CN110500060A - A rapid grouting device, system and grouting method for staged advancing drill pipe - Google Patents
A rapid grouting device, system and grouting method for staged advancing drill pipe Download PDFInfo
- Publication number
- CN110500060A CN110500060A CN201910916831.6A CN201910916831A CN110500060A CN 110500060 A CN110500060 A CN 110500060A CN 201910916831 A CN201910916831 A CN 201910916831A CN 110500060 A CN110500060 A CN 110500060A
- Authority
- CN
- China
- Prior art keywords
- drilling rod
- tube
- grouting
- double
- drill
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B21/00—Methods or apparatus for flushing boreholes, e.g. by use of exhaust air from motor
- E21B21/12—Methods or apparatus for flushing boreholes, e.g. by use of exhaust air from motor using drilling pipes with plural fluid passages, e.g. closed circulation systems
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B21/00—Methods or apparatus for flushing boreholes, e.g. by use of exhaust air from motor
- E21B21/14—Methods or apparatus for flushing boreholes, e.g. by use of exhaust air from motor using liquids and gases, e.g. foams
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B33/00—Sealing or packing boreholes or wells
- E21B33/10—Sealing or packing boreholes or wells in the borehole
- E21B33/13—Methods or devices for cementing, for plugging holes, crevices or the like
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D9/00—Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
- E21D9/001—Improving soil or rock, e.g. by freezing; Injections
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E10/00—Energy generation through renewable energy sources
- Y02E10/20—Hydro energy
Landscapes
- Engineering & Computer Science (AREA)
- Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Geology (AREA)
- Environmental & Geological Engineering (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Physics & Mathematics (AREA)
- Fluid Mechanics (AREA)
- Mechanical Engineering (AREA)
- Soil Sciences (AREA)
- Earth Drilling (AREA)
Abstract
本发明公开了一种分段前进式钻杆快速注浆装置,包括:多根双重管钻杆,各双重管钻杆均为同心的双层管结构,外层管和内层管间形成环形通道,内层管为中空结构;各双重管钻杆用于分段顺次轴向设置于注浆孔内,前后顺次可拆卸连接并相连通。钻头,轴向开设有单通孔,与最前端的一根双重管钻杆的端部相连接,并连通。多个液压囊输液管,各液压囊输液管为一两端敞口的管体,与双重管钻杆并列且紧密贴合。止浆液压囊,为一中空的弹性囊状体,包覆于最前端的所述双重管钻杆的前段外壁一周,其与最前端的液压囊输液管相连通。采用该注浆装置注浆时,可以在不退出钻杆的前提下,随时快速密封定点注浆,而后撤销密封继续向前钻孔,实现分段前进式注浆。
The invention discloses a rapid grouting device for section-advancing drill pipes, which comprises: a plurality of double-tube drill pipes, each double-tube drill pipe is a concentric double-layer pipe structure, and an annular shape is formed between the outer pipe and the inner pipe. The channel and the inner tube are hollow structures; each double-tube drill pipe is arranged axially in the grouting hole in sections and in sequence, and the front and rear are detachably connected and communicated in sequence. The drill bit is provided with a single through hole in the axial direction, and is connected with and communicated with the end of a double-tube drill rod at the front end. A plurality of hydraulic bladder infusion tubes, each hydraulic bladder infusion tube is a tube body with two ends open, which are juxtaposed and closely attached to the double-pipe drill pipe. The anti-slurry hydraulic bladder is a hollow elastic bladder, which is wrapped around the outer wall of the front section of the double-pipe drill pipe at the front end, and communicates with the infusion tube of the hydraulic bladder at the front end. When the grouting device is used for grouting, the fixed-point grouting can be quickly sealed at any time without withdrawing from the drill pipe, and then the seal can be removed to continue drilling forward to realize the segmented forward grouting.
Description
【技术领域】【Technical field】
本发明属于土木工程隧道施工技术领域,尤其涉及一种分段前进式钻杆快速注浆装置、系统和注浆方法。The invention belongs to the technical field of civil engineering tunnel construction, and in particular relates to a rapid grouting device, a system and a grouting method of a section-advancing drill pipe.
【背景技术】【Background technique】
隧道及地下工程施工中,经常遭遇软弱富水地层,容易出现开挖面突水涌泥以及大变形,危及隧道施工安全。目前常采用注浆法进行围岩性质的改善,即通过一定压力将胶凝性材料注入围岩并固结,填充孔隙挤密土体,起到良好的加固和堵水效果。In the construction of tunnels and underground projects, weak water-rich strata are often encountered, which are prone to water and mud inrush and large deformation at the excavation surface, which endangers the safety of tunnel construction. At present, the grouting method is often used to improve the properties of the surrounding rock, that is, the cementitious material is injected into the surrounding rock under a certain pressure and consolidated, filling the pores and compacting the soil, and achieving a good effect of reinforcement and water blocking.
