- CN108517954A CN108517954A CN201810593628.5A CN201810593628A CN108517954A CN 108517954 A CN108517954 A CN 108517954A CN 201810593628 A CN201810593628 A CN 201810593628A CN 108517954 A CN108517954 A CN 108517954A
- Authority
- CN
- China
- Prior art keywords
- pipe
- dredging
- spring
- crane
- live spindle
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 229910000831 Steel Inorganic materials 0.000 claims description 35
- 239000010959 steel Substances 0.000 claims description 35
- 239000007787 solid Substances 0.000 claims description 7
- 238000000034 method Methods 0.000 description 9
- 238000010586 diagram Methods 0.000 description 7
- 230000000694 effects Effects 0.000 description 4
- 238000003466 welding Methods 0.000 description 2
- 235000017166 Bambusa arundinacea Nutrition 0.000 description 1
- 235000017491 Bambusa tulda Nutrition 0.000 description 1
- 241001330002 Bambuseae Species 0.000 description 1
- 235000015334 Phyllostachys viridis Nutrition 0.000 description 1
- 239000011425 bamboo Substances 0.000 description 1
- 238000005452 bending Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000012423 maintenance Methods 0.000 description 1
- 238000000465 moulding Methods 0.000 description 1
- 238000004080 punching Methods 0.000 description 1
- 230000003014 reinforcing effect Effects 0.000 description 1
- 230000000717 retained effect Effects 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E03—WATER SUPPLY; SEWERAGE
- E03F—SEWERS; CESSPOOLS
- E03F9/00—Arrangements or fixed installations methods or devices for cleaning or clearing sewer pipes, e.g. by flushing
- E03F9/002—Cleaning sewer pipes by mechanical means
Landscapes
- Health & Medical Sciences (AREA)
- Life Sciences & Earth Sciences (AREA)
- Engineering & Computer Science (AREA)
- Hydrology & Water Resources (AREA)
- Public Health (AREA)
- Water Supply & Treatment (AREA)
- Load-Engaging Elements For Cranes (AREA)
- Cleaning In General (AREA)
Abstract
A kind of pipeline of present invention offer twists filling and pipe-dredging machinery equipment, and it includes a rotary components and the pipe-dredging component being connect with the rotary components that the pipeline, which twists filling and pipe-dredging machinery equipment,;The rotary components include the first power plant and live spindle, and the output end of first power plant is connect with one end of the live spindle, and first power plant drives the live spindle to be rotated;The pipe-dredging component includes spring and the pipe-dredging head being fixedly connected with the spring, and one end of the spring is fixedly connected with the one end of the live spindle far from power plant, and the other end is fixedly connected with the pipe-dredging head;First power plant drives the live spindle to be rotated, the live spindle drives the spring to be rotated, the spring in the state of rotation, be in spiral status, under the spiral twist active force of the spring, the pipe-dredging head follows the spring to rotate together.
Description
Technical field
The present invention relates to pipe-dredging technical fields, and in particular to a kind of pipeline, which twists, to be filled and pipe-dredging machinery equipment.
Background technology
Pipeline maintenance can substantially be divided into artificial dredging, the artificial dredging of machinery dredging and push rod dredging, wherein pipe with small pipe diameter
Based on dredging is dredged with push rod, push rod dredging be with manpower protect machinery the tools such as bamboo chip, steel bar are pushed into pipeline remove it is stifled
The dredging method of plug.
The pusher tool that the molding dredging device in home and abroad uses at present is steel bar, but such product be relatively specific for it is small
Area's pipeline (shallower 1 meter or so embedded) dredging, for basic equal 2~4 meters or so of the buried depth of city planting ductwork (pipe with small pipe diameter), steel bar enters well
When bending angle it is excessive when, reduce the onward impulse of machine straight line, cause dredging machinery can not win because power attenuation is excessive
Appoint dredging to require, especially silt up in the drainpipe it is serious, tree root mud bonded it is closely knit in the case of dredged with greater need for powerful
Logical equipment.
Invention content
In view of this, a kind of pipeline of present invention offer twists filling and pipe-dredging machinery equipment, dredged using spring and pipeline
The combination of logical head is equipped with rotary components and spring and pipe-dredging head is driven to be rotated, utilizes the spiral torsion of the spring
The pipe-dredging head is driven to realize spiral twist to realize the dredging of foul pipelines.
A kind of pipeline of present invention offer twists filling and pipe-dredging machinery equipment, it is characterised in that:The pipeline, which twists, to be filled and manages
It includes a rotary components and the pipe-dredging component being connect with the rotary components that mechanical equipment is dredged in road;
The rotary components include the first power plant and the live spindle that is connect with first power plant, described
The output end of first power plant is connect with one end of the live spindle, and first power plant drives the live spindle
It is rotated;
The pipe-dredging component includes spring and the pipe-dredging head being fixedly connected with the spring, the spring
One end is fixedly connected with the one end of the live spindle far from power plant, and the other end is fixedly connected with the pipe-dredging head;
First power plant drives the live spindle to be rotated, and the live spindle drives the spring to carry out
Rotation, the spring in the state of rotation, be in spiral status, it is described under the spiral twist active force of the spring
Pipe-dredging head follows the spring to rotate together.
