CN115263003A - A masonry device for masonry of roof enclosure based on BIM technology - Google Patents

A masonry device for masonry of roof enclosure based on BIM technology Download PDF

Info

Publication number
CN115263003A
CN115263003A CN202210957984.7A CN202210957984A CN115263003A CN 115263003 A CN115263003 A CN 115263003A CN 202210957984 A CN202210957984 A CN 202210957984A CN 115263003 A CN115263003 A CN 115263003A
Authority
CN
China
Prior art keywords
building
movable
assembly
wall
rod
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202210957984.7A
Other languages
Chinese (zh)
Inventor
孟凡元
张磊
吕权
王潇依
王晓磊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction First Group Corp Ltd
Second Construction Co Ltd of China Construction First Group Co Ltd
Original Assignee
China Construction First Group Corp Ltd
Second Construction Co Ltd of China Construction First Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction First Group Corp Ltd, Second Construction Co Ltd of China Construction First Group Co Ltd filed Critical China Construction First Group Corp Ltd
Priority to CN202210957984.7A priority Critical patent/CN115263003A/en
Publication of CN115263003A publication Critical patent/CN115263003A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/14Conveying or assembling building elements
    • E04G21/16Tools or apparatus
    • E04G21/22Tools or apparatus for setting building elements with mortar, e.g. bricklaying machines
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/14Conveying or assembling building elements
    • E04G21/16Tools or apparatus
    • E04G21/162Handles to carry construction blocks
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/14Conveying or assembling building elements
    • E04G21/16Tools or apparatus
    • E04G21/18Adjusting tools; Templates
    • E04G21/1841Means for positioning building parts or elements

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

本发明提供一种基于BIM技术对屋顶围墙进行砌筑的砌墙装置,包括:放置架,放置架表面的一侧设置有推动组件,推动组件包括固定杆,固定杆的表面套设有推动座,推动座的表面的两侧均连接有连接杆,推动座的一侧设置有卡栓,活动组件设置于两个连接杆之间,收纳架设置于活动组件的一侧,收纳架的底端设置有下料组件,两个调节组件对称设置于放置架一侧。本发明提供的一种基于BIM技术对屋顶围墙进行砌筑的砌墙装置,在放置架的一侧设置推动组件和带有收纳架的活动组件使用能带动人工手动的操作,同时也可以实现多个砖块同时上料的操作,可以代替人工单个的对砖块进行上料的操作,可以提高砌墙的速度。The invention provides a wall-laying device for building a roof enclosure based on BIM technology, comprising: a placing frame, a pushing component is arranged on one side of the surface of the placing frame, the pushing component includes a fixing rod, and the surface of the fixing rod is sleeved with a pushing seat , both sides of the surface of the push seat are connected with connecting rods, one side of the push seat is provided with a latch, the movable assembly is arranged between the two connecting rods, the storage rack is arranged on one side of the movable assembly, and the bottom end of the storage rack A blanking component is provided, and two adjustment components are symmetrically arranged on one side of the placing rack. The present invention provides a wall-laying device for building a roof enclosure based on BIM technology. A push component and a movable component with a storage shelf are arranged on one side of the placing shelf to drive manual operations, and at the same time, multiple The operation of feeding each brick at the same time can replace the manual operation of feeding the bricks individually, which can improve the speed of building walls.

Description

一种基于BIM技术对屋顶围墙进行砌筑的砌墙装置A wall-laying device for building roof enclosures based on BIM technology

技术领域technical field

本发明涉及BIM技术领域,尤其涉及一种基于BIM技术对屋顶围墙进行砌筑的砌墙装置。The invention relates to the technical field of BIM, in particular to a wall-laying device for building a roof enclosure based on the BIM technology.

背景技术Background technique

建筑信息模型是建筑学、工程学及土木工程的新工具,建筑信息模型或建筑资讯模型一词由Autodesk所创的,它是来形容那些以三维图形为主、物件导向、建筑学有关的电脑辅助设计。Building Information Modeling is a new tool for architecture, engineering and civil engineering. The term Building Information Modeling or Building Information Modeling was coined by Autodesk to describe those computer-based, object-oriented, architecture-related Aided design.

传统技术中,工人通过砖块砌墙的过程中,先用砖刀等工具将砂浆或别的粘合剂涂抹到砖块的表面和侧壁,依次将砖块放置到指定位置,砖块之间通过粘合剂粘接到一起,最终形成所需要的墙体。In the traditional technology, during the process of building a wall with bricks, workers first apply mortar or other adhesives to the surface and side walls of the bricks with tools such as brick knives, and then place the bricks in the designated positions in turn. The spaces are bonded together with adhesive to form the desired wall.

现有技术中所提出的公开号为CN114517589A的专利申请,其通过通过定位条、移动通道和基座配合,将砖块放置于夹持组件上并快速移至指定位置,通过电推杆、夹片、橡胶夹块和弹性凸起配合,将砖块推出夹持组件并借助弹性令砖块紧靠在一起,以此实现砖块砌筑的效果,实现自动砌筑的效果,代替部分人工操作,降低工人劳动强度,提高工作效率,但是现有的装置中使用橡胶夹块和夹片来代替人工手动的操作,也需要人工手动砖块进行拿取,而无法对多个砖块进行堆积上料,从而造成砌墙操作时速度降低。The patent application with the publication number CN114517589A proposed in the prior art, through the cooperation of the positioning bar, the moving channel and the base, the bricks are placed on the clamping assembly and quickly moved to the designated position, through the electric push rod, clamping Sheets, rubber clamps and elastic protrusions cooperate to push the bricks out of the clamping assembly and make the bricks close together with the help of elasticity, so as to realize the effect of brick masonry, realize the effect of automatic masonry, and replace some manual operations , reduce the labor intensity of workers, and improve work efficiency, but the existing device uses rubber clamps and clips to replace manual operations, and manual bricks are also required to take them, and it is impossible to stack multiple bricks. material, resulting in a reduction in speed during the wall-laying operation.