目前主要的水平注浆方法分两种:即分段前进式注浆和钻杆分段后退式注浆。分段前进式注浆适用地层条件较差,钻孔过程中遇到大量涌水涌砂,或者塌孔严重无法继续钻进,即退出钻杆进行注浆,改善该段围岩后,重新钻进该孔,逐段加深钻孔,直至达到设计钻孔深度,进行最后一次退出钻杆及注浆,完成该孔的设计注浆任务。此方法注浆效果较好,但重复钻孔工作量大,总体注浆量大,注浆材料损耗较多,工期较长。At present, there are two main horizontal grouting methods: that is, segmental forward grouting and drill pipe segmental retreat grouting. Segmented forward grouting is suitable for poor formation conditions. During drilling, if a large amount of water and sand gushing occurs, or the hole collapses seriously and it is impossible to continue drilling, then withdraw the drill pipe for grouting. After improving the surrounding rock in this section, drill again For this hole, the drill hole shall be deepened section by section until the design drilling depth is reached, and the drill pipe and grouting shall be withdrawn for the last time to complete the design grouting task of the hole. The grouting effect of this method is better, but the workload of repeated drilling is large, the overall grouting volume is large, the loss of grouting materials is large, and the construction period is long.
【发明内容】【Content of invention】
本发明的目的是提供一种分段前进式钻杆快速注浆装置、系统和注浆方法,注浆时,可以在不退出钻杆的前提下,随时快速密封定点注浆,而后撤销密封继续向前钻孔,实现分段前进式注浆。The purpose of the present invention is to provide a rapid grouting device, system and grouting method for drill pipes advancing in sections. When grouting, the fixed-point grouting can be quickly sealed at any time without withdrawing from the drill pipe, and then the seal can be canceled to continue Drilling forward to realize segmented forward grouting.
本发明采用以下技术方案:一种分段前进式钻杆快速注浆装置,包括:The present invention adopts the following technical solutions: a rapid grouting device for segmented advancing drill pipes, comprising:
多根双重管钻杆,各所述双重管钻杆均为同心的双层管结构,内层管为中空结构,外层管和内层管间形成环形通道;各根所述双重管钻杆顺次轴向钻入注浆孔内,各根间可拆卸连接;最后端的一根所述双重管钻杆用于连接外部浆液或者高压水和风供给系统;定义钻孔内为前,外为后。A plurality of double-tube drill pipes, each of which is a concentric double-layer pipe structure, the inner pipe is a hollow structure, and an annular channel is formed between the outer pipe and the inner pipe; each of the double-pipe drill pipes Axially drill into the grouting hole sequentially, and each root can be detachably connected; the double-tube drill pipe at the rear end is used to connect the external grout or high-pressure water and air supply system; define the inside of the hole as the front, and the outside as the rear .
钻头,轴向开设有单通孔,与最前端的所述双重管钻杆的端部相连接,并连通;The drill bit has a single through hole in the axial direction, which is connected to and communicated with the end of the double-tube drill pipe at the front end;
多个液压囊输液管,各液压囊输液管与一根双重管钻杆的长度相一致;用于分段顺次轴向设置于注浆孔内,前后顺次可拆卸连接并相连通,并与所述双重管钻杆紧密贴合;最后端的所述液压囊输液管用于与电动液压泵管路连接;A plurality of hydraulic bladder infusion tubes, the length of each hydraulic bladder infusion tube is consistent with the length of a double-pipe drill pipe; it is used to be arranged in the grouting hole in the axial direction in sequence, and the front and rear are detachably connected and connected in sequence, and It fits tightly with the double-pipe drill pipe; the hydraulic bladder infusion tube at the rearmost end is used to connect with the electric hydraulic pump pipeline;
止浆液压囊,为一中空的弹性囊状体,包覆于最前端的所述双重管钻杆的前段外壁一周,其与最前端的液压囊输液管连接并相连通;当囊状体内充入液体时,与钻孔侧壁紧密贴合,在钻孔的前部形成密封区。The anti-slurry hydraulic bladder is a hollow elastic bladder, which covers the outer wall of the front section of the double-pipe drill pipe at the forefront, and is connected and communicated with the hydraulic bladder infusion tube at the forefront; when the bladder is filled with When entering the liquid, it fits closely with the side wall of the borehole and forms a sealing area at the front of the borehole.
进一步地,该止浆液压囊前端与钻头的后端紧密贴合。Further, the front end of the anti-slurry hydraulic bag is in close contact with the rear end of the drill bit.
进一步地,该止浆液压囊处于收缩状态时,其长度不小于2m,其宽度小于所述钻头的最宽处至少2cm。Further, when the slurry-stop hydraulic bladder is in a contracted state, its length is not less than 2m, and its width is at least 2cm smaller than the widest point of the drill bit.
进一步地,在各所述双重管钻杆的外壁上沿轴向开设有一半圆形凹槽,用于卡持所述液压囊输液管;各所述凹槽的内径均与所述液压囊输液管的直径相一致。Further, a semicircular groove is provided in the axial direction on the outer wall of each of the double-tube drill rods, which is used to hold the hydraulic bladder infusion tube; the inner diameter of each groove is the same as that of the hydraulic bladder infusion tube. The diameter of the tube is the same.