Preferably, it further includes a horizontal fixing bracket that the pipeline, which twists filling and pipe-dredging machinery equipment, described horizontal solid
A crane is provided on fixed rack;
The crane is a strip holder being laterally arranged, and the first end top of the crane is provided with a rotation
Holder is provided with rotating through hole on the runing rest;
First power plant is set in fixed seat, and the fixed seat is set to the second end of the crane, institute
It states live spindle from the first end of the output axial direction crane of first power plant to extend, and is propped up from the rotation
It is passed through in the rotating through hole of frame, then connects the pipe-dredging component.
Preferably, the bottom of the first end of the crane passes through the first rotary shaft with described support bracket fastened one end of level
Hinged, the second end bottom of the crane is connected with lifting gear, and the lifting gear drives the second end of the crane
Increasing either reduces during the second end increases or reduces, and the first end of the crane is outer around described first
Rotary shaft rotates, and realizes the inclination of the crane different angle.
Preferably, the lifting gear is an oil cylinder, and described oil cylinder one end is fixed by the second rotary shaft and the level
Holder realization is hinged, and the other end is realized by third rotary shaft and the second end of the crane and is hinged, and the oil cylinder stretches
Realize the lifting of the second end of the crane.
Preferably, the both sides of the fixed seat bottom end are respectively arranged with sliding slot, and the opening of the sliding slot opens up inwardly;
The both sides of the crane are both provided with guide rail along the length direction of the crane;
The guide rail of the crane both sides is respectively arranged in the sliding slot of the fixed seat both sides, can be along by sliding slot
The guide rail sliding, to drive the fixed seat to be slided along the guide rail.
Preferably, the fixed seat is internally provided with hollow cavity, and the inside cavity is provided with a gear, the tooth
The gear shaft of wheel extends from the side wall of the cavity to the outside of the cavity, extends to the outside of the cavity, and with the
Two power plants connect;
It is provided with the rack parallel with two guide rails between two guide rails of the crane;
The gear is engaged with the rack, and second power plant drives the gear shaft rotation, to drive
Gear rotation is stated, to drive the fixed seat to be slided along the guide rail.
Preferably, the spring includes spring portion, and the both ends of the spring portion have been respectively fixedly connected with live spindle connection
Portion and dredging head interconnecting piece, the spring portion by the live spindle interconnecting piece and the dredging head interconnecting piece respectively with institute
Live spindle is stated to be fixedly connected with the pipe-dredging head.
Preferably, the spring inner is set with steel wire rope, and the both ends of the steel wire rope connect with the live spindle respectively
Socket part is fixedly connected with the dredging head interconnecting piece.
Preferably, the first reamer and the second reamer are provided on the pipe-dredging head, first reamer and second twist
Knife is coaxially disposed, and the race diameter of second reamer is more than the race diameter of first reamer.
Preferably, positioning disk, the positioning disk and first reamer and second are further sleeved on the pipe-dredging head
Reamer is coaxially disposed.
In the present invention, the live spindle of the rotary components is rotated under the driving of first power plant,
Since the live spindle is fixedly connected with the spring, so, the rotation of the live spindle drives the spring and institute
State first rotation of pipe-dredging;During pipe-dredging, the rotation of the pipe-dredging head and the spring may
It is hindered by rubbish in pipeline, at this point, one end that the spring is connect with the live spindle, in the band of the live spindle
It is rotated under dynamic, and one end that the spring is connect with the pipe-dredging head stops in pipeline under the drag effect of rubbish
Rotation, the both ends rotary motion of the spring is asynchronous, and spring is caused to be in spiral status, its own is turned round with certain spring
Power, when the spring spring torsion of itself accumulates to and is enough to overcome the resistance for feeling interior rubbish, the pipe-dredging head exists
High speed rotation under the twisting force of the spring itself has the function that remove rubbish in pipeline.
Description of the drawings
Fig. 1 is the structural schematic diagram of the rotary components of the present invention;
Fig. 2 is the structural schematic diagram of the crane of the present invention;
Fig. 3 is the structural schematic diagram of gear and rack of the present invention;
Fig. 4 is the structural schematic diagram of the pipe-dredging component of the present invention;
Fig. 5 is the internal structure schematic diagram of the pipe-dredging component of the present invention;
Fig. 6 is the structural schematic diagram of the reamer of the present invention;
Fig. 7 is the structural schematic diagram of the positioning disk of the present invention.
Specific implementation mode
In order to better understand the present invention, the present invention is further retouched with reference to specific embodiments and the drawings
It states.
It please refers to Fig.1 to Fig. 7, a kind of pipeline of present invention offer twists filling and pipe-dredging machinery equipment 10, and the pipeline twists
It fills and pipe-dredging machinery equipment includes a rotary components 100 and the pipe-dredging component that is connect with the rotary components 100
200;The rotary components 100 include the first power plant 110 and connect live spindle with first power plant 110
120, the output end of first power plant 110 is connect with one end of the live spindle 120, first power plant
110 drive the live spindle 120 to be rotated;The pipe-dredging component 200 include spring 210 and with the spring
The 210 pipe-dredging heads 220 being fixedly connected, one end of the spring 210 is with the live spindle 120 far from first power
One end of device 110 is fixedly connected, and the other end is fixedly connected with the pipe-dredging head 220;First power plant, 110 band
It moves the live spindle 120 to be rotated, the live spindle 120 drives the spring 210 to be rotated, the spring 210
In the state of rotation, be in spiral status, under the spiral twist active force of the spring 210, the pipe-dredging head
220 follow the spring 210 to rotate together.
