CN115450077A - Continuous sleeper-changing operation train and operation method - Google Patents

Continuous sleeper-changing operation train and operation method Download PDF

Info

Publication number
CN115450077A
CN115450077A CN202211130117.2A CN202211130117A CN115450077A CN 115450077 A CN115450077 A CN 115450077A CN 202211130117 A CN202211130117 A CN 202211130117A CN 115450077 A CN115450077 A CN 115450077A
Authority
CN
China
Prior art keywords
sleeper
ballast
vehicle
old
changing operation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN202211130117.2A
Other languages
Chinese (zh)
Other versions
CN115450077B (en
Inventor
罗建利
陶小虎
陈钦云
唐明明
吴玉祥
张忠健
黄琼雅
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China State Railway Group Co Ltd
CRCC High Tech Equipment Corp Ltd
China Railway Kunming Group Co Ltd
Original Assignee
CRCC High Tech Equipment Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CRCC High Tech Equipment Corp Ltd filed Critical CRCC High Tech Equipment Corp Ltd
Priority to CN202211130117.2A priority Critical patent/CN115450077B/en
Publication of CN115450077A publication Critical patent/CN115450077A/en
Application granted granted Critical
Publication of CN115450077B publication Critical patent/CN115450077B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B29/00Laying, rebuilding, or taking-up tracks; Tools or machines therefor
    • E01B29/06Transporting, laying, removing or renewing sleepers

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Machines For Laying And Maintaining Railways (AREA)

Abstract

本申请实施例提供一种连续换枕作业列车及作业方法,其中,作业列车包括:道砟处理车及换枕作业车;道砟处理车安装有道砟处理装置;所述道砟处理装置用于挖掘并运输轨道两侧道砟,将轨枕间道砟转移至轨道两侧,并在换枕作业车完成换枕后将道砟回填至轨道内侧;换枕作业车用于回收旧轨枕和布放新轨枕;所述换枕作业车设置有提轨装置,所述提轨装置用于将钢轨抬离枕面高于道钉;本申请提供的连续换枕作业列车及作业方法无需切轨,一次完成多枕的更换,实现了一体化连续作业,施工效率高。

Figure 202211130117

The embodiments of the present application provide a continuous pillow changing operation train and operation method, wherein the operation train includes: a ballast processing vehicle and a pillow changing operation vehicle; the ballast processing vehicle is equipped with a ballast processing device; the ballast processing device is used Excavate and transport the ballast on both sides of the track, transfer the ballast between the sleepers to both sides of the track, and backfill the ballast to the inner side of the track after the sleeper changing operation vehicle completes the sleeper replacement; the sleeper changing operation vehicle is used to recycle old sleepers and lay new ones Sleeper; the sleeper changing operation vehicle is provided with a rail lifting device, and the rail lifting device is used to lift the rail from the sleeper surface higher than the spike; the continuous sleeper changing operation train and operation method provided by this application do not need to cut rails, and can be completed at one time The replacement of multiple pillows realizes integrated continuous operation and high construction efficiency.

Figure 202211130117

Description

连续换枕作业列车及作业方法Continuous pillow changing operation train and operation method

技术领域technical field

本申请涉及铁路工程作业领域,尤其涉及连续换枕作业列车及作业方法。The application relates to the field of railway engineering operations, in particular to a continuous sleeper changing operation train and an operation method.

背景技术Background technique

铁路换枕是铁道线路机械化养护中的主要工作之一。随着工程技术的不断发展,换枕工作由传统的全人工作业转变为小型机械和大型养路机械作业,缩短了换枕时间,减轻了施工人员劳动强度,减少了人员配置,便于管理。Railway pillow replacement is one of the main tasks in the mechanized maintenance of railway lines. With the continuous development of engineering technology, the work of changing pillows has changed from traditional all-manual work to small machinery and large-scale road maintenance machinery, which shortens the time for changing pillows, reduces the labor intensity of construction personnel, reduces staffing, and facilitates management.

目前,利用小型机械进行换枕的方法主要有两种:其一,采用小型机械配合轨道抬高设备将轨枕由线路侧向移出,并进行侧抽式更换;其二,采用公铁两用挖机配合轨枕夹具进行施工。这两种方案都需要提前将新枕运输到待更换轨枕的轨道两旁布放,更换完成后需要将放置于轨道两旁的旧枕运走,一方面需占据轨道两旁较大的空间,另一方面需要多次运输工序;而且轨枕更换完成后需要人工上扣件,需要大量人工配合,步骤繁琐且效率较低。此外,现有技术中铁路换枕一般不处理枕底道床,施工质量不高;因此,后续还需要有对轨枕道床进行处理的步骤,导致工序较多,且连贯性较差,进而导致换枕的整个过程持续时间较长,极大地影响了铁路的正常运营。At present, there are two main methods of using small machines to replace sleepers: one is to use small machines to cooperate with track raising equipment to move the sleepers sideways from the line and perform side-extraction replacement; the other is to use road-rail dual-purpose excavators The machine cooperates with the sleeper fixture for construction. Both of these two schemes need to transport the new sleeper to both sides of the track where the sleeper is to be replaced in advance. After the replacement is completed, the old sleeper placed on both sides of the track needs to be transported away. Multiple transportation processes are required; and after the sleeper is replaced, the fasteners need to be manually installed, requiring a lot of manual cooperation, the steps are cumbersome and the efficiency is low. In addition, in the existing technology, railway sleeper replacement generally does not deal with the sleeper bed, and the construction quality is not high; therefore, subsequent steps are required to process the sleeper bed, resulting in more processes and poor continuity, which in turn leads to sleeper replacement. The whole process lasts for a long time, which greatly affects the normal operation of the railway.

采用大型养路机械来进行换枕是采用大修列车的方式进行,大修列车换枕需切断轨道,一般换枕与换轨同时进行,施工效率较低。由于施工时需切断轨道,施工完成后需要对轨道焊接将线路恢复成无缝线路,增加了施工步骤与维护成本。The use of large-scale road maintenance machinery to replace sleepers is carried out in the way of overhauling trains. To change sleepers in overhaul trains, the track needs to be cut off. Generally, sleeper replacement and track replacement are performed at the same time, and the construction efficiency is low. Since the track needs to be cut during construction, the track needs to be welded to restore the line to a seamless line after the construction is completed, which increases the construction steps and maintenance costs.

由鉴于此,特提出本申请。In view of this, the present application is proposed.

发明内容Contents of the invention

为了解决上述技术缺陷之一,本申请实施例中提供了一种连续换枕作业列车及作业方法。In order to solve one of the above-mentioned technical defects, an embodiment of the present application provides a continuous pillow changing operation train and an operation method.

根据本申请实施例的第一个方面,提供了一种连续换枕作业列车,包括:相连的道砟处理车及换枕作业车;According to the first aspect of the embodiment of the present application, a continuous pillow changing operation train is provided, including: a connected ballast processing vehicle and a pillow changing operation vehicle;

道砟处理车,设置有道砟处理装置;所述道砟处理装置用于挖掘运输边坡道砟,将枕间道砟填补边坡道砟,并在换枕作业车完成换枕后将边坡道砟回填至轨道内侧;The ballast treatment vehicle is equipped with a ballast treatment device; the ballast treatment device is used to excavate and transport side slope ballast, fill the side slope with ballast between pillows, and remove the side slope Backfill the ballast to the inner side of the track;

换枕作业车,用于回收旧轨枕和布放新轨枕;所述换枕作业车设置有提轨装置,所述提轨装置用于将钢轨抬离枕面高于道钉;A sleeper changing vehicle is used to recover old sleepers and lay out new sleepers; the sleeper changing vehicle is provided with a rail lifting device, and the rail lifting device is used to lift the rail from the sleeper surface to be higher than the spike;

根据本申请实施例的第二个方面,提供了一种连续换枕作业方法,包括如下具体步骤:According to the second aspect of the embodiment of the present application, a continuous pillow changing operation method is provided, including the following specific steps:

道砟处理车中的道砟处理装置挖掘轨道两侧的道砟并将道砟传送至道砟输送平台上,将轨枕间的道砟转移至轨道的两侧;The ballast treatment device in the ballast treatment vehicle digs the ballast on both sides of the track and transfers the ballast to the ballast conveying platform, and transfers the ballast between the sleepers to both sides of the track;

换枕作业车中的提轨装置将钢轨提离枕面高于道钉;The rail lifting device in the pillow changing operation vehicle lifts the rail away from the pillow surface and is higher than the spike;

换枕作业车旋转收集旧轨枕并传递给轨枕运输车;The sleeper changing vehicle rotates to collect old sleepers and transfers them to the sleeper transport vehicle;

换枕作业车将新轨枕旋转放置于目标放置位置;The sleeper changing vehicle rotates and places the new sleeper at the target placement position;

道砟处理装置将道砟回填至轨道内侧。The ballast treatment device backfills the ballast to the inner side of the track.

采用本申请实施例中提供的连续换枕作业列车及作业方法,具有以下有益下效果:Adopting the continuous pillow changing operation train and operation method provided in the embodiment of the present application has the following beneficial effects:

本申请实施例所提供的技术方案,可在不锯断轨道的情况下一次完成多枕的更换,实现了在一个天窗点下扣件拆卸、轨枕更换、扣件安装及轨枕运输等一体化连续作业,单个作业节拍可完成多根轨枕的更换,节约大量的施工时间、施工效率高。The technical solution provided by the embodiment of this application can complete the replacement of multiple sleepers at one time without sawing off the track, and realizes the integrated and continuous integration of fastener removal, sleeper replacement, fastener installation and sleeper transportation at one skylight point. Operation, a single operation beat can complete the replacement of multiple sleepers, saving a lot of construction time and high construction efficiency.