进一步地,各相邻的所述双重管钻杆、相邻的液压囊输液管间均通过快速接头相连接。Further, the adjacent double-pipe drill rods and adjacent hydraulic bladder infusion tubes are all connected by quick joints.
进一步地,各相邻的所述双重管钻杆、相邻的液压囊输液管间的快速接头处均套设有一橡胶套。Further, a rubber sleeve is provided at the quick joints between the adjacent double-tube drill rods and the adjacent hydraulic bladder infusion tubes.
进一步地,在孔底的一根所述双重管钻杆和钻头间一体连通有一单管。Further, a single tube is integrally connected between the double-tube drill rod and the drill bit at the bottom of the hole.
本发明还公开了一种分段前进式钻杆快速注浆系统,包括上述的一种分段前进式钻杆快速注浆装置,还包括:The present invention also discloses a rapid grouting system for segmented advancing drill pipes, which includes the above-mentioned rapid grouting device for segmented advancing drill pipes, and further includes:
高压水和风供给系统,在钻孔的时候,所述高压水供给系统与最后端的一根所述双重管钻杆的外管管路连接;所述高压风供给系统与内管管路连接;High-pressure water and air supply system, when drilling, the high-pressure water supply system is connected to the outer pipe pipeline of a double-pipe drill pipe at the rear end; the high-pressure air supply system is connected to the inner pipe pipeline;
浆液机,在注双浆液时,与最后端的一根所述双重管钻杆的内管和外管管路连接;The slurry machine is connected with the inner tube and the outer tube of the double-tube drill pipe at the rearmost end when injecting double slurry;
电动液压泵,与最后端的一根所述液压囊输液管管路可拆卸连接,用于向所述止浆液压囊内充入液体。The electric hydraulic pump is detachably connected with the hydraulic bladder infusion line at the rearmost end, and is used to fill the hydraulic bladder with liquid.
本发明还公开了一种分段前进式钻杆快速注浆方法,使用上述述的一种分段前进式钻杆快速注浆装置,该注浆方法如下:The present invention also discloses a rapid grouting method for a section-advance drill pipe, using the above-mentioned section-advance type drill pipe rapid grouting device, the grouting method is as follows:
步骤一、将高压水和风供给系统与第一根所述双重管钻杆管路连接,启动转机,在设置位置钻孔;Step 1. Connect the high-pressure water and air supply system to the first double-tube drill pipe pipeline, start the machine, and drill at the set position;
步骤二、钻孔至该根双重管钻杆的深度后,另取一根所述双重管钻杆和液压囊输液管与孔内的所述双重管钻杆和液压囊输液管相连接,继续钻孔,直至该根双重管钻杆的深度,然后依次继续顺次连接各根所述双重管钻杆;当钻孔至设计深度后,停止钻孔,直接执行步骤四;当钻孔过程中出现涌水突泥或塌孔时,执行步骤三;Step 2. After drilling to the depth of the double-tube drill pipe, take another double-tube drill pipe and hydraulic bladder infusion tube to connect with the double-tube drill pipe and hydraulic bladder infusion tube in the hole, and continue Drill until the depth of the double-tube drill pipe, and then continue to connect each of the double-tube drill pipes in sequence; when the drilling reaches the design depth, stop drilling and directly perform step 4; when the drilling process In case of water gushing and mud bursting or hole collapse, perform step 3;
步骤三、将连接在一起的所述双重管钻杆朝向孔口侧退出20-30cm,将电动液压泵与靠近孔口的所述液压囊输液管的入口管路连接,启动,将液体依次通过多根所述液压囊输液管输入止浆液压囊,至其体积膨胀贴于钻孔侧壁,膨胀后的所述止浆液压囊与钻孔前端空间形成密封区,直至压力至少为设计注浆压力的1.5倍,停止充液;Step 3. Withdraw the double-pipe drill pipes connected together by 20-30 cm toward the orifice side, connect the electric hydraulic pump to the inlet pipeline of the hydraulic bladder infusion tube near the orifice, start it, and pass the liquid through the A plurality of hydraulic bladder infusion tubes are input into the grouting hydraulic bladder until its volume expands and sticks to the side wall of the borehole. After expansion, the grouting hydraulic bladder forms a sealing area with the space at the front end of the borehole until the pressure is at least the designed grouting pressure. 1.5 times the pressure, stop filling;
步骤四、拆除高压水和风供给系统,将注浆机与靠近孔口的所述双重管钻杆的入口管路连接,启动,使浆液依次通过多根所述双重管钻杆和钻头,注入密封区,直至浆液凝固;然后排出所述止浆液压囊内的液体,使其恢复至收缩状态;Step 4. Remove the high-pressure water and air supply system, connect the grouting machine to the inlet pipeline of the double-tube drill pipe near the orifice, and start it, so that the slurry passes through multiple double-tube drill pipes and drill bits in turn, and injects the sealant area until the grout solidifies; then discharge the liquid in the grout-stop hydraulic bladder to restore it to a contracted state;
步骤五、重复步骤一~步骤四,直至钻孔至设计深度。Step 5. Repeat steps 1 to 4 until the hole is drilled to the designed depth.