During the pipeline of the present invention twists filling and pipe-dredging machinery 10 use of equipment, the rotary components 100 are set
It is placed on ground or in Operation Van, and pipe-dredging component 200 is extend into pipeline to be unclogged, the rotary components 100
Live spindle 120 rotated under the driving of first power plant 110, due to the live spindle 120 and described
Spring 210 is fixedly connected, so, the rotation of the live spindle 120 drives the spring 210 and the pipe-dredging head
220 rotate together;During pipe-dredging, the rotation of the pipe-dredging head 220 and the spring 210 may be by
The obstruction of rubbish in pipeline, at this point, one end that the spring 210 is connect with the live spindle 120, in the live spindle
It is rotated under 120 drive, one end that two springs 210 are connect with the pipe-dredging head 220 rubbish in pipeline
It stops rotating under drag effect, the both ends rotary motion of the spring 210 is asynchronous, and spring 210 is caused to be in spiral status,
Itself has certain spring torsion, is enough to overcome the resistance for feeling interior rubbish when the spring 210 spring torsion of itself accumulates to
When power, the high speed rotation under the spring 210 twisting force of itself of the pipe-dredging head 220 reaches and removes rubbish in pipeline
The effect of rubbish.
The present invention using spring 210 and pipe-dredging head 220 combination, be equipped with rotary components 100 drive spring 210 with
And pipe-dredging head 220 is rotated, and drives the pipe-dredging head 220 to realize spiral shell using the spiral torsion of the spring 210
Twist is revolved to realize the dredging of foul pipelines.
Further, it further includes a horizontal fixing bracket 300 that the pipeline, which twists filling and pipe-dredging machinery equipment 10, described
A crane 400 is provided on horizontal fixing bracket 300;The crane 400 is a strip holder being laterally arranged, described
401 top of first end of crane 400 is provided with a runing rest 410, and rotating through hole is provided on the runing rest 410
411;First power plant 110 is set in a fixed seat 420, and the fixed seat 420 is set to the crane 400
Second end 402, the first end that exports the axial crane 400 of the live spindle 120 from first power plant 110
Extend, and passed through out of the rotating through hole of the runing rest 410 411, then connects the pipe-dredging component 200.
The live spindle 120 is passed through out of the rotating through hole 411, and can be in 411 inward turning of the rotating through hole
Turn, specifically, the live spindle 120 can be by a bearing holder (housing, cover) loaded in the rotating through hole 411, first power fills
When setting the 110 drives live spindle 120 and rotating, the live spindle 120 can the rotating through hole 411 and relative to
The runing rest 410 is rotated.
Further, the output shaft of first power plant 110 stretches into the fixed seat 420, and described solid
It is attached with one end of the live spindle 120 in reservation 420, one drives the live spindle 120 to be rotated, the rotation
Turn main shaft 120 out of the fixed seat 420 to extend to outside the fixed seat 420, and extend to outside the fixed seat 420,
When first power plant 110 drives the live spindle 120 to rotate, the live spindle 120 can be relative to described solid
Reservation 420 is rotated, specifically, the live spindle 120 can be attached by a bearing and the fixed seat.
Further, the bottom of the first end of the crane 400 and one end 401 of the horizontal fixing bracket 300 are logical
It crosses the first rotary shaft 430 to be hinged, 402 bottom of second end of the crane 400 is connected with lifting gear 500, the lifting dress
The second end 402 for setting the 500 drivings crane 400 increases the mistake for either reducing and increasing or reduce in the second end 402
The first end 401 of Cheng Zhong, the crane 400 are rotated around first rotary shaft 430, realize that the crane 400 is different
The inclination of degree.
In one embodiment of the invention, the pipeline twists filling and pipe-dredging machinery equipment 10 is set to Operation Van
On, and pipeline is set to below ground, stretches to pipe-dredging component 200 inside pipeline in order to facilitate operating personnel, this hair
Lifting gear 500 is provided in bright, the lifting gear 500 is set to the crane 400 far from the pipe-dredging component
200 one end, the lifting gear 500 drive the second end 402 of the crane 400 to carry out different degrees of raising so that
The crane 400 realizes the inclination of different angle so that the pipe-dredging component 200 is more convenient to be stretched into pipeline
Portion, the and during live spindle 110 is rotated, more swimmingly drive the pipe-dredging component 200 into
Row rotation.
Further, the lifting gear 500 be an oil cylinder, described oil cylinder one end by the second rotary shaft 510 with it is described
Horizontal fixing bracket 300, which is realized, to be hinged, and the other end passes through third rotary shaft 520 and the second end of the crane 400 realizes hinge
It connects, the lifting of the second end of the flexible realization of the oil cylinder crane 400.
Further, the both sides of 420 bottom end of the fixed seat are respectively arranged with sliding slot 421, and the opening of the sliding slot 421 is equal
It opens up inwardly;The both sides of the crane 400 are both provided with guide rail 440 along the length direction of the crane 400;It is described
The guide rail 440 of 400 both sides of crane is respectively arranged in the sliding slot 421 of 420 both sides of the fixed seat, and the sliding slot 421 can be with
It is slided along the guide rail 440, to drive the fixed seat 420 to be slided along the guide rail 440.
