CN122425117A - Hydraulic bulging process for instability control of thick-wall cylinder - Google Patents

Hydraulic bulging process for instability control of thick-wall cylinder

Info

Publication number
CN122425117A
CN122425117A CN202610908782.1A CN202610908782A CN122425117A CN 122425117 A CN122425117 A CN 122425117A CN 202610908782 A CN202610908782 A CN 202610908782A CN 122425117 A CN122425117 A CN 122425117A
Authority
CN
China
Prior art keywords
blank
bulging
hydraulic
thick
hydro
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN202610908782.1A
Other languages
Chinese (zh)
Other versions
CN122425117B (en
Inventor
李飞
陈慧琴
田继红
王金亮
温慧华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Taiyuan University of Science and Technology
Original Assignee
Taiyuan University of Science and Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Taiyuan University of Science and Technology filed Critical Taiyuan University of Science and Technology
Priority to CN202610908782.1A priority Critical patent/CN122425117B/en
Publication of CN122425117A publication Critical patent/CN122425117A/en
Application granted granted Critical
Publication of CN122425117B publication Critical patent/CN122425117B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • B—PERFORMING OPERATIONS; TRANSPORTING
    • B21—MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21D—WORKING OR PROCESSING OF SHEET METAL OR METAL TUBES, RODS OR PROFILES WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21D26/00—Shaping without cutting otherwise than using rigid devices or tools or yieldable or resilient pads, i.e. applying fluid pressure or magnetic forces
    • B21D26/02—Shaping without cutting otherwise than using rigid devices or tools or yieldable or resilient pads, i.e. applying fluid pressure or magnetic forces by applying fluid pressure
    • B—PERFORMING OPERATIONS; TRANSPORTING
    • B21—MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21C—MANUFACTURE OF METAL SHEETS, WIRE, RODS, TUBES, PROFILES OR LIKE SEMI-MANUFACTURED PRODUCTS OTHERWISE THAN BY ROLLING; AUXILIARY OPERATIONS USED IN CONNECTION WITH METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL
    • B21C51/00—Measuring, gauging, indicating, counting, or marking devices specially adapted for use in the production or manipulation of material in accordance with subclasses B21B - B21F
    • G—PHYSICS
    • G06—COMPUTING OR CALCULATING; COUNTING
    • G06F—ELECTRIC DIGITAL DATA PROCESSING
    • G06F30/00—Computer-aided design [CAD]
    • G06F30/20—Design optimisation, verification or simulation
    • G06F30/23—Design optimisation, verification or simulation using finite element methods [FEM] or finite difference methods [FDM]
    • G—PHYSICS
    • G16—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR SPECIFIC APPLICATION FIELDS
    • G16C—COMPUTATIONAL CHEMISTRY; CHEMOINFORMATICS; COMPUTATIONAL MATERIALS SCIENCE
    • G16C60/00—Computational materials science, i.e. ICT specially adapted for investigating the physical or chemical properties of materials or phenomena associated with their design, synthesis, processing, characterisation or utilisation
    • G—PHYSICS
    • G06—COMPUTING OR CALCULATING; COUNTING
    • G06F—ELECTRIC DIGITAL DATA PROCESSING
    • G06F2119/00—Details relating to the type or aim of the analysis or the optimisation
    • G06F2119/14—Force analysis or force optimisation, e.g. static or dynamic forces

Landscapes

  • Engineering & Computer Science (AREA)
  • Theoretical Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • Mechanical Engineering (AREA)
  • Computing Systems (AREA)
  • Computer Hardware Design (AREA)
  • Evolutionary Computation (AREA)
  • Geometry (AREA)
  • General Engineering & Computer Science (AREA)
  • General Physics & Mathematics (AREA)
  • Fluid Mechanics (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Bioinformatics & Cheminformatics (AREA)
  • Bioinformatics & Computational Biology (AREA)
  • Shaping Metal By Deep-Drawing, Or The Like (AREA)

Abstract

一种用于厚壁筒失稳控制的液压胀形工艺,属于液压胀形技术领域,克服现有厚壁筒液压胀形工艺中易发生失稳的缺陷,包括以下步骤:S1、坯料预处理;S2、确定坯料液压胀形失稳的判断依据;S3、有限元仿真建模与参数设置;S4、模具装配与坯料安装;S5、液压胀形,液压胀形过程中,通过视觉位移传感器实时监控坯料的外形尺寸数据,若发现坯料发生鼓肚、凹腰或喇叭形状失稳现象,立即停止胀形工艺,卸载并精确测量坯料的外形尺寸,根据坯料的外形形状及尺寸测量结果调整上冲头加载速率,然后将坯料重新装载在减力液压胀形模具上,继续对坯料胀形加工。本发明有效抑制鼓肚、凹腰、喇叭口等失稳现象,实现厚壁筒胀形过程的均匀变形。

A hydraulic bulging process for controlling instability in thick-walled cylinders, belonging to the field of hydraulic bulging technology, overcomes the defects of instability that easily occur in existing hydraulic bulging processes for thick-walled cylinders. The process includes the following steps: S1, billet pretreatment; S2, determining the criteria for judging instability during hydraulic bulging of the billet; S3, finite element simulation modeling and parameter setting; S4, mold assembly and billet installation; S5, hydraulic bulging. During the hydraulic bulging process, the external dimensions of the billet are monitored in real time using a visual displacement sensor. If bulging, concave waist, or flared shape instability is detected, the bulging process is immediately stopped, the billet is unloaded, and its external dimensions are accurately measured. Based on the billet's shape and dimensional measurement results, the loading rate of the upper punch is adjusted, and then the billet is reloaded onto the reducing hydraulic bulging mold to continue the bulging process. This invention effectively suppresses instability phenomena such as bulging, concave waist, and flared mouth, achieving uniform deformation during the thick-walled cylinder bulging process.