因此,有必要提供一种基于BIM技术对屋顶围墙进行砌筑的砌墙装置解决上述技术问题。Therefore, it is necessary to provide a wall-building device for building roof enclosures based on BIM technology to solve the above technical problems.

发明内容Contents of the invention

本发明提供一种基于BIM技术对屋顶围墙进行砌筑的砌墙装置,解决了现有装置中在代替人工手动进行砖块搬运时,无法进行多个砖块整体上料的操作,从而造成砌墙操作时速度降低的问题。The invention provides a wall-laying device for building roof enclosures based on BIM technology, which solves the problem that in the existing device, when bricks are transported manually instead of manually, the operation of loading multiple bricks as a whole cannot be carried out, resulting in An issue with speed reduction during wall operations.

为解决上述技术问题,本发明提供的一种基于BIM技术对屋顶围墙进行砌筑的砌墙装置,包括:In order to solve the above-mentioned technical problems, the present invention provides a wall-building device for building roof enclosures based on BIM technology, including:

放置架,所述放置架表面的一侧设置有推动组件,所述推动组件包括固定杆,所述固定杆的表面套设有推动座,所述推动座的表面的两侧均连接有连接杆,所述推动座的一侧设置有卡栓;A placement frame, one side of the surface of the placement frame is provided with a push assembly, the push assembly includes a fixed rod, the surface of the fixed rod is covered with a push seat, and both sides of the surface of the push seat are connected with connecting rods , one side of the push seat is provided with a latch;

活动组件,所述活动组件设置于两个所述连接杆之间;a movable assembly, the movable assembly is arranged between the two connecting rods;

收纳架,所述收纳架设置于所述活动组件的一侧,所述收纳架的底端设置有下料组件;A storage rack, the storage rack is arranged on one side of the movable assembly, and the bottom end of the storage rack is provided with a blanking assembly;

调节组件,所述调节组件的数量为两个,两个所述调节组件对称设置于所述放置架一侧。There are two adjustment assemblies, and the two adjustment assemblies are arranged symmetrically on one side of the placement frame.

优选的,所述活动组件包括固定架,所述固定架的表面固定安装有液压伸缩杆,所述液压伸缩杆的底端连接有活动件,所述活动件的一侧与所述收纳架的一侧固定连接。Preferably, the movable assembly includes a fixed frame, a hydraulic telescopic rod is fixedly installed on the surface of the fixed frame, and a movable part is connected to the bottom end of the hydraulic telescopic rod, and one side of the movable part is connected to the storage rack. Fixed connection on one side.

优选的,所述调节组件包括调节杆,所述放置架表面的一侧设置有固定栓。Preferably, the adjustment assembly includes an adjustment rod, and one side of the surface of the placement frame is provided with a fixing bolt.

优选的,所述下料组件包括矩形框,所述矩形框表面的两侧均开设有活动槽,两个所述活动槽之间设置有下料件。Preferably, the blanking assembly includes a rectangular frame, movable grooves are opened on both sides of the surface of the rectangular frame, and a blanking piece is arranged between the two movable grooves.

优选的,所述放置架的一侧设置有固定组件,所述固定组件包括连接座,所述连接座的一侧设置有拆卸座,所述拆卸座表面的两侧均连接有圆形杆,两个所述圆形杆的表面均套设有配重块,所述圆形杆的表面设置有固定套,所述拆卸座表面的中心位置开设有圆形连通孔。Preferably, one side of the placement frame is provided with a fixing assembly, the fixing assembly includes a connecting seat, one side of the connecting seat is provided with a dismounting seat, and both sides of the surface of the dismounting seat are connected with circular rods, The surfaces of the two circular rods are both sleeved with counterweights, the surfaces of the circular rods are provided with fixed sleeves, and the center of the surface of the dismounting seat is provided with a circular communication hole.

优选的,所述调节杆的一端连接有阻挡组件,所述阻挡组件包括U形挡板,所述U形挡板的内部开设有放置槽,所述放置槽的内部设置有多个拆卸板。Preferably, a blocking assembly is connected to one end of the adjusting rod, and the blocking assembly includes a U-shaped baffle, a placement slot is opened inside the U-shaped baffle, and a plurality of dismounting plates are provided inside the placement slot.

优选的,所述收纳架表面的两侧均设置有活动组件,所述活动组件包括圆形连接杆,所述圆形连接杆的表面套设有活动套,所述活动套表面的两侧均通过连接块固定连接有活动杆,所述活动杆的一端连接有矩形板。Preferably, both sides of the surface of the storage frame are provided with movable components, the movable components include a circular connecting rod, the surface of the circular connecting rod is covered with a movable sleeve, and both sides of the surface of the movable sleeve are A movable rod is fixedly connected through the connecting block, and a rectangular plate is connected to one end of the movable rod.

