CN204920249U - Simple and easy quick erector for floor suspender installation - Google Patents
Simple and easy quick erector for floor suspender installation Download PDFInfo
- Publication number
- CN204920249U CN204920249U CN201520617753.7U CN201520617753U CN204920249U CN 204920249 U CN204920249 U CN 204920249U CN 201520617753 U CN201520617753 U CN 201520617753U CN 204920249 U CN204920249 U CN 204920249U
- Authority
- CN
- China
- Prior art keywords
- pipe
- nut
- mounting pipe
- hand
- held
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000009434 installation Methods 0.000 title abstract description 10
- 239000000725 suspension Substances 0.000 claims description 32
- 230000001105 regulatory effect Effects 0.000 claims description 4
- 238000010276 construction Methods 0.000 abstract description 16
- 230000000712 assembly Effects 0.000 abstract 1
- 238000000429 assembly Methods 0.000 abstract 1
- 238000004519 manufacturing process Methods 0.000 abstract 1
- 238000000034 method Methods 0.000 description 5
- 238000010586 diagram Methods 0.000 description 2
- 238000005516 engineering process Methods 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
Landscapes
- Supports For Pipes And Cables (AREA)
Abstract
A simple and rapid installer for installing a floor suspender is disclosed, wherein an expansion bolt is installed at the top of the suspender, the bottom of the suspender is provided with threads, and the installer comprises an installation pipe and a handheld pipe, wherein the handheld pipe is an inverted T-shaped pipe, the transverse part of the T-shaped pipe is used as a handle, and the pipe body of the T-shaped vertical part is fixedly sleeved at the bottom of the installation pipe; a nut is welded in an upper pipe orifice of the mounting pipe, and the bottom end of the suspender is connected with the mounting pipe through the nut; the central axes of the installation pipe, the handheld pipe, the nut and the suspender are parallel to each other. The utility model has simple structure, convenient manufacture and low cost; constructors can mount the hanger rods only by standing on the structural floor slab, potential safety hazards are reduced to zero, operation is simple, and working timeliness is improved; the installation pipe can be connected with the hanging rods with various sizes by arranging the nut assemblies with different diameters; the length of cup jointing of installation pipe and handheld pipe can be adjusted, and strong adaptability can be applied to civil engineering furred ceiling construction, electromechanical specialty jib construction etc..
Description
Technical field
The utility model technology relates to hanger erection technical field, is specifically related to a kind of simple and fast erector installed for slab hanger rod.
Background technology
Building site is in ceiling construction process, and installing suspension rod needs construction operation personnel to stand on man-like shelf to construct, and this method is very inadvisable, and first, construction operation personnel are without any security protection on man-like shelf, and safety belt is also fixed nowhere, and potential safety hazard is larger; The second, construction operation personnel are after installing place's suspension rod, and need to move the hanger construction that man-like shelf just can carry out next place, length consuming time, greatly reduces operating efficiency.In addition, the simple and fast suspension rod mounting tool suspension rod occurred in the recent period and the installation end size of instrument can not regulate, and can not adapt to the installation of multiple different model suspension rod; The whole height of erecting tools is non-adjustable, can not solve the various problems that personnel's height differences and ceiling height difference are brought, poor for applicability.
Utility model content
The purpose of this utility model is to provide a kind of simple and fast erector installed for slab hanger rod, to solve in current ceiling construction process, installs suspension rod and need construction operation personnel to stand on man-like shelf to construct, without any security protection, the ineffective technical problem of larger, the consuming time length of potential safety hazard; The installation end size of the suspension rod and instrument that also solve existing simple and easy suspension rod mounting tool can not regulate and the whole height of erecting tools is non-adjustable, can not adapt to the installation of multiple different model suspension rod, can not solve various problems, technical problem poor for applicability that personnel's height differences and ceiling height difference brings.
For achieving the above object, the utility model adopts following technical scheme:
A kind of simple and fast erector installed for slab hanger rod, the top of its middle hanger is provided with expansion bolt, bottom is threaded, it is characterized in that: comprise mounting pipe and hand-held pipe, comprise mounting pipe and hand-held pipe, described hand-held pipe is inverted T-shaped pipe, and the transverse part of T-shaped is as handle, and T-shaped stands the fixedly sleeved bottom in mounting pipe, body top in portion; Be welded with nut in the upper orifice of described mounting pipe, the bottom of described suspension rod is connected with mounting pipe by nut; The axis of described mounting pipe, hand-held pipe, nut and suspension rod is parallel to each other.
