CN201722621U - 一种预制箱梁的整体吊装架 - Google Patents
一种预制箱梁的整体吊装架 Download PDFInfo
- Publication number
- CN201722621U CN201722621U CN2010202395756U CN201020239575U CN201722621U CN 201722621 U CN201722621 U CN 201722621U CN 2010202395756 U CN2010202395756 U CN 2010202395756U CN 201020239575 U CN201020239575 U CN 201020239575U CN 201722621 U CN201722621 U CN 201722621U
- Authority
- CN
- China
- Prior art keywords
- shaped steel
- main couple
- row
- integral hoisting
- hoisting frame
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 40
- 239000010959 steel Substances 0.000 claims abstract description 40
- 239000000725 suspension Substances 0.000 claims description 19
- 238000010276 construction Methods 0.000 abstract description 16
- 238000000034 method Methods 0.000 abstract description 8
- 238000009417 prefabrication Methods 0.000 abstract description 2
- 230000003014 reinforcing effect Effects 0.000 description 6
- 230000002787 reinforcement Effects 0.000 description 4
- 230000005484 gravity Effects 0.000 description 3
- XEEYBQQBJWHFJM-UHFFFAOYSA-N Iron Chemical compound [Fe] XEEYBQQBJWHFJM-UHFFFAOYSA-N 0.000 description 2
- 238000010586 diagram Methods 0.000 description 2
- RYGMFSIKBFXOCR-UHFFFAOYSA-N Copper Chemical compound [Cu] RYGMFSIKBFXOCR-UHFFFAOYSA-N 0.000 description 1
- 108010068370 Glutens Proteins 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 229910052802 copper Inorganic materials 0.000 description 1
- 239000010949 copper Substances 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 235000021312 gluten Nutrition 0.000 description 1
- 238000009434 installation Methods 0.000 description 1
- 229910052742 iron Inorganic materials 0.000 description 1
- 230000002045 lasting effect Effects 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 229920003023 plastic Polymers 0.000 description 1
- 239000004033 plastic Substances 0.000 description 1
- 238000012797 qualification Methods 0.000 description 1
- 238000003908 quality control method Methods 0.000 description 1
Images
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
Description
Claims (2)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN2010202395756U CN201722621U (zh) | 2010-06-28 | 2010-06-28 | 一种预制箱梁的整体吊装架 |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN2010202395756U CN201722621U (zh) | 2010-06-28 | 2010-06-28 | 一种预制箱梁的整体吊装架 |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN201722621U true CN201722621U (zh) | 2011-01-26 |
Family
ID=43490936
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN2010202395756U Expired - Lifetime CN201722621U (zh) | 2010-06-28 | 2010-06-28 | 一种预制箱梁的整体吊装架 |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN201722621U (zh) |
Cited By (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN110104555A (zh) * | 2019-05-14 | 2019-08-09 | 浙江大东吴集团建设有限公司 | 一种大跨度装配式双t板吊装结构 |
| CN112850463A (zh) * | 2021-03-19 | 2021-05-28 | 中铁二局集团有限公司 | 一种新型可组合拆卸的预制吊架及其装配方法 |
| CN113445530A (zh) * | 2021-06-11 | 2021-09-28 | 中国铁建港航局集团有限公司 | 沉箱钢筋吊运安装工艺及吊装架 |
| CN114852844A (zh) * | 2022-04-29 | 2022-08-05 | 四川省交通建设集团股份有限公司 | 一种箱梁钢筋骨架吊装用吊钩 |
-
2010
- 2010-06-28 CN CN2010202395756U patent/CN201722621U/zh not_active Expired - Lifetime
Cited By (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN110104555A (zh) * | 2019-05-14 | 2019-08-09 | 浙江大东吴集团建设有限公司 | 一种大跨度装配式双t板吊装结构 |
| CN112850463A (zh) * | 2021-03-19 | 2021-05-28 | 中铁二局集团有限公司 | 一种新型可组合拆卸的预制吊架及其装配方法 |
| CN113445530A (zh) * | 2021-06-11 | 2021-09-28 | 中国铁建港航局集团有限公司 | 沉箱钢筋吊运安装工艺及吊装架 |
| CN114852844A (zh) * | 2022-04-29 | 2022-08-05 | 四川省交通建设集团股份有限公司 | 一种箱梁钢筋骨架吊装用吊钩 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN201512345U (zh) | 多功能整体吊装架 | |
| CN202936736U (zh) | 一种斜拉桥组合梁施工桥面吊机 | |
| CN109969946A (zh) | 一种地下连续墙钢筋笼起重吊装施工安全方法 | |
| CN106744257B (zh) | 一种千吨级可调式组合吊具、组装方法及吊装沉箱的方法 | |
| CN201635012U (zh) | 箱梁架桥机 | |
| CN201172574Y (zh) | 预制梁钢筋吊装架 | |
| CN102134832B (zh) | 活动支架辅助不变幅架梁吊机架设钢箱梁方法及活动支架 | |
| CN201722621U (zh) | 一种预制箱梁的整体吊装架 | |
| CN205205685U (zh) | 悬索桥墩顶多功能门架装置 | |
| CN202164030U (zh) | 整体式箱梁吊架 | |
| CN201567164U (zh) | 大垮度自行式塔式起重机 | |
| CN201943006U (zh) | 辅助不变幅架梁吊机架设钢箱梁用主塔区活动支架 | |
| CN201952736U (zh) | 辅助不变幅架梁吊机架设钢箱梁用辅助墩活动支架 | |
| CN105317031B (zh) | 一种升船机主机房桥机主梁吊装方法 | |
| CN110217684A (zh) | 一种箱梁底腹板钢筋吊装工具 | |
| CN202967862U (zh) | 一种槽形梁钢筋骨架吊具 | |
| CN217896261U (zh) | 一种吊扣合一的缆索吊塔架 | |
| CN208197158U (zh) | 一种节段预制箱梁的钢筋胎吊具 | |
| CN215717067U (zh) | 一种适用于混凝土组合剪力墙结构的施工平台 | |
| CN201817201U (zh) | 小车滑移施工装置 | |
| CN101920913A (zh) | 自行式大跨度塔式起重机 | |
| CN207244453U (zh) | 一种悬索桥轻型锚碇门架装置 | |
| CN205500636U (zh) | 一种水工构件搬运装置 | |
| CN204875543U (zh) | 轮轨式负载行走缆载吊机 | |
| CN211521358U (zh) | 一种预制空心板吊具 |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C14 | Grant of patent or utility model | ||
| GR01 | Patent grant | ||
| C41 | Transfer of patent application or patent right or utility model | ||
| TR01 | Transfer of patent right |
Effective date of registration: 20160105 Address after: Jinniu District Kam Tong Road Chengdu city Sichuan province 610031 No. 16 Patentee after: CHINA RAILWAY NO.2 BUREAU ENGINEERING CO., LTD. Patentee after: China Railway No. 2 Engineering Group Co., Ltd. Address before: 610041 high building, No. nine Hing Road, Chengdu hi tech Development Zone, Sichuan, 6 Patentee before: China Railway Erju Co., Ltd. Patentee before: China Railway No. 2 Engineering Group Co., Ltd. |
|
| TR01 | Transfer of patent right |
Effective date of registration: 20180528 Address after: No. 16, Jinniu District Road, Jinniu District Road, Chengdu, Sichuan Co-patentee after: SHENZHEN ZHONGTIE ERJU ENGINEERING CO., LTD. Patentee after: CHINA RAILWAY NO.2 BUREAU ENGINEERING CO., LTD. Address before: No. 16, Jinniu District Road, Jinniu District Road, Chengdu, Sichuan Co-patentee before: China Railway No. 2 Engineering Group Co., Ltd. Patentee before: CHINA RAILWAY NO.2 BUREAU ENGINEERING CO., LTD. |
|
| TR01 | Transfer of patent right | ||
| CP01 | Change in the name or title of a patent holder |
Address after: No. 16, Jinniu District Road, Jinniu District Road, Chengdu, Sichuan Co-patentee after: SHENZHEN ZHONGTIE ERJU ENGINEERING CO., LTD. Patentee after: China Railway No. 2 Engineering Group Co., Ltd. Address before: No. 16, Jinniu District Road, Jinniu District Road, Chengdu, Sichuan Co-patentee before: SHENZHEN ZHONGTIE ERJU ENGINEERING CO., LTD. Patentee before: CHINA RAILWAY NO.2 BUREAU ENGINEERING CO., LTD. Address after: No. 16, Jinniu District Road, Jinniu District Road, Chengdu, Sichuan Co-patentee after: SHENZHEN ZHONGTIE ERJU ENGINEERING CO., LTD. Patentee after: China Railway No. 2 Engineering Group Co., Ltd. Address before: No. 16, Jinniu District Road, Jinniu District Road, Chengdu, Sichuan Co-patentee before: SHENZHEN ZHONGTIE ERJU ENGINEERING CO., LTD. Patentee before: CHINA RAILWAY NO.2 BUREAU ENGINEERING CO., LTD. |
|
| CP01 | Change in the name or title of a patent holder | ||
| CX01 | Expiry of patent term |
Granted publication date: 20110126 |
|
| CX01 | Expiry of patent term |