CN110306830A - A kind of reinforcement structure for implantation and construction method of planting reinforcement - Google Patents
A kind of reinforcement structure for implantation and construction method of planting reinforcement Download PDFInfo
- Publication number
- CN110306830A CN110306830A CN201910661884.8A CN201910661884A CN110306830A CN 110306830 A CN110306830 A CN 110306830A CN 201910661884 A CN201910661884 A CN 201910661884A CN 110306830 A CN110306830 A CN 110306830A
- Authority
- CN
- China
- Prior art keywords
- bar
- planting
- additional
- hole
- reinforcement
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 230000002787 reinforcement Effects 0.000 title claims abstract description 47
- 238000010276 construction Methods 0.000 title claims abstract description 45
- 238000002513 implantation Methods 0.000 title claims abstract description 21
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 54
- 239000010959 steel Substances 0.000 claims abstract description 54
- 238000003466 welding Methods 0.000 claims abstract description 13
- 238000000034 method Methods 0.000 claims description 10
- 239000004567 concrete Substances 0.000 claims description 9
- 239000004744 fabric Substances 0.000 claims description 6
- 239000005457 ice water Substances 0.000 claims description 3
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims description 2
- 239000011148 porous material Substances 0.000 claims 10
- 239000000853 adhesive Substances 0.000 claims 3
- 230000001070 adhesive effect Effects 0.000 claims 3
- 210000003205 muscle Anatomy 0.000 claims 3
- 238000004873 anchoring Methods 0.000 claims 2
- 230000015572 biosynthetic process Effects 0.000 claims 1
- 239000007943 implant Substances 0.000 claims 1
- 230000001681 protective effect Effects 0.000 claims 1
- 239000003292 glue Substances 0.000 abstract description 15
- 238000005553 drilling Methods 0.000 abstract description 11
- 238000013461 design Methods 0.000 abstract description 5
- 230000003014 reinforcing effect Effects 0.000 abstract description 5
- 238000011112 process operation Methods 0.000 abstract description 3
- 238000009435 building construction Methods 0.000 abstract description 2
- 238000006467 substitution reaction Methods 0.000 description 5
- 238000010586 diagram Methods 0.000 description 4
- 239000004568 cement Substances 0.000 description 3
- 238000005516 engineering process Methods 0.000 description 3
- 238000012986 modification Methods 0.000 description 3
- 230000004048 modification Effects 0.000 description 3
- 238000009418 renovation Methods 0.000 description 3
- 238000004364 calculation method Methods 0.000 description 2
- 238000004140 cleaning Methods 0.000 description 2
- 239000000428 dust Substances 0.000 description 2
- 239000012535 impurity Substances 0.000 description 2
- 238000003908 quality control method Methods 0.000 description 2
- 239000000126 substance Substances 0.000 description 2
- 238000007792 addition Methods 0.000 description 1
- 238000004026 adhesive bonding Methods 0.000 description 1
- 239000004566 building material Substances 0.000 description 1
- 238000011161 development Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000010438 heat treatment Methods 0.000 description 1
- 239000010410 layer Substances 0.000 description 1
- 238000012423 maintenance Methods 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
- 238000009527 percussion Methods 0.000 description 1
- 239000011241 protective layer Substances 0.000 description 1
- 239000011150 reinforced concrete Substances 0.000 description 1
- 238000010008 shearing Methods 0.000 description 1
- 230000003068 static effect Effects 0.000 description 1
- 239000000758 substrate Substances 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G23/00—Working measures on existing buildings
- E04G23/02—Repairing, e.g. filling cracks; Restoring; Altering; Enlarging
- E04G23/0218—Increasing or restoring the load-bearing capacity of building construction elements
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Chemical & Material Sciences (AREA)
- Chemical Kinetics & Catalysis (AREA)
- Electrochemistry (AREA)
- Mechanical Engineering (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Joining Of Building Structures In Genera (AREA)
Abstract
本发明涉及建筑施工领域,提供了一种植入用钢筋结构及其施工方法。所述植入用钢筋结构包括一主钢筋以及2个附加植筋;2个所述附加植筋一端设置于植筋孔中,另一端与所述主钢筋焊接固定;所述主钢筋与2个所述附加植筋间的焊缝的下缘距离被植入结构表面至少200mm。所述施工方法包括:S1、开凿防滑孔;S2、钻植筋孔;S3、向所述植筋孔中灌注植筋胶;S4、主钢筋与2个附加植筋焊接固定,形成一钢筋结构;2个所述附加植筋固定设置于所述植筋孔中;S5、设置保护装置,以防止所述主钢筋和所附加植筋摇摆磕碰,直至所述植筋胶固化。本发明的优点是工艺操作简单,施工质量保证,可解决节点钢筋密集区钻孔困难导致植筋孔径和孔深不满足设计要求的问题。
The invention relates to the field of building construction, and provides a reinforced structure for implantation and a construction method thereof. The reinforcing bar structure for implanting includes a main reinforcing bar and 2 additional planting bars; one end of the 2 additional planting bars is arranged in the planting bar hole, and the other end is welded and fixed with the main bar; the main bar and the 2 The lower edge of the weld between the additional planting bars is at least 200mm away from the surface of the implanted structure. The construction method includes: S1, excavating anti-slip holes; S2, drilling reinforcement holes; S3, pouring reinforcement glue into the reinforcement holes; S4, welding and fixing the main reinforcement and 2 additional reinforcements to form a reinforcement structure ; The two additional planting bars are fixedly arranged in the planting bar holes; S5. Install a protection device to prevent the main steel bar and the additional planting bars from swinging and colliding until the planting bar glue is cured. The invention has the advantages of simple process operation, guaranteed construction quality, and can solve the problem that the hole diameter and hole depth of planting reinforcement do not meet the design requirements due to the difficulty of drilling in the densely reinforced area of nodes.