As preferred technical scheme, the latter half of described mounting pipe and the first half of hand-held pipe be corresponding perforate respectively on the both sides sidewall of differing heights, form the length-adjustment holes for regulating mounting pipe and the rear entire length of hand-held pipe socket, described mounting pipe and hand-held pipe are fixed connection by the rod shape connector of the length-adjustment holes overlapped through both.
Preferred further, described rod shape connector is pivot pin or bolt.
Preferred, described nut is a nut or the nut combinations body be welded into according to the mode that axis overlaps by the nut that some internal diameters are different, nut in described nut combinations body arranges according to the order that internal diameter reduces gradually from top to bottom, be welded and fixed between neighbouring nut, topmost the lateral wall of the nut that internal diameter is maximum is along being welded in the upper orifice of described mounting pipe.
Wherein, can be that mounting pipe is enclosed within outside described hand-held pipe during socket, the internal diameter of described mounting pipe and the external diameter of described hand-held pipe adapt.
Also can be hand-held pipe box outside described mounting pipe, the internal diameter of described hand-held pipe and the external diameter of described mounting pipe adapt.
Compared with prior art, the utility model has following characteristics and beneficial effect:
1, the utility model tool construction is simple, and easy to make, cost is low;
2, easy to use, safety is high: in operation process, constructor only need stand on structure floor just can carry out hanger erection, potential safety hazard is reduced to zero, simultaneously simple to operate, improve work limitation, prove that operating efficiency can improve more than three times through test, when overcoming traditional hanger erection, construction operation personnel on man-like shelf without any security protection, safety belt is also fixed nowhere, potential safety hazard is larger, and construction operation personnel need to move the hanger construction that man-like shelf just can carry out next place after installing place's suspension rod, this reduces the series of problems such as operating efficiency to a great extent, substantially increase operating efficiency and also ensure the safety of constructor simultaneously,
3, strong adaptability: by arranging the different nut combinations body of diameter, mounting pipe can be connected with the suspension rod of various sizes; By arranging length-adjustment holes, the socket length of mounting pipe and hand-held pipe can be regulated, and then according to the entire length of personnel's height and ceiling height regulation installer, expand the scope of application, strong adaptability.
The utility model can be applicable to civil engineering ceiling construction, electromechanical speciality hanger construction etc.
Accompanying drawing explanation
Fig. 1 is the overall structure schematic diagram of the simple and fast hanger erection device that the utility model relates to;
Fig. 2 is the structural representation of the mounting pipe 3 that the utility model relates to;
Fig. 3 is the structural representation of the hand-held pipe 4 that the utility model relates to;
Fig. 4 is the mounting pipe 3 that relates to of the utility model and the syndeton schematic diagram of hand-held pipe 4 socket part;
Fig. 5 is the installment state figure of simple and fast hanger erection device, suspension rod 1 and the floor 8 that the utility model relates to.
Reference numeral: 1-suspension rod, 2-nut, 3-mounting pipe, the hand-held pipe of 4-, 41-handle, 42-body, 5-rod shape connector, 6-length-adjustment holes, 7-expansion bolt, 8-floor.
Detailed description of the invention
Be described principle of the present utility model and feature below in conjunction with accompanying drawing, example, only for explaining the utility model, is not intended to limit scope of the present utility model.
