CN201280730Y - Loader working mechanism capable of automatically setting level - Google Patents

Loader working mechanism capable of automatically setting level Download PDF

Info

Publication number
CN201280730Y
CN201280730Y CNU200820161949XU CN200820161949U CN201280730Y CN 201280730 Y CN201280730 Y CN 201280730Y CN U200820161949X U CNU200820161949X U CN U200820161949XU CN 200820161949 U CN200820161949 U CN 200820161949U CN 201280730 Y CN201280730 Y CN 201280730Y
Authority
CN
China
Prior art keywords
pin joint
swing arm
distance
ratio
arm
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CNU200820161949XU
Other languages
Chinese (zh)
Inventor
廖晓明
祝海林
包振义
陈跃
贾文锦
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CHANGLIN Co Ltd
Jiangsu Polytechnic University
Original Assignee
CHANGLIN Co Ltd
Jiangsu Polytechnic University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CHANGLIN Co Ltd, Jiangsu Polytechnic University filed Critical CHANGLIN Co Ltd
Priority to CNU200820161949XU priority Critical patent/CN201280730Y/en
Application granted granted Critical
Publication of CN201280730Y publication Critical patent/CN201280730Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Transmission Devices (AREA)

Abstract

The utility model relates to a working mechanism for a loader, which is capable of setting flat automatically. The working mechanism comprises a front frame, a movable arm, a rocker, a bucket, a connecting rod, a lifting oil cylinder and a bucket rotating oil cylinder. The ratio of the distances between the hinge joints of the front frame, the movable arm, the rocker, the bucket, the connecting rod, the lifting oil cylinder and the bucket rotating oil cylinder is within a certain range. In each operation cycle of the loader, during the lifting process of the movable arm, the movable arm enables the bucket to maintain the translation state, thereby improving the translation performance during the lifting process, effectively preventing the material from scatting when the bucket is lifted and ensuring the cleanness of the working environment of the loader and improving operation safety. Meanwhile, when the movable arm descends, the angle of the bucket can be adjusted automatically through the rod system; after being unloaded, the bucket can be set flat automatically at minus 3degrees to minus 6 degrees; and the load working device can be reset to the previous excavating state, thus saving power, avoiding the repeated operations due to that the bucket is not restored precisely, reducing the work intensity of the operators and improving the work performance and work efficiency of the loader.

Description

The loader operating mechanism that the energy realization is set level automatically
Technical field
The utility model relates to the loader operating mechanism that a kind of energy realization is set level automatically, belongs to the loader technical field.
Background technology
Working device of loader is by hydraulic-driven and the spacing multi-connecting-rod mechanism that finishes handling operation, is one of critical component of loader, and the height of its design level directly influences service behaviour, operating efficiency and the economic indicator of loader.Present working device of loader generally adopts the counter-rotating six bar mechanism that is made of front frame, swing arm, rocking arm, scraper bowl, connecting rod, elevating ram and rotary ink tank.The counter-rotating six bar mechanism has advantages such as simple in structure, that digging force is big, but because the size of each rod member fails to reach more rational proportion configuration, in the moved arm lifting process, scraper bowl needs by oil cylinder control to reach the translation state.In addition, when swing arm dropped to ground location, this scraper bowl also needed to control to return to last spading state by oil cylinder, has not only increased labor intensity of operating personnel, and has influenced operating efficiency.
Summary of the invention
The purpose of this utility model provides a kind of loader operating mechanism set level automatically of realizing, under the prerequisite that guarantees former digging force, improves the lifting translation, and scraper bowl is set level automatically return to the spading operating position.
The utility model is that the technical scheme that achieves the above object is: the loading machine operating mechanism that a kind of energy realization is set level automatically; Comprise front frame; Swing arm; Rocking arm; Scraper bowl; Connecting rod; Elevating ram and rotary ink tank; Two swing arm rear portions are hinged on respectively the both sides of front frame; The front end of swing arm and scraper bowl bottom-hinged; The rear end of two elevating rams is hinged on respectively on the front frame; The tailpiece of the piston rod of elevating ram is hinged on the bottom of swing arm; Rocking arm is hinged on the intermediate support of two swing arms; The rear end of rotary ink tank is hinged on the front frame; The tailpiece of the piston rod of rotary ink tank is hinged on the top of rocking arm; The connecting rod two ends respectively with the lower hinge of scraper bowl bottom and rocking arm; It is characterized in that: it is characterized in that: described swing arm and the scraper bowl pin joint ratio of two pin joint length L to the distance R 1 between rocking arm and the intermediate support pin joint and the swing arm is 0.35~0.46; Swing arm and the scraper bowl pin joint ratio of two pin joint length L to the distance R 2 between scraper bowl and the connecting rod hinge point and the swing arm is 0.13~0.14; Distance R 3 between connecting rod two pin joints is 0.18~0.24 with the ratio of swing arm front and back two pin joint length L; Rocking arm lower link point ratio of two pin joint length L to the distance R 4 between rocking arm and the intermediate support pin joint and the swing arm is 0.30~0.39; Rocking arm upper link point ratio of two pin joint length L to the distance R 5 between rocking arm and the intermediate support pin joint and the swing arm is 0.23~0.39; The ratio of two pin joint length L is 0.66~0.80 before and after distance R 6 between swing arm upper link point and the intermediate support hinge and the swing arm, and swing arm upper link point ratio of two pin joint length L to the distance R 7 between the rear end pin joint of rotary ink tank and the swing arm is 0.12~0.14.
The utility model is under the constant situation of the digging force of the type product that maintains the standard and fuselage shape thereof, functional dimension, determine the size of counter-rotating six each rod member of connecting rod operating mechanism by optimal design, make loader in each work cycle, swing arm can make scraper bowl keep the translation state in the lifting process, improved the translation of lifting process, prevent material shedding in scraper bowl lifting process effectively, guaranteed the clean and tidy safety that also can improve operation of loader working environment.Simultaneously, in swing arm decline process, automatically regulate the angle of scraper bowl by this leverage, can realize after the unloading being leveled to-3 °~-6 ° automatically, will load equipment and return to last spading state, both save power consumption, avoided again because of the scraper bowl inaccurate repeatable operation that resets, thereby reduced operating personnel's number of operations, reduced labor intensity of operating personnel, improved the service behaviour and the operating efficiency of loader.
Description of drawings
Below in conjunction with accompanying drawing embodiment of the present utility model is described in further detail.
Fig. 1 is a structural representation of the present utility model.
Fig. 2 is the reverse leverage schematic diagram of six connecting rod operating mechanisms of the utility model.
Wherein: 1-scraper bowl, 2-connecting rod, 3-swing arm, 31-intermediate support, 4-rocking arm, 5-elevating ram, 6-front frame, 7-rotary ink tank.
The specific embodiment
See Fig. 1; Shown in 2; The utility model can be realized the loading machine operating mechanism that automatically sets level; Comprise front frame 6; Swing arm 3; Rocker arm 4; Scraper bowl 1; Connecting rod 2; Elevating ram 5 and rotary ink tank 7; Two swing arms, 3 rear portions are hinged on respectively the both sides of front frame 6; This pin joint is G; Swing arm 3 front ends and scraper bowl 1 bottom-hinged; This pin joint is A; The rear end of two elevating rams 5 is hinged on respectively on the front frame 6; The tailpiece of the piston rod of elevating ram 5 is hinged on the bottom of swing arm 3; Rocker arm 5 is hinged on the intermediate support 31 of two swing arms 3; This pin joint is D; Rocker arm 5 is turned round around this pin joint D; The rear end of rotary ink tank 7 is hinged on respectively on the front frame 6; Its pin joint F; The tailpiece of the piston rod of rotary ink tank 7 is hinged on the top of Rocker arm 4; This pin joint E; Connecting rod 2 one ends and scraper bowl 1 bottom-hinged; This pin joint is B; The lower hinge of the other end of connecting rod 2 and rocking arm 3; I.e. this pin joint C; Swing arm 3 and scraper bowl 1 pin joint A to the ratio of the distance R 1 between Rocker arm 4 and the intermediate support 31 pin joint D and the length L of swing arm 3 front and back two pin joint AG be 0.35~0.46; Swing arm 3 and scraper bowl 1 pin joint A to the ratio of the distance R 2 between scraper bowl 1 and the connecting rod 2 pin joint B and the length L of swing arm 3 front and back two pin joint AG be 0.13~0.14; Distance R 3 between 2 liang of pin joint BC of connecting rod is 0.18~0.24 with the ratio of the length L of swing arm 3 front and back two pin joint AG; Hinged C point to the ratio of the distance R 4 between Rocker arm 4 and the intermediate support 31 pin joint D and the length L of swing arm 3 front and back two pin joint AG is 0.30~0.39 under the Rocker arm 4; Rocker arm 4 upper link point E to the ratio of the distance R 5 between Rocker arm 4 and the intermediate support 31 pin joint D and the length L of swing arm 3 front and back two pin joint AG be 0.23~0.31; Distance R 6 between swing arm 3 upper link point G and the intermediate support 31 pin joint D is 0.66~0.80 with the ratio of the length L of swing arm 3 front and back two pin joint AG, swing arm 3 upper link point G to the ratio of the distance R 7 between the rear end pin joint F of rotary ink tank 7 and the length L of swing arm 3 front and back two pin joint AG be 0.12~0.14.
Embodiment 1
See Fig. 1, shown in 2, the utility model can realize that the length L of 3 liang of pin joint AG of swing arm of the loader operating mechanism that sets level automatically is when 2557mm, swing arm 3 and scraper bowl 1 pin joint A to the distance R 1 between Rocker arm 4 and the intermediate support 31 pin joint D at 1170mm, swing arm 3 and scraper bowl 1 pin joint A to the distance R 2 between scraper bowl 1 and the connecting rod 2 pin joint B at 350mm, distance R 3 between 2 liang of pin joint BC of connecting rod is 605mm; hinged C point to the distance R 4 between Rocker arm 4 and the intermediate support 31 pin joint D is 907mm under the Rocker arm 4; Rocker arm 4 upper link point E to the distance R 5 between Rocker arm 4 and the intermediate support 31 pin joint D be 791mm; the distance R 6 between swing arm 3 upper link point G and the intermediate support 31 pin joint D is 1695mm, swing arm 3 upper link point G to the distance R 7 between the rear end pin joint F of rotary ink tank 7 be 333mm.
Embodiment 2
See Fig. 1, shown in 2, the utility model can realize that the length L of 3 liang of pin joint AG of swing arm of the loader operating mechanism that sets level automatically is when 2561mm, swing arm 3 and scraper bowl 1 pin joint A to the distance R 1 between Rocker arm 4 and the intermediate support 31 pin joint D at 1088mm, swing arm 3 and scraper bowl 1 pin joint A to the distance R 2 between scraper bowl 1 and the connecting rod 2 pin joint B at 350mm, distance R 3 between 2 liang of pin joint BC of connecting rod is 612mm; hinged C point to the distance R 4 between Rocker arm 4 and the intermediate support 31 pin joint D is 851mm under the Rocker arm 4; Rocker arm 4 upper link point E to the distance R 5 between Rocker arm 4 and the intermediate support 31 pin joint D be 715mm; the distance R 6 between swing arm 3 upper link point G and the intermediate support 31 pin joint D is 1711mm, swing arm 3 upper link point G to the distance R 7 between the rear end pin joint F of rotary ink tank 7 be 333mm.
Embodiment 3
See Fig. 1, shown in 2, the utility model can realize that the length L of 3 liang of pin joint AG of swing arm of the loader operating mechanism that sets level automatically is when 2586mm, swing arm 3 and scraper bowl 1 pin joint A to the distance R 1 between Rocker arm 4 and the intermediate support 31 pin joint D at 1176mm, swing arm 3 and scraper bowl 1 pin joint A to the distance R 2 between scraper bowl 1 and the connecting rod 2 pin joint B at 360mm, distance R 3 between 2 liang of pin joint BC of connecting rod is 512mm; hinged C point to the distance R 4 between Rocker arm 4 and the intermediate support 31 pin joint D is 1010mm under the Rocker arm 4; Rocker arm 4 upper link point E to the distance R 5 between Rocker arm 4 and the intermediate support 31 pin joint D be 1000mm; the distance R 6 between swing arm 3 upper link point G and the intermediate support 31 pin joint D is 1910mm, swing arm 3 upper link point G to the distance R 7 between the rear end pin joint F of rotary ink tank 7 be 334mm.
Embodiment 4
See shown in Fig. 1,2, the utility model can realize that the length L of 3 liang of pin joint AG of swing arm of the loader operating mechanism that sets level automatically is when 2566mm, swing arm 3 and scraper bowl 1 pin joint A to the distance R 1 between Rocker arm 4 and the intermediate support 31 pin joint D at 1096mm, swing arm 3 and scraper bowl 1 pin joint A to the distance R 2 between scraper bowl 1 and the connecting rod 2 pin joint B at 364mm; Distance R 3 between 2 liang of pin joint BC of connecting rod is 606mm; hinged C point to the distance R 4 between Rocker arm 4 and the intermediate support 31 pin joint D is 857mm under the Rocker arm 4; Rocker arm 4 upper link point E to the distance R 5 between Rocker arm 4 and the intermediate support 31 pin joint D be 749mm; the distance R 6 between swing arm 3 upper link point G and the intermediate support 31 pin joint D is 1719mm, swing arm 3 upper link point G to the distance R 7 between the rear end pin joint F of rotary ink tank 7 be 346mm.

Claims (2)

1; The loading machine operating mechanism that a kind of energy realization is set level automatically; Comprise front frame; Swing arm; Rocking arm; Scraper bowl; Connecting rod; Elevating ram and rotary ink tank; Two swing arm rear portions are hinged on respectively the both sides of front frame; The front end of swing arm and scraper bowl bottom-hinged; The rear end of two elevating rams is hinged on respectively on the front frame; The tailpiece of the piston rod of elevating ram is hinged on the bottom of swing arm; Rocking arm is hinged on the intermediate support of two swing arms; The rear end of rotary ink tank is hinged on the front frame; The tailpiece of the piston rod of rotary ink tank is hinged on the top of rocking arm; The connecting rod two ends respectively with the lower hinge of scraper bowl bottom and rocking arm; It is characterized in that: described swing arm and the scraper bowl pin joint ratio of two pin joint length L to the distance R 1 between rocking arm and the intermediate support pin joint and the swing arm is 0.35~0.46; Swing arm and the scraper bowl pin joint ratio of two pin joint length L to the distance R 2 between scraper bowl and the connecting rod hinge point and the swing arm is 0.13~0.14; Distance R 3 between connecting rod two pin joints is 0.18~0.24 with the ratio of swing arm front and back two pin joint length L; Rocking arm lower link point ratio of two pin joint length L to the distance R 4 between rocking arm and the intermediate support pin joint and the swing arm is 0.30~0.39; Rocking arm upper link point ratio of two pin joint length L to the distance R 5 between rocking arm and the intermediate support pin joint and the swing arm is 0.23~0.39; The ratio of two pin joint length L is 0.66~0.80 before and after distance R 6 between swing arm upper link point and the intermediate support hinge and the swing arm, and swing arm upper link point ratio of two pin joint length L to the distance R 7 between the rear end pin joint of rotary ink tank and the swing arm is 0.12~0.14.
2, the loader operating mechanism that energy realization according to claim 1 is set level automatically, it is characterized in that: described swing arm and the scraper bowl pin joint ratio of two pin joint length L to the distance R 1 between rocking arm and the intermediate support pin joint and the swing arm is 0.40~0.45, swing arm and the scraper bowl pin joint ratio of two pin joint length L to the distance R 2 between scraper bowl and the connecting rod hinge point and the swing arm is 0.14, the ratio of two pin joint length L is 0.20~0.24 before and after distance R 3 between connecting rod two pin joints and the swing arm; rocking arm lower link point ratio of two pin joint length L to the distance R 4 between rocking arm and the intermediate support pin joint and the swing arm is 0.33~0.35; rocking arm upper link point ratio of two pin joint length L to the distance R 5 between rocking arm and the intermediate support pin joint and the swing arm is 0.28~0.31; the ratio of two pin joint length L is 0.67~0.74 before and after the distance R 6 between swing arm upper link point and the intermediate support hinge and the swing arm, and swing arm upper link point ratio of two pin joint length L to the distance R 7 between the rear end pin joint of rotary ink tank and the swing arm is 0.13~0.14.
CNU200820161949XU 2008-10-24 2008-10-24 Loader working mechanism capable of automatically setting level Expired - Fee Related CN201280730Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNU200820161949XU CN201280730Y (en) 2008-10-24 2008-10-24 Loader working mechanism capable of automatically setting level

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNU200820161949XU CN201280730Y (en) 2008-10-24 2008-10-24 Loader working mechanism capable of automatically setting level

Publications (1)

Publication Number Publication Date
CN201280730Y true CN201280730Y (en) 2009-07-29

Family

ID=40927609

Family Applications (1)

Application Number Title Priority Date Filing Date
CNU200820161949XU Expired - Fee Related CN201280730Y (en) 2008-10-24 2008-10-24 Loader working mechanism capable of automatically setting level

Country Status (1)

Country Link
CN (1) CN201280730Y (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102561425A (en) * 2011-12-27 2012-07-11 燕山大学 Four-degree-of-freedom connecting rod working mechanism containing composite hinges
CN103132549A (en) * 2013-01-26 2013-06-05 王开怀 Arc spading type loader
CN103147476A (en) * 2013-03-05 2013-06-12 燕山大学 Loading machine mechanism with anti-lock device
CN106088184A (en) * 2016-06-24 2016-11-09 山东交通学院 A kind of multiple-unit connecting rod drives three mobilities electro-hydraulic wheel type excavator device people
CN106120904A (en) * 2016-06-24 2016-11-16 山东交通学院 A kind of multiple-unit linear drives plane three mobility fork wood machine
CN107701536A (en) * 2017-09-15 2018-02-16 广西柳工机械股份有限公司 Hydraulic system of loading machine working device
CN108894263A (en) * 2018-06-26 2018-11-27 青岛雷沃工程机械有限公司 A kind of loading machine of general dump ram lengthens swing arm and quickly develops design method
WO2019144924A1 (en) * 2018-01-26 2019-08-01 Guangxi Liugong Machinery Co., Ltd. Loader working device

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102561425A (en) * 2011-12-27 2012-07-11 燕山大学 Four-degree-of-freedom connecting rod working mechanism containing composite hinges
CN103132549A (en) * 2013-01-26 2013-06-05 王开怀 Arc spading type loader
CN103147476A (en) * 2013-03-05 2013-06-12 燕山大学 Loading machine mechanism with anti-lock device
CN103147476B (en) * 2013-03-05 2015-04-08 燕山大学 Loading machine mechanism with anti-lock device
CN106088184A (en) * 2016-06-24 2016-11-09 山东交通学院 A kind of multiple-unit connecting rod drives three mobilities electro-hydraulic wheel type excavator device people
CN106120904A (en) * 2016-06-24 2016-11-16 山东交通学院 A kind of multiple-unit linear drives plane three mobility fork wood machine
CN107701536A (en) * 2017-09-15 2018-02-16 广西柳工机械股份有限公司 Hydraulic system of loading machine working device
CN107701536B (en) * 2017-09-15 2019-09-17 广西柳工机械股份有限公司 Hydraulic system of loading machine working device
WO2019144924A1 (en) * 2018-01-26 2019-08-01 Guangxi Liugong Machinery Co., Ltd. Loader working device
CN108894263A (en) * 2018-06-26 2018-11-27 青岛雷沃工程机械有限公司 A kind of loading machine of general dump ram lengthens swing arm and quickly develops design method

Similar Documents

Publication Publication Date Title
CN201050073Y (en) Single rocking-arm reversal six-connecting-rod mechanism for loading machine
CN202773586U (en) Arc-shaped shovel hydraulic tree excavating device
CN103526786A (en) Grass-grabbing machine with bucket provided with grabbing teeth
CN204585207U (en) A kind of industrial machine mechanical arm and gripper
CN209687435U (en) Oil field tube rod conveyer
CN2880927Y (en) Link mechanism of loading machine operating device
CN202689065U (en) Single-line dual-connection dual-swing combined force arm of grass grabbing machine
CN202850070U (en) Parallel eight-connection-rod mechanism for loading machine
CN201762740U (en) High unloading operation mechanism for loaders
CN202643145U (en) Hydraulic turn-over portal crane
CN102373721A (en) Marble supporting fork
CN202416402U (en) Forward eight-link operating device at loading end of loader-digger
CN201687019U (en) Positive rotation six-bar linkage mechanism of small-sized loading machine
CN105084047B (en) A kind of hydraulic impact type ore bucket bottom clearing machine
CN201386000Y (en) Fork structure of fork device
CN201258230Y (en) Hoisting apparatus mounted on wheel type loader
CN111287229A (en) Bucket type triangle coal cleaning device
CN204849867U (en) Eight link mechanism equipment of novel corotation of loader
CN104563176B (en) The poking device of loading machine
CN202492867U (en) Marble holding fork for forward 8-bar linkage mechanism
CN212835551U (en) Positive rotating six-link working device and underground scraper
CN103147476B (en) Loading machine mechanism with anti-lock device
CN202280091U (en) Novel reverse-rotation eight-connecting-rod mechanism of loader
CN203393759U (en) Working device of loader
CN113605473B (en) Loader working device for enhancing overturning force of bucket

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20090729

Termination date: 20141024

EXPY Termination of patent right or utility model