附图说明Description of drawings

此处所说明的附图用来提供对本申请的进一步理解,构成本申请的一部分,本申请的示意性实施例及其说明用于解释本申请,并不构成对本申请的不当限定。在附图中:The drawings described here are used to provide a further understanding of the application and constitute a part of the application. The schematic embodiments and descriptions of the application are used to explain the application and do not constitute an improper limitation to the application. In the attached picture:

图1为本申请连续换枕作业列车的整体示意图;Fig. 1 is the overall schematic diagram of the continuous pillow changing operation train of the present application;

图2为本申请连续换枕作业列车中轨枕运输车的示意图;Fig. 2 is the schematic diagram of the sleeper transport vehicle in the continuous sleeper changing operation train of the present application;

图3为本申请连续换枕作业列车中道砟处理车的示意图;Fig. 3 is the schematic diagram of the ballast processing vehicle in the continuous pillow changing operation train of the present application;

图4为本申请连续换枕作业列车中的换枕作业车示意图;Fig. 4 is the schematic diagram of the pillow changing operation vehicle in the continuous pillow changing operation train of the present application;

图5为本申请连续换枕作业列车中的动力车示意图;Fig. 5 is the schematic diagram of the power car in the continuous pillow changing operation train of the present application;

图6为本申请实施例连续换枕作业列车中的提轨装置示意图;Fig. 6 is a schematic diagram of the rail lifting device in the continuous pillow changing operation train of the embodiment of the present application;

图7为本申请实施例连续换枕作业列车中的轨枕并拢装置示意图。Fig. 7 is a schematic diagram of a sleeper closing device in a continuous sleeper changing operation train according to an embodiment of the present application.

其中:in:

A:轨枕运输车;B:道砟处理车;C:换枕作业车;D:动力车;A: Sleeper transport vehicle; B: Ballast processing vehicle; C: Sleeper changing operation vehicle; D: Power vehicle;

1、新轨枕;2、平板车;3、龙门行车;4、旧轨枕;5、新枕输送平台;6、旧枕输送平台;7、旧枕旋转装置;8、第一测量装置;9、新枕旋转装置;10、枕间道砟处理装置;11、边坡挖掘装置;12、扣件拆卸装置;13、道砟输送平台;14、扣件收集装置;15、第二测量装置;16、提轨装置;17、轨枕并拢装置18、转运平台;19、旧枕第一拾取装置;20、旧枕第一拾取装置;21、新枕第一布放装置;22、新枕第二布放装置;23、动力系统;24、拨轨装置;25、扣件安装装置;26、边坡整形装置;27、第三测量装置。1. New sleeper; 2. Flatbed truck; 3. Gantry crane; 4. Old sleeper; 5. New sleeper conveying platform; 6. Old sleeper conveying platform; 7. Old sleeper rotating device; 8. First measuring device; Pillow rotation device; 10. Ballast processing device between pillows; 11. Slope excavation device; 12. Fastener removal device; 13. Ballast conveying platform; 14. Fastener collection device; 15. Second measuring device; 16. Lifting Rail device; 17. Sleeper closing device; 18. Transfer platform; 19. First pick-up device for old sleeper; 20. First pick-up device for old sleeper; 21. First laying device for new sleeper; 22. Second laying device for new sleeper ; 23. Power system; 24. Rail shifting device; 25. Fastener installation device; 26. Slope shaping device; 27. The third measuring device.

具体实施方式detailed description

为了使本申请实施例中的技术方案及优点更加清楚明白,以下结合附图对本申请的示例性实施例进行进一步详细的说明,显然,所描述的实施例仅是本申请的一部分实施例,而不是所有实施例的穷举。需要说明的是,在不冲突的情况下,本申请中的实施例及实施例中的特征可以相互组合。In order to make the technical solutions and advantages in the embodiments of the present application clearer, the exemplary embodiments of the present application will be further described in detail below in conjunction with the accompanying drawings. Apparently, the described embodiments are only part of the embodiments of the present application, and Not an exhaustive list of all embodiments. It should be noted that, in the case of no conflict, the embodiments in the present application and the features in the embodiments can be combined with each other.

图1为本申请连续换枕作业列车的整体示意图;图2为本申请连续换枕作业列车中轨枕运输车的示意图;图3为本申请连续换枕作业列车中道砟处理车的示意图;图4为本申请连续换枕作业列车中的换枕作业车示意图;图5为本申请连续换枕作业列车中的动力车示意图;图6为本申请实施例连续换枕作业列车中的提轨装置示意图;图7为本申请实施例连续换枕作业列车中的轨枕并拢装置示意图。如图1至图7所示,本实施例提供一种连续换枕作业列车及作业方法,用于在铁路旧枕的拆除与新枕安装。Fig. 1 is the overall schematic diagram of the continuous pillow-changing operation train of the present application; Fig. 2 is the schematic diagram of the sleeper transport vehicle in the continuous pillow-changing operation train of the present application; Fig. 3 is the schematic diagram of the ballast processing vehicle in the continuous pillow-changing operation train of the present application; Fig. 4 is a schematic diagram of the pillow-changing operation vehicle in the continuous pillow-changing operation train of the present application; Fig. 5 is a schematic diagram of the power car in the continuous pillow-changing operation train of the present application; Fig. 6 is a rail lifting device in the continuous pillow-changing operation train of the embodiment of the application Schematic diagram; FIG. 7 is a schematic diagram of a sleeper closing device in a continuous sleeper changing operation train according to an embodiment of the present application. As shown in Fig. 1 to Fig. 7, this embodiment provides a continuous sleeper changing operation train and operation method, which are used for dismantling old sleepers and installing new sleepers on railways.

本申请实施例提供的连续换枕作业列车,用于对铁路连续换枕;设定沿轨道延伸的方向为纵向,垂直于轨道延伸的方向为横向,以列车行进方向为前方包括:相连接的道砟处理车B及换枕作业车C;道砟处理车B设置有道砟处理装置;道砟处理装置用于挖掘两侧道砟,将轨枕间道砟转移至轨道两侧,并在换枕作业车完成换枕后将道砟回填至轨道内侧;换枕作业车C用于回收旧轨枕和布放新轨枕。The continuous pillow changing operation train provided by the embodiment of the present application is used for continuously changing pillows on the railway; the direction extending along the track is set as the longitudinal direction, the direction extending perpendicular to the track is the horizontal direction, and the direction of the train is forward. Ballast treatment vehicle B and sleeper changing operation vehicle C; ballast treatment vehicle B is equipped with a ballast treatment device; the ballast treatment device is used to excavate the ballast on both sides, transfer the ballast between sleepers to the two sides of the track, and replace the pillow After the sleeper change, the work vehicle backfills the ballast to the inner side of the track; the sleeper change work vehicle C is used to recycle old sleepers and lay new sleepers.

作为本申请的一个实施例,道砟处理装置包括边坡挖掘装置11及枕间道砟处理装置10;枕间道砟处理装置10,连接于道砟处理车B的下方,将轨枕间的道砟扒向轨道的两侧;边坡挖掘装置11,用于挖掘轨道两侧的道砟,将道砟传送至道砟输送平台13上,由道砟输送平台13运输至回填位置处。As an embodiment of the present application, the ballast processing device includes a slope excavation device 11 and a ballast processing device 10 between sleepers; To both sides of the track; the slope excavation device 11 is used to excavate ballast on both sides of the track, transfer the ballast to the ballast conveying platform 13, and transport the ballast to the backfilling position by the ballast conveying platform 13.

作为本申请的一个实施例,道砟处理装置还包括道砟输送平台13,道砟输送平台13安装于道砟处理车B的上方,一端与边坡挖掘装置11相连接,承接边坡挖掘装置11挖掘输送的道砟,另一端延伸至换枕作业车C的道砟回填处。As an embodiment of the present application, the ballast processing device also includes a ballast conveying platform 13, the ballast conveying platform 13 is installed above the ballast processing vehicle B, and one end is connected with the slope excavation device 11, and accepts the slope excavation device 11 Excavate and convey the ballast, and the other end extends to the ballast backfilling place of the pillow changing operation vehicle C.

实施中,边坡挖掘装置11对称安装于道砟处理车B的两侧,且分设在作业列车的相对于前进方向轴线的两侧;边坡挖掘装置11上设置有旋转点,通过角度调整完成工作位和高速走行位的切换。用于挖掘轨道两侧道砟的边坡挖掘装置11结构可以用很多种,例如挖斗,也可以采用本领域已有的装置来实现道砟的挖掘,将挖掘的道砟可以绞龙螺旋输送机输送至道砟输送平台13的端部;作为一个具体的实施例,道砟输送平台13为输送带输送。During implementation, the slope excavation device 11 is symmetrically installed on both sides of the ballast processing vehicle B, and is separately arranged on both sides of the working train relative to the axis of the forward direction; Switch between working position and high-speed travel position. The slope excavation device 11 for excavating the ballast on both sides of the track can have many structures, such as a bucket, or existing devices in the field can be used to excavate the ballast, and the excavated ballast can be conveyed by the auger screw Machine transport to the end of the ballast delivery platform 13; as a specific embodiment, the ballast delivery platform 13 is conveyed by a conveyor belt.

作为本申请的一个实施例,轨道两侧道砟经边坡挖掘装置11挖掘并运输至上端的道砟输送平台13,后由道砟输送平台13回填至轨道内侧。道砟输送平台13的末端还可以安装道砟存储装置,用于控制道砟回填速度。As an embodiment of the present application, the ballast on both sides of the track is excavated by the slope excavation device 11 and transported to the ballast conveying platform 13 at the upper end, and then backfilled to the inner side of the track by the ballast conveying platform 13 . A ballast storage device may also be installed at the end of the ballast conveying platform 13 for controlling the ballast backfilling speed.

