CN111237774A - An incinerator flue gas cooling and purification system - Google Patents

An incinerator flue gas cooling and purification system Download PDF

Info

Publication number
CN111237774A
CN111237774A CN202010107266.1A CN202010107266A CN111237774A CN 111237774 A CN111237774 A CN 111237774A CN 202010107266 A CN202010107266 A CN 202010107266A CN 111237774 A CN111237774 A CN 111237774A
Authority
CN
China
Prior art keywords
flue gas
gas cooling
liquid
furnace body
incinerator
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202010107266.1A
Other languages
Chinese (zh)
Inventor
牟正旸
牟鹏辉
沈九兵
陈育平
许津津
冯国增
王黎辉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Yi Penghui
Original Assignee
Jiangsu Shankun Environmental Protection Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu Shankun Environmental Protection Technology Co Ltd filed Critical Jiangsu Shankun Environmental Protection Technology Co Ltd
Priority to CN202010107266.1A priority Critical patent/CN111237774A/en
Publication of CN111237774A publication Critical patent/CN111237774A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F23COMBUSTION APPARATUS; COMBUSTION PROCESSES
    • F23GCREMATION FURNACES; CONSUMING WASTE PRODUCTS BY COMBUSTION
    • F23G5/00Incineration of waste; Incinerator constructions; Details, accessories or control therefor
    • F23G5/44Details; Accessories
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F23COMBUSTION APPARATUS; COMBUSTION PROCESSES
    • F23JREMOVAL OR TREATMENT OF COMBUSTION PRODUCTS OR COMBUSTION RESIDUES; FLUES 
    • F23J1/00Removing ash, clinker, or slag from combustion chambers
    • F23J1/06Mechanically-operated devices, e.g. clinker pushers
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F23COMBUSTION APPARATUS; COMBUSTION PROCESSES
    • F23JREMOVAL OR TREATMENT OF COMBUSTION PRODUCTS OR COMBUSTION RESIDUES; FLUES 
    • F23J15/00Arrangements of devices for treating smoke or fumes
    • F23J15/02Arrangements of devices for treating smoke or fumes of purifiers, e.g. for removing noxious material
    • F23J15/022Arrangements of devices for treating smoke or fumes of purifiers, e.g. for removing noxious material for removing solid particulate material from the gasflow
    • F23J15/025Arrangements of devices for treating smoke or fumes of purifiers, e.g. for removing noxious material for removing solid particulate material from the gasflow using filters
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F23COMBUSTION APPARATUS; COMBUSTION PROCESSES
    • F23JREMOVAL OR TREATMENT OF COMBUSTION PRODUCTS OR COMBUSTION RESIDUES; FLUES 
    • F23J15/00Arrangements of devices for treating smoke or fumes
    • F23J15/06Arrangements of devices for treating smoke or fumes of coolers

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Chimneys And Flues (AREA)

Abstract

本发明公开了一种焚化炉烟气冷却及净化系统,包括,焚化组件,包括炉体、燃烧室、隔板、积灰室和排烟通道,所述隔板设置于所述炉体内,将所述炉体内部空间分为燃烧室和积灰室,所述排烟通道设置于所述炉体顶部并与外部相通;烟气净化组件,包括烟灰沉积件、烟气冷却件和气水分离件,所述烟灰沉积件设置于所述炉体内并与所述排烟通道相通,所述烟气冷却件和气水分离件设置于所述排烟通道上;该系统对焚化炉燃烧排出的烟气进行冷却以及净化处理后排出,减少了对环境的污染,通过排灰件有利于收集烟灰,组织烟灰飞扬处炉外,便于处理。

Figure 202010107266

The invention discloses a system for cooling and purifying flue gas of an incinerator, comprising an incineration component, including a furnace body, a combustion chamber, a baffle, an ash chamber and a fume exhaust channel, wherein the baffle is arranged in the furnace body to remove The inner space of the furnace body is divided into a combustion chamber and an ash accumulation chamber, and the smoke exhaust channel is arranged on the top of the furnace body and communicates with the outside; the flue gas purification component includes a soot deposition part, a flue gas cooling part and a gas-water separation part , the soot deposition member is arranged in the furnace body and communicated with the smoke exhaust passage, and the flue gas cooling member and the gas-water separation member are arranged on the smoke exhaust passage; It is discharged after cooling and purification treatment, which reduces the pollution to the environment. It is beneficial to collect soot through the ash discharger, and organize the soot to fly outside the furnace, which is convenient for disposal.

Figure 202010107266

Description

一种焚化炉烟气冷却及净化系统An incinerator flue gas cooling and purification system

技术领域technical field

本发明涉及焚化炉烟气处理领域,尤其是一种焚化炉烟气冷却及净化系统。The invention relates to the field of incinerator flue gas treatment, in particular to an incinerator flue gas cooling and purification system.

背景技术Background technique

随着经济的不断发展,人民生活水平的日益改善,环保问题已逐渐成为国家可持续发展所必须面对的问题,健康也成为了环保形势下人民生活的必然最求。在国内,宗教文化已有千年发展历史,每月十五以及逢年过节,各大庙会都要盛行烧香拜佛;中国的传统文化下,每年清明以及七月半,各大公墓也都要烧纸钱。这些活动都直接会产生大量的烟气、烟灰,污染周边环境,影响人体健康,甚至会引发火灾。With the continuous development of the economy and the improvement of people's living standards, environmental protection has gradually become a problem that must be faced in the sustainable development of the country. In China, religious culture has a history of thousands of years of development. On the fifteenth of every month and on New Year’s Day, temple fairs are popular to burn incense and worship Buddha; under Chinese traditional culture, paper money is also burned in every major cemetery during the Qingming Festival and in July and a half every year. . These activities will directly generate a large amount of smoke and soot, pollute the surrounding environment, affect human health, and even cause fires.

新形势下,焚化炉正在逐步被推广应用,焚烧炉主要以燃烧冥票、纸品等为主,以及衣物等,虽然焚化炉限定了焚化的地点,能避免燃烧杂志的乱飘及其可能引发的火灾,但物料燃烧不可避免的会产生温度高于500℃的高温烟气,烟气中掺杂大量颗粒污染物,国家《大气污染物综合排放标准》(GB16297-1996)中对烟气排放的颗粒物浓度进行了严格的限定,因为烟气温度较高,无法直接采用常规的净化系统进行处理。Under the new situation, incinerators are gradually being promoted and applied. The incinerators are mainly used to burn tickets, paper products, etc., as well as clothing, etc. Although the incinerators limit the incineration location, it can avoid the random drift of burning magazines and their possible causes. However, the combustion of materials will inevitably generate high-temperature flue gas with a temperature higher than 500 ℃, and the flue gas is doped with a large amount of particulate pollutants. The concentration of particulate matter is strictly limited, because the flue gas temperature is high and cannot be directly treated by conventional purification systems.

根据上述分析,合理且高效的焚化炉冷却及烟气净化技术是焚化炉广泛应用主要面临的技术难题,需研发一种烟气排放管不在焚化炉顶,且能有效冷却和净化烟气的焚化炉烟气冷却及净化系统,促进焚化炉全国范围内的推广使用,减小祭奠活动对环境及人类健康的影响。According to the above analysis, reasonable and efficient incinerator cooling and flue gas purification technology is the main technical problem faced by the wide application of incinerators. It is necessary to develop a flue gas discharge pipe that is not on the top of the incinerator and can effectively cool and purify the flue gas. Furnace flue gas cooling and purification system, promote the promotion and use of incinerators nationwide, and reduce the impact of memorial activities on the environment and human health.

发明内容SUMMARY OF THE INVENTION

本部分的目的在于概述本发明的实施例的一些方面以及简要介绍一些较佳实施例,在本部分以及本申请的说明书摘要和发明名称中可能会做些简化或省略以避免使本部分、说明书摘要和发明名称的目的模糊,而这种简化或省略不能用于限制本发明的范围。The purpose of this section is to outline some aspects of the embodiments of the present invention and briefly introduce some preferred embodiments, and some simplifications or omissions may be made in this section and in the abstract and title of the application to avoid obscuring this section, the description The abstract and title are intended to be ambiguous and such simplification or omission should not be used to limit the scope of the invention.

鉴于上述和/或现有技术中所存在的问题,提出了本发明。The present invention has been made in view of the above-mentioned and/or problems existing in the prior art.

因此,本发明所要解决的技术问题是传统焚化炉燃烧排除的烟气温度过高且排除的烟气未得到有效处理严重污染环境的问题。Therefore, the technical problem to be solved by the present invention is that the temperature of the flue gas discharged from the combustion of the traditional incinerator is too high, and the discharged flue gas is not effectively treated and seriously pollutes the environment.

为解决上述技术问题,本发明提供如下技术方案:一种焚化炉烟气冷却及净化系统,包括,焚化组件,包括炉体、燃烧室、隔板、积灰室和排烟通道,所述隔板设置于所述炉体内,将所述炉体内部空间分为燃烧室和积灰室,所述排烟通道设置于所述炉体顶部并与外部相通;烟气净化组件,包括烟灰沉积件、烟气冷却件和气水分离件,所述烟灰沉积件设置于所述炉体内并与所述排烟通道相通,所述烟气冷却件和气水分离件设置于所述排烟通道上。In order to solve the above-mentioned technical problems, the present invention provides the following technical solutions: an incinerator flue gas cooling and purification system, including an incineration component, including a furnace body, a combustion chamber, a clapboard, an ash chamber and a smoke exhaust channel, the partition The plate is arranged in the furnace body, and the inner space of the furnace body is divided into a combustion chamber and an ash accumulation chamber, and the smoke exhaust passage is arranged on the top of the furnace body and communicates with the outside; the flue gas purification assembly includes a soot depositing part , a flue gas cooling member and a gas-water separation member, the soot deposition member is arranged in the furnace body and communicates with the smoke exhaust passage, and the flue gas cooling member and the gas-water separation member are arranged on the smoke exhaust passage.

作为本发明所述焚化炉烟气冷却及净化系统的一种优选方案,其中:所述烟灰沉积件贯穿隔板,连通所述燃烧室和所述积灰室;所述烟灰沉积件顶部设置有第一过滤件,底部设置有排灰件。As a preferred solution of the incinerator flue gas cooling and purification system of the present invention, wherein: the soot depositing member penetrates through the partition plate and communicates with the combustion chamber and the soot depositing chamber; the top of the soot depositing member is provided with a The first filter element is provided with an ash discharge element at the bottom.

作为本发明所述焚化炉烟气冷却及净化系统的一种优选方案,其中:所述第一过滤件包括第一滤网和烟气导向板,所述第一滤网)设置于所述烟气导向板的内侧。As a preferred solution of the incinerator flue gas cooling and purification system of the present invention, wherein: the first filter element includes a first filter screen and a flue gas guide plate, and the first filter screen) is arranged on the smoke Inside of the air guide plate.

作为本发明所述焚化炉烟气冷却及净化系统的一种优选方案,其中:所述烟气冷却件包括积液池、抽水泵、喷淋管和导热件,所述抽水泵连通所述积液池和所述喷淋管,所述导热件设置于积液池上方,所述喷淋管端部设置于所述导热件上方。As a preferred solution of the incinerator flue gas cooling and purification system of the present invention, wherein: the flue gas cooling member includes a liquid accumulation pool, a suction pump, a spray pipe and a heat conduction member, and the suction pump communicates with the The liquid pool and the spray pipe, the heat-conducting element is arranged above the liquid pool, and the end of the spray pipe is arranged above the heat-conducting element.

作为本发明所述焚化炉烟气冷却及净化系统的一种优选方案,其中:所述排灰件包括储液室、排液槽和刮液件,所述排液槽设置于所述储液室侧面,所述刮液件设置于所述储液室顶部。As a preferred solution of the incinerator flue gas cooling and purification system of the present invention, wherein: the ash discharge member includes a liquid storage chamber, a liquid discharge groove and a liquid scraping member, and the liquid discharge groove is arranged in the liquid storage chamber. On the side of the chamber, the wiper is arranged on the top of the liquid storage chamber.

作为本发明所述焚化炉烟气冷却及净化系统的一种优选方案,其中:所述刮液件包括浮板、第一传动组、刮板和第二传动组,所述浮板设置于所述储液室内,所述刮板下底面与所述储液室上顶面重合,所述第一传动组和第二传动组设置于所述烟灰沉积件内侧壁;As a preferred solution of the incinerator flue gas cooling and purification system of the present invention, wherein: the wiper member includes a floating plate, a first transmission group, a scraper and a second transmission group, and the floating plate is arranged on the In the liquid storage chamber, the lower bottom surface of the scraper coincides with the upper top surface of the liquid storage chamber, and the first transmission group and the second transmission group are arranged on the inner side wall of the soot deposition member;

作为本发明所述焚化炉烟气冷却及净化系统的一种优选方案,其中:所述第一传动组包括第一齿条、第一传动轮、从动轮和第一主动轮,所述第一齿条竖直设置于所述浮板上,所述第一齿条和第一传动轮啮合,所述第一传动轮和从动轮设置于同一根轴上,所述从动轮和第一主动轮啮合;所述第二齿轮组包括第二齿条和第二传动轮,所述第二齿条设置于所述刮板端部,所述第二齿条和第二传动轮啮合;所述第一传动轮、第一主动轮和第二传动轮为轮齿不布满整个圆周的齿轮。As a preferred solution of the incinerator flue gas cooling and purification system of the present invention, wherein: the first transmission group includes a first rack, a first transmission wheel, a driven wheel and a first driving wheel, the first The rack is vertically arranged on the floating plate, the first rack is meshed with the first transmission wheel, the first transmission wheel and the driven wheel are arranged on the same shaft, the driven wheel and the first driving wheel meshing; the second gear set includes a second rack and a second transmission wheel, the second rack is arranged at the end of the scraper, and the second rack and the second transmission wheel are meshed; the first A transmission wheel, the first driving wheel and the second transmission wheel are gears whose teeth do not cover the entire circumference.

作为本发明所述焚化炉烟气冷却及净化系统的一种优选方案,其中:所述烟灰沉积件内侧壁设置有导液槽,导液槽与所述积液池通过管路连接。As a preferred solution of the incinerator flue gas cooling and purification system of the present invention, wherein: the inner side wall of the soot deposition member is provided with a liquid guide groove, and the liquid guide groove is connected with the liquid accumulation pool through a pipeline.

作为本发明所述焚化炉烟气冷却及净化系统的一种优选方案,其中:所述气水分离件包括排气扇和旋风除尘器,所述排气扇设置于所述旋风除尘器内。As a preferred solution of the incinerator flue gas cooling and purification system of the present invention, wherein: the gas-water separation element includes an exhaust fan and a cyclone dust collector, and the exhaust fan is arranged in the cyclone dust collector.

作为本发明所述焚化炉烟气冷却及净化系统的一种优选方案,其中:所述积液池外侧设置有进水阀、第一排水阀、第一控制阀和第二控制阀,所述第一控制阀设置于所述喷淋管上,所述第二控制阀设置于所述管路上;所述旋风除尘器下方设置有第二排水阀。As a preferred solution of the incinerator flue gas cooling and purification system of the present invention, wherein: a water inlet valve, a first drain valve, a first control valve and a second control valve are arranged on the outside of the liquid accumulation pool. The first control valve is arranged on the spray pipe, the second control valve is arranged on the pipeline; a second drain valve is arranged below the cyclone dust collector.

本发明的有益效果:该系统对焚化炉燃烧排出的烟气进行冷却以及净化处理后排出,减少了对环境的污染,通过排灰件有利于收集烟灰,组织烟灰飞扬处炉外,便于处理。Beneficial effects of the invention: the system cools and purifies the flue gas emitted from the incinerator combustion and discharges it, which reduces the pollution to the environment.

附图说明Description of drawings

为了更清楚地说明本发明实施例的技术方案,下面将对实施例描述中所需要使用的附图作简单地介绍,显而易见地,下面描述中的附图仅仅是本发明的一些实施例,对于本领域普通技术人员来讲,在不付出创造性劳动性的前提下,还可以根据这些附图获得其它的附图。其中:In order to illustrate the technical solutions of the embodiments of the present invention more clearly, the following briefly introduces the accompanying drawings used in the description of the embodiments. Obviously, the drawings in the following description are only some embodiments of the present invention. For those of ordinary skill in the art, other drawings can also be obtained based on these drawings without any creative effort. in:

图1为本发明提供的一种实施例所述的焚化炉烟气冷却及净化系统的整体结构示意图;1 is a schematic diagram of the overall structure of an incinerator flue gas cooling and purification system according to an embodiment provided by the present invention;

图2为本发明提供的一种实施例所述的焚化炉烟气冷却及净化系统中烟气导向板的结构示意图;2 is a schematic structural diagram of a flue gas guide plate in an incinerator flue gas cooling and purification system according to an embodiment provided by the present invention;

图3为本发明提供的一种实施例所述的焚化炉烟气冷却及净化系统中烟气冷却件的结构示意图;3 is a schematic structural diagram of a flue gas cooling member in an incinerator flue gas cooling and purification system according to an embodiment provided by the present invention;

图4为本发明提供的一种实施例所述的焚化炉烟气冷却及净化系统中烟气沉积件的斜视结构示意图;4 is a schematic diagram of a slanted view structure of a flue gas deposition member in an incinerator flue gas cooling and purification system according to an embodiment of the present invention;

图5为本发明提供的一种实施例所述的焚化炉烟气冷却及净化系统中展示烟气沉积件的内部结构示意图;5 is a schematic diagram showing the internal structure of the flue gas deposition member in the incinerator flue gas cooling and purification system according to an embodiment of the present invention;

图6为本发明提供的一种实施例所述的焚化炉烟气冷却及净化系统中展示排液槽的结构示意图;6 is a schematic structural diagram showing a drain tank in an incinerator flue gas cooling and purification system according to an embodiment of the present invention;

图7为本发明提供的一种实施例所述的焚化炉烟气冷却及净化系统中展示排灰件的结构示意图;7 is a schematic structural diagram showing an ash discharge member in an incinerator flue gas cooling and purification system according to an embodiment of the present invention;

图8为本发明提供的一种实施例所述的焚化炉烟气冷却及净化系统中刮液件的结构示意图;8 is a schematic structural diagram of a wiper in an incinerator flue gas cooling and purification system according to an embodiment of the present invention;

图9为本发明提供的一种实施例所述的焚化炉烟气冷却及净化系统中旋风除尘器的俯视示意图。9 is a schematic top view of a cyclone dust collector in an incinerator flue gas cooling and purification system according to an embodiment of the present invention.

具体实施方式Detailed ways

为使本发明的上述目的、特征和优点能够更加明显易懂,下面结合说明书附图对本发明的具体实施方式做详细的说明。In order to make the above objects, features and advantages of the present invention more clearly understood, the specific embodiments of the present invention will be described in detail below with reference to the accompanying drawings.

在下面的描述中阐述了很多具体细节以便于充分理解本发明,但是本发明还可以采用其他不同于在此描述的其它方式来实施,本领域技术人员可以在不违背本发明内涵的情况下做类似推广,因此本发明不受下面公开的具体实施例的限制。Many specific details are set forth in the following description to facilitate a full understanding of the present invention, but the present invention can also be implemented in other ways different from those described herein, and those skilled in the art can do so without departing from the connotation of the present invention. Similar promotion, therefore, the present invention is not limited by the specific embodiments disclosed below.

其次,本发明结合示意图进行详细描述,在详述本发明实施例时,为便于说明,表示器件结构的剖面图会不依一般比例作局部放大,而且所述示意图只是示例,其在此不应限制本发明保护的范围。此外,在实际制作中应包含长度、宽度及深度的三维空间尺寸。Next, the present invention is described in detail with reference to the schematic diagrams. When describing the embodiments of the present invention in detail, for the convenience of explanation, the cross-sectional views showing the device structure will not be partially enlarged according to the general scale, and the schematic diagrams are only examples, which should not be limited here. The scope of protection of the present invention. In addition, the three-dimensional spatial dimensions of length, width and depth should be included in the actual production.

再其次,此处所称的“一个实施例”或“实施例”是指可包含于本发明至少一个实现方式中的特定特征、结构或特性。在本说明书中不同地方出现的“在一个实施例中”并非均指同一个实施例,也不是单独的或选择性的与其他实施例互相排斥的实施例。Still further, reference herein to "one embodiment" or "an embodiment" refers to a particular feature, structure, or characteristic that may be included in at least one implementation of the present invention. The appearances of "in one embodiment" in various places in this specification are not all referring to the same embodiment, nor are they separate or selectively mutually exclusive from other embodiments.

实施例1Example 1

参照图1、2和5,本实施例提供了一种焚化炉烟气冷却及净化系统,包括,焚化组件100,包括炉体101、燃烧室102、隔板103、积灰室104和排烟通道105,隔板103设置于炉体101内,将炉体101内部空间分为燃烧室102和积灰室104,排烟通道105设置于炉体101顶部并与外部相通;烟气净化组件200,包括烟灰沉积件201、烟气冷却件202和气水分离件203,烟灰沉积件201设置于炉体101内并与排烟通道105相通,烟气冷却件202和气水分离件203设置于排烟通道105上。1, 2 and 5, the present embodiment provides an incinerator flue gas cooling and purification system, including an incineration assembly 100, including a furnace body 101, a combustion chamber 102, a partition 103, an ash chamber 104 and a smoke exhaust The channel 105, the partition plate 103 is arranged in the furnace body 101, and the inner space of the furnace body 101 is divided into the combustion chamber 102 and the ash chamber 104, and the smoke exhaust channel 105 is arranged on the top of the furnace body 101 and communicates with the outside; the flue gas purification assembly 200 , including a soot deposition part 201, a flue gas cooling part 202 and a gas-water separation part 203, the soot deposition part 201 is arranged in the furnace body 101 and communicated with the exhaust passage 105, and the flue gas cooling part 202 and the gas-water separation part 203 are arranged in the exhaust gas on channel 105.

烟灰沉积件201贯穿隔板103,连通燃烧室102和积灰室104;烟灰沉积件201顶部设置有第一过滤件201a,底部设置有排灰件201b。The soot deposition member 201 penetrates through the partition 103 and communicates with the combustion chamber 102 and the ash accumulation chamber 104; the soot deposition member 201 is provided with a first filter member 201a at the top and an ash discharge member 201b at the bottom.

第一过滤件201a包括第一滤网201a-1和烟气导向板201a-2,第一滤网201a-1设置于烟气导向板201a-2的内侧。The first filter element 201a includes a first filter screen 201a-1 and a fume guide plate 201a-2, and the first filter screen 201a-1 is disposed inside the fume guide plate 201a-2.

在本实施例中,该焚化炉燃烧室102用于放置燃烧物在其底部的隔板103上进行燃烧,燃烧后的灰尘落入下方的积灰室104中,便于集中收集并进行清理;排烟通道105设置于炉体101顶部,并与燃烧室102相通,其用于引导燃烧产生的烟气排除焚化炉,并在排除过程对烟气进行冷却以及净化清理。In this embodiment, the combustion chamber 102 of the incinerator is used to place the combustion material on the baffle 103 at the bottom of the incinerator for combustion, and the burned dust falls into the ash accumulation chamber 104 below, which is convenient for centralized collection and cleaning; The flue gas channel 105 is arranged on the top of the furnace body 101 and communicated with the combustion chamber 102, which is used to guide the flue gas generated by combustion to be discharged from the incinerator, and to cool and purify the flue gas during the discharge process.

具体的,在排烟通道105设置于燃烧室102内的端部设置有烟灰沉积件201,其用于对烟灰进行初步过滤,将其内夹带的固体颗粒过滤留在烟灰沉积件201内,并下沉至积灰室104集中处理烟气经第一过滤件201a引导、过滤后落至排灰件201b内,经排灰件201b处理落入积灰室104内。Specifically, a soot depositing member 201 is provided at the end of the smoke exhaust passage 105 disposed in the combustion chamber 102, which is used for preliminarily filtering the soot, filtering the solid particles entrained in the soot depositing member 201, and leaving the soot depositing member 201. The flue gas that sinks to the ash accumulation chamber 104 for centralized treatment is guided and filtered by the first filter element 201a and then falls into the ash discharge element 201b, and then falls into the ash accumulation chamber 104 after being processed by the ash discharge element 201b.

烟气导向板201a-2为空心圆台结构,内侧壁设置有螺旋向的翘板,该翘板以圆周阵列形式设置于圆台内,其对通过烟气导向板201a-2的空气进行引流,是空气产生旋转,借此使空气内的固体颗粒物产生离心力,移动至烟灰沉积件201底部内侧壁上,并向下滑落至排灰件201b中。The flue gas guide plate 201a-2 is of a hollow circular truncated structure, and the inner side wall is provided with a helical rocker. The rocker is arranged in the circular platform in the form of a circular array, which drains the air passing through the flue gas guide plate 201a-2. The air rotates, thereby causing the solid particles in the air to generate centrifugal force, move to the inner side wall of the bottom of the soot depositing member 201, and slide down into the ash discharging member 201b.

第一滤网201a-1包括两部分,上半部分竖直设置,下半部分倾斜,其下端指向烟灰沉积件201侧壁,以引导过滤下的固体颗粒物沿壁下落。The first filter screen 201a-1 includes two parts, the upper part is vertically arranged, and the lower part is inclined, the lower end of which points to the side wall of the soot depositing member 201 to guide the filtered solid particles to fall along the wall.

应说明的是,炉体101上设置有炉膛门和进风百叶窗,炉膛门设置于燃烧室102侧壁,进风百叶窗设置于积灰室104侧壁。炉膛门用于从此处将燃烧物放置入燃烧室102内,进风百叶窗用于流通空气,为燃烧物燃烧提供足够空气。It should be noted that the furnace body 101 is provided with a furnace door and an air inlet louver, the furnace door is arranged on the side wall of the combustion chamber 102 , and the air inlet louver is arranged on the side wall of the ash accumulation chamber 104 . The furnace door is used to place the combustion product into the combustion chamber 102 from here, and the air inlet louver is used to circulate air to provide sufficient air for the combustion of the combustion product.

实施例2Example 2

参照图4~8,本实施例提供了一种焚化炉烟气冷却及净化系统,包括,焚化组件100,包括炉体101、燃烧室102、隔板103、积灰室104和排烟通道105,隔板103设置于炉体101内,将炉体101内部空间分为燃烧室102和积灰室104,排烟通道105设置于炉体101顶部并与外部相通;烟气净化组件200,包括烟灰沉积件201、烟气冷却件202和气水分离件203,烟灰沉积件201设置于炉体101内并与排烟通道105相通,烟气冷却件202和气水分离件203设置于排烟通道105上。4 to 8 , the present embodiment provides an incinerator flue gas cooling and purification system, including an incinerator assembly 100 , including a furnace body 101 , a combustion chamber 102 , a partition 103 , an ash chamber 104 and a smoke exhaust channel 105 , the partition plate 103 is arranged in the furnace body 101, and the inner space of the furnace body 101 is divided into a combustion chamber 102 and an ash chamber 104, and a smoke exhaust channel 105 is arranged on the top of the furnace body 101 and communicates with the outside; the flue gas purification assembly 200 includes The soot deposition part 201 , the flue gas cooling part 202 and the gas-water separation part 203 , the soot deposition part 201 is arranged in the furnace body 101 and communicates with the flue gas exhaust passage 105 ; superior.

排灰件201b包括储液室201b-1、排液槽201b-2和刮液件201b-3,排液槽201b-2设置于储液室201b-1侧面,刮液件201b-3设置于储液室201b-1顶部。The ash discharge member 201b includes a liquid storage chamber 201b-1, a liquid discharge groove 201b-2 and a wiper member 201b-3. The liquid discharge groove 201b-2 is arranged on the side of the liquid storage chamber 201b-1, and the wiper member 201b-3 is arranged on the side of the liquid storage chamber 201b-1. The top of the liquid storage chamber 201b-1.

刮液件201b-3包括浮板401、第一传动组402、刮板403和第二传动组404,浮板401设置于储液室201b-1内,刮板403下底面与储液室201b-1上顶面重合,第一传动组402和第二传动组404设置于烟灰沉积件201内侧壁;The wiper member 201b-3 includes a floating plate 401, a first transmission group 402, a scraper 403 and a second transmission group 404. The floating plate 401 is arranged in the liquid storage chamber 201b-1, and the bottom surface of the scraper 403 is connected to the liquid storage chamber 201b. -1 The upper top surfaces are overlapped, and the first transmission group 402 and the second transmission group 404 are arranged on the inner side wall of the soot depositing member 201;

第一传动组402包括第一齿条402a、第一传动轮402b、从动轮402c和第一主动轮402d,第一齿条402a竖直设置于浮板401上,第一齿条402a和第一传动轮402b啮合,第一传动轮402b和从动轮402c设置于同一根轴上,从动轮402c和第一主动轮402d啮合;第二齿轮组404包括第二齿条404a和第二传动轮404b,第二齿条404a设置于刮板403端部,第二齿条404a和第二传动轮404b啮合;第一传动轮402b、第一主动轮402d和第二传动轮404b为轮齿不布满整个圆周的齿轮。The first transmission group 402 includes a first rack 402a, a first transmission wheel 402b, a driven wheel 402c and a first driving wheel 402d, the first rack 402a is vertically arranged on the floating plate 401, the first rack 402a and the first The transmission wheel 402b meshes, the first transmission wheel 402b and the driven wheel 402c are arranged on the same shaft, and the driven wheel 402c meshes with the first driving wheel 402d; the second gear set 404 includes a second rack 404a and a second transmission wheel 404b, The second rack 404a is arranged at the end of the scraper 403, and the second rack 404a meshes with the second transmission wheel 404b; Circumferential gears.

在本实施例中,图5利用将烟气冷却件202一侧切除的手法来展示其内部结构,第一过滤件201a设置于上方,用于对烟气引导、过滤,排灰件201b设置于下方,对过滤下的燃烧颗粒物进行处理收集;具体的,排灰件201b通过排液槽201b-2与积灰室104相通,排液槽201b-2和储液室201b-1通过一板相隔,储液室201b-1内放有水,储液室201b-1中设置有浮板401,浮板401可在储液室201b-1中上下周期性的移动,储液室201b-1中的水位保持在浮板401下移可浸入其中的高度,浮板向上移动停止位置为其上表面与储液室上表面齐平。In this embodiment, FIG. 5 uses the method of cutting off one side of the flue gas cooling member 202 to show its internal structure. The first filter member 201a is arranged above to guide and filter the flue gas, and the ash discharge member 201b is arranged on the Below, the filtered combustion particulate matter is processed and collected; specifically, the ash discharge member 201b communicates with the ash accumulation chamber 104 through the liquid discharge groove 201b-2, and the liquid discharge groove 201b-2 and the liquid storage chamber 201b-1 are separated by a plate , water is placed in the liquid storage chamber 201b-1, and a floating plate 401 is arranged in the liquid storage chamber 201b-1. The floating plate 401 can periodically move up and down in the liquid storage chamber 201b-1. The water level of the floating plate 401 is kept at a height at which the floating plate 401 can be immersed when it moves downward, and the floating plate moves upward to a stop position so that its upper surface is flush with the upper surface of the liquid storage chamber.

储液室201b-1内水分蒸发,附着在烟灰沉积件201中漂浮的颗粒物上,有助于其沉积。The water in the liquid storage chamber 201b-1 evaporates and adheres to the particles floating in the soot depositing member 201, which is helpful for their deposition.

浮板401上设置有孔洞,用于让水穿过,以让浮板401可以浸入水中,浮板从水中出来后其上表面将沾水湿润,从上方下落的颗粒物将附着在其上表面,刮液件201b-3保持在其下表面与储液室201b-1上表面齐平的位置,其在此处的水平位置做横向的周期性运动;因此排灰件201b的动作过程为浮板401向下浸水后上移至上表面与储液室201b-1上表面齐平,随后在此位置停止一个时间段,在此时间段内刮液件201b-3做横向运动,由远离排液槽201b-2的位置向排液槽201b-2位置移动,将附着在浮板401上表面的水和颗粒物刮至排液槽201b-2流至积灰室104内,较佳的,刮液件201b-3的移动速度尽可能的调节至浮板表面的水来不及从其上的孔洞下落就被刮走的程度。The floating plate 401 is provided with holes for allowing water to pass through, so that the floating plate 401 can be immersed in water. After the floating plate comes out of the water, its upper surface will be wet with water, and the particles falling from above will adhere to its upper surface, The wiper member 201b-3 is kept at a position where the lower surface of the wiper member 201b-3 is flush with the upper surface of the liquid storage chamber 201b-1, and it performs lateral periodic movement at the horizontal position here; therefore, the action process of the dust discharge member 201b is a floating plate 401 is immersed in water and then moved up until the upper surface is flush with the upper surface of the liquid storage chamber 201b-1, and then stops at this position for a period of time. The position of 201b-2 is moved to the position of the drain tank 201b-2, and the water and particles attached to the upper surface of the floating plate 401 are scraped to the drain tank 201b-2 to flow into the ash accumulation chamber 104. Preferably, a wiper The speed of 201b-3's movement is adjusted as much as possible to the extent that the water on the surface of the floating plate is scraped away before it falls through the holes in it.

第一传动组402用于控制浮板401进行周期性的上下运动,具体为一个周期为下移、上移、静置的运动过程;具体的,第一齿条402a设置于浮板401上,其有两个相向放置的齿条组成,第一传动轮402b为其上一半的圆周区域设置有轮齿的齿轮结构,设置于第一齿条402a之间,当第一传动轮402b转动时,将分别在不同时间与两个齿条啮合,并带来相反的传动效果;参照图8,如第一传动轮402b上轮齿与图中所示第一齿条402a左侧齿条啮合,浮板401被带动向下运动,当第一传动轮402b上轮齿与图中所示第一齿条402a右侧齿条啮合时,浮板401被带动上移,以此实现上移、下移的往复运动。The first transmission group 402 is used to control the floating plate 401 to perform periodic up and down movement, specifically a movement process of moving downward, moving upward, and standing still in one cycle; It is composed of two racks placed opposite to each other. The first transmission wheel 402b is a gear structure with gear teeth arranged in the upper half of the circumference area, and is arranged between the first racks 402a. When the first transmission wheel 402b rotates, They will mesh with the two racks at different times respectively, and bring about opposite transmission effects; referring to FIG. 8 , if the teeth on the first transmission wheel 402b mesh with the rack on the left side of the first rack 402a shown in the figure, the floating The plate 401 is driven to move downward, when the upper teeth of the first transmission wheel 402b mesh with the right rack of the first rack 402a shown in the figure, the floating plate 401 is driven to move up, so as to realize the up and down movement reciprocating motion.

与第一传动轮402b同设置有从动轮402c,从动轮402c为全齿齿轮,与其啮合的第一主动轮402d为与第一传动轮402b类似的结构,但其上轮齿所分布的圆周比视情况设置;应说明的是,定义类似第一传动轮402b这种轮齿不布满整个圆周的齿轮结构,其圆周上布置有轮齿的弧长与无轮齿的弧长比值为圆周比,该置影响了与其啮合的齿轮的工作时长与休息时长的比值,如从动轮402c与第一主动轮402d的结构,其啮合传动时从动轮402c转动,进而第一传动轮402b传动使浮板401上移、下移,其不啮合时浮板401静置不被触发动作;因此整体可实现浮板401的上移、下移和静置,具体齿数与圆周比具体设置,应说明的是,第一主动轮402d上齿数与从动轮402c上齿数相同以满足其在啮合过程可以让从动轮402c完成一圈的旋转,以达到周期性运动的效果。A driven wheel 402c is provided with the first transmission wheel 402b, the driven wheel 402c is a full-tooth gear, and the first driving wheel 402d meshing with it is of a similar structure to the first transmission wheel 402b, but the circumference ratio of the teeth distributed on it It should be set according to the situation; it should be noted that, to define a gear structure similar to the first transmission wheel 402b where the gear teeth do not cover the entire circumference, the ratio of the arc length of the gear teeth arranged on the circumference to the arc length of no gear teeth is the circumference ratio. , this setting affects the ratio of the working time to the resting time of the gear meshed with it, such as the structure of the driven wheel 402c and the first driving wheel 402d, the driven wheel 402c rotates when it is engaged and driven, and then the first driving wheel 402b drives the floating plate When the floating plate 401 moves up and down, the floating plate 401 will not be triggered when it is not meshed; therefore, the floating plate 401 can be moved up, moved down and left still as a whole. , the number of teeth on the first driving wheel 402d is the same as the number of teeth on the driven wheel 402c so that the driven wheel 402c can complete one rotation during the meshing process, so as to achieve the effect of periodic motion.

第二齿条404a和第二传动轮404b的啮合结构和原理与第一传动轮402b和第一传动轮402b的一致,不再描述,其在浮板401静置不动的时间段内动作。The meshing structure and principle of the second rack 404a and the second transmission wheel 404b are the same as those of the first transmission wheel 402b and the first transmission wheel 402b, and will not be described again.

实施例3Example 3

参照图1、3和图9,本事和私立与上一实施例的不同之处在于,烟气冷却件202包括积液池202a、抽水泵202b、喷淋管202c和导热件202d,抽水泵202b连通积液池202a和喷淋管202c,导热件202d设置于积液池202a上方,喷淋管202c端部设置于导热件202d上方。1, 3 and 9, the difference between the technology and the previous embodiment is that the flue gas cooling member 202 includes a liquid accumulation pool 202a, a suction pump 202b, a spray pipe 202c, a heat conduction member 202d, and a suction pump 202b. The liquid accumulation pool 202a is communicated with the spray pipe 202c, the heat conducting member 202d is arranged above the liquid accumulation pool 202a, and the end of the spray pipe 202c is arranged above the heat conduction member 202d.

气水分离件203包括排气扇203a和旋风除尘器203b,排气扇203a设置于旋风除尘器203b内。The air-water separator 203 includes an exhaust fan 203a and a cyclone 203b, and the exhaust fan 203a is arranged in the cyclone 203b.

积液池202a外侧设置有进水阀202a-1、第一排水阀202a-2、第一控制阀202a-3和第二控制阀202a-4,第一控制阀202a-3设置于喷淋管202c上,第二控制阀202a-4设置于管路201c-1上;旋风除尘器203b下方设置有第二排水阀203b-1。A water inlet valve 202a-1, a first drain valve 202a-2, a first control valve 202a-3 and a second control valve 202a-4 are arranged on the outside of the sump 202a, and the first control valve 202a-3 is arranged on the spray pipe On 202c, a second control valve 202a-4 is arranged on the pipeline 201c-1; a second drain valve 203b-1 is arranged below the cyclone 203b.

烟灰沉积件201内侧壁设置有导液槽201c,导液槽201c与积液池202a通过管路201c-1连接。A liquid guiding groove 201c is provided on the inner side wall of the soot depositing member 201, and the liquid guiding groove 201c is connected with the liquid accumulation pool 202a through a pipeline 201c-1.

烟气在经过烟气冷却件202时,导热件202d从烟气中吸取热量,对使烟气降温,同时抽水泵202b从积液池202a内抽取水从喷淋管202c喷淋冷却,对导热件202d进行冷却,同时对烟气冷却。When the flue gas passes through the flue gas cooling member 202, the heat-conducting member 202d absorbs heat from the flue gas to cool the flue gas. At the same time, the water pump 202b extracts water from the liquid accumulation pool 202a and sprays and cools it from the spray pipe 202c. The element 202d is cooled, and the flue gas is cooled at the same time.

带有水分的烟气进入气水分离件203中进行气水分离,如图9,带有水分的烟气进入旋风除尘器203b后沿着其内壁旋转,在离心力作用下使水附着在其内侧壁,下落至底部,再排出,应说明的是,气水分离件203中的排气管端口位置低于气水分离件203进气口的位置,以保证进入的烟气足够的行程路径进行旋转和气水分离,排气扇203a设置于排气管内。The flue gas with moisture enters the gas-water separator 203 for gas-water separation. As shown in Figure 9, the flue gas with moisture enters the cyclone dust collector 203b and rotates along its inner wall, causing water to adhere to its inner side under the action of centrifugal force. It should be noted that the position of the exhaust pipe port in the gas-water separator 203 is lower than the position of the air inlet of the gas-water separator 203, so as to ensure that the incoming flue gas has a sufficient travel path for Rotation and separation of air and water, the exhaust fan 203a is installed in the exhaust pipe.

导液槽201c用于向储液室201b-1内加水,炉内温度过高,蒸发量较大,需时刻向其内加水,保持其内水位。The liquid guiding tank 201c is used to add water to the liquid storage chamber 201b-1. The temperature in the furnace is too high and the evaporation is large, so it is necessary to add water to the liquid storage chamber 201b-1 at all times to maintain the water level.

重要的是,应注意,在多个不同示例性实施方案中示出的本申请的构造和布置仅是例示性的。尽管在此公开内容中仅详细描述了几个实施方案,但参阅此公开内容的人员应容易理解,在实质上不偏离该申请中所描述的主题的新颖教导和优点的前提下,许多改型是可能的(例如,各种元件的尺寸、尺度、结构、形状和比例、以及参数值(例如,温度、压力等)、安装布置、材料的使用、颜色、定向的变化等)。例如,示出为整体成形的元件可以由多个部分或元件构成,元件的位置可被倒置或以其它方式改变,并且分立元件的性质或数目或位置可被更改或改变。因此,所有这样的改型旨在被包含在本发明的范围内。可以根据替代的实施方案改变或重新排序任何过程或方法步骤的次序或顺序。在权利要求中,任何“装置加功能”的条款都旨在覆盖在本文中所描述的执行所述功能的结构,且不仅是结构等同而且还是等同结构。在不背离本发明的范围的前提下,可以在示例性实施方案的设计、运行状况和布置中做出其他替换、改型、改变和省略。因此,本发明不限制于特定的实施方案,而是扩展至仍落在所附的权利要求书的范围内的多种改型。It is important to note that the construction and arrangement of the present application shown in the various exemplary embodiments are merely exemplary. Although only a few embodiments have been described in detail in this disclosure, those who refer to this disclosure will readily appreciate that many modifications are possible without materially departing from the novel teachings and advantages of the subject matter described in this application are possible (eg, changes in size, dimensions, structure, shape, and proportions of various elements, as well as parameter values (eg, temperature, pressure, etc.), mounting arrangement, use of materials, color, orientation, etc.). For example, elements shown as integrally formed may be constructed of multiple parts or elements, the positions of elements may be inverted or otherwise varied, and the nature or number or positions of discrete elements may be altered or varied. Accordingly, all such modifications are intended to be included within the scope of this invention. The order or sequence of any process or method steps may be varied or re-sequenced according to alternative embodiments. In the claims, any "mean-plus-function" clause is intended to cover the structures described herein as performing the recited function and not only structural equivalents but also equivalent structures. Other substitutions, modifications, changes and omissions may be made in the design, operation and arrangement of the exemplary embodiments without departing from the scope of the present invention. Therefore, the present invention is not limited to a particular embodiment, but extends to various modifications still falling within the scope of the appended claims.

此外,为了提供示例性实施方案的简练描述,可以不描述实际实施方案的所有特征(即,与当前考虑的执行本发明的最佳模式不相关的那些特征,或于实现本发明不相关的那些特征)。Furthermore, in order to provide a concise description of example embodiments, all features of an actual implementation (ie, those that are not relevant to the best mode currently considered for carrying out the invention, or those that are not relevant for carrying out the invention, may not be described in order to provide a concise description of example embodiments) feature).

应理解的是,在任何实际实施方式的开发过程中,如在任何工程或设计项目中,可做出大量的具体实施方式决定。这样的开发努力可能是复杂的且耗时的,但对于那些得益于此公开内容的普通技术人员来说,不需要过多实验,所述开发努力将是一个设计、制造和生产的常规工作。It should be appreciated that during the development of any actual implementation, such as in any engineering or design project, numerous implementation-specific decisions may be made. Such a development effort may be complex and time-consuming, but would be a routine undertaking of design, fabrication, and production without undue experimentation for those of ordinary skill having the benefit of this disclosure .

应说明的是,以上实施例仅用以说明本发明的技术方案而非限制,尽管参照较佳实施例对本发明进行了详细说明,本领域的普通技术人员应当理解,可以对本发明的技术方案进行修改或者等同替换,而不脱离本发明技术方案的精神和范围,其均应涵盖在本发明的权利要求范围当中。It should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention and not to limit them. Although the present invention has been described in detail with reference to the preferred embodiments, those of ordinary skill in the art should understand that the technical solutions of the present invention can be Modifications or equivalent substitutions without departing from the spirit and scope of the technical solutions of the present invention should be included in the scope of the claims of the present invention.

Claims (10)

1. The utility model provides an incinerator flue gas cooling and clean system which characterized in that: comprises the steps of (a) preparing a mixture of a plurality of raw materials,
the incineration assembly (100) comprises a furnace body (101), a combustion chamber (102), a partition plate (103), an ash deposition chamber (104) and a smoke exhaust channel (105), wherein the partition plate (103) is arranged in the furnace body (101) and divides the inner space of the furnace body (101) into the combustion chamber (102) and the ash deposition chamber (104), and the smoke exhaust channel (105) is arranged at the top of the furnace body (101) and is communicated with the outside;
the flue gas purification assembly (200) comprises an ash deposition part (201), a flue gas cooling part (202) and a gas-water separation part (203), wherein the ash deposition part (201) is arranged in the furnace body (101) and communicated with the smoke exhaust channel (105), and the flue gas cooling part (202) and the gas-water separation part (203) are arranged on the smoke exhaust channel (105).
2. The incinerator flue gas cooling and scrubbing system of claim 1 wherein: the soot deposition piece (201) penetrates through a partition plate (103) and is communicated with the combustion chamber (102) and the soot deposition chamber (104);
the top of the soot deposition part (201) is provided with a first filter (201a), and the bottom is provided with an ash discharge part (201 b).
3. The incinerator flue gas cooling and scrubbing system of claim 2 wherein: the first filter element (201a) comprises a first filter screen (201a-1) and a smoke guide plate (201a-2), and the first filter screen (201a-1) is arranged on the inner side of the smoke guide plate (201 a-2).
4. The incinerator flue gas cooling and scrubbing system of claim 1 wherein: the flue gas cooling part (202) comprises a liquid accumulation pool (202a), a water suction pump (202b), a spray pipe (202c) and a heat conducting part (202d), wherein the water suction pump (202b) is communicated with the liquid accumulation pool (202a) and the spray pipe (202c), the heat conducting part (202d) is arranged above the liquid accumulation pool (202a), and the end part of the spray pipe (202c) is arranged above the heat conducting part (202 d).
5. The incinerator flue gas cooling and scrubbing system of claim 3 wherein: the ash discharging part (201b) comprises a liquid storage chamber (201b-1), a liquid discharging groove (201b-2) and a liquid scraping part (201b-3), the liquid discharging groove (201b-2) is formed in the side face of the liquid storage chamber (201b-1), and the liquid scraping part (201b-3) is arranged at the top of the liquid storage chamber (201 b-1).
6. The incinerator flue gas cooling and scrubbing system of claim 5 wherein: the liquid scraping piece (201b-3) comprises a floating plate (401), a first transmission group (402), a scraping plate (403) and a second transmission group (404), the floating plate (401) is arranged in the liquid storage chamber (201b-1), the lower bottom surface of the scraping plate (403) is coincided with the upper top surface of the liquid storage chamber (201b-1), and the first transmission group (402) and the second transmission group (404) are arranged on the inner side wall of the soot deposition piece (201).
7. The incinerator flue gas cooling and scrubbing system of claim 6 wherein: the first transmission set (402) comprises a first rack (402a), a first transmission wheel (402b), a driven wheel (402c) and a first driving wheel (402d), the first rack (402a) is vertically arranged on the floating plate (401), the first rack (402a) is meshed with the first transmission wheel (402b), the first transmission wheel (402b) and the driven wheel (402c) are arranged on the same shaft, and the driven wheel (402c) is meshed with the first driving wheel (402 d);
the second gear set (404) comprises a second rack (404a) and a second transmission wheel (404b), the second rack (404a) is arranged at the end part of the scraper (403), and the second rack (404a) is meshed with the second transmission wheel (404 b);
the first transmission wheel (402b), the first driving wheel (402d) and the second transmission wheel (404b) are gears with teeth not fully distributed on the whole circumference.
8. The incinerator flue gas cooling and scrubbing system of claim 7 wherein: the inner side wall of the soot deposition part (201) is provided with a liquid guide groove (201c), and the liquid guide groove (201c) is connected with the liquid accumulation groove (202a) through a pipeline (201 c-1).
9. The incinerator flue gas cooling and scrubbing system of claim 4 wherein: the gas-water separation piece (203) comprises an exhaust fan (203a) and a cyclone dust collector (203b), and the exhaust fan (203a) is arranged in the cyclone dust collector (203 b).
10. The incinerator flue gas cooling and scrubbing system of claim 9 wherein: a water inlet valve (202a-1), a first water discharge valve (202a-2), a first control valve (202a-3) and a second control valve (202a-4) are arranged on the outer side of the liquid accumulation pool (202a), the first control valve (202a-3) is arranged on the spray pipe (202c), and the second control valve (202a-4) is arranged on the pipeline (201 c-1);
a second drain valve (203b-1) is arranged below the cyclone dust collector (203 b).
CN202010107266.1A 2020-02-21 2020-02-21 An incinerator flue gas cooling and purification system Pending CN111237774A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202010107266.1A CN111237774A (en) 2020-02-21 2020-02-21 An incinerator flue gas cooling and purification system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202010107266.1A CN111237774A (en) 2020-02-21 2020-02-21 An incinerator flue gas cooling and purification system

Publications (1)

Publication Number Publication Date
CN111237774A true CN111237774A (en) 2020-06-05

Family

ID=70875007

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202010107266.1A Pending CN111237774A (en) 2020-02-21 2020-02-21 An incinerator flue gas cooling and purification system

Country Status (1)

Country Link
CN (1) CN111237774A (en)

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE3415517A1 (en) * 1984-04-26 1985-10-31 Rudolf Dr. 6800 Mannheim Wieser Fluidised-bed furnace
CN2277489Y (en) * 1996-06-28 1998-04-01 董鸿聚 Boiler smoke desulphurizing dust remover
JPH1144409A (en) * 1997-07-23 1999-02-16 Kozo Sekimoto Combustion furnace
JPH1194223A (en) * 1997-09-19 1999-04-09 Mametora Noki Kk Exhaust smoke cleaning unit for garbage incinerator
CN2335022Y (en) * 1998-06-26 1999-08-25 陈芳标 Cooling and deodorizing device for secondary incinerator
JP2005331172A (en) * 2004-05-20 2005-12-02 Oshima Shipbuilding Co Ltd Energy and valuable metal recovery system
JP2007240093A (en) * 2006-03-10 2007-09-20 Kyushu Olympia Kogyo Kk Solid fuel combustion device
CN212157180U (en) * 2020-02-21 2020-12-15 江苏山锟环保科技有限公司 Incinerator flue gas cooling and purifying system

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE3415517A1 (en) * 1984-04-26 1985-10-31 Rudolf Dr. 6800 Mannheim Wieser Fluidised-bed furnace
CN2277489Y (en) * 1996-06-28 1998-04-01 董鸿聚 Boiler smoke desulphurizing dust remover
JPH1144409A (en) * 1997-07-23 1999-02-16 Kozo Sekimoto Combustion furnace
JPH1194223A (en) * 1997-09-19 1999-04-09 Mametora Noki Kk Exhaust smoke cleaning unit for garbage incinerator
CN2335022Y (en) * 1998-06-26 1999-08-25 陈芳标 Cooling and deodorizing device for secondary incinerator
JP2005331172A (en) * 2004-05-20 2005-12-02 Oshima Shipbuilding Co Ltd Energy and valuable metal recovery system
JP2007240093A (en) * 2006-03-10 2007-09-20 Kyushu Olympia Kogyo Kk Solid fuel combustion device
CN212157180U (en) * 2020-02-21 2020-12-15 江苏山锟环保科技有限公司 Incinerator flue gas cooling and purifying system

Similar Documents

Publication Publication Date Title
CN212157180U (en) Incinerator flue gas cooling and purifying system
CN205340465U (en) High -efficient msw incineration schizolysis gas cleaning system
CN111237774A (en) An incinerator flue gas cooling and purification system
CN100349644C (en) Spiral purifying dust-removing device
CN107433093A (en) A kind of novel coal fume environment protection dedusting and purifying device
CN218820433U (en) Regenerative incinerator
CN113680162B (en) Medical waste incineration waste gas's flow decomposition processing apparatus
CN207085660U (en) A kind of environment-friendly type equipment for treating industrial waste gas
CN213942576U (en) A multifunctional biological boiler flue gas particulate matter purification device
CN216259861U (en) Waste gas treatment device for graphite electrode machining
CN215585896U (en) Industrial flue gas denitration system
CN212746476U (en) Energy-saving incinerator convenient to clean
CN214767572U (en) A kind of moxa smoke purifier with high absorption efficiency
CN222438556U (en) A kiln with smoke removal function
CN101961590B (en) High-precision environmental-friendly emission-reducing low-carbon dust, waste gas and lampblack collecting processor and processing method thereof
CN217594280U (en) High desulfurization efficiency's gas cleaning device
CN202122893U (en) Oil smoke-removing and dust-removing dual-purpose machine
CN221432518U (en) Smoke removal filter mechanism for incineration steam power generation
CN221649179U (en) An electric furnace for processing well grate
CN223716805U (en) A multi-stage high-efficiency purification and emission device for flue gas from biomass power plant boilers
CN210952384U (en) Water mist filtering type tail gas treatment device for ceramic kiln
CN220846181U (en) Dry dedusting spray purification device for converter flue gas
CN212841497U (en) Steam type boiler for burning biomass particles
CN213656769U (en) Garbage incinerator based on energy-saving and environment-friendly technology
CN222459531U (en) Organic waste gas heat accumulating type thermal incinerator

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right

Effective date of registration: 20210824

Address after: 213000 room 702, unit a, building 13, fuhanyuan, Xinbei District, Changzhou City, Jiangsu Province

Applicant after: Yi Penghui

Applicant after: Yi Zhengyang

Address before: 213003 No.398 Changshun Road, Lihe Town, Wujin economic development district, Changzhou City, Jiangsu Province

Applicant before: Jiangsu Shankun Environmental Protection Technology Co.,Ltd.

TA01 Transfer of patent application right
AD01 Patent right deemed abandoned

Effective date of abandoning: 20250415

AD01 Patent right deemed abandoned