CN107724331A - 一种沉箱重力式码头结构 - Google Patents
一种沉箱重力式码头结构 Download PDFInfo
- Publication number
- CN107724331A CN107724331A CN201711015121.3A CN201711015121A CN107724331A CN 107724331 A CN107724331 A CN 107724331A CN 201711015121 A CN201711015121 A CN 201711015121A CN 107724331 A CN107724331 A CN 107724331A
- Authority
- CN
- China
- Prior art keywords
- caisson
- gravity
- caisson body
- breastwork
- wharf structure
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 230000005484 gravity Effects 0.000 title claims abstract description 27
- 239000000463 material Substances 0.000 claims abstract description 12
- 239000000203 mixture Substances 0.000 claims abstract description 4
- 238000005192 partition Methods 0.000 claims description 11
- 230000008901 benefit Effects 0.000 abstract description 6
- 238000010276 construction Methods 0.000 abstract description 4
- 239000002689 soil Substances 0.000 abstract description 4
- 238000005452 bending Methods 0.000 abstract description 3
- 239000004576 sand Substances 0.000 abstract description 3
- 230000008859 change Effects 0.000 abstract description 2
- 238000005516 engineering process Methods 0.000 description 3
- 230000000694 effects Effects 0.000 description 2
- 238000000034 method Methods 0.000 description 2
- 239000011150 reinforced concrete Substances 0.000 description 2
- 239000003795 chemical substances by application Substances 0.000 description 1
- 239000000945 filler Substances 0.000 description 1
- 238000009434 installation Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000008520 organization Effects 0.000 description 1
- 230000009467 reduction Effects 0.000 description 1
- 230000002787 reinforcement Effects 0.000 description 1
- 210000003371 toe Anatomy 0.000 description 1
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02B—HYDRAULIC ENGINEERING
- E02B3/00—Engineering works in connection with control or use of streams, rivers, coasts, or other marine sites; Sealings or joints for engineering works in general
- E02B3/04—Structures or apparatus for, or methods of, protecting banks, coasts, or harbours
- E02B3/06—Moles; Piers; Quays; Quay walls; Groynes; Breakwaters ; Wave dissipating walls; Quay equipment
- E02B3/068—Landing stages for vessels
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D23/00—Caissons; Construction or placing of caissons
Landscapes
- Engineering & Computer Science (AREA)
- General Engineering & Computer Science (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Environmental & Geological Engineering (AREA)
- Ocean & Marine Engineering (AREA)
- Mechanical Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Paleontology (AREA)
- Revetment (AREA)
Abstract
本发明公开了一种沉箱重力式码头结构,包括沉箱本体、胸墙和回填料;所述沉箱本体的顶板一端设置有胸墙,沉箱本体的底板设置在基床上;所述沉箱本体的内部和沉箱本体的后方均填充有回填料;所述沉箱本体的前壁由若干个凹形曲面首尾相接组成;本发明沉箱重力式码头结构中前壁和隔板组成的组合结构,改变了受力形式,具有刚度大、抗弯能力强的优势,有效减小基地应力,更适应于硬质土,密实砂层等地基,减少应力达10%以上,减少地基的不均匀沉降;本发明沉箱重力式码头结构具有结构轻巧、施工简单、减少工程用料、工程经济、外形美观等特点,适应于大型码头工程,尤其外海大型码头。
Description
技术领域
本发明涉及码头结构技术领域,特别是一种沉箱重力式码头结构。
背景技术
采用钢筋混凝土沉箱作为主体结构的重力式码头称为沉箱重力式码头,钢筋混凝土沉箱结构由外壁、隔墙、底板和墙趾等构件组成。沉箱重力式码头一般采用整体预制方式。预制安装的沉箱码头的优点是结构简单,可一次安装出水,施工速度快,在国内各码头上应用较广。
随着船舶的大型化发展,常规沉箱重力式码头结构由于自身结构受力、结构稳定等问题受到较多限制。沉箱重力式码头结构土压力大,截面尺寸大、配筋大等导致其经济性较差,在结构方案比选时不具备优势,常规沉箱重力式结构不适应较大码头结构选型。
发明内容
本发明的目的在于提供一种结构刚度大、基地应力小、受力合理、且适用范围更广沉箱重力式码头结构,
实现本发明目的的技术解决方案为:
一种沉箱重力式码头结构,其特征在于,包括沉箱本体、胸墙和回填料;所述沉箱本体的顶板一端设置有胸墙,沉箱本体的底板设置在基床上;所述沉箱本体的内部和沉箱本体的后方均填充有回填料;所述沉箱本体的前壁由若干个凹形曲面首尾相接组成。
优选地,所述沉箱本体的内部均匀的设置有若干个纵向隔板和横向隔板,所述纵向隔板与横向隔板之间纵横交错。
优选地,所述凹形曲面的横截面呈圆弧形。
优选地,所述凹形曲面的横截面呈折线形。
优选地,所述胸墙上设置有前轨道梁。
优选地,所述胸墙上设置有系船柱和护舷结构,供船舶系靠泊作业。
本发明与现有技术相比,其显著优点:
(1)本发明沉箱重力式码头结构中前壁和隔板组成的组合结构,改变了受力形式,具有刚度大、抗弯能力强的优势,有效减小基地应力,更适应于硬质土,密实砂层等地基,减少应力达10%以上,减少地基的不均匀沉降。
(2)本发明沉箱重力式码头结构具有结构轻巧、施工简单、减少工程用料、工程经济、外形美观等特点,适应于大型码头工程,尤其外海大型码头。
下面结合附图对本发明作进一步详细描述。
附图说明
图1为本发明沉箱重力式码头结构的结构示意图。
图2为本发明沉箱重力式码头结构的右视图。
具体实施方式
实施例1:
如图1和图2所示,一种沉箱重力式码头结构,包括沉箱本体1、胸墙2和回填料;所述沉箱本体1的顶板一端设置有胸墙2,胸墙2承受码头面上部荷载作用,沉箱本体1的底板3设置在基床上;所述沉箱本体1的内部均匀的设置有若干个纵向隔板5和横向隔板6,所述纵向隔板5与横向隔板6之间纵横交错,纵向隔板5与横向隔板6之间填充有回填料;所述沉箱本体1的后方填充有回填料;所述沉箱本体1的前壁4由若干个凹形曲面首尾相接组成,所述凹形曲面的横截面呈圆弧形。
所述沉箱本体1可根据船舶靠泊需求和上部工艺布置调整沉箱结构的宽度,所述沉箱本体1的前壁4可根据码头工艺需要调整弧线的弧度。
所述胸墙2上设置有前轨道梁,且所述胸墙2上设置有系船柱和护舷结构,供船舶系靠泊作业。
实施例2:
一种沉箱重力式码头结构,包括沉箱本体1、胸墙2和回填料;所述沉箱本体1的顶板一端设置有胸墙2,胸墙2承受码头面上部荷载作用,沉箱本体1的底板3设置在基床上;所述沉箱本体1的内部均匀的设置有若干个纵向隔板5和横向隔板6,所述纵向隔板5与横向隔板6之间纵横交错,纵向隔板5与横向隔板6之间填充有回填料;所述沉箱本体1的后方填充有回填料;所述沉箱本体1的前壁4由若干个凹形曲面首尾相接组成,所述凹形曲面的横截面呈折线形。
所述沉箱本体1可根据船舶靠泊需求和上部工艺布置调整沉箱结构的宽度,所述沉箱本体1的前壁4可根据码头工艺需要调整弧线的弧度。
所述胸墙2上设置有前轨道梁,且所述胸墙2上设置有系船柱和护舷结构,供船舶系靠泊作业。
综上所述,本发明沉箱重力式码头结构中前壁和隔板组成的组合结构,改变了受力形式,具有刚度大、抗弯能力强的优势,有效减小基地应力,更适应于硬质土,密实砂层等地基,减少应力达10%以上,减少地基的不均匀沉降;本发明沉箱重力式码头结构具有结构轻巧、施工简单、减少工程用料、工程经济、外形美观等特点,适应于大型码头工程,尤其外海大型码头。
以上所述了本发明的结构原理和实施方式,但不受上述实施例的限制。上述实施例和说明书中描述的只是说明本发明的结构原理,在不脱离本发明范畴的前提下,本发明还会有各种变化和改进,这些变化和改进都落入要求保护的本发明范围内。
Claims (6)
1.一种沉箱重力式码头结构,其特征在于,包括沉箱本体(1)、胸墙(2)和回填料;所述沉箱本体(1)的顶板一端设置有胸墙(2),沉箱本体(1)的底板(3)设置在基床上;所述沉箱本体(1)的内部和沉箱本体(1)的后方均填充有回填料;所述沉箱本体(1)的前壁(4)由若干个凹形曲面首尾相接组成。
2.根据权利要求1所述的沉箱重力式码头结构,其特征在于,所述沉箱本体(1)的内部均匀的设置有若干个纵向隔板(5)和横向隔板(6),所述纵向隔板(5)与横向隔板(6)之间纵横交错。
3.根据权利要求1所述的沉箱重力式码头结构,其特征在于,所述凹形曲面的横截面呈圆弧形。
4.根据权利要求1所述的沉箱重力式码头结构,其特征在于,所述凹形曲面的横截面呈折线形。
5.根据权利要求1所述的沉箱重力式码头结构,其特征在于,所述胸墙(2)上设置有前轨道梁。
6.根据权利要求1所述的沉箱重力式码头结构,其特征在于,所述胸墙(2)上设置有系船柱和护舷结构,供船舶系靠泊作业。
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201711015121.3A CN107724331A (zh) | 2017-10-26 | 2017-10-26 | 一种沉箱重力式码头结构 |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201711015121.3A CN107724331A (zh) | 2017-10-26 | 2017-10-26 | 一种沉箱重力式码头结构 |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN107724331A true CN107724331A (zh) | 2018-02-23 |
Family
ID=61212859
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201711015121.3A Pending CN107724331A (zh) | 2017-10-26 | 2017-10-26 | 一种沉箱重力式码头结构 |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN107724331A (zh) |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN116043917A (zh) * | 2022-12-13 | 2023-05-02 | 中交天津港湾工程设计院有限公司 | 一种跨越管涵结构的轻型接岸结构 |
Citations (8)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| GB281929A (en) * | 1927-04-25 | 1927-12-15 | Frederick George Gibb | Improvements in and connected with the erection of harbourworks, breakwaters, quays,pierheads and like purposes, and in the construction of caissons for use therewith |
| KR100982970B1 (ko) * | 2010-03-25 | 2010-09-17 | 에스케이건설 주식회사 | 태극 요철형 케이슨을 이용한 방파제 시공방법 |
| CN201704670U (zh) * | 2010-06-16 | 2011-01-12 | 沈迪州 | 一种沉箱码头护岸结构 |
| CN202031060U (zh) * | 2011-03-10 | 2011-11-09 | 沈迪州 | 一种带有尾部结构的沉箱码头 |
| CN102359086A (zh) * | 2011-10-10 | 2012-02-22 | 沈迪州 | 一种带有尾部结构的沉箱码头 |
| CN104727270A (zh) * | 2015-02-07 | 2015-06-24 | 长沙理工大学 | 一种反弧形防波堤及防波堤总水平波浪力的计算方法 |
| KR20150141225A (ko) * | 2014-06-09 | 2015-12-18 | 한양대학교 산학협력단 | 해수 교환형 케이슨식 방파제 |
| CN207498890U (zh) * | 2017-10-26 | 2018-06-15 | 中交第三航务工程勘察设计院有限公司 | 一种沉箱重力式码头结构 |
-
2017
- 2017-10-26 CN CN201711015121.3A patent/CN107724331A/zh active Pending
Patent Citations (8)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| GB281929A (en) * | 1927-04-25 | 1927-12-15 | Frederick George Gibb | Improvements in and connected with the erection of harbourworks, breakwaters, quays,pierheads and like purposes, and in the construction of caissons for use therewith |
| KR100982970B1 (ko) * | 2010-03-25 | 2010-09-17 | 에스케이건설 주식회사 | 태극 요철형 케이슨을 이용한 방파제 시공방법 |
| CN201704670U (zh) * | 2010-06-16 | 2011-01-12 | 沈迪州 | 一种沉箱码头护岸结构 |
| CN202031060U (zh) * | 2011-03-10 | 2011-11-09 | 沈迪州 | 一种带有尾部结构的沉箱码头 |
| CN102359086A (zh) * | 2011-10-10 | 2012-02-22 | 沈迪州 | 一种带有尾部结构的沉箱码头 |
| KR20150141225A (ko) * | 2014-06-09 | 2015-12-18 | 한양대학교 산학협력단 | 해수 교환형 케이슨식 방파제 |
| CN104727270A (zh) * | 2015-02-07 | 2015-06-24 | 长沙理工大学 | 一种反弧形防波堤及防波堤总水平波浪力的计算方法 |
| CN207498890U (zh) * | 2017-10-26 | 2018-06-15 | 中交第三航务工程勘察设计院有限公司 | 一种沉箱重力式码头结构 |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN116043917A (zh) * | 2022-12-13 | 2023-05-02 | 中交天津港湾工程设计院有限公司 | 一种跨越管涵结构的轻型接岸结构 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN107700423A (zh) | 一种深水软土地基岸壁式码头结构及其施工方法 | |
| CN109736343A (zh) | 海上风电基础、其安装方法及风力发电机组 | |
| CN103898868A (zh) | 一种新型高桩码头 | |
| CN202899083U (zh) | 桩桶组合码头结构 | |
| CN207498890U (zh) | 一种沉箱重力式码头结构 | |
| CN201952778U (zh) | 防波堤 | |
| CN107724331A (zh) | 一种沉箱重力式码头结构 | |
| CN103758080A (zh) | 架空式消浪观景平台结构 | |
| CN203668883U (zh) | 架空式消浪观景平台结构 | |
| CN107119627A (zh) | 一种扶壁与沉箱结合的重力式码头结构 | |
| CN204875662U (zh) | 一种新型型钢抗震方块码头 | |
| CN218562376U (zh) | 高边坡复合路堤结构 | |
| CN202031060U (zh) | 一种带有尾部结构的沉箱码头 | |
| CN206486871U (zh) | 一种软基重力式码头结构 | |
| CN104963311A (zh) | 一种新型型钢抗震方块码头 | |
| CN206680945U (zh) | 一种扶壁与沉箱结合的重力式码头结构 | |
| CN216737132U (zh) | 一种深水港可陆上吊装的组装式码头结构 | |
| CN104233941A (zh) | 一种用于堤上路基的槽型桩板组合结构 | |
| CN112878357B (zh) | 超百米深水跨海大桥沉箱基础结构及施工方法 | |
| CN212427191U (zh) | 加强波形混凝土挡土墙 | |
| CN204455987U (zh) | 一种塑钢板桩与混凝土组合的护岸结构 | |
| CN104480897B (zh) | 陆域占地少应用范围广的防汛墙 | |
| CN104652355B (zh) | 一种带增强肋梁和消浪措施的板桩岸壁结构 | |
| CN212077786U (zh) | 一种码头构件及其码头结构 | |
| CN107513979A (zh) | 一种下沉式多层带缆重力式码头上部结构体系 |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| PB01 | Publication | ||
| PB01 | Publication | ||
| SE01 | Entry into force of request for substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| CB02 | Change of applicant information | ||
| CB02 | Change of applicant information |
Address after: No. 831 zhaojiaman Road, Xuhui District, Shanghai Applicant after: CCCC THIRD HARBOR CONSULTANTS Co.,Ltd. Address before: 200032 831 Zhaojia Bang Road, Xuhui District, Shanghai Applicant before: CCCC THIRD HARBOR CONSULTANTS Co.,Ltd. |
|
| RJ01 | Rejection of invention patent application after publication | ||
| RJ01 | Rejection of invention patent application after publication |
Application publication date: 20180223 |