metal cylinder pan tile.
16. metal roofing tile group as claimed in claim 10, it is characterised in that further include second support and eave tile part, described Two supports are inverted u-shaped structure, and the eave tile part combines for dome shape, and the eave tile part is located at the another of the metal semicircular tile End, and it is sheathed on the second support.
CN201611007960.6A 2015-11-16 2016-11-16 Metal roof tile set Pending CN106948552A (en)

Applications Claiming Priority (4)

Application Number Priority Date Filing Date Title
TW104137771 2015-11-16
TW104137771A TWI579442B (en) 2015-11-16 2015-11-16 Metal roofing tile assembly
TW105212029U TWM534209U (en) 2016-08-09 2016-08-09 Metal roofing tile assembly
TW105212029 2016-08-09

Publications (1)

Publication Number Publication Date
CN106948552A true CN106948552A (en) 2017-07-14

Family

ID=59040725

Family Applications (2)

Application Number Title Priority Date Filing Date
CN201621230523.6U Expired - Fee Related CN206267426U (en) 2015-11-16 2016-11-16 Metal roof tile set
CN201611007960.6A Pending CN106948552A (en) 2015-11-16 2016-11-16 Metal roof tile set

Family Applications Before (1)

Application Number Title Priority Date Filing Date
CN201621230523.6U Expired - Fee Related CN206267426U (en) 2015-11-16 2016-11-16 Metal roof tile set

Country Status (1)

Country Link
CN (2) CN206267426U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108756080A (en) * 2018-07-09 2018-11-06 汉能移动能源控股集团有限公司 Cylindrical tile and roof tile set

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN206267426U (en) * 2015-11-16 2017-06-20 齐瓦室企业有限公司 Metal roof tile set

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2003321902A (en) * 2002-05-02 2003-11-14 Akimori Matsubara Shape and structure of roofing material and fixing method thereof
CN2832968Y (en) * 2005-09-06 2006-11-01 王立柱 Metal tile
CN101886447A (en) * 2010-08-12 2010-11-17 中国建筑股份有限公司 Aluminum-magnesium-manganese alloy plate antique roof tile and manufacturing method thereof
CN202440999U (en) * 2012-02-02 2012-09-19 金星铜集团有限公司 Connected metal tile
CN206267426U (en) * 2015-11-16 2017-06-20 齐瓦室企业有限公司 Metal roof tile set

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2003321902A (en) * 2002-05-02 2003-11-14 Akimori Matsubara Shape and structure of roofing material and fixing method thereof
CN2832968Y (en) * 2005-09-06 2006-11-01 王立柱 Metal tile
CN101886447A (en) * 2010-08-12 2010-11-17 中国建筑股份有限公司 Aluminum-magnesium-manganese alloy plate antique roof tile and manufacturing method thereof
CN202440999U (en) * 2012-02-02 2012-09-19 金星铜集团有限公司 Connected metal tile
CN206267426U (en) * 2015-11-16 2017-06-20 齐瓦室企业有限公司 Metal roof tile set

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108756080A (en) * 2018-07-09 2018-11-06 汉能移动能源控股集团有限公司 Cylindrical tile and roof tile set

Also Published As

Publication number Publication date
CN206267426U (en) 2017-06-20

Similar Documents

Publication Publication Date Title
CN204662722U (en) A kind of eccentric bridge cut-off lightgage steel joist
KR101106704B1 (en) Structure of roof of metal panel with waterproof member
CN106948552A (en) Metal roof tile set
CN202544248U (en) T<+> type lock seam structure of roofing board
CN202577786U (en) Q+ type locking seam structure of roof board
KR101570104B1 (en) Finishing materials for roof and outer wall of structure
JP6338266B2 (en) Keraba drainer and keraba drainer mounting structure
CN207499256U (en) A kind of small black tile for emblem formula architecture indoor exhibition booth
CN205399838U (en) A anti -wind hasp for roofing tile
CN207776278U (en) Ultralight steel profile for connecting arc tile
KR20140104710A (en) Greenhouse frame optimized to heat insulation
CN201518631U (en) Double-sided clips for sealing gaps in greenhouse coverings
TWI579442B (en) Metal roofing tile assembly
KR101323475B1 (en) Vinyl fixing assembly combined in frame for green-house
KR101531014B1 (en) Profile for greenhouse
CN108700337A (en) The solar heat roof sheet tile of connecting element with adjustable length
TWM521099U (en) Metal roofing tile assembly
JP6392571B2 (en) Vertical facing exterior structure
CN204551915U (en) A kind of metal roofing board fastening structure
CN201518632U (en) One-sided card strips for greenhouses
CN204059772U (en) Roof longitudinal expansion joint coupling assembling
CN206752869U (en) A kind of multipurpose waterproof receives side section bar
TWM576185U (en) Metal roofing shingle set
CN205012573U (en) Colored steel joins externally gutter
KR101303057B1 (en) The rain leader gutter assembly for rainwater drain and thereof construction method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20170714