Description
技术领域technical field
本发明涉及建筑施工领域,尤其涉及一种植入用钢筋结构及植筋施工方法。The invention relates to the field of building construction, in particular to a steel bar structure for implantation and a construction method for planting bars.
背景技术Background technique
随着现代建筑业的迅速发展,因使用功能改变或需要扩容等因素影响,旧建筑的改扩建工程也日益增多,其中不乏现有常规施工技术难以顺利完成的工程。With the rapid development of the modern construction industry, due to factors such as changes in use functions or the need for expansion, the number of renovation and expansion projects of old buildings is also increasing, and there are many projects that are difficult to successfully complete with existing conventional construction techniques.
所谓的难以顺利完成的工程包括在原钢筋混凝土结构上增建或改建建筑结构。按照相应的设计节点和规范要求,新老结构的连接通常采用化学法植筋技术。化学法植筋技术是一种钢筋后锚固利用结构胶锁键握紧力作用的连接技术,是结构植筋加固与重型荷载紧固应用的最佳选择。其通用的施工方法为:首先在原结构混凝土上钻孔,并清理孔内杂物;然后注入高强植筋胶,再插入钢筋或型材,胶剂固化后将钢筋与基材粘接为一体;最后进行静置养护,以确保新老结构的连接形成可靠的刚性节点。其中,在原有结构上钻孔的操作对于孔径和孔深都有要求。The so-called difficult-to-completion projects include building additions or rebuilding building structures on the original reinforced concrete structure. According to the corresponding design nodes and specification requirements, the connection between old and new structures usually adopts the chemical method of planting bars. Chemical rebar planting technology is a connection technology in which steel bars are post-anchored using the gripping force of structural rubber lock keys. It is the best choice for structural rebar reinforcement and heavy load fastening applications. The general construction method is as follows: first drill holes in the original structure concrete, and clean up the sundries in the holes; then inject high-strength planting glue, and then insert steel bars or profiles. After the glue is cured, the steel bars and the substrate are bonded together; finally Static maintenance is carried out to ensure that the connection of the old and new structures forms a reliable rigid node. Among them, the operation of drilling holes on the original structure has requirements for hole diameter and hole depth.
但是,为了新建结构而在原结构梁柱节点上钻孔时,由于原梁柱节点部位可能存在纵横交错的主筋和柱头弯锚钢筋,因此原有钢筋交叉密集和偏位,钻头难以有效避开原有钢筋的位置,导致钻孔的孔径和孔深都无法,满足设计要求。However, when drilling holes on the beam-column joints of the original structure for the purpose of building a new structure, since the original beam-column joints may have criss-crossed main bars and column head bent anchor bars, the original bars are densely intersected and misaligned, and it is difficult for the drill bit to effectively avoid the original beam-column joints. Where there are steel bars, the diameter and depth of the drilled holes cannot meet the design requirements.
发明内容Contents of the invention
本发明的目的在于提供一种植入用钢筋结构,用于替代一根较粗的钢筋,包括一主钢筋以及2个附加植筋;2个所述附加植筋一端设置于植筋孔中,另一端与所述主钢筋焊接固定;所述主钢筋与2个所述附加植筋间的焊缝的下缘距离被植入结构表面至少200mm。The purpose of the present invention is to provide a steel bar structure for implantation, which is used to replace a thicker steel bar, including a main steel bar and 2 additional planting bars; one end of the 2 additional planting bars is arranged in the planting bar hole, and the other One end is welded and fixed to the main steel bar; the distance between the lower edge of the weld between the main steel bar and the two additional planting bars is at least 200mm from the surface of the implanted structure.