实施中,枕间道砟处理装置10将轨枕间道砟轨道内侧道砟转移至轨道外侧,以填补边坡道砟。枕间道砟处理装置10在整车连续作业前进时,进行步进式作业;也就是道砟转移时静止,道砟转移完成后走行至下一工作位;由此,枕间道砟处理装置10可移动式地与车架相连。具体实施中,多种结构均可以实现将轨枕间的道砟拨向轨道两边,例如,通过移动框架连接扒砟板,在液压缸的驱动下扒砟板沿框架导向将轨枕间的道砟拨向轨道两边;通过多关节机械臂连接一个小型挖斗,在动力驱动下用小型挖斗挖除轨枕间的道砟并通过多关节机械臂将轨枕间的道砟拨向轨道两边;通过刀板挖掘装置将枕间道砟直接挖掘至轨道外侧。During implementation, the inter-sleeper ballast processing device 10 transfers the ballast on the inner side of the inter-sleeper ballast track to the outer side of the track to fill up the side slope ballast. The inter-pillow ballast processing device 10 performs step-by-step operation when the whole vehicle is continuously operating; that is, it is stationary during the ballast transfer, and moves to the next working position after the ballast transfer is completed; thus, the inter-pillow ballast processing device 10 can be Movably connected to the frame. In specific implementation, a variety of structures can realize the ballast between the sleepers to move to both sides of the track, for example, the ballast board is connected to the ballast plate by moving the frame, and the ballast plate is driven by the hydraulic cylinder to move the ballast between the sleepers along the frame guide To both sides of the track; a small bucket is connected through a multi-joint mechanical arm, and the ballast between the sleepers is excavated with a small bucket under the power drive, and the ballast between the sleepers is shifted to both sides of the track through a multi-joint mechanical arm; through the knife plate The excavating device excavates the inter-pillow ballast directly to the outside of the track.

作为本申请的一个实施例,连续换枕作业列车还包括轨枕运输车A及动力车D,用于存放及运输新轨枕和旧轨枕;动力车D,用于为作业列车提供动力。As an embodiment of the present application, the continuous sleeper changing operation train also includes a sleeper transport vehicle A and a power vehicle D for storing and transporting new and old sleepers; the power vehicle D is used for providing power for the operation train.

实施中,新轨枕1直接通过轨枕运输车A运抵现场,旧轨枕4通过轨枕运输车驶离现场,省去了新轨枕1提前布放在轨道两侧的时间和旧轨枕4拾取并运输的时间,可实现在不锯断轨道的情况下轨枕的更换,实现在一个天窗点下扣件拆卸、轨枕更换、扣件安装及轨枕运输的一体化连续作业,节约了大量的施工时间。During the implementation, the new sleeper 1 is directly transported to the site by the sleeper transport vehicle A, and the old sleeper 4 is driven away from the site by the sleeper transport vehicle, which saves the time for the new sleeper 1 to be placed on both sides of the track in advance and the time for the old sleeper 4 to be picked up and transported. It can realize the replacement of sleepers without sawing off the track, realize the integrated continuous operation of fastener removal, sleeper replacement, fastener installation and sleeper transportation under one skylight point, saving a lot of construction time.

作为本申请的一个实施例,轨枕运输车A、道砟处理车B、换枕作业车C及动力车D沿行进方向向后依次设置并连接。As an embodiment of the present application, the sleeper transport vehicle A, the ballast processing vehicle B, the sleeper changing operation vehicle C and the power vehicle D are sequentially arranged and connected backward along the traveling direction.

如图2所示,作为本申请的一个实施例,轨枕运输车A包括多辆平板车2及龙门行车3,多辆平板车2前后依次连挂,用于承载新轨枕1和旧轨枕4;各平板车2上设有滑行轨道,各平板车2之间设有过轨装置,过轨装置用于连接相邻两辆平板车2上的滑行轨道;龙门行车3各辆平板车2之间沿滑行轨道和过轨装置行走,活动范围较大;龙门行车3上设置有轨枕夹取装置,轨枕装置可上下移动来夹持轨枕,通过轨枕运输车A实现新轨枕1和旧轨枕4的存放及运输。As shown in Figure 2, as an embodiment of the present application, the sleeper transport vehicle A includes a plurality of flat cars 2 and gantry cranes 3, and the plurality of flat cars 2 are connected in succession before and after, and are used to carry new sleepers 1 and old sleepers 4; each flat car 2 is provided with a sliding track, and a rail crossing device is provided between each flat car 2, and the rail crossing device is used to connect the sliding rails on two adjacent flat cars 2; The device travels and has a large range of motion; the gantry crane 3 is provided with a sleeper clamping device, and the sleeper device can move up and down to clamp the sleeper, and the storage and transportation of the new sleeper 1 and the old sleeper 4 are realized by the sleeper transport vehicle A.

实施中,能够实现轨枕夹取方式为现有技术,实现夹取的装置也可有很多种形式,比如夹钳与机械手;作为一种实施方式还可以在龙门行车3上配备有垂向驱动装置,垂向驱动装置控制轨枕夹取装置上下移动来夹持轨枕;垂向驱动装置可以为驱动油缸或者驱动电机,也可为其他能够驱动轨枕夹取装置上下移动的结构。为防止龙门行车3失控冲出,轨枕运输车A最前端设置缓冲车档。In practice, it is an existing technology to realize the clamping method of the sleeper, and there are many types of devices for clamping, such as clamps and manipulators; as an embodiment, the gantry crane 3 can also be equipped with a vertical drive device , the vertical driving device controls the sleeper clamping device to move up and down to clamp the sleeper; the vertical driving device can be a driving cylinder or a driving motor, and can also be other structures that can drive the sleeper clamping device to move up and down. In order to prevent the gantry crane 3 from running out of control, the front end of the sleeper transport vehicle A is provided with a buffer gear.

作为一个实施例,各平板车2上的滑行轨道,各平板车2之间的过轨装置,使龙门行车3能够在平板车2之间走行,龙门行车3配备动力系统,使得龙门行车3在平板车2可以大范围活动自走行。As an example, the sliding rails on each flatbed truck 2 and the rail passing device between each flatbed truck 2 enable the gantry crane 3 to travel between the flatbed trucks 2, and the gantry crane 3 is equipped with a power system so that the gantry crane 3 can move between the flatbed trucks 2. Self-propelled for a wide range of activities.

通过本申请的实施例,新轨枕1直接通过轨枕运输车A运抵现场,旧轨枕4通过轨枕运输车A驶离现场,省去了新轨枕1提前布放在轨道两侧的时间和旧轨枕4拾取并运输的时间。Through the embodiment of the present application, the new sleeper 1 is directly transported to the site by the sleeper transport vehicle A, and the old sleeper 4 is driven away from the site by the sleeper transport vehicle A, which saves the time for the new sleeper 1 to be placed on both sides of the track in advance and the old sleeper 4 Time to pick up and ship.

作为本申请的一个具体实施例,轨枕输送平台,平行安装于作业列车的上方,沿行进方向延伸;设置于换枕作业车C、道砟处理车B及轨枕运输车A之间,用于将拆卸的旧轨枕4输送至轨枕运输车A上,同时将轨枕运输车A传送的新轨枕1输送至新轨枕1目标放置位置处。As a specific embodiment of the present application, the sleeper conveying platform is installed in parallel above the operation train and extends along the direction of travel; it is arranged between the sleeper changing operation vehicle C, the ballast processing vehicle B and the sleeper transport vehicle A, and is used to transfer the The disassembled old sleeper 4 is transported to the sleeper transport vehicle A, and at the same time, the new sleeper 1 delivered by the sleeper transport vehicle A is transported to the target placement position of the new sleeper 1 .

如图2-图3所示,作为一个实施例,轨枕输送平台包括旧枕输送平台6、旧枕旋转装置7、新枕输送平台5及新枕旋转装置9。旧枕输送平台6依次连接并设置为多个;从换枕作业车C延伸至轨枕运输车A,将旧轨枕4沿行进方向向前运输;旧枕输送平台6之间安装一个旧枕旋转装置7,旧枕旋转装置7位于道砟处理装置的上方,用于将旧枕输送平台上的旧轨枕4转动90°后进行运输;旋转之前旧枕4的长度方向与行进方向垂直,旋转后旧轨枕4的长度方向与行进方向平行;新枕输送平台5,依次连接并设置为多个,从换枕作业车延伸至轨枕运输车;新枕输送平台5之间设置有一个新枕旋转装置9,新枕旋转装置9位于道砟处理装置,新枕旋转装置9将新轨枕1沿行进方向向后运输,旋转之前新轨枕1的长度方向与行进方向垂直,旋转后新轨枕1的长度方向与行进方向平行。新轨枕1和旧轨枕4的传送也可由采用带轨枕转运装置的轨枕运输车替代。As shown in FIGS. 2-3 , as an embodiment, the sleeper conveying platform includes an old sleeper conveying platform 6 , an old sleeper rotating device 7 , a new sleeper conveying platform 5 and a new sleeper rotating device 9 . The old sleeper conveying platforms 6 are connected sequentially and arranged in multiples; extending from the pillow changing operation vehicle C to the sleeper transport vehicle A, and transporting the old sleepers 4 forward along the traveling direction; an old sleeper rotating device is installed between the used sleeper conveying platforms 6 7. The old sleeper rotating device 7 is located above the ballast processing device, and is used to rotate the old sleeper 4 on the old sleeper delivery platform by 90° for transportation; before the rotation, the length direction of the old sleeper 4 is perpendicular to the direction of travel, and after rotation, the old sleeper The length direction of the sleeper 4 is parallel to the direction of travel; the new sleeper conveying platform 5 is sequentially connected and arranged in multiples, extending from the sleeper changing operation vehicle to the sleeper transport vehicle; a new sleeper rotating device 9 is arranged between the new sleeper conveying platforms 5 , the new sleeper rotating device 9 is located at the ballast processing device, the new sleeper rotating device 9 transports the new sleeper 1 backward along the traveling direction, the length direction of the new sleeper 1 is perpendicular to the traveling direction before the rotation, and the length direction of the new sleeper 1 after rotation The direction of travel is parallel. The transmission of the new sleeper 1 and the old sleeper 4 can also be replaced by a sleeper transport vehicle with a sleeper transfer device.

作为一个具体的实施例,新枕输送平台5与旧枕输送平台6可以为输送带输送,也可以为链轮输送。As a specific embodiment, the new pillow conveying platform 5 and the old pillow conveying platform 6 can be conveyed by conveyor belts or by sprockets.