As Fig. 1, a kind of simple and fast erector installed for slab hanger rod, the top of its middle hanger 1 is provided with expansion bolt 7, bottom is threaded, it is characterized in that: comprise mounting pipe 3 and hand-held pipe 4, as Fig. 2 and Fig. 3, described hand-held pipe 4 is inverted T-shaped pipe, the transverse part of T-shaped is as handle 41, and T-shaped stands the fixedly sleeved bottom in mounting pipe 3, top of the body 42 in portion; Be welded with nut 2 in the upper orifice of described mounting pipe 3, the bottom of described suspension rod 1 is connected with mounting pipe 3 by nut 2; The axis of described mounting pipe 3, hand-held pipe 4, nut 2 and suspension rod 1 four is parallel to each other.As shown in Figure 5, the latter half of described mounting pipe 3 and the first half of hand-held pipe 4 be corresponding perforate respectively on the both sides sidewall of differing heights, form the length-adjustment holes 6 for regulating mounting pipe 3 and hand-held pipe 4 to be socketed rear entire length, in the present embodiment mounting pipe 3 and hand-held pipe 4 adjacent lengths adjustment hole 6 between distance be all 100mm, described mounting pipe 3 and hand-held pipe 4 are fixed connection by the rod shape connector 5 of the length-adjustment holes 6 overlapped through both.As Fig. 4, described rod shape connector 5 is can be pivot pin or bolt.Wherein, for adapting to the suspension rod of different size, described nut 2 can be the nut combinations body be welded into according to the mode that axis overlaps by the nut that some internal diameters are different, nut in described nut combinations body arranges according to the order that internal diameter reduces gradually from top to bottom, be welded and fixed between neighbouring nut, topmost the lateral wall of the nut that internal diameter is maximum is along being welded in the upper orifice of described mounting pipe 3.During use, mate corresponding nut according to suspension rod size.The nut of totally three different-diameters in the embodiment related to, at 8 ~ 16mm not etc., the bottom of suspension rod 1 is connected with minimum nut and nethermost nut thread diameter.In addition, can be that described mounting pipe 3 is enclosed within outside described hand-held pipe 4 during socket, be this kind of mode in embodiment, the diameter of mounting pipe 3 be 20mm, and length is 1500mm, and hand-held pipe 4 diameter is 18mm, and length is 1900 ~ 2900mm.The internal diameter of described mounting pipe 3 and the external diameter of described hand-held pipe 4 adapt; Also can be that described hand-held pipe 4 is enclosed within outside described mounting pipe 3, the described internal diameter of hand-held pipe 4 and the external diameter of described mounting pipe 3 adapt.
Fig. 5 is the installment state figure of simple and fast hanger erection device, suspension rod 1 and the floor 8 that the utility model relates to, and main making and the constructing operation method of the utility model erector are:
1, connection pipe 3 and hand-held pipe 4: according to human height and the total length building floor height determination erector, according to the length needed, mounting pipe 3 and hand-held pipe 4 are socketed, corresponding length-adjustment holes 6 is aligned with each other, and is penetrated by rod shape connector 5 and connects in the air;
2, make nut combinations body: the mode that described nut combinations body is overlapped according to axis by the nut that some internal diameters are different is welded into, the nut in it arranges according to the order that internal diameter reduces gradually from top to bottom, is welded and fixed between neighbouring nut;
3, nut combinations body is fixed in mounting pipe 3: by the lateral wall of nut maximum for nut combinations body the top internal diameter along being welded in the upper orifice of described mounting pipe 3;
4, suspension rod 1 is threaded with nut 2: mate corresponding nut according to suspension rod size, the bottom of suspension rod 1 is threaded with nut 2;
5, install suspension rod 1: the handle holding hand-held pipe 4, the expansion bolt 7 at suspension rod 1 top is aimed at the hole place that floor 8 has been accomplished fluently, the bottom handle of the continuous hand-held pipe 4 of hammering, is fixed in floor 8 by the expansion bolt 7 of suspension rod 1 from top to bottom;
4, being separated of suspension rod 1 and erector: the hand-held pipe 4 of reverse turn spun along nut 2 and suspension rod 1, drives mounting pipe to rotate, the bottom of suspension rod 1 is separated with the nut 2 of nut combinations body, removes erector, carries out next place's hanger erection construction.
The foregoing is only preferred embodiment of the present utility model, not in order to limit the utility model, all within spirit of the present utility model and principle, any amendment done, equivalent replacement, improvement etc., all should be included within protection domain of the present utility model.
Claims (6)
1. the simple and fast erector installed for slab hanger rod, the top of its middle hanger (1) is provided with expansion bolt (7), bottom is threaded, it is characterized in that: comprise mounting pipe (3) and hand-held pipe (4), described hand-held pipe (4) is inverted T-shaped pipe, the transverse part of T-shaped is as handle (41), and T-shaped stands the fixedly sleeved bottom in mounting pipe (3) of body (42) in portion; Be welded with nut (2) in the upper orifice of described mounting pipe (3), the bottom of described suspension rod (1) is connected with mounting pipe (3) by nut (2); The axis of described mounting pipe (3), hand-held pipe (4), nut (2) and suspension rod (1) four is parallel to each other.
2. a kind of simple and fast erector installed for slab hanger rod according to claim 1, it is characterized in that: the latter half of described mounting pipe (3) and the first half of hand-held pipe (4) be corresponding perforate respectively on the both sides sidewall of differing heights, form the length-adjustment holes (6) for regulating mounting pipe (3) and the rear entire length of hand-held pipe (4) socket, described mounting pipe (3) and hand-held pipe (4) are fixed connection by the rod shape connector (5) of the length-adjustment holes (6) overlapped through both.
3. a kind of simple and fast erector installed for slab hanger rod according to claim 2, is characterized in that: described rod shape connector (5) is pivot pin or bolt.
4. a kind of simple and fast erector installed for slab hanger rod according to claims 1 to 3 any one, it is characterized in that: described nut (2) is a nut or the nut combinations body be welded into according to the mode that axis overlaps by the nut that some internal diameters are different, nut in described nut combinations body arranges according to the order that internal diameter reduces gradually from top to bottom, be welded and fixed between neighbouring nut, topmost the lateral wall of the nut that internal diameter is maximum is along being welded in the upper orifice of described mounting pipe (3).
5. a kind of simple and fast erector installed for slab hanger rod according to claim 4, it is characterized in that: described mounting pipe (3) is enclosed within described hand-held pipe (4) outside, and the internal diameter of described mounting pipe (3) and the external diameter of described hand-held pipe (4) adapt.
6. a kind of simple and fast erector installed for slab hanger rod according to claims 1 to 3,5 any one, it is characterized in that: described hand-held pipe (4) is enclosed within described mounting pipe (3) outside, and the internal diameter of described hand-held pipe (4) and the external diameter of described mounting pipe (3) adapt.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201520617753.7U CN204920249U (en) | 2015-08-17 | 2015-08-17 | Simple and easy quick erector for floor suspender installation |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201520617753.7U CN204920249U (en) | 2015-08-17 | 2015-08-17 | Simple and easy quick erector for floor suspender installation |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN204920249U true CN204920249U (en) | 2015-12-30 |
Family
ID=54969387
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201520617753.7U Expired - Fee Related CN204920249U (en) | 2015-08-17 | 2015-08-17 | Simple and easy quick erector for floor suspender installation |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN204920249U (en) |
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN106836825A (en) * | 2017-01-18 | 2017-06-13 | 浙江省建建设集团有限公司 | A kind of hanger erection mechanism and its construction method |
| CN110536991A (en) * | 2017-04-06 | 2019-12-03 | 乌尔玛Cyes公司 | vertical template |
-
2015
- 2015-08-17 CN CN201520617753.7U patent/CN204920249U/en not_active Expired - Fee Related
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN106836825A (en) * | 2017-01-18 | 2017-06-13 | 浙江省建建设集团有限公司 | A kind of hanger erection mechanism and its construction method |
| CN110536991A (en) * | 2017-04-06 | 2019-12-03 | 乌尔玛Cyes公司 | vertical template |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN204781884U (en) | Prop builder's jack of structure down | |
| CN103216012A (en) | Full-bolt splicing node for inner sleeve slotted closed-section pillar | |
| CN104074367A (en) | Mounting adjustment device for prefabricated wall panel | |
| CN204920249U (en) | Simple and easy quick erector for floor suspender installation | |
| CN203003208U (en) | Airduct hanger drilling and mounting tool | |
| CN102296828B (en) | Construction method of boom before building ceiling or pipelining | |
| CN205617778U (en) | Outer wall scaffold frame is wall structure even | |
| CN204848023U (en) | Braced system that climbing tower hung in external | |
| CN204174958U (en) | A kind of steel pipe scaffold early tears component and early-dismantling device open | |
| CN102661031A (en) | Simple tool for installing top plate support suspender and using method thereof | |
| CN202466923U (en) | Suspended ceiling counter support | |
| CN205096591U (en) | Installation engineering support device of drilling | |
| CN204252496U (en) | Convenient installation device for constructional engineering suspender | |
| CN203640225U (en) | Air pipe hanging bracket | |
| CN206336288U (en) | It is a kind of to be used to extend the Extension support that re-railing block bottom bridge uses length | |
| CN203956804U (en) | A kind of suspension rod quick-mounting instrument | |
| CN204676756U (en) | The fastener of top board furred ceiling | |
| CN204435917U (en) | Frontier defense protection unit is faced in a kind of building structure | |
| CN204676757U (en) | Suspended-ceiling suspension device | |
| CN202622700U (en) | Hanger rod installation tool | |
| CN208281627U (en) | Adjustable support guide rail used in a kind of jacking construction process | |
| CN215281729U (en) | Top plate expansion bolt spanner | |
| CN206233521U (en) | A convenient installation tool for roof suspenders | |
| CN205713154U (en) | A kind of interior wall transverse squeezing device | |
| CN103590612B (en) | Convenient purline correction device |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C14 | Grant of patent or utility model | ||
| GR01 | Patent grant | ||
| CF01 | Termination of patent right due to non-payment of annual fee | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20151230 |