优选的,所述矩形板底部的一侧设置有移动组件,所述移动组件包括滑腔,所述滑腔的内部设置有移动件。Preferably, a moving assembly is provided on one side of the bottom of the rectangular plate, and the moving assembly includes a sliding chamber, and a moving piece is arranged inside the sliding chamber.

优选的,所述放置架的一侧设置有拼接组件,所述拼接组件包括拼接套,所述拼接套的内部设置有拼接块。Preferably, a splicing assembly is provided on one side of the placing frame, and the splicing assembly includes a splicing sleeve, and a splicing block is provided inside the splicing sleeve.

优选的,所述拼接套的顶端设置有卡接组件,所述卡接组件包括移动件,所述移动件的一侧连接有L形连接杆,所述L形连接杆的一端连接有卡接块。Preferably, the top end of the splicing sleeve is provided with a clamping assembly, the clamping assembly includes a moving part, one side of the moving part is connected with an L-shaped connecting rod, and one end of the L-shaped connecting rod is connected with a clamping piece.

与相关技术相比较,本发明提供的一种基于BIM技术对屋顶围墙进行砌筑的砌墙装置具有如下有益效果:Compared with related technologies, a wall-building device for building roof enclosures based on BIM technology provided by the present invention has the following beneficial effects:

本发明提供一种基于BIM技术对屋顶围墙进行砌筑的砌墙装置,在放置架的一侧设置推动组件和带有收纳架的活动组件使用能带动人工手动的操作,同时也可以实现多个砖块同时上料的操作,可以代替人工单个的对砖块进行上料的操作,可以提高砌墙的速度。The invention provides a wall-building device for building roof enclosures based on BIM technology. A push component and a movable component with a storage frame are arranged on one side of the placement frame, which can drive manual operations, and can also realize multiple The operation of simultaneously loading bricks can replace the operation of manually loading bricks individually, which can increase the speed of building walls.

附图说明Description of drawings

图1为本发明提供的一种基于BIM技术对屋顶围墙进行砌筑的砌墙装置的第一实施例的结构示意图;Fig. 1 is a kind of structure schematic diagram of the first embodiment of the wall-laying device that builds roof enclosure wall based on BIM technology provided by the present invention;

图2为图1所示的A部放大示意图;Figure 2 is an enlarged schematic view of part A shown in Figure 1;

图3为图1所示的装置整体的立体结构示意图;FIG. 3 is a schematic diagram of the overall three-dimensional structure of the device shown in FIG. 1;

图4为图3所示的B部放大示意图;FIG. 4 is an enlarged schematic diagram of part B shown in FIG. 3;

图5为图1所示的装置整体的等轴测结构示意图;Fig. 5 is a schematic isometric structural view of the device shown in Fig. 1 as a whole;

图6为本发明提供的一种基于BIM技术对屋顶围墙进行砌筑的砌墙装置的第二实施例的结构示意图;Fig. 6 is a schematic structural view of a second embodiment of a wall-building device for building a roof enclosure based on BIM technology provided by the present invention;

图7为图6所示的C部放大示意图;Fig. 7 is an enlarged schematic diagram of part C shown in Fig. 6;

图8为图6所示的D部放大示意图;Fig. 8 is an enlarged schematic diagram of part D shown in Fig. 6;

图9为本发明提供的一种基于BIM技术对屋顶围墙进行砌筑的砌墙装置的第三实施例的结构示意图;Fig. 9 is a structural schematic diagram of a third embodiment of a wall-building device for building a roof enclosure based on BIM technology provided by the present invention;

图10为图9所示的E部放大示意图。FIG. 10 is an enlarged schematic view of part E shown in FIG. 9 .

图中标号:1、放置架,Labels in the figure: 1, placing rack,

2、推动组件,21、固定杆,22、推动座,23、连接杆,24、卡栓,2. Pushing assembly, 21. Fixing rod, 22. Pushing seat, 23. Connecting rod, 24. Locking bolt,

3、活动组件,31、固定架,32、液压伸缩杆,33、活动件,3. Movable components, 31, fixed frame, 32, hydraulic telescopic rod, 33, movable parts,

4、收纳架,4. Storage rack,

5、阻挡组件,51、U形挡板,52、放置槽,5, blocking assembly, 51, U-shaped baffle plate, 52, placement groove,

6、调节组件,61、调节杆,62、固定栓,6, adjustment assembly, 61, adjustment rod, 62, fixed bolt,

7、固定组件,71、连接座,72、拆卸座,73、圆形杆,74、配重块,75、固定套,76、圆形连通孔,7. Fixed assembly, 71. Connecting seat, 72. Dismounting seat, 73. Round rod, 74. Counterweight, 75. Fixed sleeve, 76. Round connecting hole,

8、下料组件,81、矩形框,82、活动槽,83、下料件,8, blanking assembly, 81, rectangular frame, 82, movable slot, 83, blanking part,

9、拆卸板,9. Remove the board,

10、活动组件,101、圆形连接杆,102、活动套,103、活动杆,10, movable assembly, 101, circular connecting rod, 102, movable cover, 103, movable rod,

11、矩形板,11. Rectangular plate,

12、移动组件,121、滑腔,122、移动件,12, moving assembly, 121, sliding cavity, 122, moving part,

13、拼接组件,131、拼接套,132、拼接块,13, splicing assembly, 131, splicing sleeve, 132, splicing block,

14、卡接组件,141、移动件,142、L形连接杆,143、卡接块。14. Clamping assembly, 141, moving part, 142, L-shaped connecting rod, 143, clamping block.

