CN204161908U - Tubing stacking frame - Google Patents

Tubing stacking frame Download PDF

Info

Publication number
CN204161908U
CN204161908U CN201420478038.5U CN201420478038U CN204161908U CN 204161908 U CN204161908 U CN 204161908U CN 201420478038 U CN201420478038 U CN 201420478038U CN 204161908 U CN204161908 U CN 204161908U
Authority
CN
China
Prior art keywords
pillar
connecting rod
crossbeam
fixedly connected
tubing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201420478038.5U
Other languages
Chinese (zh)
Inventor
王波
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
KUNSHAN SHIE YU VALVE Co Ltd
Original Assignee
KUNSHAN SHIE YU VALVE Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by KUNSHAN SHIE YU VALVE Co Ltd filed Critical KUNSHAN SHIE YU VALVE Co Ltd
Priority to CN201420478038.5U priority Critical patent/CN204161908U/en
Application granted granted Critical
Publication of CN204161908U publication Critical patent/CN204161908U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Stacking Of Articles And Auxiliary Devices (AREA)

Abstract

Tubing stacking frame, one group at least four isometric crossbeam (9) levels of being parallel to each other are fixed, its front and back end is vertical fixing rear column (4) and A-pillar (8) respectively, top truss (1) be fixedly connected with one between this group rear column (4) top after, connecting rod of the front end (11) is fixedly connected with between this group A-pillar (8) bottom, the A-pillar (8) of both sides, top, middle part, connecting rod of the front end (11) is fixedly connected with sinciput connecting rod (7) respectively, namely between the adjacent A-pillar (8) of top, middle part, connecting rod of the front end (11), form open gap upwards, the bottom of arm (3) is turned at the hinged installation folding in crossbeam (9) middle part.Realize carrying out goods unloading by forklift corbel, improve the efficiency of handling goods and save labour power; Tubing is put and is arranged neat, safety, prevents the distortion of tubing, is easy to management, ties up and move with conveyorization.Reduce the labour intensity of alongshoreman, improve warehouse-in, outbound efficiency.

Description

Tubing stacking frame
Technical field
The utility model relates to tubing and stores auxiliary device, especially tubing stacking frame.
Background technology
In known technology, tubing stores to be stacked comparatively common, and tubing stand for piling up is mainly used in storing and conveying goods, can the structure of reference based on shelf, shelf are a kind of rack and panel construction things.Being generally used for the shelf transporting tubing is cantilever type storage rack, is made up of, adopts plug-in type or bolt connecting type to be connected between cantilever with column base and column, with bolts between base and column, and base adopts cold rolled shape or H profile steel.Usually by workman, tubing is deposited on shelf, and is stretched into by forklift corbel and hold up shelf below base and transport.In conventional fabrication process, tubing is transported near shelf with fixture vehicle by workman after manufacturing line gets off, then is taken out by tubing from fixture vehicle by workman is manual, is then deposited on shelf.During delivery, lorry reaches shelf side, then is installed to car from storehouse expert's work taking-up tubing by workman.Bottom shelf is not used for the socket of carrying fork truck.Putting in storage, outbound time also need warehouse keeper immediately to take stock quantity, warehouse-in, outbound inefficiency.Meanwhile, due to the structural limitations of shelf, the stacking of tubing on shelf is no more than 1.5 meters highly usually, and fork truck must Transport cargo rack one by one, causes the inefficiency of carrying.
Utility model content
The purpose of this utility model is to provide a kind of tubing stacking frame, is convenient to unloaded of cargo, can be directly separated with tubing shelf by tubing by forklift corbel, carries out loading and unloading or pile coffin.
The purpose of this utility model will be realized by following technical measures: comprise rear top truss, folding turns over arm, rear column, sinciput connecting rod, A-pillar, crossbeam and connecting rod of the front end; One group at least four isometric crossbeam levels of being parallel to each other are fixed, its front and back end is vertical fixing rear column and A-pillar respectively, top truss be fixedly connected with one between this group rear column top after, the connecting rod of the front end is fixedly connected with between bottom this group A-pillar, above in the middle part of connecting rod of the front end both sides A-pillar on be fixedly connected with sinciput connecting rod respectively, namely form open gap upwards between the adjacent A-pillar above in the middle part of connecting rod of the front end, in the middle part of crossbeam, hinged installation folding turns over the bottom of arm.
Especially, truss in after being fixedly connected with between rear column with each point of connection of crossbeam.
Especially, slide and be fixed on rear column in the upper end that hinged installation folding turns over arm in the middle part of crossbeam.
Especially, tilt to be fixedly connected with end cable-stayed support to rear column at outermost crossbeam rear portion.
Especially, end connecting rod is fixedly connected with between bottom the rear column and A-pillar of correspondence.
Especially, between A-pillar, level strengthens drawbar frame before installing.
Especially, on the upside of crossbeam, vibration damping wear-resistant pad is fixed.
Advantage of the present utility model and effect: folding is set on crossbeam and turns over arm, auxiliary tubing pile is tied up, and realizes carrying out goods unloading by forklift corbel, improves the efficiency of handling goods and save labour power; Tubing is put and is arranged neat, safety, prevents the distortion of tubing, is easy to management, ties up and move with conveyorization.Reduce the labour intensity of alongshoreman, improve warehouse-in, outbound efficiency.
Accompanying drawing explanation
Fig. 1 is the utility model embodiment 1 structural representation.
Reference numeral comprises: rear top truss 1, rear middle truss 2, folding turn over arm 3, rear column 4, end cable-stayed support 5, tubing 6, sinciput connecting rod 7, A-pillar 8, crossbeam 9, end connecting rod 10, connecting rod of the front end 11, front strengthening drawbar frame 12.
Detailed description of the invention
The utility model comprises: rear top truss 1, folding turn over arm 3, rear column 4, sinciput connecting rod 7, A-pillar 8, crossbeam 9 and connecting rod of the front end 11.
Below in conjunction with drawings and Examples, the utility model is described in further detail.
Embodiment 1: as shown in Figure 1, one group at least four isometric crossbeam 9 levels of being parallel to each other are fixed, its front and back end is vertical fixing rear column 4 and A-pillar 8 respectively, top truss 1 be fixedly connected with one between this group rear column 4 top after, the connecting rod of the front end 11 is fixedly connected with between bottom this group A-pillar 8, above in the middle part of connecting rod of the front end 11 both sides A-pillar 8 on be fixedly connected with sinciput connecting rod 7 respectively, namely form open gap upwards between the adjacent A-pillar 8 above in the middle part of connecting rod of the front end 11, in the middle part of crossbeam 9, hinged installation folding turns over the bottom of arm 3.
In aforementioned, slide and be fixed on rear column 4 in the upper end that hinged installation folding turns over arm 3 in the middle part of crossbeam 9.Also can discharge to rotate forward position-limiting tube material in order to tying up.
In aforementioned, truss 2 in after being fixedly connected with between rear column 4 with each point of connection of crossbeam 9.
In aforementioned, tilt to be fixedly connected with end cable-stayed support 5 at outermost crossbeam 9 rear portion to rear column 4.
In aforementioned, between bottom the rear column 4 and A-pillar 8 of correspondence, be fixedly connected with end connecting rod 10.
In aforementioned, between A-pillar 8, level strengthens drawbar frame 12 before installing.This front strengthening drawbar frame 12 can be arranged on this group A-pillar 8 top or bottom easily, carry out tubing stacking or insert be taken as industry time, pull down temporarily.
In aforementioned, on the upside of crossbeam 9, fix vibration damping wear-resistant pad.
In the utility model, be provided with the socket for carrying fork truck, conveniently utilize forklift corbel to unload and replace artificial discharging, thus decrease the labour intensity of workman, decrease the work capacity that warehouse keeper checks tubing, improve warehouse-in, outbound efficiency; In addition, tubing is stacked firmly and safety, convenient in carrying and floor area is little; Save the storage area in warehouse.

Claims (7)

1. tubing stacking frame, comprises rear top truss (1), folding turns over arm (3), rear column (4), sinciput connecting rod (7), A-pillar (8), crossbeam (9) and connecting rod of the front end (11), it is characterized in that, one group at least four isometric crossbeam (9) levels of being parallel to each other are fixed, its front and back end is vertical fixing rear column (4) and A-pillar (8) respectively, top truss (1) be fixedly connected with one between this group rear column (4) top after, connecting rod of the front end (11) is fixedly connected with between this group A-pillar (8) bottom, the A-pillar (8) of both sides, top, middle part, connecting rod of the front end (11) is fixedly connected with sinciput connecting rod (7) respectively, namely between the adjacent A-pillar (8) of top, middle part, connecting rod of the front end (11), form open gap upwards, the bottom of arm (3) is turned at the hinged installation folding in crossbeam (9) middle part.
2. tubing stacking frame as claimed in claim 1, is characterized in that, truss (2) in after being fixedly connected with between rear column (4) with crossbeam (9) each point of connection.
3. tubing stacking frame as claimed in claim 1, is characterized in that, the upper end slip of turning over arm (3) at the hinged installation folding in crossbeam (9) middle part is fixed on rear column (4).
4. tubing stacking frame as claimed in claim 1, is characterized in that, tilts to be fixedly connected with end cable-stayed support (5) at outermost crossbeam (9) rear portion to rear column (4).
5. tubing stacking frame as claimed in claim 1, is characterized in that, between the rear column (4) and A-pillar (8) bottom of correspondence, be fixedly connected with end connecting rod (10).
6. tubing stacking frame as claimed in claim 1, is characterized in that, between A-pillar (8), level strengthens drawbar frame (12) before installing.
7. tubing stacking frame as claimed in claim 1, is characterized in that, at the fixing vibration damping wear-resistant pad in crossbeam (9) upside.
CN201420478038.5U 2014-08-22 2014-08-22 Tubing stacking frame Expired - Fee Related CN204161908U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420478038.5U CN204161908U (en) 2014-08-22 2014-08-22 Tubing stacking frame

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420478038.5U CN204161908U (en) 2014-08-22 2014-08-22 Tubing stacking frame

Publications (1)

Publication Number Publication Date
CN204161908U true CN204161908U (en) 2015-02-18

Family

ID=52535619

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420478038.5U Expired - Fee Related CN204161908U (en) 2014-08-22 2014-08-22 Tubing stacking frame

Country Status (1)

Country Link
CN (1) CN204161908U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105383953A (en) * 2015-11-27 2016-03-09 新疆蓝山屯河型材有限公司 Centralized warehousing and vehicle loading method for polyvinyl chloride (PVC) profiles
CN115353035A (en) * 2022-08-15 2022-11-18 北部湾大学 Pipe conveying device for ship engineering
CN116352488A (en) * 2023-03-24 2023-06-30 佛山市正扬机械科技有限公司 Unloading rack for pipe processing equipment
CN117302745A (en) * 2023-10-12 2023-12-29 宁波余大通信技术有限公司 Pipe storage rack

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105383953A (en) * 2015-11-27 2016-03-09 新疆蓝山屯河型材有限公司 Centralized warehousing and vehicle loading method for polyvinyl chloride (PVC) profiles
CN115353035A (en) * 2022-08-15 2022-11-18 北部湾大学 Pipe conveying device for ship engineering
CN115353035B (en) * 2022-08-15 2023-06-23 北部湾大学 A pipe transportation device for ship engineering
CN116352488A (en) * 2023-03-24 2023-06-30 佛山市正扬机械科技有限公司 Unloading rack for pipe processing equipment
CN117302745A (en) * 2023-10-12 2023-12-29 宁波余大通信技术有限公司 Pipe storage rack

Similar Documents

Publication Publication Date Title
US20070189872A1 (en) Freight rack
US20190009838A1 (en) System for conveying and stowing elongated material
CN203472926U (en) Automobile skylight storing and transporting device
CN205709720U (en) A kind of transportation fork-truck
CN204161908U (en) Tubing stacking frame
US3050206A (en) Load handling system
RU2012112622A (en) CARGO VEHICLE
JP5606170B2 (en) Attachment for forklift and load handling method using the same
CN201287921Y (en) Rack container of transportation car
CN104417618A (en) Heavy lifting self-discharging truck
CN204250065U (en) Steel pipe pallet
CN203889228U (en) Container loading tray
CN207157252U (en) Hold the shelf of the left reinforcing plate of front panel
CN206298102U (en) A kind of express mail is pulled and send power assisting device
CN210617974U (en) Sharing bicycle transport vechicle that two-layer was placed about
CN104477071A (en) Pushing and fixing device guaranteeing running of simple forklift along with container and method using device
CN108528498A (en) Rice loading-unloading vehicle
CN202089728U (en) Labor freighting and stacking vehicle
CN201068382Y (en) Novel fork lift
CN207537066U (en) A kind of horizontal bar film roll lift truck
CN206679632U (en) Suitable for the support of Container Transport car
CN105152080A (en) Lifting device for conveying glass
CN204957441U (en) 3T is whole from loading and unloading tray
CN203922590U (en) Multi-functional handling platform
CN103213733B (en) Material base plate

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150218