本发明的有益效果是:The beneficial effects of the present invention are:
1.实现了一次扫孔至设计深度,避免了重复钻孔和多次退钻杆的工作,大大减少了工作量,提高了注浆施工速度。1. It realizes one-time sweeping to the design depth, avoids the work of repeated drilling and multiple withdrawal of drill pipes, greatly reduces the workload and improves the grouting construction speed.
2.利用钻杆直接注浆,简化了钻孔工作和注浆工作的工序衔接,施工速度更快。2. Direct grouting with drill pipe simplifies the connection between drilling work and grouting work, and the construction speed is faster.
3.在钻头处形成止浆封闭区,浆液扩散区域小,局部注浆的针对性和精确性高,局部注浆效果更有保障,间接减少了浆液损耗。3. A grout-stop closed area is formed at the drill bit, the grout diffusion area is small, the pertinence and accuracy of local grouting are high, the effect of local grouting is more guaranteed, and the loss of grout is indirectly reduced.
【附图说明】【Description of drawings】
图1为本发明实施例的结构示意图。Fig. 1 is a schematic structural diagram of an embodiment of the present invention.
图2为本发明实施例施工状态的结构示意图。Fig. 2 is a schematic structural view of the construction state of the embodiment of the present invention.
图3为双重管钻杆的截面放大图。Fig. 3 is an enlarged cross-sectional view of a double-tube drill pipe.
其中:1、止浆液压囊,2、液压囊输液管,3、橡胶套,4、快速接头,5、电动液压泵,6、压力表,10、钻头,11、双重管钻杆。Among them: 1. Slurry stop hydraulic bladder, 2. Hydraulic bladder infusion tube, 3. Rubber sleeve, 4. Quick connector, 5. Electric hydraulic pump, 6. Pressure gauge, 10. Drill bit, 11. Double tube drill pipe.
【具体实施方式】【Detailed ways】
下面结合附图和具体实施方式对本发明进行详细说明。The present invention will be described in detail below in conjunction with the accompanying drawings and specific embodiments.
本发明实施例公开了一种分段前进式钻杆快速注浆装置,如图1、2和3所示,包括:多根双重管钻杆11,各双重管钻杆11均为同心的双层管结构,两端均为敞口状,内层管为中空结构,外层管和内层管间形成环形通道;各双重管钻杆11用于分段顺次轴向设置于注浆孔内,前后顺次可拆卸连接并相连通,最后端的一根双重管钻杆11用于连接外部浆液或者高压水和风供给系统;定义钻孔内为前,外为后。内层管和外层管间可通过分段间隔设置的隔板相连接。为了注浆的安全性,可在环形通道和内层管的前端安装单向阀。为将浆液注入钻孔,设置钻头10,轴向开设有单通孔,与孔内最前端的一根双重管钻杆11的端部相连接,并连通。The embodiment of the present invention discloses a section-advancing drill pipe rapid grouting device, as shown in Figures 1, 2 and 3, comprising: a plurality of double-tube drill pipes 11, each double-tube drill pipe 11 is a concentric double Layer tube structure, both ends are open, the inner tube is a hollow structure, and an annular channel is formed between the outer tube and the inner tube; each double tube drill pipe 11 is used to be axially arranged in the grouting hole in sections Inside, front and rear are detachably connected and communicated in sequence, and a double-pipe drill pipe 11 at the rear end is used to connect to an external slurry or high-pressure water and air supply system; the inside of the borehole is defined as the front, and the outside is the back. The inner tube and the outer tube can be connected by partitions arranged at intervals. For the safety of grouting, a one-way valve can be installed at the front end of the annular passage and the inner pipe. In order to inject the slurry into the borehole, a drill bit 10 is provided, and a single through hole is provided in the axial direction, which is connected to and communicated with the end of a double-tube drill rod 11 at the front end in the hole.
多个液压囊输液管2,各液压囊输液管2与一根双重管钻杆11的长度相一致;用于分段顺次轴向设置于注浆孔内,前后顺次可拆卸连接并相连通,并与双重管钻杆11紧密贴合;最后端的液压囊输液管2用于与电动液压泵5管路连接;止浆液压囊1,为一中空的弹性囊状体,包覆于最前端的所述双重管钻杆11的前段外壁一周,其与最前端的液压囊输液管2连接并相连通;当囊状体内充入液体时,与钻孔侧壁紧密贴合,在钻孔的前部形成密封区。前端与钻头10的后端紧密贴合;当囊状体内充入液体时,囊状体沿钻孔径向膨胀;与钻孔侧壁紧密贴合,在钻孔的前部形成密封区。当放出液体时,囊状体恢复为收缩状态。止浆液压囊1处于收缩状态时,止浆液压囊1长度不小于2m,其宽度小于钻头10的最宽处至少2cm。以便于扫孔过程中,孔渣可以顺利从孔壁空隙中排出;止浆液压囊1体积膨胀后,紧挨钻头10,与钻孔前端形成止浆区,避免浆液在孔壁空隙中形成固结体,影响继续钻孔排渣;止浆液压囊1长度大于2m,以便膨胀后具备足够的止浆密封能力。A plurality of hydraulic bladder infusion tubes 2, the length of each hydraulic bladder infusion tube 2 is consistent with a double-pipe drill pipe 11; it is used to be arranged axially in the grouting hole in sequence in sections, and the front and back are detachably connected and connected in sequence and is closely attached to the double-pipe drill pipe 11; the hydraulic bladder infusion tube 2 at the rearmost end is used to connect with the electric hydraulic pump 5 pipeline; The outer wall of the front section of the double-pipe drill pipe 11 at the front end is connected and communicated with the frontmost hydraulic bladder infusion tube 2; when the bladder is filled with liquid, it is closely attached to the side wall of the borehole, The front part forms a sealing area. The front end is closely attached to the rear end of the drill bit 10; when the capsule is filled with liquid, the capsule expands radially along the borehole; it is closely attached to the side wall of the borehole, forming a sealing area at the front of the borehole. When the fluid is released, the sac returns to its contracted state. When the slurry-stop hydraulic bag 1 is in a contracted state, the length of the slurry-stop hydraulic bag 1 is not less than 2m, and its width is at least 2cm smaller than the widest point of the drill bit 10 . In order to facilitate the hole sweeping process, the slag can be smoothly discharged from the hole wall gap; after the volume expansion of the grout stop hydraulic bag 1, it is close to the drill bit 10 to form a grout stop zone with the front end of the drill hole to prevent the grout from forming a solid in the hole wall gap. It will affect the continuous drilling and slag discharge; the length of the grout stop hydraulic bag 1 is greater than 2m, so as to have sufficient grout stop and sealing ability after expansion.
在各双重管钻杆11的外壁上沿轴向开设有一半圆形凹槽,用于卡持液压囊输液管2;各凹槽的内径均与液压囊输液管2的直径相一致。On the outer wall of each double-pipe drill rod 11, there is a semicircular groove along the axial direction for clamping the hydraulic bladder infusion tube 2; the inner diameter of each groove is consistent with the diameter of the hydraulic bladder infusion tube 2.
各相邻的双重管钻杆11、相邻的液压囊输液管2间均通过快速接头相连接。快速接头的规格有多种,选用适合管子连接的快速接头即可,均选用的为已有的成品。The adjacent double-pipe drill rods 11 and the adjacent hydraulic bladder infusion tubes 2 are all connected by quick joints. There are many specifications of quick connectors, and the quick connectors suitable for pipe connection can be selected, all of which are existing finished products.
各相邻的双重管钻杆11、相邻的液压囊输液管2间的快速接头处均套设有一橡胶套3,用橡胶套3勒紧盖住接头。Each adjacent double pipe drill pipe 11 and the quick joint between the adjacent hydraulic bladder infusion tubes 2 are all sleeved with a rubber sleeve 3, and the rubber sleeve 3 is used to tighten and cover the joint.
本发明还公开了一种分段前进式钻杆快速注浆系统,包括上述的一种分段前进式钻杆快速注浆装置,还包括:高压水和风供给系统,在钻孔的时候,高压水供给系统与靠近孔口的一根双重管钻杆11的外管管路连接;高压风供给系统与内管管路连接;浆液机,在注双浆液时,与靠近孔口最外端的一根双重管钻杆11的内管和外管管路连接;电动液压泵5,与靠近孔口的一根液压囊输液管2管路可拆卸连接,用于向止浆液压囊1内充入液体。高压水、风供给系统和浆液机均采用现有设备,根据不同的施工工况如所需压力、速度等选择。The present invention also discloses a rapid grouting system for segmented advancing drill pipes, which includes the aforementioned rapid grouting device for segmented advancing drill pipes, and also includes: a high-pressure water and air supply system. The water supply system is connected to the outer pipe pipeline of a double-tube drill pipe 11 near the orifice; the high-pressure air supply system is connected to the inner pipe pipeline; The inner pipe and the outer pipe of a double-pipe drill pipe 11 are connected with pipelines; the electric hydraulic pump 5 is detachably connected with a hydraulic bladder infusion tube 2 pipeline near the orifice, which is used to fill the slurry hydraulic bladder 1 liquid. The high-pressure water, air supply system and slurry machine all adopt existing equipment, which are selected according to different construction conditions such as required pressure and speed.
本发明还公开了一种分段前进式钻杆快速注浆方法,使用上述的一种分段前进式钻杆快速注浆装置,该注浆方法如下:The present invention also discloses a rapid grouting method for a section-advance type drill pipe. Using the above-mentioned section-advance type drill pipe rapid grouting device, the grouting method is as follows:
步骤一、将高压水和风供给系统与第一根双重管钻杆11管路连接,启动转机,在设置位置钻孔;Step 1. Connect the high-pressure water and air supply system to the first double-tube drill pipe 11, start the machine, and drill at the set position;
步骤二、钻孔至该根双重管钻杆11的深度后,另取一根双重管钻杆11和液压囊输液管2与孔内的双重管钻杆11和液压囊输液管2相连接,继续钻孔,直至该根双重管钻杆11的深度,然后依次继续顺次连接各根双重管钻杆11;当钻孔至设计深度后,停止钻孔,直接执行步骤四;当钻孔过程中出现涌水突泥或塌孔时,执行步骤三;Step 2, after drilling to the depth of the double-pipe drill pipe 11, another double-pipe drill pipe 11 and hydraulic bladder infusion tube 2 are connected to the double-pipe drill pipe 11 in the hole and the hydraulic bladder infusion tube 2, Continue drilling until the depth of the double-pipe drilling rod 11, and then continue to connect each double-pipe drilling rod 11 in sequence; when the drilling reaches the design depth, stop drilling and directly perform step 4; when the drilling process When there is water gushing and mud bursting or hole collapse, perform step 3;
步骤三、将连接在一起的双重管钻杆11朝向孔口侧退出20-30cm,将电动液压泵5与靠近孔口的液压囊输液管2的入口管路连接,启动,将液体依次通过多根液压囊输液管2输入止浆液压囊1,至其体积膨胀贴于钻孔侧壁,膨胀后的止浆液压囊1与钻孔前端空间形成密封区,直至压力至少为设计注浆压力的1.5倍,停止充液;Step 3. Withdraw the connected double pipe drill pipe 11 towards the orifice side by 20-30cm, connect the electric hydraulic pump 5 to the inlet pipeline of the hydraulic bladder infusion tube 2 near the orifice, start it, and pass the liquid through multiple tubes in sequence. The root hydraulic bladder infusion tube 2 is fed into the grouting hydraulic bladder 1 until its volume expands and sticks to the side wall of the borehole. The expanded grouting hydraulic bladder 1 forms a sealed area with the space at the front end of the borehole until the pressure is at least equal to the designed grouting pressure. 1.5 times, stop filling;
步骤四、拆除高压水和风供给系统,将注浆机与靠近孔口的双重管钻杆11的入口管路连接,启动,使浆液依次通过多根双重管钻杆11和钻头10,注入密封区,直至浆液凝固;然后排出止浆液压囊1内的液体,使其恢复至收缩状态;Step 4. Remove the high-pressure water and air supply system, connect the grouting machine to the inlet pipeline of the double-tube drill pipe 11 near the hole, and start it, so that the slurry passes through multiple double-tube drill pipes 11 and drill bits 10 in sequence, and injects into the sealing area , until the slurry is solidified; then discharge the liquid in the slurry-stop hydraulic bag 1 to restore it to the contracted state;
步骤五、重复步骤一~步骤四,直至钻孔至设计深度。Step 5. Repeat steps 1 to 4 until the hole is drilled to the designed depth.
具体施工时,如下:The specific construction is as follows:
钻孔准备:Preparation for drilling:
将一根液压囊输液管2嵌入一根双重管钻杆11外壁的半圆形凹槽内,并利用橡胶套3勒紧,此时液压囊输液管2与电动液压泵5处于断开状态,液压囊输液管2与双重管钻杆11可以同步旋转;将双重管钻杆11的内外管分别连接好高压风和水;Embed a hydraulic bladder infusion tube 2 into a semicircular groove on the outer wall of a double-tube drill pipe 11, and tighten it with a rubber sleeve 3. At this time, the hydraulic bladder infusion tube 2 and the electric hydraulic pump 5 are in a disconnected state. The hydraulic bladder infusion tube 2 and the double-tube drill pipe 11 can rotate synchronously; the inner and outer pipes of the double-tube drill pipe 11 are respectively connected with high-pressure air and water;
钻孔作业:Drilling work:
打开高压风和水,启动钻机开始钻孔,钻入一根双重管钻杆11后,延长一根新双重管钻杆11;同时利用快速接头4连接一根新液压囊输液管2,将新一根液压囊输液管2嵌入新一根双重管钻杆11外壁的半圆形凹槽内,并新增一枚橡胶套3勒紧;同理不断延长钻杆和输液管,增加钻孔深度。Open the high-pressure air and water, start the drilling rig and start drilling, and after drilling into a double-pipe drilling rod 11, extend a new double-pipe drilling rod 11; Utilize quick connector 4 to connect a new hydraulic bag infusion tube 2 simultaneously, put the new A hydraulic bladder infusion tube 2 is embedded in a semicircular groove on the outer wall of a new double-tube drill rod 11, and a rubber sleeve 3 is added to tighten it; similarly, the drill rod and infusion tube are continuously extended to increase the drilling depth .
注浆准备:Grouting preparation:
如钻孔达到注浆方案设计的分段长度,直接停机;如果钻孔突然遭遇不良地质情况,如涌水突泥或塌孔等,则后退钻杆2m停机;If the drilling reaches the section length designed by the grouting scheme, stop the machine directly; if the drilling suddenly encounters unfavorable geological conditions, such as water gushing mud or hole collapse, etc., retreat the drill pipe 2m and stop the machine;
通过快速接头4将液压囊输液管2与电动液压泵5相连接,启动电动液压泵5,通过液压囊输液管2向止浆液压囊1中注入液体使其体积膨胀,直至压力表6的读数达到设计注浆压力的1.5倍,形成良好的密封止浆体,与钻孔前端形成密封区;拆除双重管钻杆11连接的高压风和水,与注浆机相连。Connect the hydraulic bladder infusion tube 2 with the electric hydraulic pump 5 through the quick connector 4, start the electric hydraulic pump 5, and inject liquid into the slurry hydraulic bladder 1 through the hydraulic bladder infusion tube 2 to expand its volume until the reading of the pressure gauge 6 Reach 1.5 times of the designed grouting pressure, form a good sealing grouting body, and form a sealing area with the front end of the drill hole; remove the high-pressure air and water connected to the double pipe drill pipe 11, and connect it to the grouting machine.
注浆作业:Grouting operation:
通过注浆机向密封区域内注入速凝性浆液,如聚氨酯或者水泥-水玻璃双液浆,待本段注浆工作结束,浆液凝固后,排出止浆液压囊1中的液体,使其恢复收缩状态。Inject quick-setting grout into the sealing area through the grouting machine, such as polyurethane or cement-water glass double liquid grout. After the grouting work in this section is completed and the grout is solidified, the liquid in the grout-stop hydraulic bag 1 is discharged to restore it. contracted state.
重复上述操作分段前进进行钻孔作业与注浆作业,直至达到设计钻孔深度,完成本孔的设计注浆要求。Repeat the above operations to proceed in stages for drilling and grouting operations until the designed drilling depth is reached, and the design grouting requirements for this hole are completed.
Claims (8)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201910916831.6A CN110500060B (en) | 2019-09-26 | 2019-09-26 | A segmented advancement drill rod rapid grouting device, system and grouting method |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201910916831.6A CN110500060B (en) | 2019-09-26 | 2019-09-26 | A segmented advancement drill rod rapid grouting device, system and grouting method |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| CN110500060A true CN110500060A (en) | 2019-11-26 |
| CN110500060B CN110500060B (en) | 2025-02-18 |
Family
ID=68592820
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201910916831.6A Active CN110500060B (en) | 2019-09-26 | 2019-09-26 | A segmented advancement drill rod rapid grouting device, system and grouting method |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN110500060B (en) |
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN111472810A (en) * | 2020-04-15 | 2020-07-31 | 高军 | High-pressure grouting device and method based on weak broken surrounding rock |
| CN115977649A (en) * | 2022-08-01 | 2023-04-18 | 浙江省建投交通基础建设集团有限公司 | An integrated construction method of drilling and grouting for large pipe shed and pipe collection in shallow tunnels |
Citations (10)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| SU694629A1 (en) * | 1977-08-17 | 1979-10-30 | Boris T Bunyak | Coupling for stepwise grouting of casing |
| JPH08165638A (en) * | 1994-12-15 | 1996-06-25 | Osaka Bosui Constr Co Ltd | Retarding filling device for double-pipe rod and retarding filling construction method |
| CA2473255A1 (en) * | 2002-01-22 | 2003-07-31 | Techmo Entwicklungs- Und Vertriebs Gmbh | Rock bolts with expandable element |
| CA2592556A1 (en) * | 2006-06-24 | 2007-12-24 | Homer L. Spencer | Method and apparatus for plugging perforations |
| CN101251019A (en) * | 2008-04-14 | 2008-08-27 | 中铁隧道集团有限公司 | Method of double-pipe step-back grouting with mixing in grout stopper at orifice |
| CN201129177Y (en) * | 2007-12-29 | 2008-10-08 | 中铁隧道集团有限公司 | Drill rod back subsection grouting apparatus |
| CN102080552A (en) * | 2010-12-14 | 2011-06-01 | 山东大学 | Downhole double-fluid grouting technology and downhole double-fluid grouting device |
| CN108194047A (en) * | 2018-02-02 | 2018-06-22 | 淮南矿业(集团)有限责任公司 | The cyclic permutation grouting device and technique of a kind of drilling pipe-fixing |
| CN110259383A (en) * | 2019-07-04 | 2019-09-20 | 山东大学 | A kind of protrusive bores note integrated device and application method |
| CN210509112U (en) * | 2019-09-26 | 2020-05-12 | 中铁隧道局集团有限公司 | Quick slip casting device of segmentation marching type drilling rod, system |
-
2019
- 2019-09-26 CN CN201910916831.6A patent/CN110500060B/en active Active
Patent Citations (10)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| SU694629A1 (en) * | 1977-08-17 | 1979-10-30 | Boris T Bunyak | Coupling for stepwise grouting of casing |
| JPH08165638A (en) * | 1994-12-15 | 1996-06-25 | Osaka Bosui Constr Co Ltd | Retarding filling device for double-pipe rod and retarding filling construction method |
| CA2473255A1 (en) * | 2002-01-22 | 2003-07-31 | Techmo Entwicklungs- Und Vertriebs Gmbh | Rock bolts with expandable element |