具体实施方式Detailed ways

下面结合附图和实施方式对本发明作进一步说明。The present invention will be further described below in conjunction with the accompanying drawings and embodiments.

第一实施例first embodiment

请结合参阅图1、图2、图3、图4和图5,其中,图1为本发明提供的一种基于BIM技术对屋顶围墙进行砌筑的砌墙装置的第一实施例的结构示意图;图2为图1所示的A部放大示意图;图3为图1所示的装置整体的立体结构示意图;图4为图3所示的B部放大示意图;图5为图1所示的装置整体的等轴测结构示意图。一种基于BIM技术对屋顶围墙进行砌筑的砌墙装置,包括:Please refer to Fig. 1, Fig. 2, Fig. 3, Fig. 4 and Fig. 5 in combination, wherein Fig. 1 is a structural schematic diagram of a first embodiment of a wall-laying device based on BIM technology provided by the present invention for building roof enclosures ; Fig. 2 is an enlarged schematic diagram of part A shown in Fig. 1; Fig. 3 is a schematic three-dimensional structure schematic diagram of the whole device shown in Fig. 1; Fig. 4 is an enlarged schematic diagram of part B shown in Fig. 3; Fig. 5 is a schematic diagram of part B shown in Fig. 1 Schematic diagram of the overall isometric structure of the device. A wall-laying device for building roof enclosures based on BIM technology, including:

放置架1,所述放置架1表面的一侧设置有推动组件2,所述推动组件2包括固定杆21,所述固定杆21的表面套设有推动座22,所述推动座22的表面的两侧均连接有连接杆23,所述推动座22的一侧设置有卡栓24;Placement frame 1, one side of the surface of the placement frame 1 is provided with a push assembly 2, the push assembly 2 includes a fixed rod 21, the surface of the fixed rod 21 is provided with a push seat 22, and the surface of the push seat 22 Both sides of the push seat 22 are connected with a connecting rod 23, and one side of the push seat 22 is provided with a latch 24;

在固定杆21的两端均固定连接有定位块,在两个定位块的一侧与放置架1的一侧固定连接,放置架1的形状为字母L的形状,在固定杆21的表面开设有多个与卡栓24相适配的卡槽,使用固定杆21和推动座22能带动收纳架4进行位置的调节。Both ends of the fixed rod 21 are fixedly connected with positioning blocks, one side of the two positioning blocks is fixedly connected with one side of the placement frame 1, the shape of the placement frame 1 is the shape of the letter L, and a There are a plurality of draw-in slots matched with the latch 24, and the position adjustment of the storage frame 4 can be driven by using the fixing rod 21 and the push seat 22.

活动组件3,所述活动组件3设置于两个所述连接杆23之间;A movable assembly 3, the movable assembly 3 is arranged between the two connecting rods 23;

收纳架4,所述收纳架4设置于所述活动组件3的一侧,所述收纳架4的底端设置有下料组件8;Storage rack 4, the storage rack 4 is arranged on one side of the movable assembly 3, and the bottom end of the storage rack 4 is provided with a blanking assembly 8;

调节组件6,所述调节组件6的数量为两个,两个所述调节组件6对称设置于所述放置架1一侧。There are two adjustment assemblies 6 , and the two adjustment assemblies 6 are arranged symmetrically on one side of the placement frame 1 .

所述活动组件3包括固定架31,所述固定架31的表面固定安装有液压伸缩杆32,所述液压伸缩杆32的底端连接有活动件33,所述活动件33的一侧与所述收纳架4的一侧固定连接。The movable assembly 3 includes a fixed frame 31, the surface of the fixed frame 31 is fixedly equipped with a hydraulic telescopic rod 32, and the bottom end of the hydraulic telescopic rod 32 is connected with a movable part 33, and one side of the movable part 33 is connected to the One side of the storage rack 4 is fixedly connected.

固定杆31固定连接在两个连接杆23顶端之间,液压伸缩杆32的使用便于对收纳架4的高度进行调节,可以方便收纳架4内部的砖块进行下料。The fixed rod 31 is fixedly connected between the tops of the two connecting rods 23, and the use of the hydraulic telescopic rod 32 is convenient for adjusting the height of the storage rack 4, which can facilitate the blanking of the bricks inside the storage rack 4.

所述调节组件6包括调节杆61,所述放置架1表面的一侧设置有固定栓62。The adjustment assembly 6 includes an adjustment rod 61 , and one side of the surface of the placement frame 1 is provided with a fixing bolt 62 .

调节杆61的使用能带动U形挡板51进行移动,可以辅助砌墙的操作,在调节杆61的表面开设有多个与固定栓62相适配的固定孔,调节杆61的一端与U形挡板51的一侧连接。The use of adjusting rod 61 can drive U-shaped baffle plate 51 to move, and can assist the operation of building a wall, and the surface of adjusting rod 61 is provided with a plurality of fixing holes that are compatible with fixed bolt 62, and one end of adjusting rod 61 is connected with U One side of shaped baffle 51 is connected.

所述下料组件8包括矩形框81,所述矩形框81表面的两侧均开设有活动槽82,两个所述活动槽82之间设置有下料件83。The blanking assembly 8 includes a rectangular frame 81 , movable grooves 82 are opened on both sides of the surface of the rectangular frame 81 , and a blanking piece 83 is arranged between the two movable grooves 82 .