实施中,实现旋转功能的旧枕旋转装置7和新枕旋转装置9可以有很多种结构与形式;例如:在一个旋转基座上安装夹取轨枕的夹钳或机械手、也可以在旋转基座上安装输送带与输送电机,输送电机驱动输送带实现轨枕的输送,旋转基座在驱动机构的驱动下旋转,实现方向的改变。In practice, the old sleeper rotating device 7 and the new sleeper rotating device 9 that realize the rotating function can have many structures and forms; The conveyor belt and the conveyor motor are installed on the top, and the conveyor belt is driven by the conveyor motor to realize the transportation of sleepers, and the rotating base rotates under the drive of the driving mechanism to realize the change of direction.

作为本申请的实施例,换枕作业车C上还安装轨枕并拢装置17、两个旧枕拾取装置及转运平台18;轨枕并拢装置17用于将多根旧轨枕4并拢为旧枕组;轨枕并拢装置17将多根旧轨枕4并拢为旧枕组,便于旧枕拾取装置拾取轨枕,节约工作时间,提升工作效率。As an embodiment of the present application, a sleeper bringing together device 17, two old sleeper picking devices and a transfer platform 18 are also installed on the sleeper changing vehicle C; the sleeper bringing together device 17 is used to bring together a plurality of old sleepers 4 into an old sleeper group; the sleepers are brought together Device 17 puts together a plurality of old sleepers 4 into an old sleeper group, which is convenient for the old sleeper pick-up device to pick up sleepers, saves working time and improves work efficiency.

旧枕拾取装置设置于换枕作业车C的底部,包括第一旧枕拾取装置19和第二旧枕拾取装置20;第一旧枕拾取装置19用于夹持轨枕并拢装置17好的并拢好的旧枕组并将旧枕组旋转90°后放置于转运平台上18;接着第二旧枕拾取装置20将转运平台18上的旧枕组转运至旧枕输送平台6上。然后由旧枕输送平台6运输至轨枕运输车A;转运平台18上轨枕方向为纵向,为便于龙门行车3夹持,旧枕输送平台6前端的轨枕方向为横向,故在旧枕输送平台6上设置有旧枕旋转装置7。The old pillow picking device is arranged at the bottom of the pillow changing operation vehicle C, and includes a first old pillow picking device 19 and a second old pillow picking device 20; the first old pillow picking device 19 is used to clamp the sleeper and put the device 17 together. The old pillow group is placed on the transfer platform 18 after the old pillow group is rotated 90°; Then be transported to the sleeper transport vehicle A by the old sleeper delivery platform 6; the direction of the sleeper on the transfer platform 18 is longitudinal, for the convenience of the gantry crane 3 clamping, the direction of the sleeper at the front end of the old sleeper delivery platform 6 is horizontal, so on the old sleeper delivery platform 6 Old pillow rotating device 7 is arranged on it.

值得说明的是,本发明实施例中将旧枕拾取装置分为两个是为了加快作业效率,旧枕拾取也可通过一个装置实现。It is worth noting that, in the embodiment of the present invention, the old pillow picking device is divided into two in order to speed up the work efficiency, and the old pillow picking can also be realized by one device.

作为本申请的具体实施例,换枕作业车C的轨枕并拢装置17位于第一旧枕拾取装置19的前方,将多根旧轨枕4并拢为旧枕组;轨枕并拢装置17可以采用如图7所示的结构,包括固定杆1703、轨枕拨杆1701及拨枕油缸1702,固定杆1703、轨枕拨杆1701及拨枕油缸1702形成三角结构;固定杆1703与轨枕拨杆1701转动连接,拨枕油缸1702的底座与固定杆1703转动连接,拨枕油缸1702的活塞杆与轨枕拨杆1701的端部转动连接,拨枕油缸1702收缩将轨枕拨杆1701抬起;拨枕油缸1702伸出将轨枕拨杆1701落下,轨枕并拢装置17与换枕作业车C的车架移动式连接,轨枕并拢装置17可沿换枕作业车C纵向移动,实现拆卸后的旧轨枕4的并拢。As a specific embodiment of the present application, the sleeper bringing together device 17 of the sleeper changing operation vehicle C is located in front of the first old sleeper picking device 19, and a plurality of old sleepers 4 are brought together into an old sleeper group; the sleeper bringing together device 17 can be used as shown in FIG. 7 The structure shown includes a fixed rod 1703, a sleeper driving rod 1701 and a sleeper cylinder 1702. The fixed rod 1703, the sleeper driving rod 1701 and the sleeper cylinder 1702 form a triangular structure; the fixed rod 1703 is rotationally connected with the sleeper driving rod 1701, and the sleeper The base of oil cylinder 1702 is rotatably connected with fixed rod 1703, and the piston rod of sleeper cylinder 1702 is rotatably connected with the end of sleeper driving rod 1701. Dial sleeper cylinder 1702 contracts to lift sleeper rod 1701; dial sleeper cylinder 1702 stretches out sleeper The driving lever 1701 falls, and the sleeper closing device 17 is mobile connected with the vehicle frame of the sleeper-changing vehicle C, and the sleeper closing device 17 can move longitudinally along the sleeper-changing vehicle C, so as to realize the closing of the old sleepers 4 after disassembly.

值得说明的是,轨枕并拢装置1也可以采用自动化程度更高的轨枕并拢结构完成。It is worth noting that the sleeper closing device 1 can also be completed by adopting a more automated sleeper closing structure.

作为本申请的具体实施例,旧枕拾取装置与换枕作业车C的车架连接,换枕作业车C的底部,可与换枕作业车C相对移动,用于将并拢好的旧枕组夹持并进行旋转后;实施中,提轨装置16将轨道提起后,第一旧枕拾取装置19将旧枕组取出并将旧枕组旋转90°后放置于转运平台18上;第二旧枕拾取装置20将转运平台18上的旧枕组旋转后转运至旧枕输送平台6上,并由旧枕输送平台6转运至轨枕运输车A上;As a specific embodiment of the present application, the old pillow picking device is connected to the frame of the pillow changing operation vehicle C, and the bottom of the pillow changing operation vehicle C can move relatively with the pillow changing operation vehicle C, and is used to assemble the old pillows that have been put together After clamping and rotating; during implementation, after the rail lifting device 16 lifts the rail, the first old pillow picking device 19 takes out the old pillow group and rotates the old pillow group by 90° and places it on the transfer platform 18; The pillow picking device 20 rotates the old pillow group on the transfer platform 18 and transfers it to the old pillow conveying platform 6, and transfers it to the sleeper transport vehicle A by the old pillow conveying platform 6;

作为本申请的实施例,换枕作业车C上还安装有新枕布放装置。实施中,新枕布放装置与新枕输送平台5的端部相邻,用于夹取新枕输送平台5输送的新轨枕1,并将新轨枕1旋转90°后置于目标放置位置;新枕第一布放装置21将新枕输送平台5端部的新轨枕组夹持放置于道床上,新枕第二布放装置22将新轨枕组旋转90°进行枕间间距调整并放置于合适的位置。具体地,为使轨枕能够顺利落入轨道内侧,新枕输送平台5尾端的轨枕为纵向,而新枕输送平台5前端轨枕为横向,因此在新枕输送平台5设置有新枕旋转装置9。As an embodiment of the present application, a new pillow placement device is also installed on the pillow changing operation vehicle C. During implementation, the new sleeper laying device is adjacent to the end of the new sleeper conveying platform 5, and is used to clamp the new sleeper 1 conveyed by the new sleeper conveying platform 5, and place the new sleeper 1 at the target placement position after rotating it by 90°; The first placement device 21 for new sleepers clamps and places the new sleeper group at the end of the new sleeper delivery platform 5 on the ballast bed, and the second placement device 22 for new sleepers rotates the new sleeper group by 90° to adjust the distance between sleepers and places it on the Suitable location. Specifically, in order to make the sleeper fall smoothly into the inner side of the track, the sleeper at the rear end of the new sleeper delivery platform 5 is longitudinal, while the front sleeper of the new sleeper delivery platform 5 is horizontal, so a new sleeper rotating device 9 is provided on the new sleeper delivery platform 5 .

值得说明的是,本发明实施例中将新枕布放装置分为两个是为了加快作业效率,新枕布放也可通过一个装置实现。It is worth noting that, in the embodiment of the present invention, the new pillow placement device is divided into two in order to speed up the work efficiency, and the new pillow placement can also be realized by one device.

在新轨枕横纵向位置调整完成后,进行轨枕间道砟回填。道砟通过道砟输送平台13直接回填至轨道内侧。After the horizontal and vertical position adjustment of the new sleeper is completed, the ballast between the sleepers is backfilled. The ballast is directly backfilled to the inner side of the track through the ballast conveying platform 13 .

作为本申请的一个实施例,道砟处理车B上还设置有扣件拆卸收集装置,扣件拆卸收集装置用于将旧轨枕上的扣件拆除、收集及存储;道砟处理车B上的扣件拆卸收集装置包括扣件拆卸装置12与扣件收集装置14;扣件拆卸装置12连接于道砟处理车B的下方,一次性可以拆卸多枕的扣件,然后将扣件放置在轨道两侧;扣件拆卸装置12可以移动地连接在道砟处理车B的车架上;扣件拆卸装置12可以由多种结构实现,例如不仅可以采用内燃扳手或电动扳手,也可采用已知技术公开的拆扣件装置将轨枕上的扣件拆除。扣件收集装置14,安装有磁力装置与储存装置,磁力装置收集拆卸的扣件,存储装置用于存储拆卸的扣件;也就是,扣件拆卸装置12将拆卸的扣件放置在轨道两侧,然后磁力装置将拆卸的扣件收集起来,并储存至储存装置内。As an embodiment of the present application, the ballast processing vehicle B is also provided with a fastener removal collection device, which is used to remove, collect and store fasteners on old sleepers; The fastener removal and collection device includes a fastener removal device 12 and a fastener collection device 14; the fastener removal device 12 is connected to the bottom of the ballast processing vehicle B, and can remove multiple pillow fasteners at one time, and then place the fasteners on the track Both sides; the fastener removal device 12 can be movably connected on the vehicle frame of the ballast processing vehicle B; the fastener removal device 12 can be realized by various structures, for example, not only internal combustion wrench or electric wrench can be used, but also known The fastener removing device disclosed in the technology removes the fastener on the sleeper. The fastener collection device 14 is equipped with a magnetic device and a storage device, the magnetic device collects the disassembled fasteners, and the storage device is used to store the disassembled fasteners; that is, the fastener removal device 12 places the disassembled fasteners on both sides of the track , and then the magnetic device collects the disassembled fasteners and stores them in the storage device.

需要特别说明的是,扣件拆卸装置12与扣件收集装置14均可以采用自动化程度更高的全自动化拆扣件和收集扣件装置,也可采用人工或小机进行扣件的拆卸或安装。It should be noted that both the fastener dismantling device 12 and the fastener collecting device 14 can adopt a fully automatic fastener dismantling and collecting fastener device with a higher degree of automation, or manually or a small machine can be used to disassemble or install fasteners. .

作为本申请的一个实施例,道砟处理车B可以包括道砟处理车和扣件处理车,道砟处理装置设置于道砟处理车;扣件拆卸收集装置设置于扣件处理车。也可以将道砟处理装置与扣件拆卸收集装置按照作业合理布置于道砟处理车B。As an embodiment of the present application, the ballast processing vehicle B may include a ballast processing vehicle and a fastener processing vehicle, the ballast processing device is provided on the ballast processing vehicle, and the fastener removal and collecting device is provided on the fastener processing vehicle. The ballast processing device and the fastener removal collection device can also be reasonably arranged on the ballast processing vehicle B according to the operation.

值得说明的是,本申请通过上述实施例一次实现多枕的更换,施工效率高。It is worth noting that the present application realizes the replacement of multiple pillows at one time through the above-mentioned embodiment, and the construction efficiency is high.

作为本申请的一个实施例,道砟处理车B下方还安装有第一测量装置8与提升机构,提升机构用于控制测量装置的升降,第一测量装置8用于测量轨道参数。提升机构可以采用气缸或油缸控制第一测量装置8的升降。As an embodiment of the present application, a first measuring device 8 and a lifting mechanism are installed under the ballast processing vehicle B, the lifting mechanism is used to control the lifting of the measuring device, and the first measuring device 8 is used to measure track parameters. The lifting mechanism can use a cylinder or an oil cylinder to control the lifting of the first measuring device 8 .

实施中,第一测量装置8可以通过接触测量,例如使用升降架上安装测量轮,提升机构控制升降架的升降;具体地,第一测量装置8解锁后缓慢落下,直至测量轮与轨道接触,测量轮测量轨道参数,便于恢复轨道原始状态;作业完成后,第一测量装置8向上提起离开轨道面并锁定,便于作业后高速走行。也可以通过传感器测量。In practice, the first measuring device 8 can be measured by contact, such as using a measuring wheel installed on the lifting frame, and the lifting mechanism controls the lifting of the lifting frame; specifically, after the first measuring device 8 is unlocked, it slowly falls until the measuring wheel contacts the track. The measuring wheel measures the parameters of the track, which is convenient for restoring the original state of the track; after the operation is completed, the first measuring device 8 is lifted up to leave the track surface and locked, which is convenient for high-speed walking after the operation. It can also be measured by sensors.

作为本申请的一个实施例,换枕作业车C下方还安装有拨轨装置24,道砟回填后通过拨轨装置24将钢轨测量参数拨回承轨槽内,实现轨道复制。As an embodiment of the present application, a rail shifting device 24 is installed under the pillow changing vehicle C. After the ballast is backfilled, the rail shifting device 24 dials the measured parameters of the rail back into the rail bearing groove to realize track duplication.

如图4-图7所示,作为本申请的实施例,所述换枕作业车C上安装有提轨装置16;具体地,换枕作业车C上设置若干个提轨装置16,对称分布于轨道提升区域。提轨装置16提升换枕区段轨道的高度,使轨道底面高于道钉,便于旧轨枕被取出回收,以及方便新轨枕的布放。As shown in Figures 4-7, as an embodiment of the present application, a rail lifting device 16 is installed on the pillow changing vehicle C; specifically, several rail lifting devices 16 are arranged on the pillow changing vehicle C, symmetrically distributed in the track lift area. The rail lifting device 16 raises the height of the track in the sleeper changing section, so that the bottom surface of the track is higher than the spikes, so that the old sleeper is taken out and recovered, and the new sleeper is conveniently placed.

实施中,提轨装置16多种结构均可实现,如图6所示,以一种简单的结构形式介绍本申请提轨装置16的工作原理,提轨装置16包括升降杆1601,升降杆1601的升降方式采用电动或者油缸驱动的形式,升降杆上端连接在换枕作业车C,下端设置多个夹爪或吸盘1602将轨道夹住或吸住,由升降杆1601带动升降完成提轨的动作。提轨装置16的安装可实现在不锯断轨道的情况下轨枕的更换。In practice, various structures of the rail lifting device 16 can be realized, as shown in Figure 6, the working principle of the rail lifting device 16 of the present application is introduced in a simple structural form, the rail lifting device 16 includes a lifting rod 1601, a lifting rod 1601 The lifting method adopts the form of electric or oil cylinder drive. The upper end of the lifting rod is connected to the pillow changing operation vehicle C, and the lower end is equipped with multiple jaws or suction cups 1602 to clamp or suck the rail, and the lifting rod 1601 is driven to lift to complete the action of lifting the rail . The installation of the rail lifting device 16 can realize the replacement of sleepers without sawing off the track.

作为本申请的实施例,动力车D的底部沿作业列车行进方向依次还安装有扣件安装装置25与边坡整形装置26;扣件安装装置25用于在轨道下落至轨枕后完成扣件的安装及紧固工作;边坡整形装置26用于轨道边坡道砟的整形。扣件安装装置25可以采用自动化程度高的安装扣件的设备完成也可采用人工加小机的方式进行。As an embodiment of the present application, a fastener installation device 25 and a slope shaping device 26 are successively installed on the bottom of the power vehicle D along the traveling direction of the work train; the fastener installation device 25 is used to complete the installation of the fastener after the track falls to the sleeper Installation and fastening work; the slope shaping device 26 is used for shaping the track side slope ballast. The fastener installation device 25 can be completed by using equipment for installing fasteners with a high degree of automation, or by manually adding a small machine.

实施中,动力车D还设置有动力区与动力系统23;动力区与动力系统23用于为边坡道砟整形、安装扣件及整车提供动力。During implementation, the power car D is also provided with a power zone and a power system 23; the power zone and the power system 23 are used to provide power for shaping the side slope ballast, installing fasteners and the whole vehicle.

作为本申请的一个实施例,动力车D下方前后两端安装有第二测量装置15,动力车D前端的第二测量装置15测量拨轨后轨道参数,动力车D后端的第三测量装置27测量作业完成后的轨道参数。As an embodiment of the present application, a second measuring device 15 is installed at the front and rear ends of the bottom of the powered car D, the second measuring device 15 at the front end of the powered car D measures the track parameters after the track is shifted, and the third measuring device 27 at the rear end of the powered car D Orbital parameters after the survey job is complete.

下面将进一步结合具体的作业过程介绍上述具体实施例描述的连续换枕作业列车的作业方法,包括以下步骤:The operation method of the continuous pillow-changing operation train described in the above-mentioned specific embodiment will be further introduced below in conjunction with the specific operation process, including the following steps:

步骤一:道砟处理车B中的道砟处理装置挖掘轨道两侧的道砟并将道砟传送至道砟输送平台上,轨枕间的道砟转移至轨道的两侧;Step 1: The ballast processing device in the ballast processing vehicle B excavates the ballast on both sides of the track and transfers the ballast to the ballast conveying platform, and the ballast between the sleepers is transferred to both sides of the track;

步骤二:换枕作业车C中的提轨装置16将钢轨提离枕面高于道钉;Step 2: The rail lifting device 16 in the pillow changing operation vehicle C lifts the rail away from the pillow surface and is higher than the spike;

步骤三:换枕作业车C旋转收集旧轨枕4并传递给轨枕运输车;Step 3: the sleeper changing operation vehicle C rotates to collect the old sleeper 4 and passes it to the sleeper transport vehicle;

步骤四:换枕作业车将新轨枕1旋转放置于目标放置位置;Step 4: The sleeper changing vehicle rotates and places the new sleeper 1 at the target placement position;

步骤五:道砟处理装置将道砟回填至轨道内侧。Step 5: The ballast processing device backfills the ballast to the inner side of the track.

作为本申请的具体实施例,在步骤一之前,也就是,道砟处理车中的道砟处理装置挖掘并收集旧轨枕两侧的道砟之前,还设置如下步骤:道砟处理车下方的第一测量装置8解锁,提升机构将第一测量装置8放下至与轨面接触,第一测量装置8测量并记录轨道参数;完成后,提升装置16将第一测量装置8向上提起离开轨道面,第一测量装置8锁定。As a specific embodiment of the present application, before step 1, that is, before the ballast processing device in the ballast processing vehicle excavates and collects the ballast on both sides of the old sleeper, the following steps are also set: the first step under the ballast processing vehicle A measuring device 8 is unlocked, and the lifting mechanism lowers the first measuring device 8 to contact with the rail surface, and the first measuring device 8 measures and records the track parameters; after completion, the lifting device 16 lifts the first measuring device 8 upwards to leave the track surface, The first measuring device 8 is locked.

作为本申请的具体实施例,步骤一,道砟处理车B中的道砟处理装置挖掘轨道两侧的道砟并将道砟传送至道砟输送平台上,轨枕间的道砟转移至轨道的两侧,具体包括如下步骤:As a specific embodiment of the present application, step 1, the ballast processing device in the ballast processing vehicle B excavates the ballast on both sides of the track and transfers the ballast to the ballast conveying platform, and the ballast between the sleepers is transferred to the track Both sides, specifically include the following steps:

(1)边坡挖掘装置11将旧轨枕4两侧的道砟传送至道砟输送平台13上;(1) The slope excavation device 11 transfers the ballast on both sides of the old sleeper 4 to the ballast conveying platform 13;

(2)枕间扒砟装置10将旧轨枕4间的道砟扒向轨道的两侧。(2) The ballast removal device 10 between the sleepers removes the ballast between the 4 old sleepers to both sides of the track.

实施中,道砟采用边坡挖掘装置11进行边坡挖掘和枕间扒砟装置10进行枕间扒砟处理,枕底道砟不进行处理;During the implementation, the ballast is excavated by the slope excavation device 11 and the ballast between the pillows is removed by the ballast between pillows device 10, and the ballast under the pillow is not processed;

作为本申请的具体实施例,在步骤二之前,也就是,换枕作业车C中的提轨装置16将钢轨提离枕面高于道钉之前,还设置如下步骤:As a specific embodiment of the present application, before the second step, that is, before the rail lifting device 16 in the pillow changing operation vehicle C lifts the rail away from the pillow surface and is higher than the spike, the following steps are also set:

(1)扣件拆卸装置12拆卸多个旧轨枕4的扣件;(1) Fastener removal device 12 removes the fasteners of a plurality of old sleepers 4;

(2)扣件收集装置14利用磁力装置将拆卸的扣件收集起来,并储存至储存装置内。(2) The fastener collection device 14 uses a magnetic device to collect the disassembled fasteners and store them in the storage device.

作为本申请的具体实施例,步骤三,换枕作业车C收集旧轨枕4并传递给轨枕运输车A,具体包括如下步骤:As a specific embodiment of the present application, in step 3, the sleeper changing operation vehicle C collects the old sleeper 4 and delivers it to the sleeper transport vehicle A, which specifically includes the following steps:

(1)轨枕并拢装置17将多根旧轨枕4并拢成形成旧枕组;实施中,可以将多根旧轨枕4并拢成一组,比如三枕或四枕并拢成一组。(1) The sleeper bringing together device 17 brings together many old sleepers 4 to form an old sleeper group; during implementation, many old sleepers 4 can be brought together into a group, such as three sleepers or four sleepers together into a group.

(3)旧枕第一拾取装置19夹持旧枕组并将旧枕组旋转90°后放置于转运平台18上;(3) The first pick-up device 19 for the old pillow clamps the old pillow group and rotates the old pillow group by 90° and places it on the transfer platform 18;

(4)旧枕第二拾取装置20将旧枕组从转运平台18夹持后放置于上旧枕输送平台6上;(4) The second pick-up device 20 for old pillows clamps the old pillow group from the transfer platform 18 and places it on the upper old pillow conveying platform 6;

(5)旧枕输送平台6将旧枕组转运至轨枕输送车A上。(5) The old sleeper conveying platform 6 transfers the old sleeper group to the sleeper conveying vehicle A.

作为本申请的具体实施例,步骤四,换枕作业车C将新轨枕置于新轨枕目标放置位置,具体包括如下步骤:As a specific embodiment of the present application, in step 4, the sleeper changing operation vehicle C places the new sleeper at the target placement position of the new sleeper, specifically including the following steps:

(1)新枕第一布放装置21夹取新枕输送平台5输送的新轨枕组置于道床上;(1) The new sleeper first deployment device 21 clamps the new sleeper group transported by the new sleeper delivery platform 5 and places it on the ballast bed;

(2)新枕第二布放装置22将新轨枕组旋转90°调整好轨枕间距后置于目标位置。(2) The second arrangement device 22 for the new sleeper rotates the new sleeper group by 90° and places it at the target position after adjusting the distance between the sleepers.

作为本申请的具体实施例,步骤五:道砟处理装置将道砟回填至轨道内侧,具体为道砟由道砟处理装置的道砟输送带13输送回填至轨道内侧。As a specific embodiment of the present application, step five: the ballast processing device backfills the ballast to the inner side of the track, specifically, the ballast is transported and backfilled to the inner side of the track by the ballast conveyor belt 13 of the ballast processing device.

作为本申请的实施例,为了完成扣件的安装及轨道两边的道砟整形,连续换枕作业列车的作业方法还包括以下步骤:As an embodiment of the present application, in order to complete the installation of fasteners and ballast shaping on both sides of the track, the operation method of the continuous pillow changing operation train also includes the following steps:

步骤六:动力车D底部的扣件安装装置25在轨道下落至轨枕后安装扣件;Step 6: the fastener installation device 25 at the bottom of the power car D installs the fastener after the track falls to the sleeper;

步骤七:动力车D底部的边坡整形装置26将轨道边坡道砟整形处理。Step 7: The slope shaping device 26 at the bottom of the power car D shapes the track side slope ballast.

通过本申请实施例提供的连续换枕作业列车及作业方法,可以在不锯断轨道的情况下,一次实现多轨枕的更换,实现了在一个天窗点下扣件拆卸、轨枕更换、扣件安装及轨枕运输的一体化连续作业,且由于连续换枕作业列车及作业方法可以再不切轨进行轨枕更换,极大的降低了后续的施工成本和施工时间。Through the continuous sleeper replacement operation train and operation method provided by the embodiment of the present application, multiple sleepers can be replaced at one time without sawing off the track, and fastener removal, sleeper replacement, and fastener installation can be realized at one skylight point And the integrated continuous operation of sleeper transportation, and because of the continuous sleeper changing operation train and operation method, the sleeper can be replaced without cutting the track, which greatly reduces the subsequent construction cost and construction time.

在本申请的描述中,需要理解的是,术语“中心”、“纵向”、“横向”、“长度”、“宽度”、“厚度”、“上”、“下”、“前”、“后”、“左”、“右”、“竖直”、“水平”、“顶”、“底”“内”、“外”等指示的方位或位置关系为基于附图所示的方位或位置关系,仅是为了便于描述本申请和简化描述,而不是指示或暗示所指的装置或元件必须具有特定的方位、以特定的方位构造和操作,因此不能理解为对本申请的限制。In the description of the present application, it should be understood that the terms "center", "longitudinal", "transverse", "length", "width", "thickness", "upper", "lower", "front", " The orientation or positional relationship indicated by "rear", "left", "right", "vertical", "horizontal", "top", "bottom", "inner" and "outer" are based on the orientation or position shown in the drawings The positional relationship is only for the convenience of describing the present application and simplifying the description, but does not indicate or imply that the referred device or element must have a specific orientation, be constructed and operated in a specific orientation, and thus should not be construed as limiting the present application.

此外,术语“第一”、“第二”仅用于描述目的,而不能理解为指示或暗示相对重要性或者隐含指明所指示的技术特征的数量。由此,限定有“第一”、“第二”的特征可以明示或者隐含地包括一个或者更多个该特征。在本申请的描述中,“多个”的含义是至少两个,例如两个,三个等,除非另有明确具体的限定。In addition, the terms "first" and "second" are used for descriptive purposes only, and cannot be interpreted as indicating or implying relative importance or implicitly specifying the quantity of indicated technical features. Thus, a feature defined as "first" and "second" may explicitly or implicitly include one or more of these features. In the description of the present application, "plurality" means at least two, such as two, three, etc., unless otherwise specifically defined.

在本申请中,除非另有明确的规定和限定,术语“安装”、“相连”、“连接”、“固定”等术语应做广义理解,例如,可以是固定连接,也可以是可拆卸连接,或成一体;可以是机械连接,也可以是电连接或可以互相通讯;可以是直接相连,也可以通过中间媒介间接相连,可以是两个元件内部的连通或两个元件的相互作用关系。对于本领域的普通技术人员而言,可以根据具体情况理解上述术语在本申请中的具体含义。In this application, terms such as "installation", "connection", "connection" and "fixation" should be interpreted in a broad sense, for example, it can be a fixed connection or a detachable connection, unless otherwise clearly specified and limited. , or integrated; it can be mechanically connected, or electrically connected, or can communicate with each other; it can be directly connected, or indirectly connected through an intermediary, and it can be the internal communication of two components or the interaction relationship between two components. Those of ordinary skill in the art can understand the specific meanings of the above terms in this application according to specific situations.

尽管已描述了本申请的优选实施例,但本领域内的技术人员一旦得知了基本创造性概念,则可对这些实施例作出另外的变更和修改。所以,所附权利要求意欲解释为包括优选实施例以及落入本申请范围的所有变更和修改。While preferred embodiments of the present application have been described, additional changes and modifications can be made to these embodiments by those skilled in the art once the basic inventive concept is appreciated. Therefore, the appended claims are intended to be construed to cover the preferred embodiment and all changes and modifications which fall within the scope of the application.

显然,本领域的技术人员可以对本申请进行各种改动和变型而不脱离本申请的精神和范围。这样,倘若本申请的这些修改和变型属于本申请权利要求及其等同技术的范围之内,则本申请也意图包含这些改动和变型在内。Obviously, those skilled in the art can make various changes and modifications to the application without departing from the spirit and scope of the application. In this way, if these modifications and variations of the present application fall within the scope of the claims of the present application and their equivalent technologies, the present application is also intended to include these modifications and variations.

Claims (20)

1.一种连续换枕作业列车,包括相连接的道砟处理车及换枕作业车,其特征在于,1. A continuous pillow-changing operation train, comprising a connected ballast processing vehicle and a pillow-changing operation vehicle, characterized in that, 道砟处理车,设置有道砟处理装置;所述道砟处理装置用于挖掘并运输轨道两侧道砟,将轨枕间道砟转移至轨道两侧,并在换枕作业车完成换枕后将道砟回填至轨道内侧;The ballast processing vehicle is equipped with a ballast processing device; the ballast processing device is used to excavate and transport the ballast on both sides of the track, transfer the ballast between sleepers to the two sides of the track, and transfer the ballast to the Backfill the ballast to the inner side of the track; 换枕作业车,用于回收旧轨枕和布放新轨枕;所述换枕作业车设置有提轨装置,所述提轨装置用于将钢轨抬离枕面高于道钉。The sleeper changing operation vehicle is used to recover old sleepers and lay out new sleepers; the sleeper changing operation vehicle is provided with a rail lifting device, and the rail lifting device is used to lift the rail from the sleeper surface to be higher than the spike. 2.如权利要求1所述的连续换枕作业列车,其特征在于,所述道砟处理装置装置包括:2. The continuous sleeper changing operation train according to claim 1, wherein the ballast processing device comprises: 枕间道砟处理装置,连接于道砟处理车的下方,用于将轨枕间的道砟转移至轨道的两侧;The inter-sleeper ballast treatment device is connected under the ballast treatment vehicle and is used to transfer the ballast between sleepers to both sides of the track; 边坡挖掘装置,用于挖掘轨道两侧的道砟,将道砟传送至道砟输送平台上。The side slope excavating device is used to excavate the ballast on both sides of the track and transfer the ballast to the ballast conveying platform. 3.如权利要求2所述的连续换枕作业列车,其特征在于,所述道砟处理装置还包括道砟输送平台,所述道砟输送平台安装于道砟处理车的上方,一端与边坡挖掘装置相连接,另一端延伸至道砟回填处。3. The continuous pillow changing operation train according to claim 2, wherein the ballast processing device further comprises a ballast conveying platform, and the ballast conveying platform is installed above the ballast processing vehicle, and one end is connected to the side The slope excavation device is connected, and the other end extends to the ballast backfill. 4.如权利要求1所述的连续换枕作业列车,其特征在于,所述换枕作业车包括轨枕并拢装置、旧枕拾取装置;4. The continuous sleeper changing operation train according to claim 1, wherein the sleeper changing operation vehicle comprises a sleeper closing device and an old sleeper picking device; 轨枕并拢装置,设置于旧枕拾取装置的前方,将多根旧轨枕并拢为旧枕组;The sleeper closing device is arranged in front of the old sleeper pick-up device, and combines multiple old sleepers into an old sleeper group; 旧枕拾取装置用于夹持轨枕并拢装置并拢好的旧轨枕组并将旧轨枕组旋转后放置于轨枕输送平台。The old sleeper pick-up device is used to clamp the old sleeper group put together by the sleeper closing device and rotate the old sleeper group and place it on the sleeper conveying platform. 5.如权利要求1所述的连续换枕作业列车,其特征在于,所述换枕作业车包括新枕布放装置以及拨轨装置;5. The continuous pillow changing operation train according to claim 1, wherein the pillow changing operation vehicle comprises a new pillow laying device and a rail shifting device; 新枕布放装置用于夹取新轨枕组并将新轨枕组旋转后按照轨枕间距置于新轨枕目标放置位置;The new sleeper placement device is used to pick up the new sleeper group and rotate the new sleeper group to place the new sleeper at the target placement position according to the sleeper spacing; 拨轨装置,设置于新枕布放装置的后方,用于将轨道按原状拨回承轨槽。The rail shifting device is arranged behind the new pillow laying device, and is used to dial the rail back to the bearing rail groove according to the original state. 6.如权利要求1所述的连续换枕作业列车,其特征在于,还包括轨枕运输车及动力车;6. The continuous sleeper changing operation train according to claim 1, further comprising a sleeper transport vehicle and a power vehicle; 轨枕运输车用于存放及运输新轨枕和旧轨枕;Sleeper transport vehicles are used to store and transport new and used sleepers; 动力车,用于为作业列车提供动力。The power car is used to provide power for the work train. 7.如权利要求6所述的连续换枕作业列车,其特征在于,所述轨枕运输车包括:多辆平板车及龙门行车;7. The continuous sleeper changing operation train according to claim 6, wherein the sleeper transport vehicle comprises: a plurality of flatbed vehicles and gantry cranes; 多辆平板车前后依次连挂,用于承载新轨枕、旧轨枕;各平板车上设有滑行轨道,各平板车之间设有过轨装置,过轨装置用于连接相邻两辆平板车上的滑行轨道;A number of flatbed cars are connected in succession to carry new sleepers and old sleepers; each flatbed car is equipped with sliding rails, and there is a rail crossing device between each flatbed car, which is used to connect the sliding rails on two adjacent flatbed cars ; 龙门行车可在各辆平板车之间沿滑行轨道和过轨装置行走;所述龙门行车上设置有可上下移动的轨枕夹取装置。The gantry crane can walk along the sliding track and the rail crossing device between the flat cars; the gantry crane is provided with a sleeper clamping device that can move up and down. 8.如权利要求6所述的连续换枕作业列车,其特征在于,还包括:轨枕输送平台,设置于换枕作业车、道砟处理车、轨枕运输车之间,用于将拆卸的旧轨枕输送至轨枕运输车上,将轨枕运输车上的新轨枕输送至新枕布放装置前方。8. The continuous sleeper changing operation train according to claim 6, further comprising: a sleeper conveying platform, which is arranged between the sleeper changing operation vehicle, the ballast processing vehicle, and the sleeper transport vehicle, and is used for dismantling old The sleeper is transported to the sleeper transport vehicle, and the new sleeper on the sleeper transport vehicle is transported to the front of the new sleeper laying device. 9.根据权利要求8所述的连续换枕作业列车,其特征在于,所述轨枕输送平台包括:9. The continuous sleeper changing operation train according to claim 8, wherein the sleeper conveying platform comprises: 旧枕输送平台,从换枕作业车延伸至轨枕运输车;The used sleeper conveying platform extends from the sleeper changing operation vehicle to the sleeper transport vehicle; 旧枕旋转装置,用于将旧枕输送平台上的旧轨枕转动90°后进行运输;The old sleeper rotating device is used to rotate the old sleepers on the old sleeper conveying platform by 90° for transportation; 新枕输送平台,从换枕作业车延伸至轨枕运输车;The new sleeper delivery platform extends from the sleeper changing vehicle to the sleeper transporter; 新枕旋转装置,用于将旧枕输送平台上的旧轨枕转动90°后进行运输。The new sleeper rotating device is used to rotate the old sleeper on the old sleeper conveying platform by 90° for transportation. 10.如权利要求1所述的连续换枕作业列车,其特征在于,道砟处理车还设置有扣件拆卸收集装置,用于将旧轨枕上的扣件拆除、收集及存储;所述扣件拆卸收集装置包括:10. The continuous sleeper changing operation train as claimed in claim 1, characterized in that the ballast processing vehicle is also provided with a fastener removal collection device for removing, collecting and storing fasteners on old sleepers; Parts removal collection devices include: 扣件拆卸装置,连接于道砟处理车的下方,用于拆卸多个旧轨枕的扣件;The fastener dismantling device is connected to the bottom of the ballast handling vehicle, and is used to disassemble the fasteners of multiple old sleepers; 扣件收集装置,用于收集并存储扣件拆卸装置拆卸的扣件。The fastener collection device is used to collect and store the fasteners removed by the fastener removal device. 11.如权利要求1所述的连续换枕作业列车,其特征在于,所述道砟处理车下方还安装有测量装置与提升机构;提升机构,用于控制所述测量装置的升降;测量装置,用于测量轨道参数。11. The continuous pillow changing operation train according to claim 1, characterized in that, a measuring device and a lifting mechanism are installed below the ballast processing vehicle; a lifting mechanism is used to control the lifting of the measuring device; the measuring device , used to measure orbital parameters. 12.如权利要求6所述的连续换枕作业列车,其特征在于,所述动力车的底部安装有测量装置、扣件安装装置、边坡整形装置;12. The continuous pillow changing operation train according to claim 6, characterized in that, the bottom of the power car is equipped with a measuring device, a fastener installation device, and a slope shaping device; 测量装置用于测量轨道参数;Measuring devices for measuring orbital parameters; 扣件安装装置用于在轨道下落至轨枕后安装扣件;The fastener installation device is used to install the fastener after the track falls to the sleeper; 边坡整形装置用于对轨道边坡道砟进行整形。The slope shaping device is used to shape the ballast of the track side slope. 13.一种连续换枕作业方法,其特征在于,应用如权利要求1-12任一所述的连续换枕作业列车,包括如下具体步骤:13. A continuous pillow-changing operation method, characterized in that, applying the continuous pillow-changing operation train according to any one of claims 1-12 comprises the following specific steps: 道砟处理车中的道砟处理装置挖掘轨道两侧的道砟并将道砟传送至道砟输送平台上,轨枕间的道砟转移至轨道的两侧;The ballast treatment device in the ballast treatment vehicle excavates the ballast on both sides of the track and transfers the ballast to the ballast conveying platform, and the ballast between the sleepers is transferred to both sides of the track; 换枕作业车中的提轨装置将钢轨提离枕面高于道钉;The rail lifting device in the pillow changing operation vehicle lifts the rail away from the pillow surface and is higher than the spike; 换枕作业车旋转收集旧轨枕并传递给轨枕运输车;The sleeper changing vehicle rotates to collect old sleepers and transfers them to the sleeper transport vehicle; 换枕作业车将新轨枕旋转放置于目标放置位置;The sleeper changing vehicle rotates and places the new sleeper at the target placement position; 道砟处理装置将道砟回填至轨道内侧。The ballast treatment device backfills the ballast to the inner side of the track. 14.如权利要求13所述的连续换枕作业方法,其特征在于,还包括:14. The continuous pillow changing operation method according to claim 13, further comprising: 动力车底部的测量装置记录拨轨后的轨道参数及作业完成后的轨道参数;The measuring device at the bottom of the power car records the track parameters after the track is dialed and the track parameters after the work is completed; 动力车底部的扣件安装装置在轨道下落至轨枕后安装扣件;The fastener installation device at the bottom of the power car installs fasteners after the track falls to the sleeper; 动力车底部的边坡整形装置将轨道边坡道砟整形处理。The side slope shaping device at the bottom of the power car will shape the track side slope ballast. 15.如权利要求13所述的连续换枕作业方法,其特征在于,在道砟处理车中的道砟处理装置挖掘并收集旧轨枕两侧的道砟之前,还包括:15. The continuous sleeper changing operation method as claimed in claim 13, characterized in that, before the ballast treatment device in the ballast treatment vehicle excavates and collects the ballast on both sides of the old sleeper, it also includes: 道砟处理车下方的测量装置解锁,提升机构将所述测量装置放下至与轨面接触,测量装置测量并记录轨道参数;完成后,提升机构将所述测量装置向上提起离开轨道面,测量装置锁定。The measuring device under the ballast handling vehicle is unlocked, and the lifting mechanism lowers the measuring device to contact with the rail surface, and the measuring device measures and records the track parameters; after completion, the lifting mechanism lifts the measuring device up to leave the track surface, and the measuring device locking. 16.如权利要求13所述的连续换枕作业方法,其特征在于,道砟处理车中的道砟处理装置用于将轨枕间的道砟扒向轨道的两侧,以及挖掘轨道两侧的道砟并将道砟传送至道砟输送平台上,包括:16. The continuous sleeper changing operation method as claimed in claim 13, characterized in that, the ballast processing device in the ballast processing vehicle is used to scrape the ballast between the sleepers to both sides of the track, and excavate the ballast on both sides of the track. ballast and transfer the ballast to the ballast conveying platform, including: 枕间道砟处理装置将旧轨枕间的道砟转移至轨道的两侧;The inter-sleeper ballast processing device transfers the ballast between the old sleepers to both sides of the track; 边坡挖掘装置将旧轨枕两侧的道砟传送至道砟输送平台上。The slope excavation device transfers the ballast on both sides of the old sleeper to the ballast conveying platform. 17.如权利要求13所述的连续换枕作业方法,其特征在于,道砟处理车中的扣件拆卸收集装置拆除并收集旧轨枕上的扣件,包括:17. The continuous sleeper changing operation method according to claim 13, characterized in that, the fastener dismantling and collecting device in the ballast treatment vehicle removes and collects the fasteners on the old sleepers, including: 扣件拆卸装置拆卸多个旧轨枕的扣件;The fastener removal device removes the fasteners of multiple old sleepers; 扣件收集装置将扣件拆卸装置拆卸的扣件收集储存起来。The fastener collection device collects and stores the fasteners dismantled by the fastener removal device. 18.如权利要求13所述的连续换枕作业方法,其特征在于,换枕作业车旋转收集旧轨枕并传递给轨枕运输车,包括:18. The continuous sleeper changing operation method according to claim 13, wherein the sleeper changing operation vehicle rotates to collect old sleepers and transfers them to the sleeper transport vehicle, comprising: 轨枕并拢装置将多根旧轨枕并拢成形成旧枕组;The sleeper putting device puts together a plurality of old sleepers to form an old sleeper group; 旧枕拾取装置夹持旧枕组并将旧枕组旋转后放置于旧枕输送平台上。The old pillow picking device clamps the old pillow group and rotates the old pillow group and places it on the old pillow conveying platform. 19.如权利要求13所述的连续换枕作业方法,其特征在于,换枕作业车将新轨枕旋转放置于目标放置位置,包括:19. The continuous sleeper changing operation method according to claim 13, wherein the sleeper changing operation vehicle rotates and places the new sleeper at the target placement position, comprising: 新枕布放装置夹取轨轨枕输送平台的新轨枕组并将新轨枕组旋转后按照轨枕间距置于新轨枕目标放置位置。The new sleeper laying device clamps the new sleeper group of the sleeper conveying platform and rotates the new sleeper group and places it at the target placement position of the new sleeper according to the sleeper spacing. 20.如权利要求13所述的连续换枕作业方法,其特征在于,道砟处理装置将道砟回填至轨道内侧之后,还包括:20. The continuous pillow changing operation method according to claim 13, characterized in that, after the ballast processing device backfills the ballast to the inner side of the track, it further comprises: 拨轨装置,将轨道按原状拨回承轨槽。The rail shifting device dials the rail back to the rail bearing groove according to the original state.
CN202211130117.2A 2022-09-15 2022-09-15 Continuous sleeper-changing operation train and operation method Active CN115450077B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202211130117.2A CN115450077B (en) 2022-09-15 2022-09-15 Continuous sleeper-changing operation train and operation method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202211130117.2A CN115450077B (en) 2022-09-15 2022-09-15 Continuous sleeper-changing operation train and operation method