上述的植入用钢筋结构中,所述主钢筋与2个所述附加植筋间的焊缝的下缘距离被植入结构表面还需大于或等于20d,其中d表示所述主钢筋的直径。In the above-mentioned steel bar structure for implantation, the distance between the lower edge of the weld between the main steel bar and the two additional planting bars needs to be greater than or equal to 20d from the surface of the implanted structure, where d represents the diameter of the main steel bar .
上述的植入用钢筋结构中,2个所述附加植筋分别设置于所述主钢筋的两侧。In the aforementioned reinforcing bar structure for implantation, the two additional planting bars are respectively arranged on both sides of the main reinforcing bar.
上述的植入用钢筋结构中,2个所述附加植筋的承载力与所述主钢筋的承载力符合等截面代换原则。In the above-mentioned steel bar structure for implantation, the bearing capacity of the two additional planting bars and the bearing capacity of the main steel bar conform to the principle of equal cross-section substitution.
上述的植入用钢筋结构中,所述焊缝的长度大于5d,其中d表示所述主钢筋的直径。In the above reinforcement structure for implantation, the length of the weld seam is greater than 5d, where d represents the diameter of the main reinforcement.
本发明的另一目的在于提供一种植筋施工方法,包括如下步骤:Another object of the present invention is to provide a planting bar construction method, comprising the following steps:
S1、在纵向主筋顶部开凿防滑孔;S1. Dig anti-slip holes on the top of the longitudinal main reinforcement;
S2、从所述防滑孔开始,在所述纵向主筋顶部钻植筋孔;S2, starting from the anti-slip hole, drilling a hole for planting reinforcement at the top of the longitudinal main reinforcement;
S3、向所述植筋孔中灌注植筋胶;S3, pouring the reinforcement glue into the reinforcement hole;
S4、主钢筋的一端与2个附加植筋的第一端焊接固定,形成一钢筋结构;2个所述附加植筋的第二端固定设置于所述植筋孔中;S4, one end of the main steel bar is welded and fixed to the first ends of the two additional planting bars to form a steel bar structure; the second ends of the two additional planting bars are fixedly arranged in the planting bar holes;
S5、设置保护装置,以防止所述主钢筋和所附加植筋摇摆磕碰,直至所述植筋胶固化。S5. Install a protection device to prevent the main steel bar and the attached planting bar from swinging and colliding until the planting bar glue is cured.
上述的植筋施工方法中,在步骤S1之前,还包括凿除所述纵向主筋外的混凝土保护层。In the above construction method for planting reinforcement, before step S1, it also includes chiseling away the concrete protection layer outside the longitudinal main reinforcement.
上述的植筋施工方法中,在步骤S1之前,还包括按等截面代换原则计算所述附加植筋的直径并计算所述植筋孔相应的深度和直径。In the above construction method for planting bars, before step S1, it also includes calculating the diameter of the additional planting bar and calculating the corresponding depth and diameter of the planting bar hole according to the principle of equal cross-section substitution.
上述的植筋施工方法中,在步骤S2中,所述植筋孔的斜度小于8°。In the above construction method for planting bars, in step S2, the slope of the bar planting hole is less than 8°.
上述的植筋施工方法中,在步骤S2中,使用压缩空气以及毛刷清理所述植筋孔,并反复清洁3-5次。In the above construction method for planting bars, in step S2, use compressed air and a brush to clean the holes for planting bars, and clean them repeatedly for 3-5 times.
上述的植筋施工方法中,在步骤S2后,向所述植筋孔中灌注植筋胶至孔深的2/3。In the above construction method for planting bars, after step S2, pour planting glue into the holes for planting bars to 2/3 of the hole depth.
上述的植筋施工方法中,在步骤S4中,2个所述附加植筋的第二端采用反复拉出、插入的方法直至所述附加植筋植入孔底。In the above construction method for planting bars, in step S4, the second ends of the two additional planting bars are repeatedly pulled out and inserted until the additional planting bars are implanted into the bottom of the hole.
上述的植筋施工方法中,在步骤S4中,先通过焊接形成所述钢筋结构,然后将所述钢筋结构固定于所述植筋孔中。In the above construction method for planting bars, in step S4, the steel bar structure is firstly formed by welding, and then the steel bar structure is fixed in the bar planting hole.
上述的植筋施工方法中,在步骤S4中,先将所述2个附加植筋的第二端设置于所述植筋孔中,然后再通过焊接形成所述钢筋结构。In the above-mentioned planting bar construction method, in step S4, the second ends of the two additional planting bars are first arranged in the planting bar holes, and then the steel bar structure is formed by welding.