矩形框81固定在收纳架4的底端,下料件83由两个矩形固定板和一个连接板组成,下料件83的使用便于对砖块进行下料操作。Rectangular frame 81 is fixed on the bottom of storage frame 4, and blanking part 83 is made up of two rectangular fixing plates and a connecting plate, and the use of blanking part 83 is convenient to carry out blanking operation to brick.

所述放置架1的一侧设置有固定组件7,所述固定组件包括连接座71,所述连接座71的一侧设置有拆卸座72,所述拆卸座72表面的两侧均连接有圆形杆73,两个所述圆形杆73的表面均套设有配重块74,所述圆形杆73的表面设置有固定套75,所述拆卸座72表面的中心位置开设有圆形连通孔76。One side of the placement frame 1 is provided with a fixing assembly 7, and the fixing assembly includes a connecting seat 71, and one side of the connecting seat 71 is provided with a dismounting seat 72, and both sides of the surface of the dismounting seat 72 are connected with circles. shaped rod 73, the surfaces of the two circular rods 73 are provided with a counterweight 74, the surface of the circular rod 73 is provided with a fixed sleeve 75, and the center position of the surface of the dismounting seat 72 is provided with a circular The communication hole 76 .

在圆形杆73的表面和固定套75的内壁上均开设有相适配的螺纹,使用配重块74能增架放置架1的稳定性,使用圆形连通孔76便于对放置架1使用时起到固定的作用。The surface of the circular rod 73 and the inner wall of the fixed sleeve 75 are provided with matching threads, the use of the counterweight 74 can increase the stability of the shelf 1, and the use of the circular communication hole 76 is convenient for the use of the shelf 1 play a fixed role.

所述调节杆61的一端连接有阻挡组件5,所述阻挡组件5包括U形挡板51,所述U形挡板51的内部开设有放置槽52,所述放置槽52的内部设置有多个拆卸板9。One end of the adjustment rod 61 is connected with a blocking assembly 5, the blocking assembly 5 includes a U-shaped baffle 51, and the inside of the U-shaped baffle 51 is provided with a placement groove 52, and the inside of the placement groove 52 is provided with multiple a disassembly plate9.

拆卸板9的使用能适应各种高度的使用。The use of dismounting plate 9 can adapt to the use of various heights.

本发明提供的一种基于BIM技术对屋顶围墙进行砌筑的砌墙装置的工作原理如下:The working principle of a wall-building device for building roof enclosures based on BIM technology provided by the present invention is as follows:

使用时,首先将放置架1放置在屋顶指定的位置,当放置好放置架1后,再将配重块74套设在圆形杆73的表面,当配重块74套设在圆形杆73的表面后,再将固定套75固定在圆形杆73的表面,当固定好配重块74后,再使用螺栓穿过拆卸座72表面的圆形连通孔76并与地面固定即可。When in use, first place the rack 1 on the designated position on the roof, after placing the rack 1, set the counterweight 74 on the surface of the circular rod 73, when the counterweight 74 is sleeved on the circular rod After the surface of 73, fixed sleeve 75 is fixed on the surface of circular bar 73 again, after fixing counterweight 74, use bolt to pass the circular communicating hole 76 of dismantling seat 72 surface and get final product with the ground again.

当固定好放置架1后,再将多个砖块放置在收纳架4的内部,当放置好砖块后,再将通过推动推动座22再将固定杆21进行移动,当推动座22带动收纳架4移动至合适的位置后,再使用卡栓24将推动座22与固定杆21固定连接,当固定好推动座22后,再启动固定架31表面的液压伸缩杆32带动活动件33在两个连接杆23之间向下移动,当活动件33在连接杆23上向下移动时带动收纳架4向下移动,当收纳架4移动至合适的位置后,停止液压伸缩杆32的工作,同时再通过拉动矩形框81内部的下料件83在活动槽82的内部向外侧拉动,当下料件83与矩形块81分离后即可使砖块进行单个的下料操作。After the placement frame 1 is fixed, a plurality of bricks are placed inside the storage rack 4. After the bricks are placed, the fixed rod 21 is moved by pushing the push seat 22, and when the push seat 22 drives the storage After the frame 4 is moved to a suitable position, the push seat 22 is fixedly connected with the fixed rod 21 using the clamp 24. After the push seat 22 is fixed, the hydraulic telescopic rod 32 on the surface of the fixed frame 31 is started to drive the movable part 33 on the two sides. Move downward between the two connecting rods 23, when the movable part 33 moves downward on the connecting rod 23, it drives the storage frame 4 to move downward, and when the storage frame 4 moves to a suitable position, stop the work of the hydraulic telescopic rod 32, Simultaneously pull the blanking part 83 inside the rectangular frame 81 to the outside in the movable groove 82, after the blanking part 83 is separated from the rectangular block 81, the brick can be carried out a single blanking operation.

当砌好一层砖块后再将拆卸板9放置在U形挡板51内部的放置槽52的内部对砌好砖块进行固定即可继续砌墙操作。After laying one deck of bricks, dismounting plate 9 is placed in the inside of the placement groove 52 inside U-shaped baffle plate 51, and the bricks built are fixed to continue the operation of building walls.