In the present embodiment, the fixed seat 420 can be moved along the length direction of the crane 400, while band
It moves first power plant 110 and the live spindle 120 is moved together so that the live spindle 120 stretches out institute
Crane 400 is stated, it being capable of more easily alignment pipe road junction.
Further, in yet another embodiment of the present invention, the fixed seat 420 is realized by a rack-and-pinion
The movement of 400 length direction of the crane.Specifically, the fixed seat 420 is internally provided with hollow cavity 422, it is described
Cavity 422 is internally provided with a gear 423, and the gear shaft of the gear 423 is from the side wall of the cavity 422 to the cavity
422 outside extends, and extends to the outside of the cavity 422, and connect with the second power plant 424;The crane 400
The rack 450 parallel with two guide rails is provided between two guide rails 440;The gear 423 is engaged with the rack 450,
Second power plant 424 drives the gear shaft to rotate, described solid to drive to drive the gear 423 to rotate
Reservation 420 is slided along the guide rail 440.
During use of the present invention, the horizontal fixing bracket 300 is set in Operation Van, is needing to carry out pipeline
When dredging, the lifting gear 500 can be driven first, and the second end of the crane 400 is driven to increase, in this process,
The first end of the crane 400 is along first rotary shaft 430 so that the crane 400 tilts certain angle, should
Angle of inclination depend on the Operation Van height and the Operation Van at a distance from pipeline opening, that is, the height of Operation Van with
And the Operation Van determines the angle of inclination of the crane 400 at a distance from pipeline opening, it is described so that operating personnel more
Easily the pipe-dredging component 200 is stretched into the pipeline opening of the pipeline.
It is possible to further drive second power plant 424 that the gear 423 is driven to be rotated, to drive
The fixed seat 420 is slided along the guide rail 440 so that the live spindle 120 stretches out the crane 400, and institute
One end that live spindle 120 is connect with the pipe-dredging component 200 is stated close proximity to the pipeline opening.In ideal state
Under, the live spindle 120, the height of Operation Van and the Operation Van determine a right angle trigonometry at a distance from pipeline opening
Shape, wherein the live spindle 120 is its bevel edge, the height of Operation Van and the Operation Van are respectively at a distance from pipeline opening
The right side of the triangle.
Further, the spring 210 includes spring portion 211, and the both ends of the spring portion 211 have been respectively fixedly connected with rotation
Turn main shaft interconnecting piece 212 and dredging head interconnecting piece 213, the spring portion 211 passes through the live spindle interconnecting piece 212 and institute
Dredging head interconnecting piece 213 is stated to be fixedly connected with the live spindle 120 and the pipe-dredging head 220 respectively.Specifically, described
The both ends of spring portion 211 can be connected with the live spindle interconnecting piece 212 and 213 fixation of dredging head interconnecting piece respectively by welding
It connects.
In yet another embodiment of the present invention, 211 internal sleeve of the spring is equipped with steel wire rope 230, the steel wire rope 230
Both ends be fixedly connected respectively with the live spindle interconnecting piece 212 and the dredging head interconnecting piece 213.
In the present embodiment, 210 internal sleeve of the spring is equipped with steel wire rope 230, since the spring 210 is in the mistake of rotation
It needs to bear huge torsion in journey, the spring 210 is prevented to be broken during rotation, in the spring 210
Portion is set with the steel wire rope 230 of a reinforcing, even if in the case where the spring 210 is broken, still there is the steel wire rope
230 are fixedly connected with dredging head interconnecting piece 213, prevent the pipe-dredging head 220 in the case where the spring 210 is broken,
It is retained in inside pipeline.
Further, 230 both ends of the steel wire rope have been respectively fixedly connected with the first steel wire rope lock 231 and the second steel wire rope
Lock 232, it is solid by punching press between the steel wire rope 230 and first steel wire rope lock 231 and the second steel wire rope lock 232
Fixed connection.230 both ends of the steel wire rope the first steel wire rope lock 231 and second steel wire rope lock 232 respectively with the rotation
Main shaft interconnecting piece 212 and the dredging head interconnecting piece 213 connection.
Specifically, the live spindle interconnecting piece 212 is internally provided with the passed through for first steel wire rope lock 231
The first port 2123 of one through-hole 2121, the first through hole 2121 is provided with the first clamping step 2122, first steel wire
Cord lock button 231 is provided with the first lug boss 2311, the first steel wire rope lock without connecting one end of the steel wire rope 230
231 are set in the first through hole 2121, wherein first lug boss 2311, which is arranged in described first, clamps step 2122,
And the first plugging structure 2125 is provided at the first port of the first through hole 2,121 2123.Specifically, described first
Steel wire rope lock 231 is set in the first through hole 2121, and clamps platform by first lug boss 2311, described first
Rank 2122 and first plugging structure 2125 realize that the first steel wire rope lock 231 is connect with the live spindle
The connection in portion 212.It is interference fit between first plugging structure 2125 and the first through hole 2121.
Further, the dredging head interconnecting piece 213 is internally provided with the passed through for second steel wire rope lock 232
The third port 2133 of two through-holes 2131, second through-hole 2131 is provided with the second clamping step 2132, second steel wire
Cord lock button 232 is provided with the second lug boss 2312, the second steel wire rope lock without connecting one end of the steel wire rope 230
232 are set in second through-hole 2131, wherein second lug boss 2312, which is arranged in described second, clamps step 2132,
And the second plugging structure 2135 is provided at the third port 2133 of second through-hole 2131.Specifically, described second
Steel wire rope lock 232 is set in second through-hole 2131, and clamps platform by second lug boss 2312, described second
Rank 2132 and second plugging structure 2135 realize the second steel wire rope lock 232 and the dredging head interconnecting piece
213 connection.Further, it is interference fitted between second plugging structure 2135 and second through-hole 2131.
Further, it is provided with the first spring on the outside of one end of the second port 2124 of the live spindle interconnecting piece 212
Suit portion 2126 and the first spring weld part 2127, specifically, one end of the spring 210 is set in first spring pocket
Dress portion 2126, and an end face of the spring 210 is welded with the first spring weld part 2127, to realize
State being fixedly connected for spring and the live spindle interconnecting piece 212.
Further, it is provided with second spring set on the outside of one end of the 4th port 2134 of the dredging head interconnecting piece 213
Dress portion 2136 and second spring weld part 2137, specifically, the other end of the spring 210 is set in the second spring set
Dress portion 2136, and another end face of the spring 210 is welded with the second spring weld part 2137, to realize
The spring is fixedly connected with the dredging head interconnecting piece 213.
Further, in one embodiment of the invention, the first port of the spring live spindle interconnecting piece 212
The first T-type boss 2128, the live spindle 120 and the live spindle interconnecting piece 212 are provided on the outside of 2123 one end
One end of connection is provided with the first T-type groove 121, the first T-type boss 2128 and is installed in the first T-type groove 121
It is interior, and upper and lower two sides are fixed by pin.One end of the third port 2133 of the dredging head interconnecting piece 213
Outside is provided with the second T-type groove 2138, and one end that the pipe-dredging head 220 is connect with the dredging head interconnecting piece 213 is set
It is equipped with the second T-type boss 221, the second T-type boss 221 and is installed in the second T-type groove 2138, and upper and lower two
A side is fixed by pin.
It, can be by described when the length of the spring 210 is long in the preferred embodiment of the present invention
Interconnecting piece is arranged in both ends of the spring, the structure being then attached by interconnecting piece realization multistage spring, can between multiple interconnecting pieces
With using the connection structure of above-mentioned T-type boss and T-type groove.
During use, one section of spring is connected in one end of the live spindle 120 first, then can drives institute
Stating the second power plant 424 drives the gear 423 to be rotated, to drive the fixed seat 420 along the guide rail 440
Sliding so that the live spindle 120 stretches out the crane 400, and the live spindle 120 and the pipe-dredging group
One end that part 200 connects is close proximity to the pipeline opening.One section of spring is sent into inside the pipeline, the section is then turned off
The connection of spring and the live spindle 120 drives second power plant 424 that the gear 423 is driven to be rotated, from
And the fixed seat 420 is driven to be slided along the guide rail 440 so that the live spindle 120 returns to initial position, then will
This section of spring is attached with another section of spring, and other end spring is attached with the live spindle 120, then drives described
Two power plants 424 drive the gear 423 to be rotated, to drive the fixed seat 420 to be slided along the guide rail 440
It is dynamic so that the live spindle 120 stretches out the crane 400, another section of spring is sent into inside the pipeline, with such
It pushes away, multistage spring is attached successively, and rack-and-pinion adjutant's multistage spring by capableing of transverse shifting is sequentially sent to
Inside the pipeline.
Further, the spring 210 includes spring portion 211, and the both ends of the spring portion 211 have been respectively fixedly connected with rotation
Turn main shaft interconnecting piece 212 and dredging head interconnecting piece 213, the spring portion 211 passes through the live spindle interconnecting piece 212 and institute
Dredging head interconnecting piece 213 is stated to be fixedly connected with the live spindle 120 and the pipe-dredging head 220 respectively.Specifically, described
The both ends of spring portion 211 can be connected with the live spindle interconnecting piece 212 and 213 fixation of dredging head interconnecting piece respectively by welding
It connects.
In yet another embodiment of the present invention, 211 internal sleeve of the spring is equipped with steel wire rope 230, the steel wire rope 230
Both ends be fixedly connected respectively with the live spindle interconnecting piece 212 and the dredging head interconnecting piece 213.
Further, one end that the pipe-dredging head 220 is not connect with the dredging head interconnecting piece 213 is provided with reamer
222, in one embodiment of the invention, one end that the pipe-dredging head 220 is not connect with the dredging head interconnecting piece 213
Tapered structure is provided with the first reamer 2221 in the pyramidal structure, and the middle part of the pipe-dredging head 220 is provided with second
Reamer 2222, the coaxial arrangement of first reamer, 2221 and second reamer 2222, and the outer ring of second reamer 2222 is straight
Diameter is more than the race diameter of first reamer 2221.
Further, positioning disk 223, the positioning disk 223 and described first are further sleeved on the pipe-dredging head 220
Reamer 2221 and the coaxial arrangement of the second reamer 2222, and have between the outer wall of the positioning disk 223 and the inner wall of the pipe
Small gap so that the positioning disk 223 can advance in the pipeline, and the positioning disk 223 is to the pipe-dredging
First 220 play the role of support so that the pipe-dredging head 220 maintains the state coaxial with the pipeline.
During use of the present invention, the horizontal fixing bracket 300 is set in Operation Van, is needing to carry out pipeline
When dredging, the lifting gear 500 can be driven first, and the second end of the crane 400 is driven to increase, in this process,
The first end of the crane 400 is rotated along first rotary shaft 430 so that the crane 400 tilts certain angle
Degree, the angle of inclination is depending on the height of the Operation Van and the Operation Van at a distance from pipeline opening, that is, the height of Operation Van
Degree and the Operation Van determine the angle of inclination of the crane 400 at a distance from pipeline opening, described so that operating personnel
More easily the pipe-dredging component 200 is stretched into the pipeline opening of the pipeline.The rotation master of the rotary components 100
Axis 120 is rotated under the driving of first power plant 110, since the live spindle 120 and the spring 210 are solid
Fixed connection, so, the rotation of the live spindle 120 drives the spring 210 and the pipe-dredging head 220 to revolve together
Turn;During pipe-dredging, the rotation of the pipe-dredging head 220 and the spring 210 may be by rubbish in pipeline
The obstruction of rubbish, at this point, one end that the spring 210 is connect with the live spindle 120, in the drive of the live spindle 120
Under rotated, and one end that the spring 210 is connect with the pipe-dredging head 220 is in pipeline under the drag effect of rubbish
It stops rotating, the both ends rotary motion of the spring 210 is asynchronous, and spring 210 is caused to be in spiral status, its own has one
Determine spring torsion, when the spring 210 spring torsion of itself accumulates to and is enough to overcome the resistance for feeling interior rubbish, the pipe
The high speed rotation under the spring 210 twisting force of itself of head 220 is dredged in road, has the function that remove rubbish in pipeline.This
The pipe-dredging component is advanced to inside the pipeline by invention by the rotation of the live spindle 120, is pushed away using rotation
The purpose for removing rubbish in pipeline is realized into principle.
It should be noted that herein, relational terms such as first and second and the like are used merely to a reality
Body or operation are distinguished with another entity or operation, are deposited without necessarily requiring or implying between these entities or operation
In any actual relationship or order or sequence.Moreover, the terms "include", "comprise" or its any other variant are intended to
Non-exclusive inclusion, so that the process, method, article or equipment including a series of elements is not only wanted including those
Element, but also include other elements that are not explicitly listed, or further include for this process, method, article or equipment
Intrinsic element.In the absence of more restrictions, the element limited by sentence "including a ...", it is not excluded that
There is also other identical elements in process, method, article or equipment including the element.
Finally it should be noted that:Obviously, the above embodiment is merely an example for clearly illustrating the present invention, and simultaneously
The non-restriction to embodiment.For those of ordinary skill in the art, it can also do on the basis of the above description
Go out other various forms of variations or variation.There is no necessity and possibility to exhaust all the enbodiments.And thus drawn
The obvious changes or variations that Shen goes out are still in the protection scope of this invention.
Claims (10)
1. a kind of pipeline twists filling and pipe-dredging machinery equipment, it is characterised in that:The pipeline twists filling and pipe-dredging machinery is set
The standby pipe-dredging component for including a rotary components and being connect with the rotary components;
The rotary components include the first power plant and the live spindle that is connect with first power plant, and described first
The output end of power plant is connect with one end of the live spindle, and first power plant drives the live spindle to carry out
Rotation;
The pipe-dredging component includes spring and the pipe-dredging head being fixedly connected with the spring, one end of the spring
It is fixedly connected with the one end of the live spindle far from power plant, the other end is fixedly connected with the pipe-dredging head;
First power plant drives the live spindle to be rotated, and the live spindle drives the spring to be revolved
Turn, the spring in the state of rotation, be in spiral status, under the spiral twist active force of the spring, the pipe
Road dredging head follows the spring to rotate together.
2. pipeline according to claim 1 twists filling and pipe-dredging machinery equipment, it is characterised in that:The pipeline twist fill and
Pipe-dredging machinery equipment further includes a horizontal fixing bracket, and a crane is provided on the horizontal fixing bracket;
The crane is a strip holder being laterally arranged, and the first end top of the crane is provided with a rotation branch
Frame is provided with rotating through hole on the runing rest;
First power plant is set in fixed seat, and the fixed seat is set to the second end of the crane, the rotation
Turn main shaft from the first end of the axial crane of the output of first power plant to extend, and from the runing rest
It is passed through in rotating through hole, then connects the pipe-dredging component.
3. pipeline according to claim 2 twists filling and pipe-dredging machinery equipment, it is characterised in that:The of the crane
The bottom of one end is hinged by the first rotary shaft with described support bracket fastened one end of level, and the second end bottom of the crane connects
It is connected to lifting gear, the lifting gear drives the second end of the crane to increase or reduce, and is increased in the second end
Or during reducing, the first end of the crane is outer to be rotated around first rotary shaft, realizes that the crane is different
The inclination of angle.