Description

Hydraulic bulging process for instability control of thick-wall cylinder
Technical Field
The invention belongs to the technical field of hydraulic bulging, and particularly relates to a hydraulic bulging process for controlling instability of a thick-wall cylinder.
Background
The thick-wall cylinder forging is a core component in the fields of turbogenerators, aerospace, petrochemical industry and the like, hydraulic bulging is a key forming process, and a blank is subjected to plastic deformation by applying liquid high pressure in a thick-wall cylinder, so that the target size, shape and performance are obtained. Particularly for the non-magnetic guard ring forging of the large-sized generator, the material is single-phase austenitic stainless steel, and can only be strengthened by a cold deformation method to meet the technical requirements.
The existing large-sized guard ring forging adopts a hydraulic bulging method mostly by a conical punch decompression method, because of the thick-wall barrel blank wall thickness, short forming time, high deformation resistance and uneven stress distribution, unstable phenomena such as bulging, concave waist, bell mouth and the like are easy to occur in the forming process, so that the product size precision is low, the wall thickness is uneven, meanwhile, the existing technology lacks effective real-time monitoring means for instability, is mainly detected after bulging, once the instability is serious, the blank cannot be repaired and even is scrapped directly, and in addition, the blank pretreatment, tool adaptation selection and other links are unreasonable in design, and the bulging instability is aggravated from the source.
Therefore, aiming at the instability problem of the conventional bulging process, a hydraulic bulging process method based on instability control is needed, the dimensional accuracy and the product qualification rate of formed pieces are improved, and meanwhile, the real-time monitoring and active regulation and control of the instability are realized.
Disclosure of Invention
The invention aims to overcome the defects of easy instability, low dimensional accuracy and insufficient production efficiency in the existing thick-wall cylinder hydraulic bulging process, and provides the hydraulic bulging process for controlling the instability of the thick-wall cylinder, so that uniform deformation of the thick-wall cylinder bulging process is realized, instability phenomena such as bulging, waist concave, bell mouth and the like are effectively inhibited, the dimensional accuracy and the product qualification rate of formed parts are improved, simultaneously, the real-time monitoring and active regulation of the instability are realized, and the production efficiency is improved.
The invention is realized by the following technical scheme:
A hydro-bulging process for destabilization control of thick-walled cylinders comprising the steps of:
S1, blank pretreatment, which comprises the following steps of firstly detecting the initial overall dimension, microscopic grain size and grain size uniformity of a blank, secondly removing oxide skin, burrs and scratches on the surface of the blank to ensure the surface of the blank to be clean and smooth, thirdly carrying out ultrasonic flaw detection on the blank to ensure that no obvious defects exist in the blank, ensuring the mechanical properties of the blank to be uniform, and avoiding instability caused by defect expansion in the bulging process, and finally, machining C10 chamfers (10 mm multiplied by 45 DEG chamfers) at the upper and lower inner circular ports of the blank to facilitate the lamination and sealing with a special force-reducing hydraulic bulging die punch in the hydraulic bulging process;
S2, determining a judgment basis of blank hydro-bulging instability, which comprises the following steps:
Firstly, a metal mechanical property test is carried out, namely a standard tensile sample is prepared by selecting a sample which is the same as a blank and is in the same heat treatment state, the standard tensile sample is adopted for carrying out the tensile test, the mechanical property parameters of the material are obtained, the mechanical behavior of the material in the cold deformation process under the room temperature condition is represented, and accurate parameter support is provided for the subsequent establishment of a hydraulic bulging process and simulation modeling;
Then, drawing a real stress-strain curve of the material according to mechanical property parameters of the material, and fitting the real stress-strain curve in Origin software by adopting a nonlinear power exponent hardening model sigma true=Kεtrue m, wherein K is a hardening coefficient, epsilon true is a hydraulic bulging deformation amount, and m is a strengthening coefficient;
Finally, determining the judgment basis of material hydro-expansion instability (tangential necking) according to the hydro-expansion deformation epsilon (determined according to the bulging strengthening technical requirement), wherein the judgment basis is epsilon true is less than or equal to 2m, if epsilon true is less than or equal to 2m, the blank is considered to be difficult to generate hydro-expansion instability in the subsequent hydro-expansion process, the blank meets the requirement of the subsequent hydro-expansion, if epsilon true is more than 2m, the blank is easy to generate hydro-expansion instability in the subsequent hydro-expansion process, and the value of the strengthening coefficient m of the material needs to be increased until epsilon true is less than or equal to 2m;
S3, performing flow-solid coupling CEL analysis (Coupled Eulerian-Lagrangian is a mainstream numerical method specially solving the problems of large deformation, strong impact and free liquid surface flow-solid coupling) by adopting ABAQUS finite element simulation software, wherein the core is that solid and Euler grid computing fluids are computed by using Lagrangian grids, and bidirectional interaction is realized through interface coupling), a thick-wall cylinder hydraulic bulging finite element model is established, an actual hydraulic bulging working condition is simulated, technological parameters are optimized and adjusted, and the optimal loading rate is determined;
S4, die assembly and blank installation;
S5, hydraulic bulging is carried out by adopting a two-section loading mode according to the optimized technological parameters in the step S3, and the method comprises the following steps:
S5-1, in an initial bulging stage, the pressure in a hydraulic medium is rapidly increased from 0 to 130-150 MPa, the loading rate of an upper punch is 10-20 mm/S, and the core of the stage is that an bulging device rapidly builds ultrahigh pressure so that a blank is rapidly and uniformly stressed and enters a plastic deformation state. The problem that partial hydraulic medium is not continuously sprayed due to too slow pressure rising in the initial stage, so that the hydraulic pressure is unstable, the blank is subjected to uneven internal pressure, and the shape instability is induced is avoided;
S5-2, in a stable bulging stage, the loading rate of an upper punch is kept 15-20 mm/S, the internal pressure is continuously pressurized to 150-300 MPa, the process hardening characteristic of a material is utilized, the bulging internal pressure of a thick-wall cylinder is uniform and stable through stable loading speed control, the strength of the material is gradually improved, local deformation is restrained from being overlarge, shape instability is avoided, the requirement of dimensional accuracy is met, the outline dimension data of a blank in the stable bulging stage are monitored in real time through a visual displacement sensor, if the blank is found to have a bulge, a concave waist or a horn shape instability phenomenon, the bulging process is immediately stopped, the outline dimension of the blank is unloaded and accurately measured, the loading rate of the upper punch is adjusted according to the outline shape and dimension measurement result of the blank, then the blank is reloaded on a force-reducing hydraulic bulging die, the blank is continuously bulging, and the processing method after the instability phenomenon is generated is specifically as follows:
a) Firstly, determining that the deflection of an outer bus of the blank is delta mm, if delta mm is less than 7mm, carrying out subsequent steps, if delta mm is more than or equal to 7mm, stopping bulging processing of the blank, and then reducing the value of the loading rate of an upper punch by 1-2 times of the deflection value delta;
b) Firstly, determining that the deflection of an outer bus of the blank is delta mm, if delta mm is less than 7mm, carrying out subsequent steps, if delta mm is more than or equal to 7mm, stopping bulging processing of the blank, then increasing the value of the loading rate of an upper punch by 1-2 times of the deflection value delta, repeating the step b) if the concave waist shape still appears in the bulging process of the blank after the loading rate of the upper punch is increased, increasing the loading rate of the upper punch until the outer bus of the blank is flat, and if the loading rate of the upper punch reaches the maximum limit value or the whole blank is still concave waist shape after the bulging of the upper punch is increased, increasing the chamfer of 5-10 mm on the basis of the chamfer of the upper inner circle port and the lower inner circle port of the blank;
c) The method comprises the steps of respectively measuring the outer diameters of a large end and a small end at the bell mouth position of a blank, calculating the ratio of the outer diameter of the large end to the outer diameter of the small end to be c, increasing the chamfer angle of the inner round port of the blank corresponding to the small end to be 5 degrees if c is more than or equal to 0.98, increasing the chamfer angle of the inner round port of the blank corresponding to the small end to be 10 degrees if c is more than or equal to 0.96 and less than or equal to 0.98, increasing the chamfer angle of the inner round port of the blank corresponding to the small end to be 15 degrees if c is more than or equal to 0.94 and increasing the chamfer angle of the inner round port of the blank corresponding to the small end to be 20 degrees if c is less than or equal to 0.94;
d) If the blank is expanded and then the whole body is in a mixed shape and unstable, if the blank is expanded and then the whole body is in a horn mouth shape and is accompanied by the instability of a drum belly shape, the loading rate of the upper punch and the chamfering angle of the inner circular port of the blank are adjusted according to the steps a) and c) until the outer bus of the blank is flat, and if the blank is expanded and then the whole body is in a horn mouth shape and is accompanied by the instability of a concave waist shape, the loading rate of the upper punch and the chamfering angle of the inner circular port of the blank are adjusted according to the steps b) and c) until the outer bus of the blank is flat.
S5-3, unloading, namely when the pressure equipment reaches a preset stroke, the blank is swelled to a calibrated size, the pressure equipment beam is lifted up rapidly, pressure is relieved rapidly, instability phenomenon caused by unstable internal pressure due to discontinuous spraying of the hydraulic medium or uneven local leakage of the liquid is avoided, and hydraulic bulging of the blank is completed, so that the hydraulic bulging thick-wall cylinder is manufactured.
Further, in the step S2, the mechanical property parameters include yield strength, tensile strength, uniform elongation, total elongation, elastic modulus, poisson' S ratio, hardening coefficient, and strengthening coefficient.
Further, the step S3 includes the steps of:
Firstly, a thick-wall cylinder hydraulic bulging geometric model is established in ABAQUS finite element simulation software and grids are divided, wherein the geometric model comprises a blank, a hydraulic medium, an upper punch, a lower punch and a force reducing column of a force reducing hydraulic bulging die;
secondly, inputting the mechanical property parameters of the material obtained in the step S2 into a simulation model to serve as core parameters of a constitutive relation of the material, ensuring that the model can truly reflect the mechanical response of the material, and setting a hydraulic medium as water;
Thirdly, setting a plastic flow criterion of the material according to the real stress-strain curve determined in the step S2, setting a friction coefficient between a die and a blank and loading boundary constraint, and simulating a contact state and constraint conditions in an actual bulging process;
finally, the relation among the loading rate of the pressure equipment, the spraying volume of the hydraulic medium and the cylindrical shape size of the thick wall is analyzed by simulating bulging processes under different loading rates of the upper punch, the process parameters are optimally adjusted, the optimal loading rate is determined, and the blank is ensured not to be unstable such as bulging, loudspeaker and the like.
Further, in the step S5, if the hydro-bulging deformation amount epsilon true is greater than 0.2 or the hydraulic press forming force F < P maxπ(r2-r Reduction of 2),Pmax is the maximum internal pressure of the liquid, r is the inner diameter of the blank, r Reduction of is the radius of the force-reducing column, the diameter of the force-reducing column is increased, and the steps S4 and S5 are repeated until the preset size is reached.
Further, detecting the diameter, the wall thickness and the roundness of the hydraulic bulging thick-wall cylinder by adopting a detecting instrument, adjusting unqualified parts according to the instability phenomenon, and then bulging again until the product is qualified in detection.
The invention has the beneficial effects that:
1. According to the invention, through a preliminary metal mechanical property test, the mechanical behavior of the material is comprehensively represented, and the plasticity and the strengthening characteristic of the material are analyzed by combining the stress-strain curve, so that the expansion necking instability caused by insufficient material performance is avoided in advance, and a foundation is provided for the implementation of the subsequent expansion process;
2. According to the invention, by combining a finite element simulation technology, the mechanical behavior parameters of the material are accurately set, the shape change rule and stress strain distribution of a thick-wall cylinder blank in the bulging process are simulated, the instability risk point is predicted, the blindness of optimizing process formulation in the prior art is solved, the accurate prediction and control of the bulging instability of the thick-wall cylinder are realized, the instability defects such as bulging belly, concave waist, bell mouth and the like are effectively inhibited, and the scientificity and rationality of the process are improved from the source;
3. The invention adopts a strategy of accurately controlling the loading speed of the pressure equipment and the size of the blank to implement measurement and control, realizes quick pressurization and quick unloading, ensures quick response and continuous and uniform establishment of high pressure in the bulging of the thick-wall cylinder, and avoids the instability problem caused by uneven stress of the blank. Meanwhile, the invention also provides a specific adjustment solution for the abnormal instability of bulging, concave waist, bell mouth and the like of the thick-wall cylinder blank, so that the dimensional accuracy and the forming quality of the product are improved, and the qualification rate of the product is improved to more than 98%;
4. The invention is designed for the manganese-chromium austenitic stainless steel thick-wall cylinder forgings such as the nonmagnetic retaining ring of the 50 MW-1000 MW steam turbine generator, has strong adaptability, solves the technical bottlenecks of large bulging difficulty and difficult control of instability of the forgings, reduces the production cost, and has important engineering application value for localization of the booster thick-wall cylinder forgings.
5. The invention defines the association logic of metal mechanical property test, stress-strain curve analysis and finite element simulation parameter setting, forms a complete technology system of test-simulation-process optimization, and provides a borrowable technical scheme for hydraulic bulging processing of similar thick-wall cylinder forgings.
Drawings
FIG. 1 is a flow chart of the method of the present invention.
Detailed Description
The invention is described in further detail below with reference to the drawings and examples.
Example 1
In the embodiment 1, a Mn18Cr18N high-nitrogen austenitic stainless steel thick-wall cylinder is selected as a blank for processing a non-magnetic retaining ring of a 300MW steam turbine generator, the dimension requirement after the retaining ring is expanded is 1210 mm, 990 mm is an inner diameter, 110 mm is a wall thickness, the height is 910 mm, and the requirement of an initial blank meets the hot forging technical requirement of the non-magnetic retaining ring of the 50 MW-1000 MW steam turbine generator;
a hydro-bulging process for the destabilization control of thick-walled cylinders as shown in fig. 1 comprising the steps of:
S1, preprocessing a blank, wherein the method comprises the following steps of:
firstly, detecting the initial external dimension, microscopic grain size and grain size uniformity of a blank, selecting a Mn18Cr18N thick-wall cylinder blank, wherein the external diameter is 937 mm, the internal diameter is 672 mm, the wall thickness is 132.5 mm, and the height is 1034 mm;
Secondly, removing oxide skin, burrs and scratches on the surface of the blank, and ensuring the surface of the blank to be clean and smooth;
thirdly, carrying out ultrasonic flaw detection on the blank, ensuring that no obvious defect exists in the blank, and ensuring that the mechanical properties of the blank are uniform;
finally, machining C10 chamfers on the upper and lower inner circular ports of the blank.
S2, determining a judgment basis of blank hydro-bulging instability, which comprises the following steps:
Firstly, a standard tensile sample is prepared by selecting a sample which is the same as a blank and is in the same heat treatment state, axial tension is applied by a WDW3200 micro-control electronic universal tester, the standard tensile sample is adopted for tensile test (the standard tensile sample is prepared according to GB/T228-2002 ' room temperature tensile test method for metallic materials ', the axial tension is applied by the electronic universal tester, load and elongation data are synchronously recorded until the standard tensile sample breaks), and the mechanical performance parameters of the material are obtained, namely, the yield strength is 640 MPa, the tensile strength is 970 MPa, the uniform elongation is 42%, the total elongation is 58%, the elastic modulus is 200 GPa and the Poisson's ratio is 0.3;
Then, drawing a real stress-strain curve of the material according to mechanical property parameters of the material, fitting the real stress-strain curve in Origin software by adopting a nonlinear power exponent hardening model sigma true=Kεtrue m, wherein a hardening coefficient K=1445, a hydraulic bulging deformation epsilon true =0.307, and determining a strengthening coefficient m=0.216 of the material;
Finally, epsilon true =0.307 and m=0.216 are substituted into the material instability judging basis to know epsilon true is less than or equal to 2m, so that the blank provided in the embodiment 1 is not easy to generate hydro-bulging instability in the subsequent hydro-bulging process, and the blank meets the requirement of the subsequent hydro-bulging, namely the bulging does not generate tangential necking instability, the material plasticity is good, the work hardening characteristic is obvious, and the method is suitable for the hydro-bulging processing.
S3, finite element simulation modeling and parameter setting, namely performing flow-solid coupling CEL analysis by adopting ABAQUS finite element simulation software, establishing a thick-wall cylinder hydraulic bulging finite element model, simulating actual hydraulic bulging working conditions, optimizing and adjusting process parameters, and determining optimal loading rate, wherein the method comprises the following steps:
firstly, establishing a thick-wall cylinder hydraulic bulging geometric model in ABAQUS finite element simulation software and dividing grids, wherein the geometric model comprises a blank, a hydraulic medium, an upper punch, a lower punch and a force reducing column of a force reducing hydraulic bulging die;
secondly, inputting mechanical property parameters of the material obtained in the step S2 into a simulation model, and setting a hydraulic medium as water;
Thirdly, setting a plastic flow criterion of the material according to the real stress-strain curve determined in the step S2, selecting Mi Saisi yield criterion in the embodiment 1, matching the plastic deformation rule of Mn18Cr18N steel in a complex stress state, accurately predicting the yield and plastic deformation process of the material, setting the friction coefficient between the die and the blank to be 0.1, loading boundary constraint, and simulating the contact state and constraint condition in the actual bulging process;
Finally, the relationship among the loading rate of the pressure equipment, the spraying volume of the hydraulic medium and the cylindrical shape size of the thick wall is analyzed by simulating bulging processes under different loading rates of the upper punch, the process parameters are optimized and adjusted, and the optimal loading rate is determined.
S4, die assembly and blank installation;
Firstly, checking forming force based on the tonnage of the press and the size of a die, and ensuring that the tonnage of the press meets enough forming force. And selecting an 8000 ton press, selecting two sets of special force-reducing hydraulic bulging dies for double-pass forming, wherein the diameters of force-reducing columns are 650 mm and 800 mm respectively, calculating forming passes, and preparing the special force-reducing hydraulic bulging dies with corresponding sets. Checking the working size of the die, assembling and measuring, cleaning the moving part, ensuring flexible action, repairing damaged parts and ensuring good working state of the die. Preparing tooling auxiliary tools such as measuring tools, sealing rings, lifting tools, butter, cotton yarns, protective covers and the like;
Then cleaning the working walking table of the hydraulic press, horizontally placing the lower die of the force-reducing hydraulic bulging die in the center of the walking table, uniformly smearing butter on the chamfer positions of the upper and lower ends of the blank, the working conical surface of the die and the surface of the guide post, lifting the ring blank by using a binding belt, centering and sleeving the ring blank on the guide post, leveling, lifting the upper punch and the spherical cushion together and stably lifting the ring blank sleeved on the guide post, slightly lifting after centering, filling tap water into a gap, ensuring that the water is full and not leaked, pressing the ring blank by falling, installing a visual displacement sensor to detect the real-time dimension of the blank in the hydraulic bulging process, stably conveying the bulging die and the ring blank under the movable hydraulic press beam, and measuring and recording the initial flange spacing of the upper punch and the lower punch of the die before bulging. The work is ready and then ready for compression bulging.
S5, hydraulic bulging, which comprises the following steps:
S5-1, in an initial bulging stage, rapidly loading, wherein the pressure in a hydraulic medium is rapidly increased from 0 to 150MPa, and the loading rate of an upper punch is 12mm/S;
S5-2, in the stable bulging stage, the loading speed of the upper punch is kept at 15mm/S, the internal pressure is continuously pressurized to 271MPa, and in the embodiment 1, when the stroke of the press reaches 223mm, the blank size in the stable bulging stage is monitored in real time through a visual displacement sensor, and the blank is found to have the instability phenomenon of the concave waist shape. The pressure equipment beam is lifted up quickly, the pressure is relieved quickly, and bulging is stopped. And measuring the size of the blank, wherein the blank is slightly concave, the busbar deflection delta is 3mm, and the loading rate of the upper punch is increased by 1-2 times of the deflection value delta, namely the loading rate of the upper punch is increased to 18mm/s, and bulging is performed again. Correspondingly, if the whole blank is unstable in the shape of a bulge after bulging, the value of the loading rate of the upper punch is reduced by 1-2 times of the deflection value delta, namely, if the slight bulge appears in the stable bulging stage of the blank and the busbar deflection delta is 3mm, the loading rate of the upper punch is reduced to 9-12 mm/s, and bulging is performed again. In this example 1, when the press stroke reaches 348mm, the grommet expands a first time to the nominal size, the pressure equipment beam lifts up rapidly, and pressure is relieved rapidly. In the hydraulic bulging process, blank size data are monitored in real time through a visual displacement sensor, and the phenomena of shape instability such as bulging, concave waist or loudspeaker are avoided. After unloading, measuring the sizes of blanks, wherein the sizes of the blanks are 1115mm in outer diameter, 882.4mm in inner diameter and 948mm in height, and the bus is straight;
And replacing the hydraulic bulging die with the diameter of the force reducing column of 800mm to perform second-pass bulging. The die mounting repeats the above step S4. During hydraulic bulging, the initial bulging stage is quickly loaded, the pressure in a hydraulic medium is quickly increased from 0 to 150MPa, the loading speed of an upper punch is controlled to be 15mm/s, the loading speed of the upper punch is stabilized at 18mm/s as much as possible in the stable bulging stage, and the pressure is gradually increased to 282MPa. When the stroke of the press reaches 232mm, the guard ring is expanded to the calibrated size in the second pass, and the pressure equipment beam is quickly lifted and quickly relieved. The blank size data is monitored in real time through a visual displacement sensor, so that the instability phenomenon does not occur;
S5-3, unloading, namely expanding the blank to a calibrated size when the pressure equipment reaches a preset stroke, rapidly lifting the pressure equipment beam, rapidly releasing pressure, and completing hydraulic expansion of the blank to obtain the hydraulic expansion thick-wall cylinder. And after unloading, measuring the size of the blank, wherein a blank bus is straight and reaches a preset size, specifically, the outer diameter is 1210mm, the inner diameter is 990mm, the wall thickness is 110mm, the height is 910mm, and the hydraulic bulging is finished.
On the basis, a detecting instrument is adopted to detect the diameter, the wall thickness and the roundness of the hydraulic bulging thick-wall cylinder, unqualified parts are adjusted according to the instability phenomenon, then bulging is carried out again until the product is detected to be qualified, the product enters a subsequent processing procedure, and finally the thick-wall cylinder forge piece such as the nonmagnetic retaining ring of the 50 MW-1000 MW steam turbine generator meeting the requirements is obtained.
Example 2
In the embodiment 2, a Mn18Cr18N high-nitrogen austenitic stainless steel thick-wall cylinder is selected as a blank, and is used for processing a non-magnetic retaining ring of a 1000MW steam turbine generator, the size requirement after the retaining ring is expanded is 2060 mm, the inner diameter 1830 mm, the wall thickness is 115mm, the height is 1016mm, and the requirement of an initial blank meets the hot forging technical requirement of the non-magnetic retaining ring of the 1000MW steam turbine generator;
a hydro-bulging process for the destabilization control of thick-walled cylinders as shown in fig. 1 comprising the steps of:
S1, preprocessing a blank, wherein the method comprises the following steps of:
Firstly, detecting the initial external dimension, microscopic grain size and grain size uniformity of a blank, selecting a Mn18Cr18N thick-wall cylinder blank with the outer diameter of 1700mm, the inner diameter of 1450mm, the wall thickness of 125mm and the height of 1120mm;
Secondly, removing oxide skin, burrs and scratches on the surface of the blank, and ensuring the surface of the blank to be clean and smooth;
thirdly, carrying out ultrasonic flaw detection on the blank, ensuring that no obvious defect exists in the blank, and ensuring that the mechanical properties of the blank are uniform;
finally, machining C10 chamfers on the upper and lower inner circular ports of the blank.
S2, determining a judgment basis of blank hydro-bulging instability, which comprises the following steps:
Firstly, a standard tensile sample is prepared by selecting a sample which is the same as a blank and is in the same heat treatment state, axial tension is applied by a WDW3200 micro-control electronic universal tester, the standard tensile sample is adopted for tensile test (the standard tensile sample is prepared according to GB/T228-2002 ' room temperature tensile test method for metallic materials ', the axial tension is applied by the electronic universal tester, load and elongation data are synchronously recorded until the standard tensile sample breaks), and the mechanical performance parameters of the material are obtained, namely, the yield strength is 600 MPa, the tensile strength is 980 MPa, the uniform elongation is 38%, the total elongation is 51%, the elastic modulus is 200GPa, and the Poisson's ratio is 0.3;
then, drawing a real stress-strain curve of the material according to mechanical property parameters of the material, fitting the real stress-strain curve in Origin software by adopting a nonlinear power exponent hardening model sigma true=Kεtrue m, wherein a hardening coefficient K=1402 and a hydro-bulging deformation epsilon true =0.201, and determining a strengthening coefficient m=0.202 of the material;
Finally, epsilon true =0.201 and m=0.202 are substituted into the material instability judging basis to know epsilon true is less than or equal to 2m, so that the blank provided in the embodiment 2 is not easy to generate hydro-bulging instability in the subsequent hydro-bulging process, the blank meets the requirement of the subsequent hydro-bulging, namely the bulging does not generate tangential necking instability, the material plasticity is good, the work hardening characteristic is obvious, and the method is suitable for the hydro-bulging processing.
S3, finite element simulation modeling and parameter setting, namely performing flow-solid coupling CEL analysis by adopting ABAQUS finite element simulation software, establishing a thick-wall cylinder hydraulic bulging finite element model, simulating actual hydraulic bulging working conditions, optimizing and adjusting process parameters, and determining optimal loading rate, wherein the method comprises the following steps:
firstly, establishing a thick-wall cylinder hydraulic bulging geometric model in ABAQUS finite element simulation software and dividing grids, wherein the geometric model comprises a blank, a hydraulic medium, an upper punch, a lower punch and a force reducing column of a force reducing hydraulic bulging die;
secondly, inputting mechanical property parameters of the material obtained in the step S2 into a simulation model, and setting a hydraulic medium as water;
Thirdly, setting a plastic flow criterion of the material according to the real stress-strain curve determined in the step S2, selecting Mi Saisi yield criterion in the embodiment 2, matching the plastic deformation rule of Mn18Cr18N steel in a complex stress state, accurately predicting the yield and plastic deformation process of the material, setting the friction coefficient between the die and the blank to be 0.1, loading boundary constraint, and simulating the contact state and constraint condition in the actual bulging process;
Finally, the relationship among the loading rate of the pressure equipment, the spraying volume of the hydraulic medium and the cylindrical shape size of the thick wall is analyzed by simulating bulging processes under different loading rates of the upper punch, the process parameters are optimized and adjusted, and the optimal loading rate is determined. The method is characterized in that the speed of the initial bulging stage is 14 mm/s, the speed of the stable stage is 18 mm/s, the internal pressure is 165 and MPa of the maximum hydraulic pressure of the first pass, and 178 and MPa of the maximum hydraulic pressure of the second pass, so that the thick-wall cylinder blank is ensured not to be unstable such as bulging, loudspeaker and the like.
S4, die assembly and blank installation;
Firstly, checking forming force based on the tonnage of the press and the size of a die, and ensuring that the tonnage of the press meets enough forming force. Selecting 18500 ton press, selecting two sets of special force-reducing hydraulic bulging dies for double-pass forming, wherein the diameters of force-reducing columns are 1130 mm and 1300 mm respectively, calculating forming passes, and preparing the special force-reducing hydraulic bulging dies with corresponding sets. Checking the working size of the die, assembling and measuring, cleaning the moving part, ensuring flexible action, repairing damaged parts and ensuring good working state of the die. Preparing tooling auxiliary tools such as measuring tools, sealing rings, lifting tools, butter, cotton yarns, protective covers and the like;
Then cleaning the working walking table of the hydraulic press, horizontally placing the lower die of the force-reducing hydraulic bulging die in the center of the walking table, uniformly smearing butter on the chamfer positions of the upper and lower ends of the blank and the working conical surfaces of the die and the surfaces of the guide posts, lifting the ring blank by using a binding belt, centering and leveling, lifting the upper punch and the spherical pad together and stably lifting the ring blank sleeved on the guide posts, slightly lifting the ring blank after centering, filling tap water into a gap to ensure that the water is full, pressing the ring blank by falling, installing a visual displacement sensor to detect the real-time dimension of the blank in the hydraulic bulging process, stably conveying the bulging die and the ring blank under the movable hydraulic press beam, and measuring and recording the initial flange spacing of the upper punch and the lower punch of the die before bulging. The work is ready and then ready for compression bulging.
S5, hydraulic bulging, which comprises the following steps:
s5-1, in an initial bulging stage, rapidly loading, wherein the pressure in a hydraulic medium is rapidly increased from 0 to 150MPa, and the loading rate of an upper punch is 14mm/S;
s5-2, in a stable bulging stage, the loading speed of the upper punch is kept at 18mm/S, and the internal pressure is continuously pressurized to 165MPa;
In the embodiment 2, when the stroke of the press reaches 704mm, the guard ring is bulging to the calibrated size for the first time, the cross beam of the pressure equipment is lifted up quickly and relieved quickly, the instability phenomenon caused by unstable internal pressure due to discontinuous spraying of the hydraulic medium or uneven local leakage of the liquid is avoided, blank size data in the stable bulging stage are monitored in real time through a visual displacement sensor, and the instability phenomenon of the shape such as bulging, concave waist or loudspeaker does not occur;
And after the first-pass bulging is finished, replacing a hydraulic bulging die with the diameter of 1300mm for the force-reducing column to perform second-pass bulging. The die mounting repeats the above step S4. During hydraulic bulging, the initial bulging stage is rapidly loaded, the pressure in the hydraulic medium is rapidly increased from 0 to 150 MPa, and the loading rate of the upper punch is controlled to be 14 mm/s. In the steady bulging stage, the loading speed of the upper punch is as stable as possible at 18 mm/s, and the internal pressure is gradually increased to 178 MPa. When the stroke of the press reaches 500 mm, the guard ring is expanded to the calibrated size in the second pass, and the pressure equipment beam is quickly lifted and quickly relieved. The blank size data is monitored in real time through a visual displacement sensor, so that the instability phenomenon does not occur;
S5-3, unloading, namely expanding the blank to a calibrated size when the pressure equipment reaches a preset stroke, rapidly lifting the pressure equipment beam, rapidly releasing pressure, and completing hydraulic expansion of the blank to obtain the hydraulic expansion thick-wall cylinder. And after unloading, measuring the size of the blank, wherein the bus bar of the blank is straight and reaches a preset size, specifically, the outer diameter is 2060 mm, the inner diameter is 1830 mm, the wall thickness is 115mm, the height is 1016mm, and the hydraulic bulging is finished.
On the basis, a detecting instrument is adopted to detect the diameter, the wall thickness and the roundness of the hydraulic bulging thick-wall cylinder, unqualified parts are adjusted according to the instability phenomenon, then bulging is carried out again until the products are detected to be qualified, the subsequent processing procedure is carried out, and finally the thick-wall cylinder forge piece such as the non-magnetic retaining ring of the 1000MW steam turbine generator meeting the requirements is obtained.
The foregoing is merely illustrative of the present invention, and the present invention is not limited thereto, and any changes or substitutions easily contemplated by those skilled in the art within the scope of the present invention should be included in the scope of the present invention. Therefore, the protection scope of the present invention shall be subject to the protection scope of the claims.