| CA2592556A1 (en) * | 2006-06-24 | 2007-12-24 | Homer L. Spencer | Method and apparatus for plugging perforations |
| CN201129177Y (en) * | 2007-12-29 | 2008-10-08 | 中铁隧道集团有限公司 | Drill rod back subsection grouting apparatus |
| CN101251019A (en) * | 2008-04-14 | 2008-08-27 | 中铁隧道集团有限公司 | Method of double-pipe step-back grouting with mixing in grout stopper at orifice |
| CN102080552A (en) * | 2010-12-14 | 2011-06-01 | 山东大学 | Downhole double-fluid grouting technology and downhole double-fluid grouting device |
| CN108194047A (en) * | 2018-02-02 | 2018-06-22 | 淮南矿业(集团)有限责任公司 | The cyclic permutation grouting device and technique of a kind of drilling pipe-fixing |
| CN110259383A (en) * | 2019-07-04 | 2019-09-20 | 山东大学 | A kind of protrusive bores note integrated device and application method |
| CN210509112U (en) * | 2019-09-26 | 2020-05-12 | 中铁隧道局集团有限公司 | Quick slip casting device of segmentation marching type drilling rod, system |
Non-Patent Citations (1)
| Title |
|---|
| 李治国;王全胜;徐海廷;: "隧道钻孔注浆一体化施工技术", 隧道建设, no. 04, 20 August 2010 (2010-08-20), pages 365 - 370 * |
Cited By (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN111472810A (en) * | 2020-04-15 | 2020-07-31 | 高军 | High-pressure grouting device and method based on weak broken surrounding rock |
| CN111472810B (en) * | 2020-04-15 | 2021-07-06 | 高军 | High-pressure grouting device and method based on weak broken surrounding rock |
| CN115977649A (en) * | 2022-08-01 | 2023-04-18 | 浙江省建投交通基础建设集团有限公司 | An integrated construction method of drilling and grouting for large pipe shed and pipe collection in shallow tunnels |
| CN115977649B (en) * | 2022-08-01 | 2026-04-07 | 浙江省建投交通基础建设集团有限公司 | A construction method for integrated drilling and grouting of large pipe sheds and pipe collection systems in shallow-buried tunnels. |
Also Published As
| Publication number | Publication date |
|---|---|
| CN110500060B (en) | 2025-02-18 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN110259383B (en) | A kind of advanced drilling and injection integrated device and using method | |
| CN112031655B (en) | Drilling tool combining water jet reaming and local grouting and hole fixing process method | |
| CN101768974B (en) | Method and device for grouting in holes and effectively stopping grouting | |
| CN101251017B (en) | Subsection retrusive slip-casting method for porthole slurry-stop jackrod | |
| CN101251019B (en) | Method of double-pipe step-back grouting with mixing in grout stopper at orifice | |
| CN108301807B (en) | Hole wall fixing device for gas extraction drill hole of soft coal seam and construction method | |
| CN107605498B (en) | Construction method of horizontal grouting reinforcement structure at the end of shield tunnel in water-rich sandy pebble stratum | |
| CN105909257A (en) | Separated grouting device in drilled hole and sectional grouting operation process | |
| CN106381863B (en) | Drilling-injection compound device and construction technology for grouting reinforcement of water-rich sand layer | |
| CN110454115A (en) | A gas drainage drilling hole sealing device and hole sealing method | |
| CN105840134A (en) | Single-bag grouting hole sealing device for upward crossing boreholes and hole sealing method adopting single-bag grouting hole sealing device | |
| CN102913184B (en) | Secondary composite high-pressure grouting and sealing process of gas drainage drilling artificial separation barrier | |
| CN104747075A (en) | Anti-collapsing drilling method for grout spraying of soft coal seam | |
| CN105200978B (en) | A kind of protrusive localization two-liquid grouting device and construction method | |
| CN110529155B (en) | Drill bit grout stopping drill rod sectional retreating type grouting method | |
| CN205117357U (en) | Weak surrounding rock tunnel advance support structure based on self -drilling spiral pipe canopy | |
| CN110761734B (en) | Sealing method of sealing device for drilling high-gas soft coal seam | |
| CN105715230A (en) | Middle slurry-permeating type single-bag grouting hole sealing device and hole sealing method thereof | |
| CN110725661B (en) | Segmented spiral rubber bag hole sealing device | |
| CN202416312U (en) | Pre-blastable anchor rod with integration of drilling, injecting and anchoring | |
| CN201129184Y (en) | One-way step-back grouting device with small conduit outer valve | |
| CN110500060A (en) | A rapid grouting device, system and grouting method for staged advancing drill pipe | |
| CN110985004A (en) | A kind of advanced small conduit pre-reinforcement system and construction method thereof | |
| CN210509112U (en) | Quick slip casting device of segmentation marching type drilling rod, system | |
| CN103541679B (en) | Combined hole sealing method for hydraulic fracturing drilling in coal mine |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| PB01 | Publication | ||
| PB01 | Publication | ||
| SE01 | Entry into force of request for substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| GR01 | Patent grant | ||
| GR01 | Patent grant |