上述的植筋施工方法中,焊接前,在所述附加植筋裸露部分的根部包裹湿布,所述湿布事先用冷水或冰水浸渍。In the above construction method of planting bars, before welding, the root of the exposed part of the additional planting bars is wrapped with a wet cloth, and the wet cloth is soaked with cold water or ice water in advance.
与现有技术相比,本发明的技术方案根据等截面代换的原则,使用直径较小的附加植筋代换通过计算得出的标准植筋,然后再通过焊接和胶接来固定新增的钢筋。该做法在工艺操作上相对简单,施工质量控制比较有保证,可解决节点钢筋密集区钻孔困难导致植筋孔径和孔深不满足设计要求的问题。Compared with the prior art, the technical solution of the present invention is based on the principle of equal cross-section replacement, using additional planting bars with smaller diameters to replace the calculated standard planting bars, and then fixing the newly added bars by welding and gluing. steel bars. This method is relatively simple in terms of process operation, and the construction quality control is relatively guaranteed. It can solve the problem that the hole diameter and hole depth of the planting reinforcement do not meet the design requirements due to the difficulty of drilling in the densely reinforced areas of the nodes.
附图说明Description of drawings
图1是本发明中植入用钢筋结构的一实施例的示意图;Fig. 1 is the schematic diagram of an embodiment of implantation steel bar structure among the present invention;
图2是将图1的应用示意图。Fig. 2 is a schematic diagram of the application of Fig. 1 .
具体实施方式Detailed ways
为使本发明的目的、特征更明显易懂,下面结合附图对本发明的具体实施方式作进一步的说明。然而,本发明可以用不同的形式实现,不应只是局限在所述的实施例。且,在不冲突的情况下,本申请中的实施例及实施例中的特征允许相互组合或替换。结合以下的说明,本发明的优点和特征将更清楚。In order to make the purpose and features of the present invention more comprehensible, the specific implementation manners of the present invention will be further described below in conjunction with the accompanying drawings. However, the present invention can be implemented in different forms and should not be limited to the described embodiments. Moreover, in the case of no conflict, the embodiments in the present application and the features in the embodiments are allowed to be combined or replaced with each other. The advantages and features of the present invention will become clearer in conjunction with the following descriptions.
需说明的是,附图均采用非常简化的形式且均使用非精准的比例,仅用以方便、明晰地辅助说明本发明实施例的目的。It should be noted that all the drawings are in a very simplified form and use imprecise scales, and are only used to facilitate and clearly assist the purpose of illustrating the embodiments of the present invention.
还需声明的是,本发明中对步骤编号的目的在于便于引用,而非限定先后顺序。对于个别需强调顺序的步骤,文中将以专门文字进行特别说明。It should also be stated that the purpose of numbering the steps in the present invention is to facilitate reference, not to limit the sequence. For individual steps that need to be emphasized in order, special instructions will be given in special text in the text.
请参考图1和图2,本实施例提出一种植入用钢筋结构,图1示出了所述植入用钢筋结构的示意图。所述植入用钢筋结构包括一个主钢筋3以及2个附加植筋4。2个附加植筋4的一端(将其定义为第二端)设置于植筋孔6(参见图2)中,另一端(将其定义为第一端)与主钢筋3焊接固定,也就是说,一个主钢筋3以及2个附加植筋4通过焊接固定在一起形成可靠的刚性节点,从而“制造”出一根新的钢筋。优选的,2个附加植筋分别位于主钢筋的两侧。然后在这根“新的”钢筋外再重新浇筑水泥、混凝土等,以重新形成立柱、墙面等建筑物结构体。Please refer to FIG. 1 and FIG. 2 , this embodiment proposes a steel bar structure for implantation, and FIG. 1 shows a schematic diagram of the steel bar structure for implantation. The reinforcing bar structure for implanting includes a main steel bar 3 and 2 additional planting bars 4. One end (defined as the second end) of the 2 additional planting bars 4 is arranged in the planting bar hole 6 (see Fig. 2 ), The other end (defined as the first end) is welded and fixed with the main steel bar 3, that is to say, a main steel bar 3 and two additional planting bars 4 are fixed together by welding to form a reliable rigid node, thereby "manufacturing" a Root new rebar. Preferably, the two additional planting bars are respectively located on both sides of the main steel bar. Then re-pour cement, concrete, etc. outside this "new" steel bar to re-form building structures such as columns and walls.