Claims (5)

1. The hydro-bulging process for controlling the instability of the thick-wall cylinder is characterized by comprising the following steps of:
S1, blank pretreatment, which comprises the following steps of firstly detecting the initial overall dimension, microscopic grain size and grain size uniformity of a blank, secondly removing oxide skin, burrs and scratches on the surface of the blank to ensure the surface of the blank to be clean and smooth, thirdly carrying out ultrasonic flaw detection on the blank to ensure that no obvious defect exists in the blank and the mechanical properties of the blank are uniform, and finally machining C10 chamfers on the upper inner circular port and the lower inner circular port of the blank;
S2, determining a judgment basis of blank hydro-bulging instability, which comprises the following steps:
firstly, a metal mechanical property test, namely selecting a sample which is the same as a blank material and is in the same heat treatment state to manufacture a standard tensile sample, and carrying out a tensile test by adopting the standard tensile sample to obtain mechanical property parameters of the material;
Then, drawing a real stress-strain curve of the material according to mechanical property parameters of the material, and fitting the real stress-strain curve in Origin software by adopting a nonlinear power exponent hardening model sigma true=Kεtrue m, wherein K is a hardening coefficient, epsilon true is a hydraulic bulging deformation amount, and m is a strengthening coefficient;
Finally, determining that the judgment basis of the hydro-bulging destabilization of the material is epsilon true is less than or equal to 2m according to the hydro-bulging deformation epsilon true, if epsilon true is less than or equal to 2m, considering that the blank is not easy to generate hydro-bulging destabilization in the subsequent hydro-bulging process, and the blank meets the requirement of the subsequent hydro-bulging, if epsilon true is more than 2m, the blank is easy to generate hydro-bulging destabilization in the subsequent hydro-bulging process, and increasing the value of the strengthening coefficient m of the material until epsilon true is less than or equal to 2m;
S3, finite element simulation modeling and parameter setting, namely performing flow-solid coupling CEL analysis by adopting ABAQUS finite element simulation software, establishing a thick-wall cylinder hydraulic bulging finite element model, simulating an actual hydraulic bulging working condition, optimizing and adjusting process parameters, and determining an optimal loading rate;
S4, die assembly and blank installation;
S5, hydraulic bulging, which comprises the following steps:
S5-1, in an initial bulging stage, the pressure in a hydraulic medium is rapidly increased from 0 to 130-150 MPa, and the loading rate of an upper punch is 10-20 mm/S;
S5-2, in a stable bulging stage, the loading rate of an upper punch is kept to be 15-20 mm/S, the internal pressure is continuously pressurized to 150-300 MPa, the outline dimension data of a blank in the stable bulging stage is monitored in real time through a visual displacement sensor, if the blank is found to have a bulge, a concave waist or a horn shape instability phenomenon, the bulging process is immediately stopped, the outline dimension of the blank is unloaded and accurately measured, the loading rate of the upper punch is adjusted according to the outline shape and the dimension measurement result of the blank, then the blank is reloaded on a force-reducing hydraulic bulging die, the blank bulging processing is continued, and the processing method after the instability phenomenon is carried out is specifically as follows:
a) Firstly, determining that the deflection of an outer bus of the blank is delta mm, if delta mm is less than 7mm, carrying out subsequent steps, if delta mm is more than or equal to 7mm, stopping bulging processing of the blank, and then reducing the value of the loading rate of an upper punch by 1-2 times of the deflection value delta;
b) Firstly, determining that the deflection of an outer bus of the blank is delta mm, if delta mm is less than 7mm, carrying out subsequent steps, if delta mm is more than or equal to 7mm, stopping bulging processing of the blank, then increasing the value of the loading rate of an upper punch by 1-2 times of the deflection value delta, repeating the step b) if the concave waist shape still appears in the bulging process of the blank after the loading rate of the upper punch is increased, increasing the loading rate of the upper punch until the outer bus of the blank is flat, and if the loading rate of the upper punch reaches the maximum limit value or the whole blank is still concave waist shape after the bulging of the upper punch is increased, increasing the chamfer of 5-10 mm on the basis of the chamfer of the upper inner circle port and the lower inner circle port of the blank;
c) The method comprises the steps of respectively measuring the outer diameters of a large end and a small end at the bell mouth position of a blank, calculating the ratio of the outer diameter of the large end to the outer diameter of the small end to be c, increasing the chamfer angle of the inner round port of the blank corresponding to the small end to be 5 degrees if c is more than or equal to 0.98, increasing the chamfer angle of the inner round port of the blank corresponding to the small end to be 10 degrees if c is more than or equal to 0.96 and less than or equal to 0.98, increasing the chamfer angle of the inner round port of the blank corresponding to the small end to be 15 degrees if c is more than or equal to 0.94 and increasing the chamfer angle of the inner round port of the blank corresponding to the small end to be 20 degrees if c is less than or equal to 0.94;
d) If the blank is expanded and then the whole body is in a mixed shape and unstable, if the blank is expanded and then the whole body is in a horn mouth shape and is accompanied by the instability of a drum belly shape, the loading rate of the upper punch and the chamfering angle of the inner round port of the blank are adjusted according to the steps a) and c) until the outer bus of the blank is straight;
S5-3, unloading, namely expanding the blank to a calibrated size when the pressure equipment reaches a preset stroke, rapidly lifting the pressure equipment beam, rapidly releasing pressure, and completing hydraulic expansion of the blank to obtain the hydraulic expansion thick-wall cylinder.
2. The hydro-bulging process for the destabilization control of thick-walled cylinders according to claim 1, characterized in that in the step S2 the mechanical property parameters comprise yield strength, tensile strength, uniform elongation, total elongation, elastic modulus, poisson' S ratio, hardening coefficient and strengthening coefficient.
3. The hydro-bulging process for the destabilization control of thick-walled cylinders according to claim 1, characterized in that step S3 comprises the steps of:
firstly, establishing a thick-wall cylinder hydraulic bulging geometric model in ABAQUS finite element simulation software and dividing grids, wherein the geometric model comprises a blank, a hydraulic medium, an upper punch, a lower punch and a force reducing column of a force reducing hydraulic bulging die;
secondly, inputting mechanical property parameters of the material obtained in the step S2 into a simulation model, and setting a hydraulic medium as water;
Thirdly, setting a plastic flow criterion of the material according to the real stress-strain curve determined in the step S2, setting a friction coefficient between a die and a blank and loading boundary constraint, and simulating a contact state and constraint conditions in an actual bulging process;
Finally, the relationship among the loading rate of the pressure equipment, the spraying volume of the hydraulic medium and the cylindrical shape size of the thick wall is analyzed by simulating bulging processes under different loading rates of the upper punch, the process parameters are optimized and adjusted, and the optimal loading rate is determined.
4. The hydro-bulging process for the destabilization control of thick-walled cylinders according to claim 1, characterized in that in the step S5, if the hydro-bulging deformation epsilon true >0.2 or the hydraulic press forming force F < P maxπ(r2-r Reduction of 2),Pmax is the liquid maximum internal pressure, r is the blank inner diameter, r Reduction of is the force-reducing column radius, the diameter of the force-reducing column is increased and steps S4, S5 are repeated until the preset size is reached.
5. The hydro-bulging process for the destabilization control of thick-walled cylinders according to claim 1, wherein a detecting instrument is used to detect the diameter, the wall thickness and the roundness of the hydro-bulging thick-walled cylinder, and the reject is adjusted according to the destabilization phenomenon and then bulging again until the product is detected to be acceptable.
CN202610908782.1A 2026-06-23 2026-06-23 Hydraulic bulging process for instability control of thick-wall cylinder Active CN122425117B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202610908782.1A CN122425117B (en) 2026-06-23 2026-06-23 Hydraulic bulging process for instability control of thick-wall cylinder

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202610908782.1A CN122425117B (en) 2026-06-23 2026-06-23 Hydraulic bulging process for instability control of thick-wall cylinder

Publications (2)

Publication Number Publication Date
CN122425117A true CN122425117A (en) 2026-07-21
CN122425117B CN122425117B (en) 2026-08-18

Family

ID=100551376

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202610908782.1A Active CN122425117B (en) 2026-06-23 2026-06-23 Hydraulic bulging process for instability control of thick-wall cylinder

Country Status (1)

Country Link
CN (1) CN122425117B (en)

Citations (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH09314244A (en) * 1996-05-28 1997-12-09 Kawasaki Steel Corp Method and device for manufacturing tapered metal tube
JP2004337898A (en) * 2003-05-14 2004-12-02 Nissan Motor Co Ltd Hydraulic forming method and hydraulic forming apparatus for tubular member
JP2006000870A (en) * 2004-06-15 2006-01-05 Toyota Motor Corp Liquid pressure forming apparatus and liquid pressure control method thereof
CN102451868A (en) * 2010-10-29 2012-05-16 中国科学院金属研究所 A Hydroforming Method of Fluctuating Internal Pressure Controlled Loading Mode
CN102941273A (en) * 2012-11-16 2013-02-27 太原科技大学 Super-pressure hydraulic tensioner ring reinforcing device
CN110270619A (en) * 2019-06-11 2019-09-24 太原科技大学 A kind of circular material blank ultrahigh-pressure hydraulic breathing intensifying device
CN111985139A (en) * 2020-08-28 2020-11-24 燕山大学 A Method for Predicting Large Strain Data of Sheet Metal Using Small Punch Bulge Data
CN112045025A (en) * 2020-06-30 2020-12-08 中国航发南方工业有限公司 Hydraulic bulging processing die and hydraulic bulging processing method for flange type casing outer cover
CN114700436A (en) * 2022-03-28 2022-07-05 秦皇岛通桥科技有限公司 A shaft head forming process for a combined drive axle housing with shaft head
US20230084149A1 (en) * 2021-09-10 2023-03-16 Dalian University Of Technology Forming method of deep cavity thin-walled metal component with extremely small fillet radius
CN115828445A (en) * 2022-10-31 2023-03-21 苏州事达同泰汽车零部件有限公司 Method for researching high-pressure forming defects in stainless steel welded pipe
CN118180244A (en) * 2024-03-26 2024-06-14 太原理工大学 A wrinkle defect control method for open shell hydroforming
CN119203635A (en) * 2024-07-11 2024-12-27 南京航空航天大学 A continuous simulation method for stress and deformation evolution of bellows bulging-pressure wave-arc welding

Patent Citations (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH09314244A (en) * 1996-05-28 1997-12-09 Kawasaki Steel Corp Method and device for manufacturing tapered metal tube
JP2004337898A (en) * 2003-05-14 2004-12-02 Nissan Motor Co Ltd Hydraulic forming method and hydraulic forming apparatus for tubular member
JP2006000870A (en) * 2004-06-15 2006-01-05 Toyota Motor Corp Liquid pressure forming apparatus and liquid pressure control method thereof
CN102451868A (en) * 2010-10-29 2012-05-16 中国科学院金属研究所 A Hydroforming Method of Fluctuating Internal Pressure Controlled Loading Mode
CN102941273A (en) * 2012-11-16 2013-02-27 太原科技大学 Super-pressure hydraulic tensioner ring reinforcing device
CN110270619A (en) * 2019-06-11 2019-09-24 太原科技大学 A kind of circular material blank ultrahigh-pressure hydraulic breathing intensifying device
CN112045025A (en) * 2020-06-30 2020-12-08 中国航发南方工业有限公司 Hydraulic bulging processing die and hydraulic bulging processing method for flange type casing outer cover
CN111985139A (en) * 2020-08-28 2020-11-24 燕山大学 A Method for Predicting Large Strain Data of Sheet Metal Using Small Punch Bulge Data
US20230084149A1 (en) * 2021-09-10 2023-03-16 Dalian University Of Technology Forming method of deep cavity thin-walled metal component with extremely small fillet radius
CN114700436A (en) * 2022-03-28 2022-07-05 秦皇岛通桥科技有限公司 A shaft head forming process for a combined drive axle housing with shaft head
CN115828445A (en) * 2022-10-31 2023-03-21 苏州事达同泰汽车零部件有限公司 Method for researching high-pressure forming defects in stainless steel welded pipe
CN118180244A (en) * 2024-03-26 2024-06-14 太原理工大学 A wrinkle defect control method for open shell hydroforming
CN119203635A (en) * 2024-07-11 2024-12-27 南京航空航天大学 A continuous simulation method for stress and deformation evolution of bellows bulging-pressure wave-arc welding

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
李飞;李鹏;何文武;陈慧琴;: "护环液压缩径工艺数值模拟与试验研究", 锻压技术, vol. 45, no. 07, 31 July 2020 (2020-07-31), pages 95 - 102 *
郑晓华;何文武;: "大型核电变截面入口管内高压液力胀形数值模拟", 锻压装备与制造技术, no. 01, 28 February 2010 (2010-02-28), pages 104 - 106 *

Also Published As

Publication number Publication date
CN122425117B (en) 2026-08-18

Similar Documents

Publication Publication Date Title
LANG et al. Pre-bulging effect during sheet hydroforming process of aluminum alloy box with unequal height and flat bottom
Zheng et al. Effect of shape imperfection on the buckling of large-scale thin-walled ellipsoidal head in steel nuclear containment
CN108844824A (en) A kind of known materials residual stress analysis method based on conical pressure head
Han et al. Thickness improvement in hydroforming of a variable diameter tubular component by using wrinkles and preforms
CN116423166A (en) Forming method of large thin-walled head
Al-Ghamdi et al. Forming forces in incremental forming of a geometry with corner feature: investigation into the effect of forming parameters using response surface approach
Liu et al. Modified Johnson–Cook Constitutive Model of 18CrNiMo7-6 Alloy Steel under Ultrasonic Surface Burnishing Process
Shen et al. Investigation on the inner hole spiral-groove of cross wedge rolling of hollow shafts with mandrel
JP5672215B2 (en) Surface processing crack sensitivity evaluation method and apparatus
CN122425117B (en) Hydraulic bulging process for instability control of thick-wall cylinder
Shang et al. Incremental forming of hydraulic supports: a numerical and experimental study of thickness distribution
Reggiani et al. Comparison of experimental methods to evaluate seam welds quality in extruded profiles
CN107490520A (en) A kind of detection method of thin plate limited drawing ratio
Kocabıçak et al. Finite element modelling and experimental validation of two-roller vertical forward flow forming process of EN36B steel
Jia et al. Influence of die parameters on internal voids during multi-wedge-multi-pass cross-wedge rolling
Stančeková et al. Investigation of defects in forging tools by nondestructive detection method
CN114762885A (en) Precision forging method of GH4720Li high-temperature alloy blade and blade forging thereof
CN113092253B (en) Method for measuring critical deformation condition of wrought alloy
CN116337991B (en) Manufacturing method of nondestructive testing calibration tube containing axial cracks
Duspara et al. Conventional shaping the edges of thick steel plates after welding process
Sun et al. Reduction of die roll height in duplex gears through a sheet-bulk metal forming method: X.-L. Sun et al.
Heidarian et al. Influence of Tilted Die on the Eccentricity and Residual Stress of Copper Tubes Drawn with Floating Plug: Heidarian, Carradó, and Palkowski
Dudnikov et al. Improving the technology of part machining by surface plastic deformation
Łukaszek-Sołek et al. The numerical analysis of selected defects in forging processes
Voronko et al. Process simulation of hole mandrelling in steel aircraft parts

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant