CN1760102A - Method for guiding band into a rewinder and rewinder thereof - Google Patents

Method for guiding band into a rewinder and rewinder thereof Download PDF

Info

Publication number
CN1760102A
CN1760102A CNA2005101133711A CN200510113371A CN1760102A CN 1760102 A CN1760102 A CN 1760102A CN A2005101133711 A CNA2005101133711 A CN A2005101133711A CN 200510113371 A CN200510113371 A CN 200510113371A CN 1760102 A CN1760102 A CN 1760102A
Authority
CN
China
Prior art keywords
auxiliary device
band
rewinding machine
winding position
station
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CNA2005101133711A
Other languages
Chinese (zh)
Other versions
CN1760102B (en
Inventor
赫尔曼·A·斯蒂茨
约瑟夫·内利斯
安德烈亚斯·科罗奈
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Voith Patent GmbH
Original Assignee
Voith Paper Patent GmbH
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Voith Paper Patent GmbH filed Critical Voith Paper Patent GmbH
Publication of CN1760102A publication Critical patent/CN1760102A/en
Application granted granted Critical
Publication of CN1760102B publication Critical patent/CN1760102B/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65HHANDLING THIN OR FILAMENTARY MATERIAL, e.g. SHEETS, WEBS, CABLES
    • B65H19/00Changing the web roll
    • B65H19/22Changing the web roll in winding mechanisms or in connection with winding operations
    • B65H19/28Attaching the leading end of the web to the replacement web-roll core or spindle
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65HHANDLING THIN OR FILAMENTARY MATERIAL, e.g. SHEETS, WEBS, CABLES
    • B65H2301/00Handling processes for sheets or webs
    • B65H2301/40Type of handling process
    • B65H2301/41Winding, unwinding
    • B65H2301/414Winding
    • B65H2301/4148Winding slitting
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65HHANDLING THIN OR FILAMENTARY MATERIAL, e.g. SHEETS, WEBS, CABLES
    • B65H2301/00Handling processes for sheets or webs
    • B65H2301/40Type of handling process
    • B65H2301/41Winding, unwinding
    • B65H2301/417Handling or changing web rolls
    • B65H2301/4171Handling web roll
    • B65H2301/4173Handling web roll by central portion, e.g. gripping central portion
    • B65H2301/41734Handling web roll by central portion, e.g. gripping central portion involving rail
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65HHANDLING THIN OR FILAMENTARY MATERIAL, e.g. SHEETS, WEBS, CABLES
    • B65H2301/00Handling processes for sheets or webs
    • B65H2301/50Auxiliary process performed during handling process
    • B65H2301/52Auxiliary process performed during handling process for starting
    • B65H2301/522Threading web into machine
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65HHANDLING THIN OR FILAMENTARY MATERIAL, e.g. SHEETS, WEBS, CABLES
    • B65H2801/00Application field
    • B65H2801/84Paper-making machines

Landscapes

  • Replacement Of Web Rolls (AREA)

Abstract

Rewinder and Method for threading a material web into a rewinder, in which the start of the material web is drawn off a supply roll at full width by an auxiliary device in order to improve automation possibilities. Further, provision is made for the material web to be fed to a winding position at full width and for the auxiliary device to be released from the material web in the region of the winding position.

Description

Band is worn the method and the rewinding machine of leading in the rewinding machine
Technical field
The present invention relates to a kind of band (material web) be worn the method for leading in the rewinding machine, wherein band is pulled out from the supply roll coil of strip with the initiating terminal of full duration state by auxiliary device.In addition, the invention still further relates to a kind of rewinding machine, it has the station of expansion and winder station, launch station and have the position that at least one is used to supply the roll coil of strip, winder station has at least one winding position and auxiliary device, auxiliary device launch station zone clamping from the band of the supply roll coil of strip with the full duration state.
Background technology
Such method and rewinding machine are disclosed in EP0820946B1.For the ease of the coiling band, band is directed on the cutter sweep after pulling out on the supply roll coil of strip, and this cutter sweep cuts out tip (point) from band.For this purpose, rewinding machine has at least one cutter, when band can laterally move with respect to the band moving direction through out-of-date this cutter.In this mode, by use this cutter can with angled ground of band moving direction cutting of web.Because this tip can easier operation band.But also by some shortcomings.At first loss the band of scheduled volume.This part band no longer has overall with after cutting out the tip.Partly arrive winding position because band must continue to move forward up to its overall with after arriving winding position, so operating winding needs the more relatively time.Usually the speed that moves forward is less than winding speed.Therefore consumed the relative plenty of time.Also need operator or sensor to determine when to arrive band overall with part.This monitoring can cause the mistake that adds in addition, makes the automation mechanized operation difficulty that becomes.
Summary of the invention
The purpose of this invention is to provide a kind of automatic guidance.
Purpose of the present invention realizes by following manner, promptly at the initial period of said method, band is directed to winding position with the full duration state, and in the winding position zone band and auxiliary device is separated.
By this structure, all saved required intermediate steps, promptly band is being worn the cutting tip step of carrying out before leading in the rewinding machine, and the step at the cut-out tip after arriving winding position.By contrast, the band that this structure not only can the clamping overall with can also make band pass whole rewinding machine with unmodified form (being full duration), up to arriving winding position.Here only need band is separated with auxiliary device, and begin to carry out operating winding.Therefore neither can or not pass through winding position and elapsed time by a large amount of relatively band of loss in order to make the tip yet.Though also loss band slightly here, this loss only is limited to a part, promptly in order to be firmly held in a necessary part on the auxiliary device.But auxiliary device automatic guidance.Because band always is in the overall with state, so can save the sensor of judging width.In addition, operator's monitoring becomes easier.
Preferably band is through slitter, this slitter at auxiliary device by being in open mode before.Formed in the process of reel by the former roll coil of strip (parent reel) or the large-scale roll coil of strip (jumbo reel), band is cut into the required width of user usually.Slitter is required for this purpose.Therefore can obtain a large amount of reels by the former roll coil of strip.Slitter all comprises two row's cutters in many cases, and it shears band from both sides.In order to make band process under the control of auxiliary device, this two rows cutter must be removed enough distances so that the auxiliary device process.Yet this is easy to realize.
Preferably slitter is closed through later at auxiliary device, and produces at least one vertical cutting part before auxiliary device arrives winding position in band.This is to save time and the another kind of measure of material.Usually wish beginning winding part band, promptly the strip coil that will be separated by slitter when winding position is separated from one another when the part band is on a plurality of reels.If through cutting of web immediately later, then can make " shearing " zone become very short at auxiliary device.For example, if slitter is closed immediately after auxiliary device passes through, then can keep the not share zone of 50cm to 1m.In order to begin to carry out actual operating winding, only this zone is sent to outside the spool positions.
Preferably auxiliary device further transmits band after arriving winding position, arrives winding position up to vertical cutting part.Thereby single reel no longer is connected to each other together.
In this case, preferably band is wound on the auxiliary device in the winding position zone, arrives winding position up to vertical cutting part.Therefore after arriving winding position, no longer need to be moved further auxiliary device vertical cutting part is sent to winding position.Auxiliary device for rotation or its part band of reeling simply.
Preferably, band is firmly held in the winding position zone, and band cuts off between winding position and auxiliary device, and auxiliary device moves to the processing position.Handling the position, the cut-off parts of band (particularly not cutting part) falls (for example launching) and delivers to the pulper from auxiliary device.Auxiliary device continues the initiating terminal of the next band of clamping then.
If auxiliary device is from the take-off location to the winding position and to return be that what to move along loop also is favourable.In this structure, for example can guide auxiliary device from the supply roll coil of strip to the process of winding position, passing slitter, and in the process of returning (promptly from winding position to the supply roll coil of strip) can walk around slitter.Just can begin to reel in case result's auxiliary device arrives winding position, comprise rip cutting.Auxiliary device do not transmitted can hinder operating winding.
In the rewinding machine of the above-mentioned type, can be by making auxiliary device move to winder station, arriving winding position and realize the object of the invention from launching station.
Therefore can be by the initiating terminal of auxiliary device with full duration state clamping band.If the down-stream guiding auxiliary device according to band passes rewinding machine, then auxiliary device can draw with the band of full duration state in its back.Therefore only need guarantee whether auxiliary device arrives winding position, after cutting off band from auxiliary device, band can be wound on the ready core in winding position place.
Preferably launching between station and the winder station slitter to be set, slitter has cut state and transition condition (passage state), and it vertically cuts the band of process, the removable slitter that passes through of auxiliary device when transition condition when cut state.Usually slitter has the two row's cutters that are arranged in the band two sides, and band is divided into a plurality of strip sections (part web), two cutters always interact vertically to cut.Therefore in cut state, there is not space even stacked on top of each other between the cutter.If therefore auxiliary device is through slitter, auxiliary device needs some spaces.Cutter is separated.So entered transition condition.The result of conversion can make band pass through whole rewinding machine with the full duration state between two states, especially passes through slitter.
In this case, preferably slitter has two cross members (crossmember), and one of them can move with respect to another.By mobile cross member, can create in simple mode is that guiding is connected with the auxiliary device of band by the required space of slitter.Compare with mobile cutter on cross member, it is simpler usually to realize moving at least one cross member.
Preferably auxiliary device is directed on two mobile routes, and these two mobile routes are laterally arranged with respect to the band moving direction, and each interval one preset distance.For example mobile route can be made of track or guide rail.Auxiliary device is supported on the both sides, means that this auxiliary device can obtain guiding very quietly.By such support, band can be guided through rewinding machine under the situation that folding line can not take place or tear.Distance between two mobile routes also can guarantee to tilt.
In this case, particularly preferably, with the outside of these mobile route lateral arrangement at band.Therefore these mobile routes can not hinder the residue component part (remainingconstituent parts) of rewinding machine when operation.Especially, although there is mobile route, need not adopt any method to come closed slitter in the slitter zone yet.These mobile routes laterally are positioned at the outside of slitter.
The mobile route of auxiliary device is loop preferably.Therefore auxiliary device can move to winder station from launching station in the first of mobile route, is moved back into the expansion station at second portion from winder station.Therefore auxiliary device is guided the operation that can not hinder rewinding machine.
Selectively or additionally, make mobile route be used for two-way moving.In other words, if desired, auxiliary device can be when the threading material be got back to the expansion station from winder station on the same section of the mobile route of process.In this case, because slitter must stay open state before auxiliary device is returned, so have the shortcoming that has postponed slitter cut-in time.But when the restricted quarter, can accept this shortcoming.
Preferably, transmitting device (transport device) is directed along at least one mobile route.Therefore do not need auxiliary device itself to have the actuating device that therewith moves.On the contrary static actuating device can be set, it acts on the transmitting device.This transmitting device can be made of for example chain, band or hawser, and draws auxiliary device along mobile route.
It also is favourable that the cross-cutter that band between auxiliary device and the winding position is worked is arranged in the winding position zone.Under the effect of cross-cutter, band can be cut off between winding position and auxiliary device.Can simplify the threading material like this.Do not need at first to discharge band from auxiliary device.Therefore not absolute demand carefully can damage band when the initiating terminal of auxiliary device clamping band initiating terminal.The sub-fraction of loss band is an acceptable, as long as this part is required when being auxiliary device clamping band.
It also is favourable that the expansion station has ready position, and thereunder is furnished with the pulper mouth, and auxiliary device is removable through the zone between ready position and the pulper mouth.Launch station and all have expanded position usually, and the former upon deployment roll coil of strip is positioned at wherein.For two former roll coil of strips can successfully be changed, launching that another space, i.e. ready position at least are set on the station.Prepare that in this ready position the new former roll coil of strip is arranged, that is to say that the skin that is easy to damage launches to produce straight band front edge, its moving direction with respect to band becomes about 90 °.This operation also is called as " stretching (squaring) ".Damage owing to can produce some in this operating process, promptly the skin of the former roll coil of strip damages, and it is directly dropped into the pulper mouth is favourable.Therefore the initiating terminal of the band that downward near vertical is hung is directed to the pulper mouth from ready position.In this case, can make relatively easily clamping band of auxiliary device.Only need from the band back, promptly from the back of the band of moving direction, auxiliary device moves up.If auxiliary device has clamped band, can band be sent to winding position by simply moving forward auxiliary device subsequently.
Preferably cross-cutter is arranged in this zone.Be convenient to produce neat band initiating terminal like this.If auxiliary device has clamped band, the band of cross-cutter action and cut-out auxiliary device downside.Cut-off parts drops in the pulper mouth.Auxiliary device can controlled the initiating terminal of band securely then.
Preferably cross-cutter has cut zone, and it can move on the moving direction of band.In some cases, the former roll coil of strip or the large-scale roll coil of strip are not that identical diameter is always arranged.If the former roll coil of strip always is positioned at identical ready position, then the initiating terminal of band also is suspended on the diverse location on the moving direction downwards.This is no problem usually for auxiliary device, because it can at any time move along moving direction, therefore can adapt to little position difference difference.If slitter similarly can move, then it similarly can adapt to this little position difference.
Preferably auxiliary device has sucking hole and/or holding device.Be used for controlling securely the initiating terminal of band.Sucking hole is being controlled band securely by vacuum.Certainly in this case, need guarantee that air can discharge from auxiliary device, or at any time from sucking hole, discharge.Under the situation of using holding device, but only need to guarantee the initiating terminal of these holding device clamping bands and can control band securely.Two kinds of anchor fittings are all remote controlled, i.e. operation from the outside.
In this case, preferably, the actuation gear that auxiliary device is worked is set in expansion station zone.Thereby can behind the clamping band, actuate auxiliary device at once.If auxiliary device is being controlled band securely by sucking hole, then for example under the effect of actuation gear, in auxiliary device, produce vacuum.If controlling band securely by holding device, then actuation gear can be actuated holding device.Usually, actuation gear only works just enough in the initial secured stage of auxiliary device.Therefore can make actuation gear keep static, but also can move a little in this case to be adapted to the diameter difference of the former roll coil of strip.But do not need to make actuation gear to move to winder station, and then retract from launching station.This makes guiding become easy.
Preferably actuation gear is a rotating driving device, and it can be worked with auxiliary device and be connected.Therefore rotating driving device makes the auxiliary device rotation, thereby makes auxiliary device roll the initiating terminal of band.In case obtain the winding layer of scheduled volume, as long as have predetermined tensile force, band just is firmly held on the auxiliary device.For example can close the vacuum at sucking hole place then or reduce the power that holding device applies.Being operatively connected by engageable power-transfer clutch between rotating driving device and the auxiliary device realizes that rotating driving device just can not participate in whole the moving of auxiliary device like this.
The rotating driving device of the auxiliary connecting device of can working preferably is arranged in winding position.After arriving winding position, this rotating driving device also can for example pass through the power-transfer clutch auxiliary connecting device.Rotating driving device can make auxiliary device further rotate, the band part of reeling and not cut by slitter.Can under the situation that is not moved further auxiliary device, move band to winding position like this, and have only the cutting part of band to be positioned at winding position, and the formation reel separately of reeling.
Preferably launching between station and the slitter docking station to be set.Such docking station for example can produce known " abutment joint ", as described in DE19923097A1.This docking station can save and upgrade insertion process or after changing the former roll coil of strip band worn and lead in the rewinding machine.The initiating terminal of the new former roll coil of strip can simply be connected to an end that launches the former roll coil of strip.
Preferably auxiliary device moves in the underground space, launches station and winder station and is arranged on the ground.In other words, moving at " subterranean room " of auxiliary device carried out, and expansion station and winder station are arranged on " ground ".This layout has increased safety.Be positioned at that the operator who launches station and winder station zone contacts auxiliary device and the possibility that comes to harm is relatively low.
Description of drawings
Below in conjunction with accompanying drawing and preferred embodiment explanation the present invention, wherein:
Fig. 1 is the scheme drawing of first embodiment of rewinding machine,
Fig. 2 is the scheme drawing of second embodiment of rewinding machine,
Fig. 3 is the detailed view at X place among Fig. 2, and
Fig. 4 is the detailed view at Z place among Fig. 2.
The specific embodiment
Fig. 1 is the scheme drawing with the rewinding machine 1 that launches station 2 and winder station 3.Slitter 4 is arranged in and launches between station 2 and the winder station 3.
Has expanded position 5 at the expansion station.Have the bearing 6 of expansion at expanded position 5, wherein spool 7 is installed in rotation on it.The former roll coil of strip 8 is wound on the spool 7, also can find out its part from Fig. 1.Band 9 is pulled out from the former roll coil of strip 8, and the former roll coil of strip 8 also can be described as " the large-scale roll coil of strip ".Band 9 is cut into a plurality of strip sections at slitter 4 places, and is wound into a plurality of reels 10 at winder station 3 and since these reels 10 on the direction vertical with plane, accompanying drawing place one by one, so in Fig. 1, can only see a reel.
Launch bearing 6 and be suitable for relative high-speed operation.For example, can 2000 speed that arrive 3000m/min extract band 9 out.Certainly, can arrange identical expansion bearing 6 at the opposite side of spool 7.
Reel 10 is bearing on two bearing rollers 11,12, and wherein at least one is a driven voller.Loaded roll 13 can be set with the control operating winding." the two bearing roller rewinding machine " of backing roll rewinding machine shown in substituting also can be set, and wherein the center of reel 10 keeps and is bearing on backing roll or the touch roll.
Launch station 2 and also have ready position 14, have another spool 15 thereon in advance with new former roll coil of strip 16.This ready position has preparation bearing 17, and similarly it allows spool 15 to rotate, but because required here rotative speed is slower, so its structure is fairly simple.Preparation bearing 17 and launch bearing 6 and be connected to each other by running track 18 and be in the same place, when needs were changed spool, spool 15 can 5 rollings from ready position 14 towards expanded position on the running track.
Prepare to have the former roll coil of strip 16 in ready position 14.In order to prepare, launch and arrange which floor band usually.This operation also is called as " stretching ".For the ease of handling band 9 parts, pulper mouth 19, particularly by gravity are set below ready position 14 band 9 is hung contact pulper mouth 19 downwards.Because the radius of the former roll coil of strip 16 is always not identical, so the position of the band 9 that hangs can change a little downwards.Can receive the band that falls but pulper mouth 19 is very big.If desired, also funnel 20 can be set in addition.
Sometimes need band 9 is directed to winder station 3 from launching station 2.In this process, band 9 also must be through slitter 4.This process also is called as " threading material ".
In order to realize the threading material, rewinding machine 1 has auxiliary device 21, and the diverse location in Fig. 1 shows this auxiliary device.For the sake of clarity, (a, b c) represent auxiliary device 21 by lowercase at diverse location.
Auxiliary device 21 is directed along the mobile route shown in the long and two-short dash line 22.Mobile route is made of the track or the guide rail that are arranged in band 9 both sides (and in width outside).Can also be along mobile route 22 guiding chain, band or hawsers, these devices drive by common type of drive, no longer specify here, thereby on the direction vertical with band 9 moving directions auxiliary device 21 are directed to winder station 3 from launching station 2.
(left side shown in Figure 1) rises to because gravity and the band 9 that hangs downward vertically auxiliary device 21 from the left side, and is fixed on the band.For example, auxiliary device 21 can have sucking hole, does not here understand specifically.If produce vacuum at the sucking hole place, then auxiliary device 21 just can controlled band 9 securely.Also available holding device replaces sucking hole controlling band 9 securely.At last, auxiliary device 21 is rotated around axle (perpendicular to the plane at accompanying drawing place), it can be by rotating the band 9 of reeling in several weeks and hanging downwards like this.As long as keep enough tensile forces in band 9, band 9 just can be firmly held on the auxiliary device 21.In order to realize reeling, auxiliary device 21 can link to each other with static rotating driving device, does not understand specifically here.
In case auxiliary device 21 clamps band 9, just can actuate cross-cutter 23, it can cut off the redundance 24 of band 9.This part 24 will drop in the pulper mouth 19 then.Cross-cutter 23 can move to adapt to the former roll coil of strip 16 change in radius, the position change that the former roll coil of strip 16 change in radius can make band 9 hang along the direction shown in the double-head arrow 25.Because auxiliary device 21 can at any time move along mobile route 22, so the position change of band 9 can not influence auxiliary device 21.
Auxiliary device 21 moves to winder station 3 along mobile route 22 then, and guiding band 9 is walked around a plurality of deflection roll 26 up to winder station 3 in this process.Mobile route 22 keep with deflection roll 26-29 at a distance of enough distances, just can be in the operation subsequently required mode of band 9 (its back at auxiliary device 21 is drawn) is on deflection roll 16 like this.But auxiliary device 21 can not collide with deflection roll 26-29.In guiding band initiating terminal, the new former roll coil of strip 16 is movable to expanded position 5.
Cutter sweep has last cross member 30 and lower cross member 32, and last cross member has fixes a cutting tool 31, and lower cross member has bottom tool 33.Lower cross member 32 can move along the direction shown in the double-head arrow 34, like this at the bottom tool 33 of cutting position shown in the dotted line with regard to the crossover position shown in the removable solid line.Therefore slitter 4 has cut state and transition condition, band 9 is cut into a plurality of strip sections when cut state, when transition condition, fix a cutting tool 31 and bottom tool 33 each interval certain distances, the very big so that auxiliary device 21 of this distance at an easy rate through fixing a cutting tool 31 and bottom tool 33 between the zone.
By slitter 4 is closed immediately afterwards, beginning vertical cutting from the short relatively distance of auxiliary device 21 at auxiliary device 21 like this.This distance is 0.5 to 1m.
Auxiliary device is moved further up to arriving the position shown in the 21c, and it makes band contact bearing roller 12.Described all processes so far all carries out with the overall with form, that is to say band 9 with the state of overall with by auxiliary device 21 clampings, be transmitted with the state of overall with and pass slitter 4, and be placed on the bearing roller 12 with the state of overall with.For example controlling band securely there by suction.
Auxiliary device 21c is further rotated up to the part of vertically being cut by slitter 4 and also arrives bearing roller 12 then.Cross-cutter 35 actions afterwards and the band 9 of cut-out between auxiliary device 21c and bearing roller 12.In case band 9 arrives bearing roller 12, it just is positioned known " winding position ".Cross-cutter 35 moves towards bearing roller 12 along the direction shown in the double-head arrow 36 then, and cuts off the band 9 that is positioned between auxiliary device 21c and the winding position (being bearing roller 12).Auxiliary device 21c moves to its initial position once more then.Cross-cutter 35 moved to outside the mobile route of auxiliary device 21c before moving along direction shown in the double-head arrow 36.
In case the band 9 of cutting arrives winding position and just begins to carry out operating winding.Therefore in winding process, auxiliary device 21c can retract its initial position, thereby reduces the time that is consumed.Initial position is positioned at the top of pulper mouth 19, makes to launch to fall into pulper mouth 19 and to handle simply by the unnecessary band that will be wrapped on the auxiliary device 21.
Also lasting rotating driving device (not specifically illustrating) can be set in the winding position zone, and auxiliary device for rotation 21c arrives bearing roller 12 up to vertical cutting part.In this way, can avoid once more mobile auxiliary device 21c so that vertical cutting part is sent to bearing roller 12.
Except saving time, all right saving in material is because the waste of band 9 is less than wedge that uses in the prior art or the most advanced and sophisticated band of being wasted.
Auxiliary device 21a also can be used for making known " butt joint ".For this purpose, the docking facilities 37 that moves along direction shown in the double-head arrow 38 can be set between expanded position 5 and slitter 4.Auxiliary device 21a is used to make the band 9 contact docking facilitiess 37 that launch from the former roll coil of strip 8.Docking facilities 37 is being controlled band 9 securely and it is separated with the former roll coil of strip 8.
Afterwards, the band 9 of the former roll coil of strip 16 that auxiliary device 21 clampings are made a fresh start, and similarly with its guiding docking facilities 37.The end of two bands is connected to each other together there, and for example DE19923097A1 is disclosed.In this case, auxiliary device 21 moves forward and backward along mobile route 22.But in this operation engineering, auxiliary device 21 is only moved along a direction of mobile route 22.
Fig. 2 shows the variant embodiment of rewinding machine 1, and wherein identical and corresponding parts use identical mark.Here launch station 2 and have only the bearing 6 of expansion.When needs are changed spool, for example can move up and pull down the former roll coil of strip 8, to insert the new former roll coil of strip 16.
Mechanism shown in Figure 2 and mechanism shown in Figure 1 have 2 different.Auxiliary device 21 (referring to Fig. 3) has the cutter 39 that moves with auxiliary device 21.When this cutter 39 was wanted transverse cuts band 9, the part 40 (being in a fixed position in Fig. 1) that is relatively fixed just moved towards band 9 along the direction shown in the double-head arrow 41.
In addition, auxiliary device 21 has deflection roll 42.This deflection roll 42 has a plurality of effects.At first it can be by the initiating terminal of several all coiling bands 9 of rotation, to control this end securely.Secondly (lower left side of Fig. 2) this deflection roll 42 can also be used for deflection band 9 when auxiliary device 21 is in reference position, wherein this deflection roll clamping band 9.
In the embodiment shown in Figure 2, mobile route 22 is not a loop; Move opposite auxiliary device 21 front and back on same mobile route 22.Therefore when auxiliary device 21 was sent to band 9 on the bearing roller 12, auxiliary device 21 just was positioned the top of band 9.When auxiliary device 21 is moved back into initial position, thereby exist other tip of band to contact danger that auxiliary device 21 damages.
On the other hand, if being inserted into along the direction that turns over 180 °, spool 7 launches then can use another kind of auxiliary device 21 (as shown in Figure 4) in the bearing 6.This auxiliary device 21 also has the cutter 39 that therewith moves.When this auxiliary device 21 was sent to band 9 on the bearing roller 12, it just was positioned " correction " side of band 9.
In this embodiment, also bottom tool cross member 32 can be set to, it is lower than the cross member 30 of fixing a cutting tool when auxiliary device 21 process slitters 4.
In two embodiment, mobile route 22 can be arranged in the below on plane 43, launch station 2 and winder station 3 and be arranged on this plane 43.For example, mobile route 22 can be arranged in subterranean room, and two winder stations 2,3 are arranged on the ground.Be more convenient for like this protecting.Reduce personnel's danger greatly.
Can change described embodiment.For example can make mobile route 22 not only have a loop.Two or more loops can be set, use the auxiliary device of respective numbers then, it can make band 9 be sent to another loop from a loop.

Claims (25)

1. band worn the method for leading in the rewinding machine for one kind, by an auxiliary device initiating terminal of one band is pulled out from a supply roll coil of strip with the full duration state in the method, wherein, described band is sent to a winding position with the overall with state, and in this winding position zone described auxiliary device and described band is separated.
2. method according to claim 1 wherein, guides described band through a slitter, and this slitter was in open mode before described auxiliary device process.
3. method according to claim 2, wherein, described slitter is closed after described auxiliary device process, and produces at least one vertical cutting part before described auxiliary device arrives described winding position in described band.
4. method according to claim 3, wherein, described auxiliary device further draws described band after arriving described winding position, arrives described winding position up to described vertical cutting part.
5. method according to claim 4, wherein, described band is wound on the described auxiliary device in described winding position zone, arrives described winding position up to described vertical cutting part.
6. according to each described method in the claim 1 to 5, wherein, described band is firmly held in described winding position zone, and described band is cut off between described winding position and described auxiliary device, and described auxiliary device moves to a processing position.
7. according to each described method in the claim 1 to 6, wherein, described auxiliary device moves to described winding position along a loop from a take-off location and returns.
8. one kind has a rewinding machine that launches station, a winder station and an auxiliary device, described expansion station has at least one position that is used for a supply roll coil of strip, described winder station has at least one winding position, described auxiliary device in described expansion station zone with the band of full duration state clamping from the described supply roll coil of strip, wherein, described auxiliary device (21) can move to described winder station (3) from described expansion station (2), arrives described winding position (12) zone.
9. rewinding machine according to claim 8, wherein, between described expansion station (2) and described winder station (3), be provided with a slitter (4), this slitter (4) has a cutting state and a transition condition, at least produce a vertical cutting part in the described band (9) that it is passing through when described cut state, described auxiliary device (21) is removable by described slitter (4) when described transition condition.
10. rewinding machine according to claim 9, wherein, described slitter (4) has two cross members (30,32), and one of them can move with respect to another.
11. each described rewinding machine in 10 according to Claim 8, wherein, described auxiliary device (21) is directed on two mobile routes (22), and these two mobile routes are laterally arranged with respect to the moving direction of described band (9), and each interval one preset distance.
12. rewinding machine according to claim 11, wherein, described mobile route (22) laterally is arranged in the outside of described band.
13. according to each described rewinding machine in claim 11 or 12, wherein, the mobile route of described auxiliary device (22) is a loop.
14. according to each described rewinding machine in the claim 11 to 13, wherein, described mobile route (22) is designed to two-way moving.
15., wherein, guide a transmitting device along at least one mobile route according to each described rewinding machine in the claim 11 to 14.
16. each described rewinding machine in 15 according to Claim 8, wherein, the cross-cutter (35) that the band (9) between described auxiliary device (21) and the described winding position (12) is worked is arranged in described winding position (12) zone.
17. each described rewinding machine in 16 according to Claim 8, wherein, described expansion station (2) has a ready position (14), and in this ready position arranged beneath one pulper mouth (19) is arranged, described auxiliary device (21) is removable by the zone between described ready position (14) and the described pulper mouth (19).
18. rewinding machine according to claim 17, wherein, described cross-cutter (23) is arranged in described zone.
19. rewinding machine according to claim 18, wherein, described cross-cutter (23) has a cut zone, and it can move on the moving direction of described band.
20. each described rewinding machine in 19 according to Claim 8, wherein, described auxiliary device (21) has a sucking hole and/or a holding device.
21. each described rewinding machine in 20 according to Claim 8, wherein, the actuation gear that described auxiliary device (21) is worked is arranged on the zone of described expansion station (2).
22. rewinding machine according to claim 21, wherein, described actuation gear is a rotating driving device, and it can be connected with described auxiliary device (21) work.
23. each described rewinding machine in 22 according to Claim 8, wherein, the rotating driving device that connects described auxiliary device (21) of can working is arranged in the zone of described winding position.
24. each described rewinding machine in 23 wherein, is provided with a butt joint station (37) between described expansion station (2) and described slitter (4) according to Claim 8.
25. each described rewinding machine in 24 according to Claim 8, wherein, described auxiliary device can move in the space under ground (43), and described expansion station (2) and described winder station (3) are arranged on this ground.
CN2005101133711A 2004-10-11 2005-10-11 Method for guiding band into a rewinder and rewinder thereof Expired - Fee Related CN1760102B (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
DE102004049720.6 2004-10-11
DE102004049720A DE102004049720A1 (en) 2004-10-11 2004-10-11 Method for introducing a material web into a roll winding device and roll winding device

Publications (2)

Publication Number Publication Date
CN1760102A true CN1760102A (en) 2006-04-19
CN1760102B CN1760102B (en) 2010-12-08

Family

ID=35645736

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2005101133711A Expired - Fee Related CN1760102B (en) 2004-10-11 2005-10-11 Method for guiding band into a rewinder and rewinder thereof

Country Status (6)

Country Link
US (1) US20060076449A1 (en)
EP (1) EP1645534B1 (en)
CN (1) CN1760102B (en)
AT (1) ATE399734T1 (en)
CA (1) CA2522489A1 (en)
DE (2) DE102004049720A1 (en)

Cited By (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102730462A (en) * 2011-04-07 2012-10-17 上海东冠纸业有限公司 Paper bearing device for papermaking rewinder
CN103373603A (en) * 2012-04-18 2013-10-30 珠海格力电器股份有限公司 Feeding mechanism and feeding method for heat-insulating cotton pipes
CN103640915A (en) * 2013-12-17 2014-03-19 青岛云路新能源科技有限公司 Amorphous strip threading method and device
CN103662946A (en) * 2013-12-25 2014-03-26 常熟市高新造纸机械有限公司 Novel rewinder
CN104526747A (en) * 2014-12-24 2015-04-22 江门市蓬江区华龙包装材料有限公司 Air bubble film cutting table
CN105129474A (en) * 2015-07-29 2015-12-09 程黔 Automatic paper leading device used on operating side of paper winding machine
CN105173831A (en) * 2015-09-18 2015-12-23 恒天重工股份有限公司 Wet winding machine suitable for spunlaced nonwoven makeup cotton production line
CN106672669A (en) * 2017-02-05 2017-05-17 宁夏佳美精细纸制品有限公司 Paper winding machine
CN109019101A (en) * 2018-08-14 2018-12-18 陶佑佳 A kind of drum mechanism built of high speed rotary machine
CN109230724A (en) * 2018-08-21 2019-01-18 广州和井贸易有限公司 A kind of nylon cloth process equipment
CN110589559A (en) * 2019-09-04 2019-12-20 格力电器(武汉)有限公司 Automatic continuous material collecting device that connects
CN113844923A (en) * 2021-09-02 2021-12-28 江苏信息职业技术学院 Intelligent full-automatic coil separator
CN113998518A (en) * 2021-11-18 2022-02-01 邓波 Belt winding machine and winding method

Families Citing this family (17)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE102005038477A1 (en) 2005-08-13 2007-02-15 Voith Patent Gmbh Device for guiding a web
DE102005038478A1 (en) 2005-08-13 2007-02-15 Voith Patent Gmbh Device for guiding a web
DE102005038671A1 (en) 2005-08-16 2007-02-22 Voith Patent Gmbh Web e.g. paper web, directing device for roll packing device, has auxiliary device with retaining units having magnet bars that hold one of units in closing position, where one of units is movable opposite to other unit
FI118894B (en) * 2006-03-20 2008-04-30 Metso Paper Inc Procedure in connection with a roller cutting machine
US7513277B2 (en) * 2007-05-23 2009-04-07 Voith Patent Gmbh Low tensile creep belt
US11090896B2 (en) 2012-10-12 2021-08-17 Heidelberger Druckmaschinen Ag Web insertion device for a flat-bed die-cutting machine, manufacturing system for packages and method for feeding a web of printing material
DE102012019992A1 (en) * 2012-10-12 2014-04-17 Gallus Stanz- Und Druckmaschinen Gmbh Apparatus for a flat bed punch and method for feeding a printing material web
DE102013211111A1 (en) * 2013-06-14 2014-06-18 Voith Patent Gmbh Winding device for fiber web e.g. paper, has cutting device that is provided for longitudinal cutting of web edges and web travel path that is provided in region of cutting device is perpendicular
ITUA20163344A1 (en) * 2016-05-11 2017-11-11 Celli Nonwovens Spa MACHINE AND METHOD FOR THE WINDING OF STRIPS OF MATTRESS WITH THE MEANS OF TRANSVERSAL CUTTING OF THE STRIPS AND ANCHORING OF THE STRIPES AT THE ANCHORING SOUL
CN109132651B (en) * 2018-07-11 2020-01-17 湛江丰麒塑料制品有限公司 Plastic film's tractive rolling flattening processing apparatus
IT201800009236A1 (en) * 2018-10-08 2020-04-08 A Celli Paper Spa REWINDING MACHINE AND METHOD FOR CHECKING THE SPEED OF MOTORS IN A REWINDING MACHINE
DE102019203742A1 (en) 2019-02-07 2020-08-13 Bhs Corrugated Maschinen- Und Anlagenbau Gmbh Material web feed device
DE102019201601A1 (en) * 2019-02-07 2020-08-13 Bhs Intralogistics Gmbh Material roll preparation arrangement
CN112061856B (en) * 2020-09-11 2024-11-29 中山鑫硕包装材料有限公司 Cut disconnected rewinding machine of some
FI129371B (en) * 2020-11-05 2021-12-31 Valmet Technologies Oy Unwinding section and a method for removing slab fiber web from a reeling shaft
DE102024115904A1 (en) * 2024-06-07 2025-12-11 Voith Patent Gmbh Device and method for disposing of a residual material web in a roll slitting machine
CN119237975B (en) * 2024-12-09 2025-03-21 江苏新凯源汽车零部件制造有限公司 A laser cutting and feeding device for automobile roof production

Family Cites Families (27)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3306801A (en) * 1962-09-14 1967-02-28 Nu Roll Corp Web severing means for web splicing machines
US3756527A (en) * 1970-10-29 1973-09-04 Du Pont Method of and apparatus for threading a web of plastic film onto a windup roll and winding it thereon
JPS4837942B1 (en) * 1970-12-18 1973-11-14
GB1519524A (en) * 1975-11-19 1978-08-02 Agfa Gevaert Butt splicer for butt-joining a fresh web to an expiring web
CH615817A5 (en) * 1977-04-19 1980-02-29 Apura Gmbh
JPS58127048U (en) * 1982-02-18 1983-08-29 富士写真フイルム株式会社 Band-shaped sheet tip locking detection device
US4488466A (en) * 1982-09-07 1984-12-18 Seal Tech Corp. Apparatus for cutting sheet material
FI71708C (en) * 1983-07-07 1992-03-23 Valmet Paper Machinery Inc reeling device
US4697755A (en) * 1984-08-27 1987-10-06 Hiroshi Kataoka Rewinder with slitter
FI69439C (en) * 1984-09-07 1986-02-10 Waertsilae Oy Ab FOERFARANDE OCH ANORDNING FOER ATT FORSLA BANANS AENDA
DE3710039A1 (en) * 1987-03-30 1988-10-20 Jagenberg Ag DEVICE FOR PULLING IN A MATERIAL RAIL IN A MACHINE FOR TREATING THE MATERIAL RAIL, IN PARTICULAR IN A ROLLER
FI76390C (en) * 1987-05-20 1988-10-10 Valmet Paper Machinery Inc FOERFARANDE OCH ANORDNING FOER SPETSDRAGNING AV EN BANA.
DE3723601A1 (en) * 1987-07-17 1989-02-02 Voith Gmbh J M MACHINE FOR WRAPPING A PAPER OR CARDBOARD
DE3737504A1 (en) * 1987-11-05 1989-05-24 Beloit Corp ROLL CUTTER
EP0475886B1 (en) * 1990-08-24 1994-11-09 Fabriques De Tabac Reunies S.A. Method and means for opening a paper roll and for splicing the end of a paper ribbon to the end of a second paper ribbon
JPH0657578B2 (en) * 1990-12-13 1994-08-03 株式会社東京機械製作所 Paper threading device
IT1257624B (en) * 1992-01-09 1996-02-01 Gd Spa DEVICE FOR THE COLLECTION OF THE HEAD OF THE TAPE OF A NEW REEL AND ITS TRANSFER TO A SUBSEQUENT OPERATING STATION
GB2274835B (en) * 1993-02-05 1996-12-18 Fuji Iron Works Automatic slitter rewinder machine
DE4415114A1 (en) * 1993-09-23 1995-04-13 Erapa Ceka Maschbau Film stretching device for a plastics film
DE4342277C2 (en) * 1993-12-11 1996-02-08 Beiersdorf Ag Turret carrier roller winder
GB2287242A (en) * 1994-03-11 1995-09-13 Bretting C G Mfg Co Inc Threading webs through web-transport machines.
FI99283C (en) * 1996-07-16 1998-06-10 Valmet Corp Method for head export of a paper web or similar web-like material in a winding device, in particular a slitter, and device for carrying out the method
ATE290504T1 (en) * 1997-01-25 2005-03-15 Voith Paper Patent Gmbh WINDING MACHINE AND METHOD FOR CONTINUOUSLY WINDING A WEB OF MATERIAL
US5931406A (en) * 1997-12-08 1999-08-03 Voith Sulzer Papiertechnik Patent Gmbh Method and winder for the continuous winding of a material web
DE10017371C1 (en) * 2000-04-07 2001-12-06 Oce Printing Systems Gmbh Device for drawing in an endless web for a printing or copying system with a modular structure
ES2241388B1 (en) * 2002-07-25 2006-10-16 Manuel Torres Martinez WINDING SYSTEM IN THE HANDLING OF TISU COILS.
US20040256434A1 (en) * 2003-06-23 2004-12-23 Allan Broom Tail rail

Cited By (18)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102730462A (en) * 2011-04-07 2012-10-17 上海东冠纸业有限公司 Paper bearing device for papermaking rewinder
CN103373603A (en) * 2012-04-18 2013-10-30 珠海格力电器股份有限公司 Feeding mechanism and feeding method for heat-insulating cotton pipes
CN103373603B (en) * 2012-04-18 2015-05-20 珠海格力电器股份有限公司 Feeding mechanism and feeding method for heat-insulating cotton pipes
CN103640915A (en) * 2013-12-17 2014-03-19 青岛云路新能源科技有限公司 Amorphous strip threading method and device
CN103662946A (en) * 2013-12-25 2014-03-26 常熟市高新造纸机械有限公司 Novel rewinder
CN104526747A (en) * 2014-12-24 2015-04-22 江门市蓬江区华龙包装材料有限公司 Air bubble film cutting table
CN105129474A (en) * 2015-07-29 2015-12-09 程黔 Automatic paper leading device used on operating side of paper winding machine
CN105173831B (en) * 2015-09-18 2017-03-22 恒天重工股份有限公司 Wet winding machine suitable for spunlaced nonwoven makeup cotton production line
CN105173831A (en) * 2015-09-18 2015-12-23 恒天重工股份有限公司 Wet winding machine suitable for spunlaced nonwoven makeup cotton production line
CN106672669A (en) * 2017-02-05 2017-05-17 宁夏佳美精细纸制品有限公司 Paper winding machine
CN106672669B (en) * 2017-02-05 2018-08-21 宁夏佳美精细纸制品有限公司 A kind of reel machine
CN109019101A (en) * 2018-08-14 2018-12-18 陶佑佳 A kind of drum mechanism built of high speed rotary machine
CN109019101B (en) * 2018-08-14 2024-05-28 陶佑佳 Winding drum mechanism of high-speed winding drum machine
CN109230724A (en) * 2018-08-21 2019-01-18 广州和井贸易有限公司 A kind of nylon cloth process equipment
CN110589559A (en) * 2019-09-04 2019-12-20 格力电器(武汉)有限公司 Automatic continuous material collecting device that connects
CN110589559B (en) * 2019-09-04 2020-11-27 格力电器(武汉)有限公司 Automatic continuous material collecting device that connects
CN113844923A (en) * 2021-09-02 2021-12-28 江苏信息职业技术学院 Intelligent full-automatic coil separator
CN113998518A (en) * 2021-11-18 2022-02-01 邓波 Belt winding machine and winding method

Also Published As

Publication number Publication date
DE102004049720A1 (en) 2006-04-20
US20060076449A1 (en) 2006-04-13
ATE399734T1 (en) 2008-07-15
EP1645534B1 (en) 2008-07-02
CN1760102B (en) 2010-12-08
EP1645534A1 (en) 2006-04-12
DE502005004564D1 (en) 2008-08-14
CA2522489A1 (en) 2006-04-11

Similar Documents

Publication Publication Date Title
CN1760102A (en) Method for guiding band into a rewinder and rewinder thereof
JP4790714B2 (en) Fiber strip addition system head
EP0315569A2 (en) Roll slitting machine
FI99283C (en) Method for head export of a paper web or similar web-like material in a winding device, in particular a slitter, and device for carrying out the method
EP0089595B1 (en) Method to cut off a preferably band shaped running web of tearable material and means to carry out the method
KR102273391B1 (en) Apparatus for cutting wire-rod
KR20160121625A (en) Optical cable Winding System
WO1986006357A1 (en) Apparatus for cutting a paper web
CN88101962A (en) Sheet material slitting and rewinding machines and unloading rolls from machines
EP0792831B1 (en) Collecting and stacking device for laminar sheets and stacking method
CN102303787A (en) Automatic bobbin paper slitting and rewinding machine
CN204549571U (en) Expansion equipment
US7617852B2 (en) Apparatus for temporarily holding logs within cutting-off machines
EP1518615B1 (en) Device for feeding strip material and for cutting strip-edges of strip material for machine tools, especially for thin strip rolling mills and for foil rolling mills
EP3532417B1 (en) Machine and method for winding strips of web material with means for the transverse cutting of the strips at the end of winding
CN108790231A (en) Cut the cutting equipment of continuous band, particularly all-steel cord band or textile cord band
CN206447380U (en) Device is cut to film book
JP2000280345A (en) Method and apparatus for manufacturing sheet-like member
CN212488214U (en) Interlayer coiled material coiling robot
CN116924145A (en) Automatic threading device for coil
CN110155773B (en) Full-automatic tape feeding, winding and cutting and tail tape sticking integrated machine
JP2010005660A (en) Reinforcing bar machining device
JP2961012B2 (en) Method and apparatus for removing short tube of web take-up roll
JP2007314317A (en) Device and method for automatically splicing and continuously delivering roll paper
CN113209826A (en) Feeding mechanism and feeding method for separation net, diaphragm and flow guide cloth of filter element

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20101208

Termination date: 20131011