CN202492854U - 深水裸岩、岩溶桩的基础平台结构 - Google Patents

深水裸岩、岩溶桩的基础平台结构 Download PDF

Info

Publication number
CN202492854U
CN202492854U CN2012201048593U CN201220104859U CN202492854U CN 202492854 U CN202492854 U CN 202492854U CN 2012201048593 U CN2012201048593 U CN 2012201048593U CN 201220104859 U CN201220104859 U CN 201220104859U CN 202492854 U CN202492854 U CN 202492854U
Authority
CN
China
Prior art keywords
steel
pile foundation
steel casing
steel pipe
piles
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2012201048593U
Other languages
English (en)
Inventor
刘世龙
赵鑫
陈清安
胡博
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway 22nd Bureau Group Co Ltd
Original Assignee
Third Engineering Co Ltd of China Railway 22nd Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Third Engineering Co Ltd of China Railway 22nd Bureau Group Co Ltd filed Critical Third Engineering Co Ltd of China Railway 22nd Bureau Group Co Ltd
Priority to CN2012201048593U priority Critical patent/CN202492854U/zh
Application granted granted Critical
Publication of CN202492854U publication Critical patent/CN202492854U/zh
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Revetment (AREA)

Abstract

本实用新型公开一种深水裸岩、岩溶桩的基础平台结构,该结构包括直接落在河床裸露基岩的钢管桩和桩基钢护筒,所述的桩基钢护筒位于钢管桩中间;所述钢管桩的顶部用I45a工字钢纵横梁连接固定,该I45a工字钢纵横梁与贝雷梁连接,贝雷梁顶部设置I14工字钢,该I14工字钢顶部铺设防滑钢板。还包括有一包围全部钢管桩和桩基桩基钢护筒的钢套箱,该钢套箱内灌注水下混凝土,该混凝土将所有的钢管桩和所有的桩基桩基钢护筒与河床裸露基岩固结成一整体结构。本实用新型用钢管桩作“板凳”支腿支撑,贝雷梁和工字钢纵横梁作为施工平台。为了解决钢管桩支腿与河床裸岩面的连接问题,施作“人造岩”基础,设置安装钢套箱作为混凝土封底关键工序。

Description

深水裸岩、岩溶桩的基础平台结构
技术领域
本实用新型涉及桥梁施工结构,该结构特别适用于跨越水库、河流、海湾、影响通航的铁路、公路桥梁深水基础施工,施工地河床底为裸岩、斜岩、溶洞区不良地质段施工结构。
背景技术
根据地质钻探资料,目前,有的桥位区存在溶沟、溶洞、溶蚀裂隙、河床底为裸岩等不良地质情况。如墩台处岩溶蚀较发育,主要为垂直发育的溶沟、溶蚀裂隙,岩溶发育深度多在地表下6m-25m之内,一般在上部4至6米发育溶沟、小溶洞等,其下6至15米有大量溶蚀裂隙,存在溶沟、溶洞、溶蚀裂隙等,局部桩位存在溶沟、溶洞相互串通,孔内地下水丰富,对岩体强度影响较大,施工难度比较大。
实用新型内容
针对现有技术中存在的缺陷,本实用新型提供一种膨胀加强板。该混凝土结构有效控制了预拌混凝土超长结构施工期裂缝的产生,提高了结构耐久性。既可解决因结构过长所造成的混凝土收缩裂缝问题,又可避免因后浇带滞留过长,难以处理而造成的裂、渗隐患,其质量效果较为明显。
为实现上述目的,本实用新型技术方案为:
深水裸岩、岩溶桩的基础平台结构,该结构包括直接落在河床裸露基岩的钢管桩和桩基钢护筒,所述的桩基钢护筒位于钢管桩中间;所述钢管桩的顶部用工字钢纵横梁连接固定,该I工字钢纵横梁与贝雷梁连接,贝雷梁顶部设置工字钢,该工字钢顶部铺设防滑钢板。
进一步,还包括有一包围全部钢管桩和桩基桩基钢护筒的钢套箱,该钢套箱内灌注水下混凝土,该混凝土将所有的钢管桩和所有的桩基桩基钢护筒与河床裸露基岩固结成一整体结构。
进一步,钢管桩露出水面的部分用剪刀撑连接固定。
进一步,所述的桩基钢护筒由一外壁钢护筒和一设置于该外壁钢护筒内的内壁钢护筒组成。
上述技术方案的有益之处在于:
本实用新型用钢管桩作“板凳”支腿支撑,贝雷梁和工字钢纵横梁作为施工平台。为了解决钢管桩支腿与河床裸岩面的连接问题,施作“人造岩”基础,设置安装钢套箱作为混凝土封底关键工序。本实用新型采用的“双壁钢护筒”在深水裸岩、岩溶桩基础施工技术中应用,保证了桩基钻孔施工时河床冲刷面层间连接,钻孔时不漏浆、顺利钻孔,水下混凝土灌注过程中砼不窜孔,不断桩,控制桩基础施工质量,保证桩基的完整性和承载力。
附图说明
图1是本实用新型板凳状钢平台主视结构示意图;
图2是本实用新型板凳状钢平台侧视结构示意图;
图3是本实用新型板凳状钢平台俯视结构示意图;
图4是本实用新型钢套箱安装主视结构示意图;
图5是本实用新型钢套箱安装侧视结构示意图;
图6是本实用新型钢套箱安装俯视结构示意图。
具体实施方式
现结合附图和实施例说明本实用新型。
如图1、2、3所示的深水裸岩、岩溶桩的基础平台结构,该结构包括直接落在河床裸露基岩1的钢管桩2和桩基钢护筒3,所述的桩基钢护筒3位于钢管桩2中间。在埋设桩基钢护筒3前,先用冲锤在桩位处冲一个比桩基钢护筒3大、深约1m的坑,再下桩基钢护筒3,用灌注水下混凝土的方法灌注混凝土或抛填砂包固定桩基钢护筒3。所述钢管桩2的顶部用I45a的工字钢纵横梁4连接固定,该I45a工字钢纵横梁4与贝雷梁5连接,贝雷片组安装在I45a工字钢纵横梁4上,并利用U型螺栓与贝雷梁5连接,贝雷梁组数根据荷载验算确认后安装片数,安装时组与组间在贝雷梁5连接处设置横向连接,贝雷梁5顶部设置I14工字钢6,间距为60cm铺设,该I14工字钢6顶部铺设厚12mm防滑钢板7,组成一个板凳状的钢平台,四周拉锚固定。本实用新型钢管桩2采用¢800mm的支腿形式,纵向4排,横向2排设置,钢管桩2壁厚为12mm,支腿间距根据桩径和钻孔施工平台空间设置,支腿露出水面部分用剪刀撑连接固定,确保支腿的整体稳定性。
如图4、5、6所示,由于钢“板凳”的钢管桩支腿直接落在无覆盖层的裸岩河床上,牢固性整体性稳定性差。为了解决钢管桩支腿与河床裸露基岩面的固结问题,本实用新型设置有一包围全部钢管桩2和桩基钢护筒3的钢套箱8,该钢套箱8内灌注水下混凝土9,该混凝土9将所有的钢管桩2和所有的桩基钢护筒3与河床裸露基岩1固结成一整体结构。在灌注套箱8内水下混凝土前,桩基钢护筒3也必须先就位固定好,使得桩基钢护筒3也包裹在混凝土9内,可有效的解决桩基钢护筒底在河床基岩处因结合不好产生漏浆的问题。
如图3、6所示,为确保裸岩面与桩基钢护筒3接触良好,考虑到岩面凹凸不平,在埋设钢护筒前,先用冲机在桩位处冲一个比桩基钢护筒3大,但不小于25cm、深约1m的坑。先安装外壁钢护筒31,用水下灌注混凝土的方法在外壁钢护筒内灌注50cm混凝土,使得“人造岩”混凝土封底时从钢护筒缝隙中冒出,所以桩基钢护筒制作比桩基设计半径大25cm以上,待“人造岩”封底混凝土完成后强度达到75%时,再已“栽桩”的外壁钢护筒31内钻孔安装内壁钢护筒32,形成“双壁钢护筒”解决技术关键难题。
本实用新型的“外壁钢护筒”在灌注套箱内水下混凝土前安装,使得桩基钢护筒也包裹在混凝土内,可有效的解决桩基钢护筒底在河床基岩处因结合不好产生漏浆的问题。‘内壁钢护筒’在桩基础钻孔施工时安装,主要解决岩溶区溶洞、溶槽、暗河等技术问题,起到钻孔时防止漏浆、塌孔,另外混凝土灌注时防止混凝土漏浆、窜孔,使得桩基断桩或存在质量缺陷。
“内壁钢护筒”的安装值得注意的是,钻孔施工时严格全过程跟踪记录溶洞、溶槽等地质情况记录,使得钻孔记录判定安装钢护筒长度,桩基终孔判定按设计要求,嵌岩2D直径+溶洞、暗沟以下确保不小于8m无钢护筒安装,确保其桩基单桩承载力要求。故桩基终孔判定后为防止桩尖以下10m内存在溶洞、暗沟等不良地质现象,混凝土灌注前进行一道地质钻探试验,确保桩基础质量要求。

Claims (5)

1.深水裸岩、岩溶桩的基础平台结构,其特征在于:该结构包括直接落在河床裸露基岩的钢管桩和桩基钢护筒,所述的桩基钢护筒位于钢管桩中间;所述钢管桩的顶部用工字钢纵横梁连接固定,该工字钢纵横梁与贝雷梁连接,贝雷梁顶部设置工字钢,该工字钢顶部铺设防滑钢板。
2.如权利要求1所述的深水裸岩、岩溶桩的基础平台结构,其特征在于:还包括有一包围全部钢管桩和桩基桩基钢护筒的钢套箱,该钢套箱内灌注水下混凝土,该混凝土将所有的钢管桩和所有的桩基桩基钢护筒与河床裸露基岩固结成一整体结构。
3.如权利要求1或2所述的深水裸岩、岩溶桩的基础平台结构,其特征在于:钢管桩露出水面的部分用剪刀撑连接固定。
4.如权利要求1或2所述的深水裸岩、岩溶桩的基础平台结构,其特征在于:所述的桩基钢护筒由一外壁钢护筒和一设置于该外壁钢护筒内的内壁钢护筒组成。
5.如权利要求3所述的深水裸岩、岩溶桩的基础平台结构,其特征在于:所述的桩基钢护筒由一外壁钢护筒和一设置于该外壁钢护筒内的内壁钢护筒组成。
CN2012201048593U 2012-03-19 2012-03-19 深水裸岩、岩溶桩的基础平台结构 Expired - Fee Related CN202492854U (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2012201048593U CN202492854U (zh) 2012-03-19 2012-03-19 深水裸岩、岩溶桩的基础平台结构

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2012201048593U CN202492854U (zh) 2012-03-19 2012-03-19 深水裸岩、岩溶桩的基础平台结构

Publications (1)

Publication Number Publication Date
CN202492854U true CN202492854U (zh) 2012-10-17

Family

ID=46999089

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2012201048593U Expired - Fee Related CN202492854U (zh) 2012-03-19 2012-03-19 深水裸岩、岩溶桩的基础平台结构

Country Status (1)

Country Link
CN (1) CN202492854U (zh)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102619206A (zh) * 2012-04-06 2012-08-01 中铁二十二局集团第三工程有限公司 一种深水裸岩、岩溶桩的基础平台结构
CN102979090A (zh) * 2012-12-13 2013-03-20 中铁上海工程局第二工程有限公司 一种在深水急流无覆盖层陡峭裸岩上固定钢护筒的施工方法
CN103233432A (zh) * 2013-04-26 2013-08-07 济南城建集团有限公司 贝雷梁反吊支撑体系及其施工方法
CN105569064A (zh) * 2015-12-10 2016-05-11 中铁大桥局集团有限公司 一种适用于深水裸岩的设置式沉井基础施工方法
CN109914399A (zh) * 2019-03-21 2019-06-21 杭州公路工程监理咨询有限公司 一种环保的桩基施工方法
CN110485305A (zh) * 2019-08-27 2019-11-22 中铁大桥局集团有限公司 用于水中桥梁基础施工的钢护筒防掉落平台及其施工方法
CN116289652A (zh) * 2023-04-04 2023-06-23 中船第九设计研究院工程有限公司 一种桩式引桥修复结构和方法

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102619206A (zh) * 2012-04-06 2012-08-01 中铁二十二局集团第三工程有限公司 一种深水裸岩、岩溶桩的基础平台结构
CN102979090A (zh) * 2012-12-13 2013-03-20 中铁上海工程局第二工程有限公司 一种在深水急流无覆盖层陡峭裸岩上固定钢护筒的施工方法
CN103233432A (zh) * 2013-04-26 2013-08-07 济南城建集团有限公司 贝雷梁反吊支撑体系及其施工方法
CN103233432B (zh) * 2013-04-26 2015-02-18 济南城建集团有限公司 贝雷梁反吊支撑体系及其施工方法
CN105569064A (zh) * 2015-12-10 2016-05-11 中铁大桥局集团有限公司 一种适用于深水裸岩的设置式沉井基础施工方法
CN109914399A (zh) * 2019-03-21 2019-06-21 杭州公路工程监理咨询有限公司 一种环保的桩基施工方法
CN109914399B (zh) * 2019-03-21 2021-06-01 杭州公路工程监理咨询有限公司 一种环保的桩基施工方法
CN110485305A (zh) * 2019-08-27 2019-11-22 中铁大桥局集团有限公司 用于水中桥梁基础施工的钢护筒防掉落平台及其施工方法
CN116289652A (zh) * 2023-04-04 2023-06-23 中船第九设计研究院工程有限公司 一种桩式引桥修复结构和方法

Similar Documents

Publication Publication Date Title
CN102619206A (zh) 一种深水裸岩、岩溶桩的基础平台结构
CN202492854U (zh) 深水裸岩、岩溶桩的基础平台结构
CN205776347U (zh) 用于地铁车站的新型盖挖逆作结构体系
CN101666081A (zh) 深水库区陡坡裸岩钻孔平台及工艺
CN103255771B (zh) 分级开挖超深基坑工程桩兼作支护桩分级复合支护的工法
CN106930319A (zh) 一种高边坡框架式挡土墙及其施工方法
CN102953341A (zh) 一种设置于深水急流无覆盖层陡峭裸岩上的高位栈桥结构
CN206308569U (zh) 一种加固处治下伏溶洞的路基结构
CN104790410B (zh) 一种适用于浅水淤泥河道的基坑开挖支护方法
CN107761708A (zh) 大厚度湿陷性黄土地区地铁车站地基加固的处理方法
CN103195076A (zh) 淤泥质深基坑塔吊基础施工方法
CN106087997A (zh) 一种高纬、高寒多年冻土地区钻孔桩施工工法
CN107489164A (zh) 一种在役钢筋混凝土挡土墙的加高加固结构及方法
CN112227401A (zh) 一种水下石质陡坡区填石筑岛施工承台方法
CN108625368A (zh) 一种深厚软土地区刚性长短桩复合地基施工方法
CN108755698B (zh) 一种陡坡松散堆积体大倾斜岩面基础施工方法
CN109137885A (zh) 一种地下连续墙施工方法
CN102561406A (zh) 控制沉井后背土体变形的施工方法
CN107489106B (zh) 一种岩石河床水中承台施工方法
CN114045839A (zh) 一种临水陡坎地段桥梁半挖半悬空低桩承台支护结构及其施工方法
CN201502056U (zh) 深水库区陡坡裸岩钻孔平台
CN113174991B (zh) 一种海洋深水斜桩桩周地层塌陷注浆加固方法
CN207331739U (zh) 一种在役钢筋混凝土挡土墙的加高加固结构
CN205502063U (zh) 一种复合式支挡结构
CN111350106A (zh) 一种铁路轨道临时支护结构及其施工方法

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: CHINA RAILWAY 22TH BUREAU GROUP CO., LTD.

Effective date: 20130123

C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20130123

Address after: TA Pu Siming East Road Xiamen city Fujian province 361000 No. 166 22 floor

Patentee after: The No.3 Engineering., Ltd. of China Railway 22th Bureau Group

Patentee after: China Railway 22nd Construction Bureau Co., Ltd.

Address before: TA Pu Siming East Road Xiamen city Fujian province 361000 No. 166 22 floor

Patentee before: The No.3 Engineering., Ltd. of China Railway 22th Bureau Group

CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20121017

Termination date: 20210319

CF01 Termination of patent right due to non-payment of annual fee