与相关技术相比较,本发明提供的一种基于BIM技术对屋顶围墙进行砌筑的砌墙装置具有如下有益效果:Compared with related technologies, a wall-building device for building roof enclosures based on BIM technology provided by the present invention has the following beneficial effects:

本发明提供一种基于BIM技术对屋顶围墙进行砌筑的砌墙装置,在放置架1的一侧设置推动组件2和带有收纳架4的活动组件3使用能带动人工手动的操作,同时也可以实现多个砖块同时上料的操作,可以代替人工单个的对砖块进行上料的操作,可以提高砌墙的速度。The present invention provides a wall-building device for building roof enclosures based on BIM technology. A push component 2 and a movable component 3 with a storage frame 4 are arranged on one side of the placement frame 1, which can drive manual operations, and at the same time It can realize the operation of loading multiple bricks at the same time, which can replace the operation of manually loading individual bricks, and can increase the speed of wall building.

第二实施例second embodiment

请结合参阅图6、图7和图8,基于本申请的第一实施例提供的一种基于BIM技术对屋顶围墙进行砌筑的砌墙装置,本申请的第二实施例提出另一种基于BIM技术对屋顶围墙进行砌筑的砌墙装置。第二实施例仅仅是第一实施例优选的方式,第二实施例的实施对第一实施例的单独实施不会造成影响。Please refer to Fig. 6, Fig. 7 and Fig. 8 in combination. Based on the first embodiment of the application, a wall-laying device based on BIM technology for building roof enclosures is provided. The second embodiment of the application proposes another method based on A wall-laying device for building roof enclosures with BIM technology. The second embodiment is only a preferred mode of the first embodiment, and the implementation of the second embodiment will not affect the independent implementation of the first embodiment.

具体的,本申请的第二实施例提供的一种基于BIM技术对屋顶围墙进行砌筑的砌墙装置的不同之处在于,一种基于BIM技术对屋顶围墙进行砌筑的砌墙装置,所述收纳架4表面的两侧均设置有活动组件10,所述活动组件10包括圆形连接杆101,所述圆形连接杆101的表面套设有活动套102,所述活动套102表面的两侧均通过连接块固定连接有活动杆103,所述活动杆103的一端连接有矩形板11。Specifically, the second embodiment of the present application provides a wall-laying device for building a roof enclosure based on BIM technology. The difference is that a wall-laying device for building a roof enclosure based on BIM technology is Both sides of the surface of the storage rack 4 are provided with a movable assembly 10, the movable assembly 10 includes a circular connecting rod 101, the surface of the circular connecting rod 101 is covered with a movable sleeve 102, and the movable sleeve 102 surface A movable rod 103 is fixedly connected to both sides through a connecting block, and a rectangular plate 11 is connected to one end of the movable rod 103 .

所述矩形板11底部的一侧设置有移动组件12,所述移动组件12包括滑腔121,所述滑腔121的内部设置有移动件122。One side of the bottom of the rectangular plate 11 is provided with a moving assembly 12 , and the moving assembly 12 includes a sliding chamber 121 , and a moving piece 122 is arranged inside the sliding chamber 121 .

本发明提供的一种基于BIM技术对屋顶围墙进行砌筑的砌墙装置的工作原理如下:The working principle of a wall-building device for building roof enclosures based on BIM technology provided by the present invention is as follows:

使用时,当对收纳架4的距离进行调节时,通过拉动收纳架4两侧的矩形板11向两侧移动,当矩形板11移动时带动两个活动杆103进行移动,当两个活动杆103移动时通过连接块带动活动套102在圆形连接杆101的表面进行移动,当矩形板11移动时还带动移动件122在滑腔121的内部进行移动,当矩形板11调节至合适的位置后,使用螺栓将活动套102与圆形连接杆101螺纹连接即可。During use, when the distance of the storage frame 4 is adjusted, the rectangular plates 11 on both sides of the storage frame 4 are pulled to move to both sides, and when the rectangular plates 11 move, the two movable rods 103 are driven to move. When 103 moves, the movable sleeve 102 is driven by the connecting block to move on the surface of the circular connecting rod 101. When the rectangular plate 11 moves, it also drives the moving part 122 to move inside the sliding cavity 121. When the rectangular plate 11 is adjusted to a suitable position Finally, bolts are used to thread the movable sleeve 102 to the circular connecting rod 101.

与相关技术相比较,本发明提供的一种基于BIM技术对屋顶围墙进行砌筑的砌墙装置具有如下有益效果:Compared with related technologies, a wall-building device for building roof enclosures based on BIM technology provided by the present invention has the following beneficial effects:

本发明提供一种基于BIM技术对屋顶围墙进行砌筑的砌墙装置,在收纳架4表面的两侧设置活动组件10能带动矩形板11进行左右位置的调节,能适应各种大小的砖块进行放置,在收纳架4底部的两侧设置移动组件12可以在矩形板11移动时起到定位的作用。The present invention provides a wall-building device for building a roof wall based on BIM technology. Movable components 10 are arranged on both sides of the surface of the storage frame 4, which can drive the rectangular plate 11 to adjust the left and right positions, and can adapt to bricks of various sizes. For placement, a moving assembly 12 is provided on both sides of the bottom of the storage frame 4 to play a positioning role when the rectangular plate 11 moves.

第三实施例third embodiment

请结合参阅图9和图10,基于本申请的第一实施例提供的一种基于BIM技术对屋顶围墙进行砌筑的砌墙装置,本申请的第三实施例提出另一种基于BIM技术对屋顶围墙进行砌筑的砌墙装置。第三实施例仅仅是第一实施例优选的方式,第三实施例的实施对第一实施例的单独实施不会造成影响。Please refer to Fig. 9 and Fig. 10 in combination. Based on the first embodiment of the present application, a wall-laying device based on BIM technology is provided for building roof enclosures. The third embodiment of the present application proposes another BIM-based technology A wall-laying device for building a roof enclosure. The third embodiment is only a preferred mode of the first embodiment, and the implementation of the third embodiment will not affect the independent implementation of the first embodiment.

具体的,本申请的第三实施例提供的一种基于BIM技术对屋顶围墙进行砌筑的砌墙装置的不同之处在于,一种基于BIM技术对屋顶围墙进行砌筑的砌墙装置,所述放置架1的一侧设置有拼接组件13,所述拼接组件13包括拼接套131,所述拼接套131的内部设置有拼接块132。Specifically, the third embodiment of the present application provides a wall-laying device for building roof enclosures based on BIM technology. The difference is that a wall-laying device for building roof enclosures based on BIM technology is One side of the placement frame 1 is provided with a splicing assembly 13 , the splicing assembly 13 includes a splicing sleeve 131 , and a splicing block 132 is arranged inside the splicing sleeve 131 .

所述拼接套131的顶端设置有卡接组件14,所述卡接组件14包括移动件141,所述移动件141的一侧连接有L形连接杆142,所述L形连接杆142的一端连接有卡接块143。The top end of the splicing sleeve 131 is provided with a clamping assembly 14, the clamping assembly 14 includes a moving piece 141, one side of the moving piece 141 is connected with an L-shaped connecting rod 142, one end of the L-shaped connecting rod 142 A clamping block 143 is connected.

本发明提供的一种基于BIM技术对屋顶围墙进行砌筑的砌墙装置的工作原理如下:The working principle of a wall-building device for building roof enclosures based on BIM technology provided by the present invention is as follows:

使用时,首先将其中一个带动拼接块132的放置架1套设在另外一个带有拼接套131的放置架1的内部,当拼接块132和拼接套131重合连接后,再通过推动卡接块143带动L形连接杆142在移动件141上向下移动,当卡接块143移动至拼接套131的内部后即可对拼接块132起到固定的作用。When in use, first one of the placement racks 1 that drives the splicing block 132 is sleeved inside the other placement rack 1 with the splicing sleeve 131, and after the splicing block 132 and the splicing sleeve 131 are overlapped and connected, the splicing block is then pushed. 143 drives the L-shaped connecting rod 142 to move downward on the moving part 141 , and when the clamping block 143 moves to the inside of the splicing sleeve 131 , it can fix the splicing block 132 .

与相关技术相比较,本发明提供的一种基于BIM技术对屋顶围墙进行砌筑的砌墙装置具有如下有益效果:Compared with related technologies, a wall-building device for building roof enclosures based on BIM technology provided by the present invention has the following beneficial effects:

本发明提供一种基于BIM技术对屋顶围墙进行砌筑的砌墙装置,在放置架1的一侧设置拼接组件13便于对多个放置架1进行拼接,可以适应各种长度墙体的砌墙操作,在拼接组件13的一侧设置卡接组件14可以对拼接块132起到固定的作用,防止拼接块132在拼接套131上脱落。The present invention provides a wall-building device for building roof enclosures based on BIM technology. A splicing component 13 is provided on one side of the placement frame 1 to facilitate the splicing of a plurality of placement frames 1, and can be adapted to wall-building of walls of various lengths. Operation, the snap-joint component 14 provided on one side of the splicing component 13 can fix the splicing block 132 and prevent the splicing block 132 from falling off on the splicing sleeve 131 .

以上所述仅为本发明的实施例,并非因此限制本发明的专利范围,凡是利用本发明说明书及附图内容所作的等效结构或等效流程变换,或直接或间接运用在其它相关的技术领域,均同理包括在本发明的专利保护范围内。The above is only an embodiment of the present invention, and does not limit the patent scope of the present invention. Any equivalent structure or equivalent process conversion made by using the description of the present invention and the contents of the accompanying drawings, or directly or indirectly used in other related technologies fields, all of which are equally included in the scope of patent protection of the present invention.

Claims (10)

1. The utility model provides a device of building a wall of building by laying bricks or stones based on BIM technique to roof enclosure which characterized in that includes:
the push assembly is arranged on one side of the surface of the placing rack and comprises a fixed rod, a push seat is sleeved on the surface of the fixed rod, connecting rods are connected to two sides of the surface of the push seat, and a clamping bolt is arranged on one side of the push seat;
the movable assembly is arranged between the two connecting rods;
the storage rack is arranged on one side of the movable assembly, and a blanking assembly is arranged at the bottom end of the storage rack;
the adjusting components are two in number and are symmetrically arranged on one side of the placing rack.
2. The wall building device for building a roof enclosing wall based on the BIM technology as claimed in claim 1, wherein the movable assembly comprises a fixed frame, a hydraulic telescopic rod is fixedly installed on the surface of the fixed frame, a movable member is connected to the bottom end of the hydraulic telescopic rod, and one side of the movable member is fixedly connected with one side of the storage frame.
3. The device of claim 1, wherein the adjusting assembly comprises an adjusting rod, and one side of the surface of the placing frame is provided with a fixing bolt.
4. The wall building device for building a roof enclosing wall based on the BIM technology as claimed in claim 1, wherein the blanking assembly comprises a rectangular frame, two sides of the surface of the rectangular frame are provided with movable grooves, and a blanking member is arranged between the two movable grooves.
5. The device of claim 1, wherein a fixing member is disposed on one side of the placing frame, the fixing member comprises a connecting seat, a detaching seat is disposed on one side of the connecting seat, circular rods are connected to two sides of the surface of the detaching seat, balancing weights are sleeved on the surfaces of the two circular rods, fixing sleeves are disposed on the surfaces of the circular rods, and circular communication holes are formed in the center of the surface of the detaching seat.
6. The wall building device for building a roof enclosing wall based on the BIM technology as claimed in claim 3, wherein one end of the adjusting rod is connected with a blocking assembly, the blocking assembly comprises a U-shaped baffle, a placing groove is formed in the U-shaped baffle, and a plurality of detaching plates are arranged in the placing groove.
7. The device of building a wall of building a masonry to roof enclosure based on BIM technique of claim 1, characterized in that, the both sides of storage frame surface all are provided with movable assembly, movable assembly includes circular connecting rod, the surperficial cover of circular connecting rod is equipped with the movable sleeve, the both sides on movable sleeve surface all are through connecting block fixedly connected with movable rod, the one end of movable rod is connected with the rectangular plate.
8. The device of claim 7, wherein the rectangular plate is provided with a moving assembly at one side of the bottom thereof, the moving assembly comprises a sliding chamber, and the sliding chamber is provided with a moving member inside.
9. The wall building device for building a roof enclosure based on the BIM technology as claimed in claim 1, wherein a splicing assembly is arranged on one side of the placing frame, the splicing assembly comprises a splicing sleeve, and splicing blocks are arranged inside the splicing sleeve.
10. The wall building device for building a roof enclosing wall based on the BIM technology as claimed in claim 9, wherein a clamping component is arranged at the top end of the splicing sleeve, the clamping component comprises a moving member, one side of the moving member is connected with an L-shaped connecting rod, and one end of the L-shaped connecting rod is connected with a clamping block.
CN202210957984.7A 2022-08-11 2022-08-11 A masonry device for masonry of roof enclosure based on BIM technology Pending CN115263003A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202210957984.7A CN115263003A (en) 2022-08-11 2022-08-11 A masonry device for masonry of roof enclosure based on BIM technology

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202210957984.7A CN115263003A (en) 2022-08-11 2022-08-11 A masonry device for masonry of roof enclosure based on BIM technology

Publications (1)

Publication Number Publication Date
CN115263003A true CN115263003A (en) 2022-11-01

Family

ID=83750877

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202210957984.7A Pending CN115263003A (en) 2022-08-11 2022-08-11 A masonry device for masonry of roof enclosure based on BIM technology

Country Status (1)

Country Link
CN (1) CN115263003A (en)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE4417928A1 (en) * 1994-05-24 1995-11-30 Lissmac Maschb & Diamantwerkz Device for deploying building blocks
CN104806028A (en) * 2015-03-06 2015-07-29 同济大学 Full-automatic brick laying machine with high degree of freedom and high precision
CN113338644A (en) * 2021-06-24 2021-09-03 烟台红卫建筑工程服务有限公司 Top brick structure of brick laying machine for building construction and use method thereof
CN114809679A (en) * 2022-06-29 2022-07-29 江苏顺为绿色建筑科学研究院有限公司 Adjustable bricklaying equipment

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE4417928A1 (en) * 1994-05-24 1995-11-30 Lissmac Maschb & Diamantwerkz Device for deploying building blocks
CN104806028A (en) * 2015-03-06 2015-07-29 同济大学 Full-automatic brick laying machine with high degree of freedom and high precision
CN113338644A (en) * 2021-06-24 2021-09-03 烟台红卫建筑工程服务有限公司 Top brick structure of brick laying machine for building construction and use method thereof
CN114809679A (en) * 2022-06-29 2022-07-29 江苏顺为绿色建筑科学研究院有限公司 Adjustable bricklaying equipment

Similar Documents

Publication Publication Date Title
CN218149907U (en) Adjusting mechanism of partition plate mounting machine
CN115263003A (en) A masonry device for masonry of roof enclosure based on BIM technology
CN107939052B (en) Installation method of concrete wallboard
CN213710198U (en) Combined wallboard for green house
CN212613323U (en) Assembled furred ceiling structure
CN212001708U (en) Socket joint formula shear force wall of protruding structure of area grafting
CN117722026A (en) Assembled building wall fixing device
CN212794998U (en) Clamping device and robot
CN204748807U (en) Hole machine is drawn to full -automatic high efficiency of furniture board
CN218643749U (en) Wallboard mounting structure for decoration
CN221678401U (en) Automatic embossing forming device for fire doors
CN211201179U (en) Reinforced environment-friendly building template
CN220620691U (en) A kind of composite wall panel for architectural design
CN221321580U (en) Wall decoration board convenient to splice
CN215107214U (en) Stable novel scaffold guide rail
CN216949521U (en) Concrete formwork unit easy to assemble and concrete formwork
CN221136276U (en) Hollow block manufacturing equipment
CN207700649U (en) A kind of wall plastering structure of the pedestal with guide rail
CN217080989U (en) Assembled plywood
CN221856440U (en) A kind of municipal engineering construction protection device
CN223707159U (en) Building curtain wall auxiliary installation device
CN218205213U (en) Assembled energy-saving building
CN113653216B (en) Building external wall heat preservation and decoration integrated construction installation method
CN213477647U (en) Connecting structure of building template
CN221792679U (en) A display rack for building materials

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination