CN115450077A - Continuous sleeper-changing operation train and operation method - Google Patents
Continuous sleeper-changing operation train and operation method Download PDFInfo
- Publication number
- CN115450077A CN115450077A CN202211130117.2A CN202211130117A CN115450077A CN 115450077 A CN115450077 A CN 115450077A CN 202211130117 A CN202211130117 A CN 202211130117A CN 115450077 A CN115450077 A CN 115450077A
- Authority
- CN
- China
- Prior art keywords
- sleeper
- ballast
- vehicle
- old
- changing operation
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01B—PERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
- E01B29/00—Laying, rebuilding, or taking-up tracks; Tools or machines therefor
- E01B29/06—Transporting, laying, removing or renewing sleepers
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Machines For Laying And Maintaining Railways (AREA)
Abstract
本申请实施例提供一种连续换枕作业列车及作业方法,其中,作业列车包括:道砟处理车及换枕作业车;道砟处理车安装有道砟处理装置;所述道砟处理装置用于挖掘并运输轨道两侧道砟,将轨枕间道砟转移至轨道两侧,并在换枕作业车完成换枕后将道砟回填至轨道内侧;换枕作业车用于回收旧轨枕和布放新轨枕;所述换枕作业车设置有提轨装置,所述提轨装置用于将钢轨抬离枕面高于道钉;本申请提供的连续换枕作业列车及作业方法无需切轨,一次完成多枕的更换,实现了一体化连续作业,施工效率高。
The embodiments of the present application provide a continuous pillow changing operation train and operation method, wherein the operation train includes: a ballast processing vehicle and a pillow changing operation vehicle; the ballast processing vehicle is equipped with a ballast processing device; the ballast processing device is used Excavate and transport the ballast on both sides of the track, transfer the ballast between the sleepers to both sides of the track, and backfill the ballast to the inner side of the track after the sleeper changing operation vehicle completes the sleeper replacement; the sleeper changing operation vehicle is used to recycle old sleepers and lay new ones Sleeper; the sleeper changing operation vehicle is provided with a rail lifting device, and the rail lifting device is used to lift the rail from the sleeper surface higher than the spike; the continuous sleeper changing operation train and operation method provided by this application do not need to cut rails, and can be completed at one time The replacement of multiple pillows realizes integrated continuous operation and high construction efficiency.
Description
技术领域technical field
本申请涉及铁路工程作业领域,尤其涉及连续换枕作业列车及作业方法。The application relates to the field of railway engineering operations, in particular to a continuous sleeper changing operation train and an operation method.
背景技术Background technique
铁路换枕是铁道线路机械化养护中的主要工作之一。随着工程技术的不断发展,换枕工作由传统的全人工作业转变为小型机械和大型养路机械作业,缩短了换枕时间,减轻了施工人员劳动强度,减少了人员配置,便于管理。Railway pillow replacement is one of the main tasks in the mechanized maintenance of railway lines. With the continuous development of engineering technology, the work of changing pillows has changed from traditional all-manual work to small machinery and large-scale road maintenance machinery, which shortens the time for changing pillows, reduces the labor intensity of construction personnel, reduces staffing, and facilitates management.
目前,利用小型机械进行换枕的方法主要有两种:其一,采用小型机械配合轨道抬高设备将轨枕由线路侧向移出,并进行侧抽式更换;其二,采用公铁两用挖机配合轨枕夹具进行施工。这两种方案都需要提前将新枕运输到待更换轨枕的轨道两旁布放,更换完成后需要将放置于轨道两旁的旧枕运走,一方面需占据轨道两旁较大的空间,另一方面需要多次运输工序;而且轨枕更换完成后需要人工上扣件,需要大量人工配合,步骤繁琐且效率较低。此外,现有技术中铁路换枕一般不处理枕底道床,施工质量不高;因此,后续还需要有对轨枕道床进行处理的步骤,导致工序较多,且连贯性较差,进而导致换枕的整个过程持续时间较长,极大地影响了铁路的正常运营。At present, there are two main methods of using small machines to replace sleepers: one is to use small machines to cooperate with track raising equipment to move the sleepers sideways from the line and perform side-extraction replacement; the other is to use road-rail dual-purpose excavators The machine cooperates with the sleeper fixture for construction. Both of these two schemes need to transport the new sleeper to both sides of the track where the sleeper is to be replaced in advance. After the replacement is completed, the old sleeper placed on both sides of the track needs to be transported away. Multiple transportation processes are required; and after the sleeper is replaced, the fasteners need to be manually installed, requiring a lot of manual cooperation, the steps are cumbersome and the efficiency is low. In addition, in the existing technology, railway sleeper replacement generally does not deal with the sleeper bed, and the construction quality is not high; therefore, subsequent steps are required to process the sleeper bed, resulting in more processes and poor continuity, which in turn leads to sleeper replacement. The whole process lasts for a long time, which greatly affects the normal operation of the railway.
采用大型养路机械来进行换枕是采用大修列车的方式进行,大修列车换枕需切断轨道,一般换枕与换轨同时进行,施工效率较低。由于施工时需切断轨道,施工完成后需要对轨道焊接将线路恢复成无缝线路,增加了施工步骤与维护成本。The use of large-scale road maintenance machinery to replace sleepers is carried out in the way of overhauling trains. To change sleepers in overhaul trains, the track needs to be cut off. Generally, sleeper replacement and track replacement are performed at the same time, and the construction efficiency is low. Since the track needs to be cut during construction, the track needs to be welded to restore the line to a seamless line after the construction is completed, which increases the construction steps and maintenance costs.
由鉴于此,特提出本申请。In view of this, the present application is proposed.
发明内容Contents of the invention
为了解决上述技术缺陷之一,本申请实施例中提供了一种连续换枕作业列车及作业方法。In order to solve one of the above-mentioned technical defects, an embodiment of the present application provides a continuous pillow changing operation train and an operation method.
