CN106988169B - A kind of method that transverse direction pulls out progress track plates replacement after rail - Google Patents
A kind of method that transverse direction pulls out progress track plates replacement after rail Download PDFInfo
- Publication number
- CN106988169B CN106988169B CN201710344424.3A CN201710344424A CN106988169B CN 106988169 B CN106988169 B CN 106988169B CN 201710344424 A CN201710344424 A CN 201710344424A CN 106988169 B CN106988169 B CN 106988169B
- Authority
- CN
- China
- Prior art keywords
- rail
- track plates
- plate
- replaced
- transverse direction
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01B—PERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
- E01B29/00—Laying, rebuilding, or taking-up tracks; Tools or machines therefor
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Machines For Laying And Maintaining Railways (AREA)
Abstract
本发明公开了一种横向拔钢轨后进行轨道板更换的方法。所述方法包括钢轨实际锁定轨温及当前轨温测试设备、钢轨应力应变测试设备、钢轨横向顶推设备、轨道板运输设备、轨道板吊装设备、测量装置、钢轨回拔装置。所述方法包括在被更换轨道板前后一定距离线路上设立反力档块或反力装置,在钢轨上设立顶推点,松开一定长度扣件,采用顶推设备将钢轨顶推至被更换轨道板外侧,采用垂直起吊方式进行旧板的移除及新板的就位。所述应力测试设备全过程测量钢轨应力;所述测量装置设于吊板作业区外侧控制新板平面位置。本方法具有工装轻便、更换快捷、工效高、对钢轨损伤小等特点,特别适合于高铁“天窗时间”作业。
The invention discloses a method for replacing rail plates after horizontally drawing steel rails. The method includes testing equipment for the actual locked rail temperature and current rail temperature of the rail, rail stress and strain testing equipment, rail lateral pushing equipment, rail plate transportation equipment, rail plate hoisting equipment, measuring devices, and rail pulling devices. The method includes setting up a reaction force block or a reaction force device on a line at a certain distance before and after the track plate to be replaced, setting up a pushing point on the rail, loosening a certain length of fastener, and using a pushing device to push the rail to the position to be replaced. On the outside of the track plate, the old plate is removed and the new plate is placed in place by means of vertical lifting. The stress testing equipment measures the rail stress in the whole process; the measuring device is arranged outside the hanging plate operation area to control the plane position of the new plate. The method has the characteristics of light tooling, quick replacement, high work efficiency, and little damage to the rails, and is especially suitable for the "skylight time" operation of high-speed railways.
Description
Claims (8)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201710344424.3A CN106988169B (en) | 2017-05-16 | 2017-05-16 | A kind of method that transverse direction pulls out progress track plates replacement after rail |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201710344424.3A CN106988169B (en) | 2017-05-16 | 2017-05-16 | A kind of method that transverse direction pulls out progress track plates replacement after rail |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| CN106988169A CN106988169A (en) | 2017-07-28 |
| CN106988169B true CN106988169B (en) | 2019-03-29 |
Family
ID=59420883
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201710344424.3A Active CN106988169B (en) | 2017-05-16 | 2017-05-16 | A kind of method that transverse direction pulls out progress track plates replacement after rail |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN106988169B (en) |
Families Citing this family (9)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN108130825B (en) * | 2017-12-31 | 2019-03-19 | 天津市金荣通核修护工程有限公司 | Subgrade of metro concrete replacement technique in special limiting condition |
| CN108385454A (en) * | 2018-03-07 | 2018-08-10 | 中国铁道科学研究院铁道建筑研究所 | A kind of railway plate-type ballastless track working drawing review operational method |
| CN108385455B (en) * | 2018-03-07 | 2021-11-05 | 中国铁道科学研究院集团有限公司铁道建筑研究所 | A method for construction and maintenance of cast-in-place bed slab type ballastless track |
| CN108385451A (en) * | 2018-03-07 | 2018-08-10 | 中国铁道科学研究院铁道建筑研究所 | Board-like ballastless track boards replacing options under a kind of special operation condition |
| CN108385456A (en) * | 2018-03-07 | 2018-08-10 | 中国铁道科学研究院铁道建筑研究所 | A kind of board-like ballastless track bed board integral replacing method of cast-in-place railway roadbed |
| CN111794024A (en) * | 2020-07-07 | 2020-10-20 | 中国铁建高新装备股份有限公司 | Ballastless track grinding system and method |
| CN115976894A (en) * | 2023-02-17 | 2023-04-18 | 株洲时代电子技术有限公司 | A method for replacing track slabs of ballastless lines |
| CN117107562B (en) * | 2023-10-11 | 2026-04-14 | 中国铁道科学研究院集团有限公司铁道建筑研究所 | Method for replacing high-speed rail curve super-high section ballastless track plate |
| CN117107563A (en) * | 2023-10-11 | 2023-11-24 | 中国铁道科学研究院集团有限公司铁道建筑研究所 | A method for replacing ballastless track slabs in the curved super-elevation section of the high-speed railway base section |
Family Cites Families (10)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| DE3644540A1 (en) * | 1986-12-24 | 1988-07-07 | Guenter Finke | Rail-joint aligning device for aligning the facing ends of railway and tramway rails |
| DE4442498A1 (en) * | 1994-11-30 | 1996-06-05 | Hochtief Ag Hoch Tiefbauten | Mobile concreting machine |
| US6755135B2 (en) * | 2001-03-16 | 2004-06-29 | Nordco Inc. | Combined tie extractor and plate remover for rail maintenance |
| CN202945512U (en) * | 2012-12-11 | 2013-05-22 | 中铁二十局集团有限公司 | Device for replacing plate-type ballastless track reinforced concrete base plate |
| CN202945513U (en) * | 2012-12-11 | 2013-05-22 | 中铁二十局集团有限公司 | Hoisting bracket for replacing plate-type ballastless track reinforced concrete base plate |