Publications (2)

Publication Number Publication Date
CN115450077A true CN115450077A (en) 2022-12-09
CN115450077B CN115450077B (en) 2025-10-17

Family

ID=84305148

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202211130117.2A Active CN115450077B (en) 2022-09-15 2022-09-15 Continuous sleeper-changing operation train and operation method

Country Status (1)

Country Link
CN (1) CN115450077B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116145483A (en) * 2023-03-31 2023-05-23 中国铁建高新装备股份有限公司 A continuous sleeper replacement operation vehicle and its operation method

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1109935A (en) * 1993-12-07 1995-10-11 弗兰茨普拉塞铁路机械工业股份有限公司 Method and working train for renewing old sleeper of rail
CN2552999Y (en) * 2002-06-07 2003-05-28 中国铁道建筑总公司昆明机械厂 Machine for replacing sleeper
AT7113U2 (en) * 2004-06-07 2004-10-25 Plasser Bahnbaumasch Franz METHOD FOR REPLACING DAMAGED THREADS OF A TRACK AND MACHINE
EP1607522A1 (en) * 2004-06-07 2005-12-21 Franz Plasser Bahnbaumaschinen-Industriegesellschaft m.b.H. A method and a machine for exchanging railway sleepers
CN106906705A (en) * 2017-04-28 2017-06-30 株洲时代电子技术有限公司 A kind of sleeper replacement device and its operational method
CN110965408A (en) * 2019-12-20 2020-04-07 武汉利德测控技术有限公司 Switch digs tiny fragments of stone, coal, etc. unit
CN111733638A (en) * 2020-07-06 2020-10-02 中铁一局集团有限公司 Railway mechanical sleeper replacement construction method based on sleeper replacement machine
CN218596780U (en) * 2022-09-15 2023-03-10 中国铁建高新装备股份有限公司 Continuous sleeper-changing operation train

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1109935A (en) * 1993-12-07 1995-10-11 弗兰茨普拉塞铁路机械工业股份有限公司 Method and working train for renewing old sleeper of rail
CN2552999Y (en) * 2002-06-07 2003-05-28 中国铁道建筑总公司昆明机械厂 Machine for replacing sleeper
AT7113U2 (en) * 2004-06-07 2004-10-25 Plasser Bahnbaumasch Franz METHOD FOR REPLACING DAMAGED THREADS OF A TRACK AND MACHINE
EP1607522A1 (en) * 2004-06-07 2005-12-21 Franz Plasser Bahnbaumaschinen-Industriegesellschaft m.b.H. A method and a machine for exchanging railway sleepers
CN106906705A (en) * 2017-04-28 2017-06-30 株洲时代电子技术有限公司 A kind of sleeper replacement device and its operational method
CN110965408A (en) * 2019-12-20 2020-04-07 武汉利德测控技术有限公司 Switch digs tiny fragments of stone, coal, etc. unit
CN111733638A (en) * 2020-07-06 2020-10-02 中铁一局集团有限公司 Railway mechanical sleeper replacement construction method based on sleeper replacement machine
CN218596780U (en) * 2022-09-15 2023-03-10 中国铁建高新装备股份有限公司 Continuous sleeper-changing operation train

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116145483A (en) * 2023-03-31 2023-05-23 中国铁建高新装备股份有限公司 A continuous sleeper replacement operation vehicle and its operation method

Also Published As

Publication number Publication date
CN115450077B (en) 2025-10-17

Similar Documents

Publication Publication Date Title
AU595647B2 (en) Tie exchange method
US4307667A (en) Railroad track relaying train
CN1179091C (en) Machinery and working methods for demolition of old track and laying of new track
US4809614A (en) Mobile tie gang apparatus
SU884578A3 (en) Device for changing rails and sleepers of railroad
CN1066507C (en) Method and working train for renewing old sleeper of rail
US4955301A (en) Tie exchange machine
US6415720B2 (en) Machine for renewing a railroad track
CN87104397A (en) Change the machinery of circuit rail, sleeper
CN106592351B (en) Pillow device and method are changed in a kind of overhaul
CN114892457B (en) Construction method of integrated sleeper recovery operation vehicle without rail cutting replacement
CN105473787A (en) Method for renewing sleepers and cleaning gravel ballast under raised rails
US4955302A (en) Mobile tie gang apparatus
CN115450077A (en) Continuous sleeper-changing operation train and operation method
CN208088032U (en) A kind of railway tunnel bridge ballast screen scarifier taking electric equipment with contact net
CN208088031U (en) A kind of railway tunnel bridge ballast screen scarifier
CN218596780U (en) Continuous sleeper-changing operation train
US4862806A (en) Mobile tie gang apparatus and tie exchange method
CN217499805U (en) Integrated rail-uncut replacement and recovery sleeper operation vehicle
WO2014019021A1 (en) Ballast undercutter
EP1348057A1 (en) Ballast removal method and apparatus
CN221029331U (en) Railway ballast cleaning device
CN115404730B (en) A combined sleeper replacement unit
CN117265925B (en) Railway ballast cleaning device and method
CN223991218U (en) Device for railway bridge tunnel screening operation

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right

Effective date of registration: 20250116

Address after: No.384, yangfangwang, Guandu District, Kunming, Yunnan, 650217

Applicant after: CRCC HIGH-TECH EQUIPMENT Corp.,Ltd.

Country or region after: China

Applicant after: China National Railway Group Co.,Ltd.

Applicant after: China Railway Kunming Bureau Group Co.,Ltd.

Address before: No.384, yangfangwang, Guandu District, Kunming, Yunnan, 650217

Applicant before: CRCC HIGH-TECH EQUIPMENT Corp.,Ltd.

Country or region before: China

TA01 Transfer of patent application right
GR01 Patent grant
GR01 Patent grant