The invention belongs to wall grouting technical fields, and in particular to a kind of precast shear wall rapid grouting device and its construction
Method.
Background technique
With the development trend of building trade, no matter assembled architecture is one kind from economic benefit, or from environmental benefit
All with a kind of modern architecture mode of suitable advantage for upper.But domestic assembled engineering technology is at the early-stage, in industry
Every associated construction standard, construction skill it is immature, there are construction speeds it is slow, construction quality is unqualified the problems such as.For assembly
Formula shear wall grouting construction problem, most common is electronic grouting pump, the grouting of manual grouting lance, but the former has grouting pressure
The problems such as power is unable to control, leakiness of being in the milk;There is the problems such as consuming one's strength, grouting pressure is small, grouting efficiency is low in the latter.
Summary of the invention
In order to overcome in the prior art, shear wall grouting construction skill is immature, work progress construction personnel's physical demands
Greatly, the technological deficiencies such as grouting efficiency is low, the present invention provides a kind of precast shear wall rapid grouting device and its construction method,
Handle is pulled when use backward, pressure lever pushes piston by force-increasing mechanism, and the slurry in storage compartment is pressed into Grouting Pipe, is made
Slurry, which enters in precast shear wall body grouting storehouse, completes grouting, improves construction efficiency and solves above-mentioned technical problem.
The present invention is achieved through the following technical solutions above-mentioned purpose, a kind of precast shear wall rapid grouting device, including
Force-increasing mechanism and slip casting channel, force-increasing mechanism be arranged in slip casting Channel front end, the force-increasing mechanism include pressure lever, push rod,
Piston and sealed cylinder block, the upper end of the pressure lever are welded with handle, and two ears welded on lower end and pedestal are hinged on
Together, the front end of intermediate upper position and push rod is hinged, and the rear end of the push rod is fixedly connected with piston, the piston
It can be moved forward and backward in the inner surface of sealed cylinder block;The slip casting channel includes charging hopper, storage compartment, slip casting end and Grouting Pipe,
The storage compartment and slip casting end are connected to the rear end of the sealed cylinder block, the upper end connection of the storage compartment in turn by flange
There is charging hopper, the rear end of the slip casting end is connected with Grouting Pipe.
A kind of construction method that precast shear wall is quickly in the milk, the construction method mainly comprise the steps that
Step 1: it is equipped with grouting material as required, and is fed into storage compartment by charging hopper;
Step 2: pulling handle backward, and the piston of putting back-end installation is pushed by the pressure lever being hinged on pedestal;
Step 3: when piston moves forward in sealed cylinder block, the slurry in storage compartment is depressed into Grouting Pipe by slip casting end;
Step 4: the Grouting Pipe of slip casting end front end installation is directed at precast shear wall grout hole, grouting material is made to enter prefabricated cut
In power wall grouting storehouse, hole is blocked after grouting material is discharged in plasma discharge hole, completes filling process.
In general, through the invention it is contemplated above technical scheme is compared with the prior art, can achieve following has
Beneficial effect:
1, a kind of precast shear wall rapid grouting device of the present invention, is hinged using handle, pressure lever, pedestal and push rod,
Formed reinforcement link mechanism, when handle pulls backward, push rod generate increase thrust push piston in sealed cylinder block forward
When mobile, the slurry in storage compartment is depressed into Grouting Pipe by slip casting end, and then pour to precast shear wall grout hole,
Reasonable in design, the labour for alleviating construction personnel is slight;
2, construction method of the present invention is simple, easily operated, solves that grouting pressure during traditional construction is small, grouting effect
The low technical problem of rate, provides working efficiency, has saved construction cost, especially reduces to construction worker's high-tech water
Flat requirement.
Detailed description of the invention
Specific embodiments of the present invention are further described in detail with reference to the accompanying drawing, in which:
Fig. 1 is a kind of overall structure diagram of precast shear wall rapid grouting device of the present invention;
Fig. 2 is a kind of fractionation structural representation of precast shear wall rapid grouting device of the present invention;
In figure: 1- handle, 2- pressure lever, 3- pedestal, 4- push rod, 5- piston, 6- sealed cylinder block, 7- charging hopper, the storage compartment 8-,
9- slip casting end, 10- Grouting Pipe.
Specific embodiment
It as depicted in figs. 1 and 2, is a kind of overall structure of precast shear wall rapid grouting device of the present invention and fractionation signal
Figure, the rapid grouting device include force-increasing mechanism and slip casting channel, and force-increasing mechanism setting exists in slip casting Channel front end for grouting material
Movement in slip casting channel provides power.
Above-mentioned force-increasing mechanism includes pressure lever 2, push rod 4, piston 5 and sealed cylinder block 6, the pressure lever 2 it is upper
End is welded with handle 1, and two ears welded on lower end and pedestal 3 are hinged, the front end of intermediate upper position and push rod 4
Hinged, the rear end of the push rod 4 is fixedly connected with piston 5, and the piston 5 can be before and after the inner surface of sealed cylinder block 6
It is mobile.
Above-mentioned slip casting channel includes charging hopper 7, storage compartment 8, slip casting end 9 and Grouting Pipe 10, the storage compartment 8 and note
Slurry end 9 is connected to the rear end of sealed cylinder block 6 in turn by connecting flange, and the upper end of the storage compartment 8 is connected with charging hopper 7,
The rear end of the slip casting end 9 is connected with Grouting Pipe 10, and grouting material is entered in storage compartment 8 by charging hopper 7, using slip casting end
9 spray outward along Grouting Pipe 10.
In the use of the present invention, being equipped with grouting material as required first, and it is fed into storage compartment 8, is constructed by charging hopper 7
Personnel pull handle 1 backward, and the piston 5 of 4 rear end of push rod installation is pushed by pressure lever 2 hingedly on the base 3, so that living
When plug 5 moves forward in sealed cylinder block 6, the slurry in storage compartment 8 is depressed into Grouting Pipe 10 by slip casting end 9, then will
Grouting Pipe 10 is directed at precast shear wall grout hole, enters grouting material in precast shear wall body grouting storehouse, is discharged and fills to plasma discharge hole
Hole is blocked after slurry, completes filling process.
The rapid grouting device is hinged using handle 1, pressure lever 2, pedestal 3 and push rod 4, forms reinforcement connecting rod machine
Structure when the thrust that push rod 4 generates increase pushes piston 5 to move forward in sealed cylinder block 6, will be stored up when handle 1 pulls backward
Slurry in material room 8 is depressed into Grouting Pipe 10 by slip casting end 9, and then pours to precast shear wall grout hole, entire to fill
It sets reasonable in design, provides construction efficiency, saved construction cost, the labour for especially alleviating construction personnel is slight, and
Reduce the technical requirements to construction worker.
As it will be easily appreciated by one skilled in the art that the foregoing is merely illustrative of the preferred embodiments of the present invention, it is not used to
The limitation present invention, any modifications, equivalent substitutions and improvements made within the spirit and principles of the present invention should all include
Within protection scope of the present invention.