为了保证所述植入用钢筋结构的强度(包括剪切力、拉应力等),主钢筋3与附加植筋4焊接形成的焊缝5(参见图2)的长度优选大于5d,其中,d为主钢筋3的直径。In order to ensure the strength (comprising shearing force, tensile stress, etc.) The diameter of the main bar 3.
为了保证所述植入用钢筋结构最终的固定节点的强度,对于先种植后焊接的植入用钢筋结构,焊缝5的下缘距离被植入结构表面至少200mm。此处所说的被植入结构表面是指已使用水泥、混凝土等重新浇筑的建筑物结构体的表面。进一步地,考虑到附加植筋4和主钢筋3的本身直径,焊缝5还需进一步满足下缘距离被植入结构表面距离大于或等于20d的要求,其中,d为主钢筋3的直径。即,焊缝5的下缘距离被植入结构表面的距离需同时满足大于200mm和大于或等于20d的要求。In order to ensure the strength of the final fixed node of the implanted steel bar structure, for the implanted steel bar structure that is planted first and then welded, the distance from the lower edge of the weld 5 to the surface of the implanted structure is at least 200mm. The surface of the implanted structure as used herein refers to the surface of the building structure that has been recast with cement, concrete, or the like. Further, considering the diameters of the additional planting bar 4 and the main steel bar 3 , the weld 5 needs to further meet the requirement that the distance between the lower edge and the surface of the implanted structure is greater than or equal to 20d, where d is the diameter of the main steel bar 3 . That is, the distance between the lower edge of the weld 5 and the surface of the implanted structure must meet the requirements of greater than 200mm and greater than or equal to 20d.
进一步地,2个附加植筋的总承载力相当于一主钢筋3的承载力。本领域技术人员可以理解,主钢筋3的直径一般都是根据实际情况,选用业内通用的计算公式计算得出的,是一个固定值。那么,根据业内常用的等截面代换原则,可计算出总承载力与主钢筋3相当的2个附加植筋的直径。关于计算过程,此处不多做说明。Further, the total bearing capacity of the two additional planted bars is equivalent to the bearing capacity of one main steel bar 3 . Those skilled in the art can understand that the diameter of the main steel bar 3 is generally calculated according to the actual situation by using a calculation formula commonly used in the industry, and is a fixed value. Then, according to the common cross-section substitution principle in the industry, the diameters of the two additional planted bars whose total bearing capacity is equivalent to the main steel bar 3 can be calculated. Regarding the calculation process, there is not much explanation here.
图2所示的是在一根立柱上植入前述的植入用钢筋结构的示意图。施工方需要在原有立柱2的基础上加长该立柱。图中,施工方在原有立柱2上钻出了2个植筋孔6,需要植入2个主钢筋3。按原有设计数据,主钢筋3的直径为25mm,植筋孔6的孔径为32mm,孔深为620mm。但是在实施过程中发现,原有立柱2内部的钢筋结构比较复杂,植筋孔6无法按设计深度钻出。根据本发明的植入用钢筋结构的解决方案,现场考虑采用2个附加植筋4替代一个主钢筋3植入植筋孔6中。根据实践效果,附加植筋4可采用比主钢筋3小1~2个规格的钢筋。根据等截面代换原则,本实施例选取了2根直径为20mm的钢筋作为附加植筋4。此时,对应的植筋孔孔深为470mm,孔径为25mm。Figure 2 is a schematic diagram of implanting the aforementioned reinforcement structure for implantation on a column. The construction party needs to lengthen the column on the basis of the original column 2. In the figure, the construction party has drilled two reinforcement holes 6 on the original column 2, and two main reinforcement bars 3 need to be implanted. According to the original design data, the diameter of the main steel bar 3 is 25mm, the aperture of the reinforcement hole 6 is 32mm, and the hole depth is 620mm. However, it was found in the course of implementation that the reinforcement structure inside the original column 2 was relatively complicated, and the reinforcement hole 6 could not be drilled according to the designed depth. According to the solution of the steel bar structure for implantation of the present invention, it is considered to adopt two additional planting bars 4 instead of one main steel bar 3 to be implanted in the planting bar hole 6 on site. According to the practical effect, the additional planting bar 4 can adopt a steel bar that is 1 to 2 specifications smaller than the main steel bar 3 . According to the principle of equal section substitution, two steel bars with a diameter of 20 mm are selected as the additional planting bar 4 in this embodiment. At this time, the depth of the corresponding reinforcement hole is 470mm, and the hole diameter is 25mm.
将该植入用钢筋结构植入原有立柱2的植筋施工方法包括如下步骤:The reinforcement construction method of implanting the steel bar structure into the original column 2 includes the following steps:
S0、凿除原有立柱2上表面的混凝土保护层。S0, chiseling away the concrete protective layer on the upper surface of the original column 2.
S1、找出纵向主筋,在所述纵向主筋顶部用凿子开凿防滑孔,以免钻孔时钻头滑动,导致错位等误操作。S1. Find out the longitudinal main reinforcement, and use a chisel to dig an anti-skid hole on the top of the longitudinal main reinforcement, so as to avoid the drill bit from sliding during drilling, resulting in misoperation such as misalignment.
S2、根据事先计算好的孔深、孔径钻出植筋孔6。由于施工现场多数使用冲击钻,钻孔一般要求垂直于混凝土构件平面,斜度不大于8度。并且,钻植筋孔时进度不宜太快,以免钻头发热影响植筋孔6周围混凝土强度。S2. Drill the reinforcement hole 6 according to the pre-calculated hole depth and hole diameter. Since most of the construction sites use percussion drills, the drilling is generally required to be perpendicular to the plane of the concrete member, and the inclination should not be greater than 8 degrees. And, when drilling the reinforcement hole, the progress should not be too fast, so as not to affect the strength of the concrete around the reinforcement hole 6 due to the heating of the drill.
S3、向植筋孔6中灌注植筋胶。由于还需插入2个附加植筋4,灌胶深度不易超过孔深的2/3。在灌注所述植筋胶之前,还需对植筋孔6进行清理,可使用压缩空气和毛刷轮流、反复清理孔内的粉尘、油污等杂质,务必做到孔壁无灰尘、无油污、无有机杂质。反复清洁的次数一般为3~5次。S3, pouring the reinforcement glue into the reinforcement hole 6 . Since two additional planting bars 4 need to be inserted, the depth of glue filling is not easy to exceed 2/3 of the hole depth. Before pouring the rebar-planting glue, the rebar-planting hole 6 needs to be cleaned. Compressed air and a brush can be used to repeatedly clean the dust, oil and other impurities in the hole. Make sure that the hole wall is free of dust, oil and No organic impurities. The number of repeated cleanings is generally 3 to 5 times.
S4、主钢筋3的一端与2个附加植筋4的第一端焊接固定,形成一钢筋结构;2个所述附加植筋4的第二端固定设置于所述植筋孔中。由于步骤S3中灌入的植筋胶一般都具有比较高的浓度,需采用反复拉出、插入的方法插入,直至附加植筋4的第二端植入孔底。S4. One end of the main steel bar 3 is welded and fixed to the first ends of the two additional planting bars 4 to form a steel bar structure; the second ends of the two additional planting bars 4 are fixedly arranged in the planting bar holes. Since the rebar glue poured in step S3 generally has a relatively high concentration, it needs to be inserted by repeatedly pulling out and inserting until the second end of the additional rebar 4 is implanted into the bottom of the hole.
S5、设置保护装置,以防止所述植入用钢筋结构摇摆磕碰,直至所述植筋胶固化。同时,最好还派专人保护现场。S5. Install a protection device to prevent the steel bar structure for implantation from swinging and colliding until the bar-planting glue is cured. At the same time, it is best to send someone to protect the scene.
S6、在所述植入用钢筋结构外重新浇筑水泥、混凝土等建筑材料,以形成新增立柱1。S6. Re-pour building materials such as cement and concrete outside the reinforcement structure for implantation to form a newly added column 1 .
事实上,步骤S3和步骤S4是相互错杂的两个施工步骤。本领域技术人员可以会意,一方面,钻孔清洁和焊接两个操作是可以同时进行的;另一方面,由于场地和工具的限制,主钢筋3和附加植筋4可能无法在空地上先焊接然后再运输到原有立柱2顶部进行灌胶固定的工作。因此,步骤S3和步骤S4综合来讲,可以是焊接、灌胶然后插入所述第二端的过程,也可以是灌胶、插入所述第二端然后焊接的过程。In fact, step S3 and step S4 are two construction steps intertwined with each other. Those skilled in the art can understand that, on the one hand, the two operations of drilling cleaning and welding can be carried out at the same time; on the other hand, due to the limitations of the site and tools, the main steel bars 3 and the additional planting bars 4 may not be welded in the open space Then it is transported to the top of the original column 2 for glue filling and fixing. Therefore, generally speaking, step S3 and step S4 may be a process of welding, glue filling and then inserting the second end, or a process of glue filling, inserting the second end and then welding.
在后一种过程中,在焊接主钢筋3和辅助植筋4的过程中,需要在附加植筋4裸露部分的根部,即图2中圆圈所示的部分包裹湿布,所述湿布需事先用冷水或冰水浸渍。In the latter process, in the process of welding the main steel bar 3 and the auxiliary planting bar 4, it is necessary to wrap the wet cloth at the root of the exposed part of the additional planting bar 4, that is, the part shown in the circle in Figure 2, and the wet cloth needs to be used in advance. Soak in cold or ice water.
上述的植入用钢筋结构及植筋施工方法利用等截面代换原则,通过2个规格较小的钢筋代替一个规格较大的钢筋插入植筋孔中,使得所述植筋孔的开孔深度和直径都得以缩小,减低了在框柱节点密集区钻孔植筋的困难,且工艺操作上相对简单,施工质量控制比较有保证,为旧房改造、房屋翻新等提供了很好的解决方案。The above-mentioned steel bar structure for implantation and the construction method of planting bars utilize the principle of equal cross-section substitution, and insert two smaller steel bars into the planting bar hole instead of one larger bar, so that the opening depth of the bar planting hole is Both the diameter and diameter can be reduced, which reduces the difficulty of drilling and planting bars in the densely populated areas of frame-column joints, and the process operation is relatively simple, and the construction quality control is relatively guaranteed. It provides a good solution for the renovation of old houses and house renovations. .
显然,本领域的技术人员可以对发明进行各种改动和变型而不脱离本发明的精神和范围。这样,倘若本发明的这些修改和变型属于本发明权利要求及其等同技术的范围之内,则本发明也意图包含这些改动和变型在内。Obviously, those skilled in the art can make various changes and modifications to the invention without departing from the spirit and scope of the invention. Thus, if these modifications and variations of the present invention fall within the scope of the claims of the present invention and equivalent technologies thereof, the present invention also intends to include these modifications and variations.
Claims (15)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201910661884.8A CN110306830A (en) | 2019-07-22 | 2019-07-22 | A kind of reinforcement structure for implantation and construction method of planting reinforcement |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201910661884.8A CN110306830A (en) | 2019-07-22 | 2019-07-22 | A kind of reinforcement structure for implantation and construction method of planting reinforcement |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN110306830A true CN110306830A (en) | 2019-10-08 |
Family
ID=68081626
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201910661884.8A Pending CN110306830A (en) | 2019-07-22 | 2019-07-22 | A kind of reinforcement structure for implantation and construction method of planting reinforcement |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN110306830A (en) |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN111794292A (en) * | 2019-10-28 | 2020-10-20 | 呼和浩特市四方工程质量检测试验中心 | An anchor pile reaction force technology based on post-planting reinforcement for the static load test of plain concrete piles |
Citations (9)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| FR2980222A1 (en) * | 2011-09-16 | 2013-03-22 | Soletanche Freyssinet | Method for repairing construction work, involves producing reinforced concrete body above concrete base and around pile, and connecting reinforced concrete body to pile, where anchor pile is connected to concrete body through concrete base |
| CN203625944U (en) * | 2013-12-13 | 2014-06-04 | 中建六局建设发展有限公司 | Connecting structure of new foundation structure and existing foundation structure |
| CN103967289A (en) * | 2014-04-23 | 2014-08-06 | 江苏建研建设工程质量安全鉴定有限公司 | Steel bar planting method and steel bar planting structure suitable for improving plain concrete post-installed fastening bearing capacity |
| CN204455872U (en) * | 2014-12-02 | 2015-07-08 | 中航天建设工程有限公司 | Pile-based reinforcement structure |
| WO2017015016A1 (en) * | 2015-07-23 | 2017-01-26 | Sikorsky Aircraft Corporation | Structure reinforcement with polymer matrix composite |
| CN106759440A (en) * | 2016-12-27 | 2017-05-31 | 中国铁塔股份有限公司盐城市分公司 | Foundation of iron tower screw bolt reinforcing method |
| CN206521955U (en) * | 2017-01-20 | 2017-09-26 | 无锡市城归设计有限责任公司 | A kind of Rebar bonding device |
| US20180313100A1 (en) * | 2017-04-26 | 2018-11-01 | Ryszard M. Borys | Method of repairing and improving hermetically sealed insulated glass units in curtain wall systems of older buildings |
| CN211007743U (en) * | 2019-07-22 | 2020-07-14 | 江苏苏南建筑安装工程有限公司 | Steel bar structure for implantation |
-
2019
- 2019-07-22 CN CN201910661884.8A patent/CN110306830A/en active Pending
Patent Citations (9)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| FR2980222A1 (en) * | 2011-09-16 | 2013-03-22 | Soletanche Freyssinet | Method for repairing construction work, involves producing reinforced concrete body above concrete base and around pile, and connecting reinforced concrete body to pile, where anchor pile is connected to concrete body through concrete base |
| CN203625944U (en) * | 2013-12-13 | 2014-06-04 | 中建六局建设发展有限公司 | Connecting structure of new foundation structure and existing foundation structure |
| CN103967289A (en) * | 2014-04-23 | 2014-08-06 | 江苏建研建设工程质量安全鉴定有限公司 | Steel bar planting method and steel bar planting structure suitable for improving plain concrete post-installed fastening bearing capacity |
| CN204455872U (en) * | 2014-12-02 | 2015-07-08 | 中航天建设工程有限公司 | Pile-based reinforcement structure |
| WO2017015016A1 (en) * | 2015-07-23 | 2017-01-26 | Sikorsky Aircraft Corporation | Structure reinforcement with polymer matrix composite |
| CN106759440A (en) * | 2016-12-27 | 2017-05-31 | 中国铁塔股份有限公司盐城市分公司 | Foundation of iron tower screw bolt reinforcing method |
| CN206521955U (en) * | 2017-01-20 | 2017-09-26 | 无锡市城归设计有限责任公司 | A kind of Rebar bonding device |
| US20180313100A1 (en) * | 2017-04-26 | 2018-11-01 | Ryszard M. Borys | Method of repairing and improving hermetically sealed insulated glass units in curtain wall systems of older buildings |
| CN211007743U (en) * | 2019-07-22 | 2020-07-14 | 江苏苏南建筑安装工程有限公司 | Steel bar structure for implantation |
Non-Patent Citations (2)
| Title |
|---|
| 张炳林;: "植筋锚固深度不足的处理技术", 路基工程, no. 02, 20 April 2010 (2010-04-20), pages 204 - 205 * |
| 袁广林等: "建筑结构检测鉴定与加固技术", 31 January 2016, 武汉大学出版社, pages: 150 - 152 * |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN111794292A (en) * | 2019-10-28 | 2020-10-20 | 呼和浩特市四方工程质量检测试验中心 | An anchor pile reaction force technology based on post-planting reinforcement for the static load test of plain concrete piles |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| JP4010383B2 (en) | Pile method | |
| JP5239190B2 (en) | Reinforcing method for existing RC member and panel for reinforcing existing RC member | |
| JP5274145B2 (en) | Cast-in-place pile and its construction method | |
| JP6936613B2 (en) | Masonry reinforcement structure and reinforcement method | |
| CN109937282A (en) | Reinforced concrete frame antidetonation is reinforced using PC wallboard, reinforced concrete frame antidetonation reinforcement structure and its construction method using PC wallboard | |
| CN111648787A (en) | A method of using ultra-high performance concrete to reinforce shield tunnel lining structure | |
| KR20140013497A (en) | Method for constructing block type reinforced retaining wall in cut site | |
| CN115929065A (en) | Reinforcement technology for the connection between buildings in disrepair and new buildings | |
| JP6921536B2 (en) | Construction method of anchors to be installed in existing masonry and post-construction anchors | |
| CN110878641A (en) | Reinforcement structure and new construction method using superimposed hollow floor grid system | |
| JPH1018608A (en) | Seismic retrofit method for existing reinforced concrete buildings | |
| CN211007743U (en) | Steel bar structure for implantation | |
| US6402427B1 (en) | Method for reinforcing tunnel linings | |
| CN107366355A (en) | Add the bean column node and its construction method of new beam on existing reinforced concrete frame column | |
| KR101161844B1 (en) | Method for constructing micro pile | |
| CN105019449B (en) | Prestressed concrete pipe pile with air exhaust function and construction method thereof | |
| JP6336850B2 (en) | Pile head reinforcement method for foundation pile | |
| KR20090109282A (en) | Micro pile foundation method using a pack and pile assembly used therein | |
| KR100888166B1 (en) | Construction Method of Soil Concrete Pile and Soil Concrete Pile | |
| JP2002302939A (en) | Spacer for joint part in continuous underground wall | |
| CN120425726B (en) | Waist pile expanding device for construction of concrete filling pile | |
| GB2153892A (en) | A wall tie, a method of tying the leaves of a cavity wall and a cavity wall incorporating a tie | |
| KR101131766B1 (en) | Reinforced Matrix Soil-Nailing Method using fiber reinforced cement paste | |
| JP7558833B2 (en) | Reinforcement structure of masonry wall and reinforcement method of masonry wall | |
| CN111456061A (en) | Existing raft foundation perforating and repairing construction method |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| PB01 | Publication | ||
| PB01 | Publication | ||
| SE01 | Entry into force of request for substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| RJ01 | Rejection of invention patent application after publication |
Application publication date: 20191008 |
|
| RJ01 | Rejection of invention patent application after publication |