| CN203188070U (en) * | 2013-03-29 | 2013-09-11 | 中铁一局集团有限公司 | Plate-type ballast-less track plate replacing device |
| CN203807900U (en) * | 2014-04-16 | 2014-09-03 | 徐州徐工铁路装备有限公司 | Plate changing device for high-speed railway ballastless track |
| CN106436492A (en) * | 2015-12-30 | 2017-02-22 | 中国铁道科学研究院铁道建筑研究所 | Maintaining method of base plates of CRTS II-shaped plate type ballastless tracks |
| CN105908583B (en) * | 2016-04-22 | 2020-12-01 | 北京瑞威世纪岩土工程有限公司 | System for replacing ballast track bed of tunnel with ballastless track under condition of uninterrupted driving |
| CN205741779U (en) * | 2016-05-31 | 2016-11-30 | 中铁第四勘察设计院集团有限公司 | A kind of little beam type for CRTS III plate-type non-fragment orbit repairs structure |
-
2017
- 2017-05-16 CN CN201710344424.3A patent/CN106988169B/en active Active
Also Published As
| Publication number | Publication date |
|---|---|
| CN106988169A (en) | 2017-07-28 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN106988169B (en) | A kind of method that transverse direction pulls out progress track plates replacement after rail | |
| CN106978784B (en) | A kind of Long span highway suspension bridge Demolition Construction method | |
| CN102268851B (en) | Ballastless track construction device and construction method thereof | |
| CN105239514B (en) | Stepless-adjustment ball-hinge type multi-support-leg forward transverse shifting track system of bridge girder erection machine | |
| CN103161126A (en) | Road bridge variable section hollow high pier slip-form construction method | |
| CN106192620B (en) | A kind of railway ballastless track supporting layer and substructure change method | |
| CN106284079A (en) | A kind of bridge break post replace classification synchronize integral jacking construction method | |
| CN102200019B (en) | Tunnel boring machine middle-plate stepping reinforcing support mechanism and construction method thereof | |
| CN101603288A (en) | Three-truss main girder structure and installation method of a cable-stayed bridge for highway and railway | |
| CN105464008B (en) | Large longitudinal beam system line reinforcement construction device and method | |
| CN108374296A (en) | The construction method of straddle type monorail rail tracks installation | |
| CN106522096A (en) | Curved incremental launching construction technology for 48m-long-span railway simply-supported box girders and high piers | |
| CN105484162B (en) | Suspension bridge construction stiff girder secondary on the bank swings moving device and method | |
| CN106758590A (en) | The construction beam and construction method of railroad track are changed under the conditions of for not stopping transport | |
| CN107059506A (en) | A method for replacing a track plate of a slab ballastless track | |
| CN214005452U (en) | High-position pushing longitudinal moving device for 900t bridge girder erection machine | |
| CN101372231B (en) | Technique for drawing, transporting and lifting ground rail type cable railway equipment | |
| CN111501432A (en) | Steel truss type track structure of seamless magnetic suspension track panel and construction method thereof | |
| CN102094393B (en) | Construction process of steel-concrete joint for steel and concrete mixed continuous steel structure bridge | |
| CN105908583A (en) | System for replacing tunnel ballast track bed with ballastless track under non-interruption traveling condition | |
| CN106948228A (en) | A kind of plate-type ballastless track track plates fast replacement system and method | |
| CN212668345U (en) | Simple pile supply platform equipment for shore-connected wharf pile foundation construction | |
| CN107059507B (en) | A kind of curved section plate-type ballastless track track plates replacing options | |
| CN102926330B (en) | Installation method of hanging basket suitable for bridge construction | |
| CN202622992U (en) | Universal-type post-tensioned T-beam precast pedestal with detachable modules and adjustable steel members |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| PB01 | Publication | ||
| PB01 | Publication | ||
| SE01 | Entry into force of request for substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| CB02 | Change of applicant information |
Address after: No. 2, Da Liu Shu Road, Haidian District, Beijing Applicant after: Railway Construction Research Institute of China Railway Research Institute Group Co., Ltd. Applicant after: China Railway Scientific Research Institute Group Co., Ltd. Address before: No. 2, Da Liu Shu Road, Haidian District, Beijing Applicant before: Railway Construction Institute of China Academy of Railway Sciences Applicant before: China Academy of Railway Sciences |
|
| CB02 | Change of applicant information | ||
| GR01 | Patent grant | ||
| GR01 | Patent grant | ||
| TR01 | Transfer of patent right |
Effective date of registration: 20191220 Address after: 100081 Beijing city Haidian District Daliushu Road No. 2 district two building 303 Co-patentee after: China Railway Scientific Research Institute Group Co., Ltd. Patentee after: Railway Construction Research Institute of China Railway Research Institute Group Co., Ltd. Co-patentee after: Beijing Tieke Special Engineering Technology Co., Ltd. Address before: 100081 Beijing city Haidian District Daliushu Road No. 2 Co-patentee before: China Railway Scientific Research Institute Group Co., Ltd. Patentee before: Railway Construction Research Institute of China Railway Research Institute Group Co., Ltd. |
|
| TR01 | Transfer of patent right |