4. pipeline according to claim 3 twists filling and pipe-dredging machinery equipment, it is characterised in that:The lifting gear is
One oil cylinder, described oil cylinder one end realize with the horizontal fixing bracket by the second rotary shaft and are hinged that the other end is revolved by third
Shaft and the second end of the crane realize hinged, the lifting of the second end of the flexible realization crane of the oil cylinder.
5. the pipeline according to Claims 2 or 3 or 4 twists filling and pipe-dredging machinery equipment, it is characterised in that:The fixation
The both sides of seat bottom end are respectively arranged with sliding slot, and the opening of the sliding slot opens up inwardly;
The both sides of the crane are both provided with guide rail along the length direction of the crane;
The guide rail of the crane both sides is respectively arranged in the sliding slot of the fixed seat both sides, can be along described by sliding slot
Guide rail slides, to drive the fixed seat to be slided along the guide rail.
6. pipeline according to claim 5 twists filling and pipe-dredging machinery equipment, it is characterised in that:Inside the fixed seat
Be provided with hollow cavity, the inside cavity is provided with a gear, the gear shaft of the gear from the side wall of the cavity to
The outside of the cavity extends, and extends to the outside of the cavity, and connect with the second power plant;
It is provided with the rack parallel with two guide rails between two guide rails of the crane;
The gear is engaged with the rack, and second power plant drives the gear shaft rotation, to drive the tooth
Wheel rotation, to drive the fixed seat to be slided along the guide rail.
7. pipeline according to claim 1 twists filling and pipe-dredging machinery equipment, it is characterised in that:The spring includes bullet
The both ends in spring portion, the spring portion have been respectively fixedly connected with live spindle interconnecting piece and dredging head interconnecting piece, the spring portion
It is solid with the live spindle and the pipe-dredging head respectively by the live spindle interconnecting piece and the dredging head interconnecting piece
Fixed connection.
8. pipeline according to claim 7 twists filling and pipe-dredging machinery equipment, it is characterised in that:The spring inner set
Equipped with steel wire rope, the both ends of the steel wire rope are fixed with the live spindle interconnecting piece and the dredging head interconnecting piece respectively to be connected
It connects.
9. pipeline according to claim 8 twists filling and pipe-dredging machinery equipment, it is characterised in that:The pipe-dredging head
On be provided with the first reamer and the second reamer, first reamer and the coaxial arrangement of the second reamer, and second reamer
Race diameter is more than the race diameter of first reamer.
10. pipeline according to claim 9 twists filling and pipe-dredging machinery equipment, it is characterised in that:The pipe-dredging
Positioning disk is further sleeved on head, the positioning disk is coaxially disposed with first reamer and the second reamer.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201810593628.5A CN108517954B (en) | 2018-06-11 | 2018-06-11 | Pipeline is twisted and is irritated and pipeline mediation mechanical equipment |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201810593628.5A CN108517954B (en) | 2018-06-11 | 2018-06-11 | Pipeline is twisted and is irritated and pipeline mediation mechanical equipment |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| CN108517954A true CN108517954A (en) | 2018-09-11 |
| CN108517954B CN108517954B (en) | 2024-06-25 |
Family
ID=63428269
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201810593628.5A Active CN108517954B (en) | 2018-06-11 | 2018-06-11 | Pipeline is twisted and is irritated and pipeline mediation mechanical equipment |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN108517954B (en) |
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN110469718A (en) * | 2019-07-16 | 2019-11-19 | 嵊州市越通非开挖建设有限公司 | It is a kind of for adjusting the mounting device of pipe angle |
| CN112590197A (en) * | 2020-12-14 | 2021-04-02 | 江苏金物新材料有限公司 | A quantitative compounding conveyor for 3D prints |
Citations (12)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN2057683U (en) * | 1989-06-13 | 1990-05-30 | 北京新星机械厂 | Hand managing cleaning machine |
| CN2061492U (en) * | 1989-11-09 | 1990-09-05 | 关中信 | Air-pressure pipe dredger |
| JPH06238249A (en) * | 1993-02-17 | 1994-08-30 | Makoto Azuma | Pipe interior cleaning device |
| KR100770976B1 (en) * | 2007-03-30 | 2007-10-30 | 수자원기술 주식회사 | Unmanned customs vehicle for water rehabilitation |
| CN101845843A (en) * | 2010-06-05 | 2010-09-29 | 张光裕 | Impact type drain cleaner |
| WO2014079116A1 (en) * | 2012-11-24 | 2014-05-30 | 西南石油大学 | Actively driven spiral pipeline robot |
| CN104032827A (en) * | 2014-06-07 | 2014-09-10 | 冯政 | Dredging drill for blowdown pipelines |
| CN104741346A (en) * | 2013-12-25 | 2015-07-01 | 辽宁石油化工大学 | Novel multifunctional pipe cleaner |
| CN106351299A (en) * | 2016-10-31 | 2017-01-25 | 国家电网公司 | Pipeline dredging device |
| CN205949423U (en) * | 2016-07-29 | 2017-02-15 | 腾飞 | Novel mediation equipment of petroleum pipeline |
| CN106807697A (en) * | 2017-03-24 | 2017-06-09 | 李诚智 | A kind of rotating shredder regurgitates the pipeline drainer of propulsion |
| CN208395982U (en) * | 2018-06-11 | 2019-01-18 | 天津市鼎风逸宸科技发展有限公司 | A kind of pipeline, which twists, to be filled and pipe-dredging machinery equipment |
-
2018
- 2018-06-11 CN CN201810593628.5A patent/CN108517954B/en active Active
Patent Citations (12)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN2057683U (en) * | 1989-06-13 | 1990-05-30 | 北京新星机械厂 | Hand managing cleaning machine |
| CN2061492U (en) * | 1989-11-09 | 1990-09-05 | 关中信 | Air-pressure pipe dredger |
| JPH06238249A (en) * | 1993-02-17 | 1994-08-30 | Makoto Azuma | Pipe interior cleaning device |
| KR100770976B1 (en) * | 2007-03-30 | 2007-10-30 | 수자원기술 주식회사 | Unmanned customs vehicle for water rehabilitation |
| CN101845843A (en) * | 2010-06-05 | 2010-09-29 | 张光裕 | Impact type drain cleaner |
| WO2014079116A1 (en) * | 2012-11-24 | 2014-05-30 | 西南石油大学 | Actively driven spiral pipeline robot |
| CN104741346A (en) * | 2013-12-25 | 2015-07-01 | 辽宁石油化工大学 | Novel multifunctional pipe cleaner |
| CN104032827A (en) * | 2014-06-07 | 2014-09-10 | 冯政 | Dredging drill for blowdown pipelines |
| CN205949423U (en) * | 2016-07-29 | 2017-02-15 | 腾飞 | Novel mediation equipment of petroleum pipeline |
| CN106351299A (en) * | 2016-10-31 | 2017-01-25 | 国家电网公司 | Pipeline dredging device |
| CN106807697A (en) * | 2017-03-24 | 2017-06-09 | 李诚智 | A kind of rotating shredder regurgitates the pipeline drainer of propulsion |
| CN208395982U (en) * | 2018-06-11 | 2019-01-18 | 天津市鼎风逸宸科技发展有限公司 | A kind of pipeline, which twists, to be filled and pipe-dredging machinery equipment |
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN110469718A (en) * | 2019-07-16 | 2019-11-19 | 嵊州市越通非开挖建设有限公司 | It is a kind of for adjusting the mounting device of pipe angle |
| CN112590197A (en) * | 2020-12-14 | 2021-04-02 | 江苏金物新材料有限公司 | A quantitative compounding conveyor for 3D prints |
Also Published As
| Publication number | Publication date |
|---|---|
| CN108517954B (en) | 2024-06-25 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN206860090U (en) | A kind of long-spiral drilling machine | |
| CN108517954A (en) | A kind of pipeline, which twists, to be filled and pipe-dredging machinery equipment | |
| CN201535139U (en) | Spiral drill bar soil cleaning device | |
| CN108738509A (en) | A kind of garden seedling tree plantation equipment of digging pit | |
| CN110476541A (en) | A kind of plant transplantation digging apparatus | |
| CN208395982U (en) | A kind of pipeline, which twists, to be filled and pipe-dredging machinery equipment | |
| CN208754849U (en) | A kind of quick Tree planting vehicle | |
| CN201056444Y (en) | Gas delivery machine automatically returning reel pipe back at low speed | |
| CN102926656B (en) | A kind of can the spindle-type drill of mechanical unloading drilling rod | |
| CN201860571U (en) | Special seedling planting machine | |
| CN104863495B (en) | Pipe guard aperture rig | |
| CN207340463U (en) | A kind of automatic hack planter of digging a pit, hole, etc. of agricultural | |
| CN205357039U (en) | Small -size vertical automatic earth boring machine | |
| CN218337105U (en) | Digging equipment for landscaping | |
| CN108547578B (en) | Power cable construction pole digger | |
| CN204612955U (en) | A kind of fast automatic alkaline land soil sampling equipment | |
| CN103321266B (en) | Curved knife groover | |
| CN115708467A (en) | Improve planting device of bush survival rate | |
| CN106437587A (en) | High-pressure liquid-driven eccentric wheel bottomhole casing cutter | |
| CN219761875U (en) | Tree planting equipment for garden construction | |
| CN112576198A (en) | Oil drill pipe convenient to install and good in sealing performance | |
| CN223772580U (en) | Tea seedling cuttage instrument | |
| CN206166151U (en) | Novel brush pipeline scraper | |
| CN215745265U (en) | Water supply plant is with conduit that has pretreatment function | |
| CN208213824U (en) | A kind of deduster convenient for cleaning |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| PB01 | Publication | ||
| PB01 | Publication | ||
| SE01 | Entry into force of request for substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| TA01 | Transfer of patent application right | ||
| TA01 | Transfer of patent application right |
Effective date of registration: 20190816 Address after: 300000 Tianjin Jinnan District Xiaozhan Town Dongfengli No. 2 Building No. 3 Applicant after: Tianjin Kehuanyichen Science and Technology Development Co.,Ltd. Address before: 300000 Building No. 4, Yunan Creative Park, Shuanggang Town Industrial Park, Jinnan District, Tianjin - 1-203 Applicant before: TIANJIN DINGFENG YICHEN TECHNOLOGY DEVELOPMENT Co.,Ltd. |
|
| GR01 | Patent grant | ||
| GR01 | Patent grant |