根据本申请实施例的第一个方面,提供了一种连续换枕作业列车,包括:相连的道砟处理车及换枕作业车;According to the first aspect of the embodiment of the present application, a continuous pillow changing operation train is provided, including: a connected ballast processing vehicle and a pillow changing operation vehicle;
道砟处理车,设置有道砟处理装置;所述道砟处理装置用于挖掘运输边坡道砟,将枕间道砟填补边坡道砟,并在换枕作业车完成换枕后将边坡道砟回填至轨道内侧;The ballast treatment vehicle is equipped with a ballast treatment device; the ballast treatment device is used to excavate and transport side slope ballast, fill the side slope with ballast between pillows, and remove the side slope Backfill the ballast to the inner side of the track;
换枕作业车,用于回收旧轨枕和布放新轨枕;所述换枕作业车设置有提轨装置,所述提轨装置用于将钢轨抬离枕面高于道钉;A sleeper changing vehicle is used to recover old sleepers and lay out new sleepers; the sleeper changing vehicle is provided with a rail lifting device, and the rail lifting device is used to lift the rail from the sleeper surface to be higher than the spike;
根据本申请实施例的第二个方面,提供了一种连续换枕作业方法,包括如下具体步骤:According to the second aspect of the embodiment of the present application, a continuous pillow changing operation method is provided, including the following specific steps:
道砟处理车中的道砟处理装置挖掘轨道两侧的道砟并将道砟传送至道砟输送平台上,将轨枕间的道砟转移至轨道的两侧;The ballast treatment device in the ballast treatment vehicle digs the ballast on both sides of the track and transfers the ballast to the ballast conveying platform, and transfers the ballast between the sleepers to both sides of the track;
换枕作业车中的提轨装置将钢轨提离枕面高于道钉;The rail lifting device in the pillow changing operation vehicle lifts the rail away from the pillow surface and is higher than the spike;
换枕作业车旋转收集旧轨枕并传递给轨枕运输车;The sleeper changing vehicle rotates to collect old sleepers and transfers them to the sleeper transport vehicle;
换枕作业车将新轨枕旋转放置于目标放置位置;The sleeper changing vehicle rotates and places the new sleeper at the target placement position;
道砟处理装置将道砟回填至轨道内侧。The ballast treatment device backfills the ballast to the inner side of the track.
采用本申请实施例中提供的连续换枕作业列车及作业方法,具有以下有益下效果:Adopting the continuous pillow changing operation train and operation method provided in the embodiment of the present application has the following beneficial effects:
本申请实施例所提供的技术方案,可在不锯断轨道的情况下一次完成多枕的更换,实现了在一个天窗点下扣件拆卸、轨枕更换、扣件安装及轨枕运输等一体化连续作业,单个作业节拍可完成多根轨枕的更换,节约大量的施工时间、施工效率高。The technical solution provided by the embodiment of this application can complete the replacement of multiple sleepers at one time without sawing off the track, and realizes the integrated and continuous integration of fastener removal, sleeper replacement, fastener installation and sleeper transportation at one skylight point. Operation, a single operation beat can complete the replacement of multiple sleepers, saving a lot of construction time and high construction efficiency.
附图说明Description of drawings
此处所说明的附图用来提供对本申请的进一步理解,构成本申请的一部分,本申请的示意性实施例及其说明用于解释本申请,并不构成对本申请的不当限定。在附图中:The drawings described here are used to provide a further understanding of the application and constitute a part of the application. The schematic embodiments and descriptions of the application are used to explain the application and do not constitute an improper limitation to the application. In the attached picture:
图1为本申请连续换枕作业列车的整体示意图;Fig. 1 is the overall schematic diagram of the continuous pillow changing operation train of the present application;
图2为本申请连续换枕作业列车中轨枕运输车的示意图;Fig. 2 is the schematic diagram of the sleeper transport vehicle in the continuous sleeper changing operation train of the present application;
图3为本申请连续换枕作业列车中道砟处理车的示意图;Fig. 3 is the schematic diagram of the ballast processing vehicle in the continuous pillow changing operation train of the present application;
图4为本申请连续换枕作业列车中的换枕作业车示意图;Fig. 4 is the schematic diagram of the pillow changing operation vehicle in the continuous pillow changing operation train of the present application;
图5为本申请连续换枕作业列车中的动力车示意图;Fig. 5 is the schematic diagram of the power car in the continuous pillow changing operation train of the present application;
图6为本申请实施例连续换枕作业列车中的提轨装置示意图;Fig. 6 is a schematic diagram of the rail lifting device in the continuous pillow changing operation train of the embodiment of the present application;
图7为本申请实施例连续换枕作业列车中的轨枕并拢装置示意图。Fig. 7 is a schematic diagram of a sleeper closing device in a continuous sleeper changing operation train according to an embodiment of the present application.
其中:in:
A:轨枕运输车;B:道砟处理车;C:换枕作业车;D:动力车;A: Sleeper transport vehicle; B: Ballast processing vehicle; C: Sleeper changing operation vehicle; D: Power vehicle;
1、新轨枕;2、平板车;3、龙门行车;4、旧轨枕;5、新枕输送平台;6、旧枕输送平台;7、旧枕旋转装置;8、第一测量装置;9、新枕旋转装置;10、枕间道砟处理装置;11、边坡挖掘装置;12、扣件拆卸装置;13、道砟输送平台;14、扣件收集装置;15、第二测量装置;16、提轨装置;17、轨枕并拢装置18、转运平台;19、旧枕第一拾取装置;20、旧枕第一拾取装置;21、新枕第一布放装置;22、新枕第二布放装置;23、动力系统;24、拨轨装置;25、扣件安装装置;26、边坡整形装置;27、第三测量装置。1. New sleeper; 2. Flatbed truck; 3. Gantry crane; 4. Old sleeper; 5. New sleeper conveying platform; 6. Old sleeper conveying platform; 7. Old sleeper rotating device; 8. First measuring device; Pillow rotation device; 10. Ballast processing device between pillows; 11. Slope excavation device; 12. Fastener removal device; 13. Ballast conveying platform; 14. Fastener collection device; 15. Second measuring device; 16. Lifting Rail device; 17. Sleeper closing device; 18. Transfer platform; 19. First pick-up device for old sleeper; 20. First pick-up device for old sleeper; 21. First laying device for new sleeper; 22. Second laying device for new sleeper ; 23. Power system; 24. Rail shifting device; 25. Fastener installation device; 26. Slope shaping device; 27. The third measuring device.
具体实施方式detailed description
为了使本申请实施例中的技术方案及优点更加清楚明白,以下结合附图对本申请的示例性实施例进行进一步详细的说明,显然,所描述的实施例仅是本申请的一部分实施例,而不是所有实施例的穷举。需要说明的是,在不冲突的情况下,本申请中的实施例及实施例中的特征可以相互组合。In order to make the technical solutions and advantages in the embodiments of the present application clearer, the exemplary embodiments of the present application will be further described in detail below in conjunction with the accompanying drawings. Apparently, the described embodiments are only part of the embodiments of the present application, and Not an exhaustive list of all embodiments. It should be noted that, in the case of no conflict, the embodiments in the present application and the features in the embodiments can be combined with each other.
图1为本申请连续换枕作业列车的整体示意图;图2为本申请连续换枕作业列车中轨枕运输车的示意图;图3为本申请连续换枕作业列车中道砟处理车的示意图;图4为本申请连续换枕作业列车中的换枕作业车示意图;图5为本申请连续换枕作业列车中的动力车示意图;图6为本申请实施例连续换枕作业列车中的提轨装置示意图;图7为本申请实施例连续换枕作业列车中的轨枕并拢装置示意图。如图1至图7所示,本实施例提供一种连续换枕作业列车及作业方法,用于在铁路旧枕的拆除与新枕安装。Fig. 1 is the overall schematic diagram of the continuous pillow-changing operation train of the present application; Fig. 2 is the schematic diagram of the sleeper transport vehicle in the continuous pillow-changing operation train of the present application; Fig. 3 is the schematic diagram of the ballast processing vehicle in the continuous pillow-changing operation train of the present application; Fig. 4 is a schematic diagram of the pillow-changing operation vehicle in the continuous pillow-changing operation train of the present application; Fig. 5 is a schematic diagram of the power car in the continuous pillow-changing operation train of the present application; Fig. 6 is a rail lifting device in the continuous pillow-changing operation train of the embodiment of the application Schematic diagram; FIG. 7 is a schematic diagram of a sleeper closing device in a continuous sleeper changing operation train according to an embodiment of the present application. As shown in Fig. 1 to Fig. 7, this embodiment provides a continuous sleeper changing operation train and operation method, which are used for dismantling old sleepers and installing new sleepers on railways.
本申请实施例提供的连续换枕作业列车,用于对铁路连续换枕;设定沿轨道延伸的方向为纵向,垂直于轨道延伸的方向为横向,以列车行进方向为前方包括:相连接的道砟处理车B及换枕作业车C;道砟处理车B设置有道砟处理装置;道砟处理装置用于挖掘两侧道砟,将轨枕间道砟转移至轨道两侧,并在换枕作业车完成换枕后将道砟回填至轨道内侧;换枕作业车C用于回收旧轨枕和布放新轨枕。The continuous pillow changing operation train provided by the embodiment of the present application is used for continuously changing pillows on the railway; the direction extending along the track is set as the longitudinal direction, the direction extending perpendicular to the track is the horizontal direction, and the direction of the train is forward. Ballast treatment vehicle B and sleeper changing operation vehicle C; ballast treatment vehicle B is equipped with a ballast treatment device; the ballast treatment device is used to excavate the ballast on both sides, transfer the ballast between sleepers to the two sides of the track, and replace the pillow After the sleeper change, the work vehicle backfills the ballast to the inner side of the track; the sleeper change work vehicle C is used to recycle old sleepers and lay new sleepers.
作为本申请的一个实施例,道砟处理装置包括边坡挖掘装置11及枕间道砟处理装置10;枕间道砟处理装置10,连接于道砟处理车B的下方,将轨枕间的道砟扒向轨道的两侧;边坡挖掘装置11,用于挖掘轨道两侧的道砟,将道砟传送至道砟输送平台13上,由道砟输送平台13运输至回填位置处。As an embodiment of the present application, the ballast processing device includes a
作为本申请的一个实施例,道砟处理装置还包括道砟输送平台13,道砟输送平台13安装于道砟处理车B的上方,一端与边坡挖掘装置11相连接,承接边坡挖掘装置11挖掘输送的道砟,另一端延伸至换枕作业车C的道砟回填处。As an embodiment of the present application, the ballast processing device also includes a
实施中,边坡挖掘装置11对称安装于道砟处理车B的两侧,且分设在作业列车的相对于前进方向轴线的两侧;边坡挖掘装置11上设置有旋转点,通过角度调整完成工作位和高速走行位的切换。用于挖掘轨道两侧道砟的边坡挖掘装置11结构可以用很多种,例如挖斗,也可以采用本领域已有的装置来实现道砟的挖掘,将挖掘的道砟可以绞龙螺旋输送机输送至道砟输送平台13的端部;作为一个具体的实施例,道砟输送平台13为输送带输送。During implementation, the
作为本申请的一个实施例,轨道两侧道砟经边坡挖掘装置11挖掘并运输至上端的道砟输送平台13,后由道砟输送平台13回填至轨道内侧。道砟输送平台13的末端还可以安装道砟存储装置,用于控制道砟回填速度。As an embodiment of the present application, the ballast on both sides of the track is excavated by the
实施中,枕间道砟处理装置10将轨枕间道砟轨道内侧道砟转移至轨道外侧,以填补边坡道砟。枕间道砟处理装置10在整车连续作业前进时,进行步进式作业;也就是道砟转移时静止,道砟转移完成后走行至下一工作位;由此,枕间道砟处理装置10可移动式地与车架相连。具体实施中,多种结构均可以实现将轨枕间的道砟拨向轨道两边,例如,通过移动框架连接扒砟板,在液压缸的驱动下扒砟板沿框架导向将轨枕间的道砟拨向轨道两边;通过多关节机械臂连接一个小型挖斗,在动力驱动下用小型挖斗挖除轨枕间的道砟并通过多关节机械臂将轨枕间的道砟拨向轨道两边;通过刀板挖掘装置将枕间道砟直接挖掘至轨道外侧。During implementation, the inter-sleeper
作为本申请的一个实施例,连续换枕作业列车还包括轨枕运输车A及动力车D,用于存放及运输新轨枕和旧轨枕;动力车D,用于为作业列车提供动力。As an embodiment of the present application, the continuous sleeper changing operation train also includes a sleeper transport vehicle A and a power vehicle D for storing and transporting new and old sleepers; the power vehicle D is used for providing power for the operation train.
实施中,新轨枕1直接通过轨枕运输车A运抵现场,旧轨枕4通过轨枕运输车驶离现场,省去了新轨枕1提前布放在轨道两侧的时间和旧轨枕4拾取并运输的时间,可实现在不锯断轨道的情况下轨枕的更换,实现在一个天窗点下扣件拆卸、轨枕更换、扣件安装及轨枕运输的一体化连续作业,节约了大量的施工时间。During the implementation, the
作为本申请的一个实施例,轨枕运输车A、道砟处理车B、换枕作业车C及动力车D沿行进方向向后依次设置并连接。As an embodiment of the present application, the sleeper transport vehicle A, the ballast processing vehicle B, the sleeper changing operation vehicle C and the power vehicle D are sequentially arranged and connected backward along the traveling direction.
如图2所示,作为本申请的一个实施例,轨枕运输车A包括多辆平板车2及龙门行车3,多辆平板车2前后依次连挂,用于承载新轨枕1和旧轨枕4;各平板车2上设有滑行轨道,各平板车2之间设有过轨装置,过轨装置用于连接相邻两辆平板车2上的滑行轨道;龙门行车3各辆平板车2之间沿滑行轨道和过轨装置行走,活动范围较大;龙门行车3上设置有轨枕夹取装置,轨枕装置可上下移动来夹持轨枕,通过轨枕运输车A实现新轨枕1和旧轨枕4的存放及运输。As shown in Figure 2, as an embodiment of the present application, the sleeper transport vehicle A includes a plurality of
实施中,能够实现轨枕夹取方式为现有技术,实现夹取的装置也可有很多种形式,比如夹钳与机械手;作为一种实施方式还可以在龙门行车3上配备有垂向驱动装置,垂向驱动装置控制轨枕夹取装置上下移动来夹持轨枕;垂向驱动装置可以为驱动油缸或者驱动电机,也可为其他能够驱动轨枕夹取装置上下移动的结构。为防止龙门行车3失控冲出,轨枕运输车A最前端设置缓冲车档。In practice, it is an existing technology to realize the clamping method of the sleeper, and there are many types of devices for clamping, such as clamps and manipulators; as an embodiment, the
作为一个实施例,各平板车2上的滑行轨道,各平板车2之间的过轨装置,使龙门行车3能够在平板车2之间走行,龙门行车3配备动力系统,使得龙门行车3在平板车2可以大范围活动自走行。As an example, the sliding rails on each
通过本申请的实施例,新轨枕1直接通过轨枕运输车A运抵现场,旧轨枕4通过轨枕运输车A驶离现场,省去了新轨枕1提前布放在轨道两侧的时间和旧轨枕4拾取并运输的时间。Through the embodiment of the present application, the
作为本申请的一个具体实施例,轨枕输送平台,平行安装于作业列车的上方,沿行进方向延伸;设置于换枕作业车C、道砟处理车B及轨枕运输车A之间,用于将拆卸的旧轨枕4输送至轨枕运输车A上,同时将轨枕运输车A传送的新轨枕1输送至新轨枕1目标放置位置处。As a specific embodiment of the present application, the sleeper conveying platform is installed in parallel above the operation train and extends along the direction of travel; it is arranged between the sleeper changing operation vehicle C, the ballast processing vehicle B and the sleeper transport vehicle A, and is used to transfer the The disassembled
如图2-图3所示,作为一个实施例,轨枕输送平台包括旧枕输送平台6、旧枕旋转装置7、新枕输送平台5及新枕旋转装置9。旧枕输送平台6依次连接并设置为多个;从换枕作业车C延伸至轨枕运输车A,将旧轨枕4沿行进方向向前运输;旧枕输送平台6之间安装一个旧枕旋转装置7,旧枕旋转装置7位于道砟处理装置的上方,用于将旧枕输送平台上的旧轨枕4转动90°后进行运输;旋转之前旧枕4的长度方向与行进方向垂直,旋转后旧轨枕4的长度方向与行进方向平行;新枕输送平台5,依次连接并设置为多个,从换枕作业车延伸至轨枕运输车;新枕输送平台5之间设置有一个新枕旋转装置9,新枕旋转装置9位于道砟处理装置,新枕旋转装置9将新轨枕1沿行进方向向后运输,旋转之前新轨枕1的长度方向与行进方向垂直,旋转后新轨枕1的长度方向与行进方向平行。新轨枕1和旧轨枕4的传送也可由采用带轨枕转运装置的轨枕运输车替代。As shown in FIGS. 2-3 , as an embodiment, the sleeper conveying platform includes an old
作为一个具体的实施例,新枕输送平台5与旧枕输送平台6可以为输送带输送,也可以为链轮输送。As a specific embodiment, the new
实施中,实现旋转功能的旧枕旋转装置7和新枕旋转装置9可以有很多种结构与形式;例如:在一个旋转基座上安装夹取轨枕的夹钳或机械手、也可以在旋转基座上安装输送带与输送电机,输送电机驱动输送带实现轨枕的输送,旋转基座在驱动机构的驱动下旋转,实现方向的改变。In practice, the old sleeper
作为本申请的实施例,换枕作业车C上还安装轨枕并拢装置17、两个旧枕拾取装置及转运平台18;轨枕并拢装置17用于将多根旧轨枕4并拢为旧枕组;轨枕并拢装置17将多根旧轨枕4并拢为旧枕组,便于旧枕拾取装置拾取轨枕,节约工作时间,提升工作效率。As an embodiment of the present application, a sleeper bringing together
旧枕拾取装置设置于换枕作业车C的底部,包括第一旧枕拾取装置19和第二旧枕拾取装置20;第一旧枕拾取装置19用于夹持轨枕并拢装置17好的并拢好的旧枕组并将旧枕组旋转90°后放置于转运平台上18;接着第二旧枕拾取装置20将转运平台18上的旧枕组转运至旧枕输送平台6上。然后由旧枕输送平台6运输至轨枕运输车A;转运平台18上轨枕方向为纵向,为便于龙门行车3夹持,旧枕输送平台6前端的轨枕方向为横向,故在旧枕输送平台6上设置有旧枕旋转装置7。The old pillow picking device is arranged at the bottom of the pillow changing operation vehicle C, and includes a first old
值得说明的是,本发明实施例中将旧枕拾取装置分为两个是为了加快作业效率,旧枕拾取也可通过一个装置实现。It is worth noting that, in the embodiment of the present invention, the old pillow picking device is divided into two in order to speed up the work efficiency, and the old pillow picking can also be realized by one device.
作为本申请的具体实施例,换枕作业车C的轨枕并拢装置17位于第一旧枕拾取装置19的前方,将多根旧轨枕4并拢为旧枕组;轨枕并拢装置17可以采用如图7所示的结构,包括固定杆1703、轨枕拨杆1701及拨枕油缸1702,固定杆1703、轨枕拨杆1701及拨枕油缸1702形成三角结构;固定杆1703与轨枕拨杆1701转动连接,拨枕油缸1702的底座与固定杆1703转动连接,拨枕油缸1702的活塞杆与轨枕拨杆1701的端部转动连接,拨枕油缸1702收缩将轨枕拨杆1701抬起;拨枕油缸1702伸出将轨枕拨杆1701落下,轨枕并拢装置17与换枕作业车C的车架移动式连接,轨枕并拢装置17可沿换枕作业车C纵向移动,实现拆卸后的旧轨枕4的并拢。As a specific embodiment of the present application, the sleeper bringing together
值得说明的是,轨枕并拢装置1也可以采用自动化程度更高的轨枕并拢结构完成。It is worth noting that the
作为本申请的具体实施例,旧枕拾取装置与换枕作业车C的车架连接,换枕作业车C的底部,可与换枕作业车C相对移动,用于将并拢好的旧枕组夹持并进行旋转后;实施中,提轨装置16将轨道提起后,第一旧枕拾取装置19将旧枕组取出并将旧枕组旋转90°后放置于转运平台18上;第二旧枕拾取装置20将转运平台18上的旧枕组旋转后转运至旧枕输送平台6上,并由旧枕输送平台6转运至轨枕运输车A上;As a specific embodiment of the present application, the old pillow picking device is connected to the frame of the pillow changing operation vehicle C, and the bottom of the pillow changing operation vehicle C can move relatively with the pillow changing operation vehicle C, and is used to assemble the old pillows that have been put together After clamping and rotating; during implementation, after the
作为本申请的实施例,换枕作业车C上还安装有新枕布放装置。实施中,新枕布放装置与新枕输送平台5的端部相邻,用于夹取新枕输送平台5输送的新轨枕1,并将新轨枕1旋转90°后置于目标放置位置;新枕第一布放装置21将新枕输送平台5端部的新轨枕组夹持放置于道床上,新枕第二布放装置22将新轨枕组旋转90°进行枕间间距调整并放置于合适的位置。具体地,为使轨枕能够顺利落入轨道内侧,新枕输送平台5尾端的轨枕为纵向,而新枕输送平台5前端轨枕为横向,因此在新枕输送平台5设置有新枕旋转装置9。As an embodiment of the present application, a new pillow placement device is also installed on the pillow changing operation vehicle C. During implementation, the new sleeper laying device is adjacent to the end of the new
值得说明的是,本发明实施例中将新枕布放装置分为两个是为了加快作业效率,新枕布放也可通过一个装置实现。It is worth noting that, in the embodiment of the present invention, the new pillow placement device is divided into two in order to speed up the work efficiency, and the new pillow placement can also be realized by one device.
在新轨枕横纵向位置调整完成后,进行轨枕间道砟回填。道砟通过道砟输送平台13直接回填至轨道内侧。After the horizontal and vertical position adjustment of the new sleeper is completed, the ballast between the sleepers is backfilled. The ballast is directly backfilled to the inner side of the track through the
作为本申请的一个实施例,道砟处理车B上还设置有扣件拆卸收集装置,扣件拆卸收集装置用于将旧轨枕上的扣件拆除、收集及存储;道砟处理车B上的扣件拆卸收集装置包括扣件拆卸装置12与扣件收集装置14;扣件拆卸装置12连接于道砟处理车B的下方,一次性可以拆卸多枕的扣件,然后将扣件放置在轨道两侧;扣件拆卸装置12可以移动地连接在道砟处理车B的车架上;扣件拆卸装置12可以由多种结构实现,例如不仅可以采用内燃扳手或电动扳手,也可采用已知技术公开的拆扣件装置将轨枕上的扣件拆除。扣件收集装置14,安装有磁力装置与储存装置,磁力装置收集拆卸的扣件,存储装置用于存储拆卸的扣件;也就是,扣件拆卸装置12将拆卸的扣件放置在轨道两侧,然后磁力装置将拆卸的扣件收集起来,并储存至储存装置内。As an embodiment of the present application, the ballast processing vehicle B is also provided with a fastener removal collection device, which is used to remove, collect and store fasteners on old sleepers; The fastener removal and collection device includes a
需要特别说明的是,扣件拆卸装置12与扣件收集装置14均可以采用自动化程度更高的全自动化拆扣件和收集扣件装置,也可采用人工或小机进行扣件的拆卸或安装。It should be noted that both the
作为本申请的一个实施例,道砟处理车B可以包括道砟处理车和扣件处理车,道砟处理装置设置于道砟处理车;扣件拆卸收集装置设置于扣件处理车。也可以将道砟处理装置与扣件拆卸收集装置按照作业合理布置于道砟处理车B。As an embodiment of the present application, the ballast processing vehicle B may include a ballast processing vehicle and a fastener processing vehicle, the ballast processing device is provided on the ballast processing vehicle, and the fastener removal and collecting device is provided on the fastener processing vehicle. The ballast processing device and the fastener removal collection device can also be reasonably arranged on the ballast processing vehicle B according to the operation.
值得说明的是,本申请通过上述实施例一次实现多枕的更换,施工效率高。It is worth noting that the present application realizes the replacement of multiple pillows at one time through the above-mentioned embodiment, and the construction efficiency is high.
作为本申请的一个实施例,道砟处理车B下方还安装有第一测量装置8与提升机构,提升机构用于控制测量装置的升降,第一测量装置8用于测量轨道参数。提升机构可以采用气缸或油缸控制第一测量装置8的升降。As an embodiment of the present application, a first measuring device 8 and a lifting mechanism are installed under the ballast processing vehicle B, the lifting mechanism is used to control the lifting of the measuring device, and the first measuring device 8 is used to measure track parameters. The lifting mechanism can use a cylinder or an oil cylinder to control the lifting of the first measuring device 8 .
实施中,第一测量装置8可以通过接触测量,例如使用升降架上安装测量轮,提升机构控制升降架的升降;具体地,第一测量装置8解锁后缓慢落下,直至测量轮与轨道接触,测量轮测量轨道参数,便于恢复轨道原始状态;作业完成后,第一测量装置8向上提起离开轨道面并锁定,便于作业后高速走行。也可以通过传感器测量。In practice, the first measuring device 8 can be measured by contact, such as using a measuring wheel installed on the lifting frame, and the lifting mechanism controls the lifting of the lifting frame; specifically, after the first measuring device 8 is unlocked, it slowly falls until the measuring wheel contacts the track. The measuring wheel measures the parameters of the track, which is convenient for restoring the original state of the track; after the operation is completed, the first measuring device 8 is lifted up to leave the track surface and locked, which is convenient for high-speed walking after the operation. It can also be measured by sensors.
作为本申请的一个实施例,换枕作业车C下方还安装有拨轨装置24,道砟回填后通过拨轨装置24将钢轨测量参数拨回承轨槽内,实现轨道复制。As an embodiment of the present application, a
如图4-图7所示,作为本申请的实施例,所述换枕作业车C上安装有提轨装置16;具体地,换枕作业车C上设置若干个提轨装置16,对称分布于轨道提升区域。提轨装置16提升换枕区段轨道的高度,使轨道底面高于道钉,便于旧轨枕被取出回收,以及方便新轨枕的布放。As shown in Figures 4-7, as an embodiment of the present application, a
实施中,提轨装置16多种结构均可实现,如图6所示,以一种简单的结构形式介绍本申请提轨装置16的工作原理,提轨装置16包括升降杆1601,升降杆1601的升降方式采用电动或者油缸驱动的形式,升降杆上端连接在换枕作业车C,下端设置多个夹爪或吸盘1602将轨道夹住或吸住,由升降杆1601带动升降完成提轨的动作。提轨装置16的安装可实现在不锯断轨道的情况下轨枕的更换。In practice, various structures of the
作为本申请的实施例,动力车D的底部沿作业列车行进方向依次还安装有扣件安装装置25与边坡整形装置26;扣件安装装置25用于在轨道下落至轨枕后完成扣件的安装及紧固工作;边坡整形装置26用于轨道边坡道砟的整形。扣件安装装置25可以采用自动化程度高的安装扣件的设备完成也可采用人工加小机的方式进行。As an embodiment of the present application, a
实施中,动力车D还设置有动力区与动力系统23;动力区与动力系统23用于为边坡道砟整形、安装扣件及整车提供动力。During implementation, the power car D is also provided with a power zone and a
作为本申请的一个实施例,动力车D下方前后两端安装有第二测量装置15,动力车D前端的第二测量装置15测量拨轨后轨道参数,动力车D后端的第三测量装置27测量作业完成后的轨道参数。As an embodiment of the present application, a
下面将进一步结合具体的作业过程介绍上述具体实施例描述的连续换枕作业列车的作业方法,包括以下步骤:The operation method of the continuous pillow-changing operation train described in the above-mentioned specific embodiment will be further introduced below in conjunction with the specific operation process, including the following steps:
步骤一:道砟处理车B中的道砟处理装置挖掘轨道两侧的道砟并将道砟传送至道砟输送平台上,轨枕间的道砟转移至轨道的两侧;Step 1: The ballast processing device in the ballast processing vehicle B excavates the ballast on both sides of the track and transfers the ballast to the ballast conveying platform, and the ballast between the sleepers is transferred to both sides of the track;
步骤二:换枕作业车C中的提轨装置16将钢轨提离枕面高于道钉;Step 2: The
步骤三:换枕作业车C旋转收集旧轨枕4并传递给轨枕运输车;Step 3: the sleeper changing operation vehicle C rotates to collect the
步骤四:换枕作业车将新轨枕1旋转放置于目标放置位置;Step 4: The sleeper changing vehicle rotates and places the
步骤五:道砟处理装置将道砟回填至轨道内侧。Step 5: The ballast processing device backfills the ballast to the inner side of the track.
作为本申请的具体实施例,在步骤一之前,也就是,道砟处理车中的道砟处理装置挖掘并收集旧轨枕两侧的道砟之前,还设置如下步骤:道砟处理车下方的第一测量装置8解锁,提升机构将第一测量装置8放下至与轨面接触,第一测量装置8测量并记录轨道参数;完成后,提升装置16将第一测量装置8向上提起离开轨道面,第一测量装置8锁定。As a specific embodiment of the present application, before
作为本申请的具体实施例,步骤一,道砟处理车B中的道砟处理装置挖掘轨道两侧的道砟并将道砟传送至道砟输送平台上,轨枕间的道砟转移至轨道的两侧,具体包括如下步骤:As a specific embodiment of the present application,
(1)边坡挖掘装置11将旧轨枕4两侧的道砟传送至道砟输送平台13上;(1) The
(2)枕间扒砟装置10将旧轨枕4间的道砟扒向轨道的两侧。(2) The
实施中,道砟采用边坡挖掘装置11进行边坡挖掘和枕间扒砟装置10进行枕间扒砟处理,枕底道砟不进行处理;During the implementation, the ballast is excavated by the
作为本申请的具体实施例,在步骤二之前,也就是,换枕作业车C中的提轨装置16将钢轨提离枕面高于道钉之前,还设置如下步骤:As a specific embodiment of the present application, before the second step, that is, before the
(1)扣件拆卸装置12拆卸多个旧轨枕4的扣件;(1)
(2)扣件收集装置14利用磁力装置将拆卸的扣件收集起来,并储存至储存装置内。(2) The
作为本申请的具体实施例,步骤三,换枕作业车C收集旧轨枕4并传递给轨枕运输车A,具体包括如下步骤:As a specific embodiment of the present application, in
(1)轨枕并拢装置17将多根旧轨枕4并拢成形成旧枕组;实施中,可以将多根旧轨枕4并拢成一组,比如三枕或四枕并拢成一组。(1) The sleeper bringing together
(3)旧枕第一拾取装置19夹持旧枕组并将旧枕组旋转90°后放置于转运平台18上;(3) The first pick-up
(4)旧枕第二拾取装置20将旧枕组从转运平台18夹持后放置于上旧枕输送平台6上;(4) The second pick-up
(5)旧枕输送平台6将旧枕组转运至轨枕输送车A上。(5) The old
作为本申请的具体实施例,步骤四,换枕作业车C将新轨枕置于新轨枕目标放置位置,具体包括如下步骤:As a specific embodiment of the present application, in
(1)新枕第一布放装置21夹取新枕输送平台5输送的新轨枕组置于道床上;(1) The new sleeper
(2)新枕第二布放装置22将新轨枕组旋转90°调整好轨枕间距后置于目标位置。(2) The
作为本申请的具体实施例,步骤五:道砟处理装置将道砟回填至轨道内侧,具体为道砟由道砟处理装置的道砟输送带13输送回填至轨道内侧。As a specific embodiment of the present application, step five: the ballast processing device backfills the ballast to the inner side of the track, specifically, the ballast is transported and backfilled to the inner side of the track by the
作为本申请的实施例,为了完成扣件的安装及轨道两边的道砟整形,连续换枕作业列车的作业方法还包括以下步骤:As an embodiment of the present application, in order to complete the installation of fasteners and ballast shaping on both sides of the track, the operation method of the continuous pillow changing operation train also includes the following steps:
步骤六:动力车D底部的扣件安装装置25在轨道下落至轨枕后安装扣件;Step 6: the
步骤七:动力车D底部的边坡整形装置26将轨道边坡道砟整形处理。Step 7: The
通过本申请实施例提供的连续换枕作业列车及作业方法,可以在不锯断轨道的情况下,一次实现多轨枕的更换,实现了在一个天窗点下扣件拆卸、轨枕更换、扣件安装及轨枕运输的一体化连续作业,且由于连续换枕作业列车及作业方法可以再不切轨进行轨枕更换,极大的降低了后续的施工成本和施工时间。Through the continuous sleeper replacement operation train and operation method provided by the embodiment of the present application, multiple sleepers can be replaced at one time without sawing off the track, and fastener removal, sleeper replacement, and fastener installation can be realized at one skylight point And the integrated continuous operation of sleeper transportation, and because of the continuous sleeper changing operation train and operation method, the sleeper can be replaced without cutting the track, which greatly reduces the subsequent construction cost and construction time.
在本申请的描述中,需要理解的是,术语“中心”、“纵向”、“横向”、“长度”、“宽度”、“厚度”、“上”、“下”、“前”、“后”、“左”、“右”、“竖直”、“水平”、“顶”、“底”“内”、“外”等指示的方位或位置关系为基于附图所示的方位或位置关系,仅是为了便于描述本申请和简化描述,而不是指示或暗示所指的装置或元件必须具有特定的方位、以特定的方位构造和操作,因此不能理解为对本申请的限制。In the description of the present application, it should be understood that the terms "center", "longitudinal", "transverse", "length", "width", "thickness", "upper", "lower", "front", " The orientation or positional relationship indicated by "rear", "left", "right", "vertical", "horizontal", "top", "bottom", "inner" and "outer" are based on the orientation or position shown in the drawings The positional relationship is only for the convenience of describing the present application and simplifying the description, but does not indicate or imply that the referred device or element must have a specific orientation, be constructed and operated in a specific orientation, and thus should not be construed as limiting the present application.
此外,术语“第一”、“第二”仅用于描述目的,而不能理解为指示或暗示相对重要性或者隐含指明所指示的技术特征的数量。由此,限定有“第一”、“第二”的特征可以明示或者隐含地包括一个或者更多个该特征。在本申请的描述中,“多个”的含义是至少两个,例如两个,三个等,除非另有明确具体的限定。In addition, the terms "first" and "second" are used for descriptive purposes only, and cannot be interpreted as indicating or implying relative importance or implicitly specifying the quantity of indicated technical features. Thus, a feature defined as "first" and "second" may explicitly or implicitly include one or more of these features. In the description of the present application, "plurality" means at least two, such as two, three, etc., unless otherwise specifically defined.
在本申请中,除非另有明确的规定和限定,术语“安装”、“相连”、“连接”、“固定”等术语应做广义理解,例如,可以是固定连接,也可以是可拆卸连接,或成一体;可以是机械连接,也可以是电连接或可以互相通讯;可以是直接相连,也可以通过中间媒介间接相连,可以是两个元件内部的连通或两个元件的相互作用关系。对于本领域的普通技术人员而言,可以根据具体情况理解上述术语在本申请中的具体含义。In this application, terms such as "installation", "connection", "connection" and "fixation" should be interpreted in a broad sense, for example, it can be a fixed connection or a detachable connection, unless otherwise clearly specified and limited. , or integrated; it can be mechanically connected, or electrically connected, or can communicate with each other; it can be directly connected, or indirectly connected through an intermediary, and it can be the internal communication of two components or the interaction relationship between two components. Those of ordinary skill in the art can understand the specific meanings of the above terms in this application according to specific situations.
尽管已描述了本申请的优选实施例,但本领域内的技术人员一旦得知了基本创造性概念,则可对这些实施例作出另外的变更和修改。所以,所附权利要求意欲解释为包括优选实施例以及落入本申请范围的所有变更和修改。While preferred embodiments of the present application have been described, additional changes and modifications can be made to these embodiments by those skilled in the art once the basic inventive concept is appreciated. Therefore, the appended claims are intended to be construed to cover the preferred embodiment and all changes and modifications which fall within the scope of the application.
显然,本领域的技术人员可以对本申请进行各种改动和变型而不脱离本申请的精神和范围。这样,倘若本申请的这些修改和变型属于本申请权利要求及其等同技术的范围之内,则本申请也意图包含这些改动和变型在内。Obviously, those skilled in the art can make various changes and modifications to the application without departing from the spirit and scope of the application. In this way, if these modifications and variations of the present application fall within the scope of the claims of the present application and their equivalent technologies, the present application is also intended to include these modifications and variations.
Claims (20)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202211130117.2A CN115450077B (en) | 2022-09-15 | 2022-09-15 | Continuous sleeper-changing operation train and operation method |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202211130117.2A CN115450077B (en) | 2022-09-15 | 2022-09-15 | Continuous sleeper-changing operation train and operation method |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| CN115450077A true CN115450077A (en) | 2022-12-09 |
| CN115450077B CN115450077B (en) | 2025-10-17 |
Family
ID=84305148
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN202211130117.2A Active CN115450077B (en) | 2022-09-15 | 2022-09-15 | Continuous sleeper-changing operation train and operation method |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN115450077B (en) |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN116145483A (en) * | 2023-03-31 | 2023-05-23 | 中国铁建高新装备股份有限公司 | A continuous sleeper replacement operation vehicle and its operation method |
Citations (8)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN1109935A (en) * | 1993-12-07 | 1995-10-11 | 弗兰茨普拉塞铁路机械工业股份有限公司 | Method and working train for renewing old sleeper of rail |
| CN2552999Y (en) * | 2002-06-07 | 2003-05-28 | 中国铁道建筑总公司昆明机械厂 | Machine for replacing sleeper |
| AT7113U2 (en) * | 2004-06-07 | 2004-10-25 | Plasser Bahnbaumasch Franz | METHOD FOR REPLACING DAMAGED THREADS OF A TRACK AND MACHINE |
| EP1607522A1 (en) * | 2004-06-07 | 2005-12-21 | Franz Plasser Bahnbaumaschinen-Industriegesellschaft m.b.H. | A method and a machine for exchanging railway sleepers |
| CN106906705A (en) * | 2017-04-28 | 2017-06-30 | 株洲时代电子技术有限公司 | A kind of sleeper replacement device and its operational method |
| CN110965408A (en) * | 2019-12-20 | 2020-04-07 | 武汉利德测控技术有限公司 | Switch digs tiny fragments of stone, coal, etc. unit |
| CN111733638A (en) * | 2020-07-06 | 2020-10-02 | 中铁一局集团有限公司 | Railway mechanical sleeper replacement construction method based on sleeper replacement machine |
| CN218596780U (en) * | 2022-09-15 | 2023-03-10 | 中国铁建高新装备股份有限公司 | Continuous sleeper-changing operation train |
-
2022
- 2022-09-15 CN CN202211130117.2A patent/CN115450077B/en active Active
Patent Citations (8)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN1109935A (en) * | 1993-12-07 | 1995-10-11 | 弗兰茨普拉塞铁路机械工业股份有限公司 | Method and working train for renewing old sleeper of rail |
| CN2552999Y (en) * | 2002-06-07 | 2003-05-28 | 中国铁道建筑总公司昆明机械厂 | Machine for replacing sleeper |
| AT7113U2 (en) * | 2004-06-07 | 2004-10-25 | Plasser Bahnbaumasch Franz | METHOD FOR REPLACING DAMAGED THREADS OF A TRACK AND MACHINE |
| EP1607522A1 (en) * | 2004-06-07 | 2005-12-21 | Franz Plasser Bahnbaumaschinen-Industriegesellschaft m.b.H. | A method and a machine for exchanging railway sleepers |
| CN106906705A (en) * | 2017-04-28 | 2017-06-30 | 株洲时代电子技术有限公司 | A kind of sleeper replacement device and its operational method |
| CN110965408A (en) * | 2019-12-20 | 2020-04-07 | 武汉利德测控技术有限公司 | Switch digs tiny fragments of stone, coal, etc. unit |
| CN111733638A (en) * | 2020-07-06 | 2020-10-02 | 中铁一局集团有限公司 | Railway mechanical sleeper replacement construction method based on sleeper replacement machine |
| CN218596780U (en) * | 2022-09-15 | 2023-03-10 | 中国铁建高新装备股份有限公司 | Continuous sleeper-changing operation train |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN116145483A (en) * | 2023-03-31 | 2023-05-23 | 中国铁建高新装备股份有限公司 | A continuous sleeper replacement operation vehicle and its operation method |
Also Published As
| Publication number | Publication date |
|---|---|
| CN115450077B (en) | 2025-10-17 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| AU595647B2 (en) | Tie exchange method | |
| US4307667A (en) | Railroad track relaying train | |
| CN1179091C (en) | Machinery and working methods for demolition of old track and laying of new track | |
| US4809614A (en) | Mobile tie gang apparatus | |
| SU884578A3 (en) | Device for changing rails and sleepers of railroad | |
| CN1066507C (en) | Method and working train for renewing old sleeper of rail | |
| US4955301A (en) | Tie exchange machine | |
| US6415720B2 (en) | Machine for renewing a railroad track | |
| CN87104397A (en) | Change the machinery of circuit rail, sleeper | |
| CN106592351B (en) | Pillow device and method are changed in a kind of overhaul | |
| CN114892457B (en) | Construction method of integrated sleeper recovery operation vehicle without rail cutting replacement | |
| CN105473787A (en) | Method for renewing sleepers and cleaning gravel ballast under raised rails | |
| US4955302A (en) | Mobile tie gang apparatus | |
| CN115450077A (en) | Continuous sleeper-changing operation train and operation method | |
| CN208088032U (en) | A kind of railway tunnel bridge ballast screen scarifier taking electric equipment with contact net | |
| CN208088031U (en) | A kind of railway tunnel bridge ballast screen scarifier | |
| CN218596780U (en) | Continuous sleeper-changing operation train | |
| US4862806A (en) | Mobile tie gang apparatus and tie exchange method | |
| CN217499805U (en) | Integrated rail-uncut replacement and recovery sleeper operation vehicle | |
| WO2014019021A1 (en) | Ballast undercutter | |
| EP1348057A1 (en) | Ballast removal method and apparatus | |
| CN221029331U (en) | Railway ballast cleaning device | |
| CN115404730B (en) | A combined sleeper replacement unit | |
| CN117265925B (en) | Railway ballast cleaning device and method | |
| CN223991218U (en) | Device for railway bridge tunnel screening operation |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| PB01 | Publication | ||
| PB01 | Publication | ||
| SE01 | Entry into force of request for substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| TA01 | Transfer of patent application right |
Effective date of registration: 20250116 Address after: No.384, yangfangwang, Guandu District, Kunming, Yunnan, 650217 Applicant after: CRCC HIGH-TECH EQUIPMENT Corp.,Ltd. Country or region after: China Applicant after: China National Railway Group Co.,Ltd. Applicant after: China Railway Kunming Bureau Group Co.,Ltd. Address before: No.384, yangfangwang, Guandu District, Kunming, Yunnan, 650217 Applicant before: CRCC HIGH-TECH EQUIPMENT Corp.,Ltd. Country or region before: China |
|
| TA01 | Transfer of patent application right | ||
| GR01 | Patent grant | ||
| GR01 | Patent grant |