CN207348024U - Seepage control of dam processing system - Google Patents
Seepage control of dam processing system Download PDFInfo
- Publication number
- CN207348024U CN207348024U CN201721317267.9U CN201721317267U CN207348024U CN 207348024 U CN207348024 U CN 207348024U CN 201721317267 U CN201721317267 U CN 201721317267U CN 207348024 U CN207348024 U CN 207348024U
- Authority
- CN
- China
- Prior art keywords
- drilling
- dam
- sleeve
- mud
- processing system
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000005553 drilling Methods 0.000 claims abstract description 44
- 230000004888 barrier function Effects 0.000 claims description 3
- 230000003014 reinforcing effect Effects 0.000 claims description 3
- 230000000694 effects Effects 0.000 abstract description 4
- 238000005429 filling process Methods 0.000 abstract description 3
- 239000008267 milk Substances 0.000 abstract description 3
- 210000004080 milk Anatomy 0.000 abstract description 3
- 235000013336 milk Nutrition 0.000 abstract description 3
- 238000012856 packing Methods 0.000 abstract description 3
- 238000007789 sealing Methods 0.000 abstract description 3
- 239000011800 void material Substances 0.000 abstract description 3
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 3
- 239000004568 cement Substances 0.000 description 2
- 239000004927 clay Substances 0.000 description 2
- 238000010586 diagram Methods 0.000 description 2
- 238000005516 engineering process Methods 0.000 description 1
- 238000009434 installation Methods 0.000 description 1
- 239000000203 mixture Substances 0.000 description 1
- 239000002002 slurry Substances 0.000 description 1
- 239000002689 soil Substances 0.000 description 1
Landscapes
- Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)
Abstract
The utility model discloses a kind of seepage control of dam processing system, including dam body, drilling is set on dam body, the mud mixed up is poured into from drilling, mud is mutually communicated in the bottom of drilling, so that dam body bottom is all in the milk, improves grouting quantity, and then improve anti-seepage effect.Mud can cause impact force to the inner wall of drilling in filling process, and sleeve can reduce the impact force, avoid the inner wall of drilling from being damaged, and the flow velocity of protrusion mud when can slow down grouting on sleeve lining, further cut down impact force.In addition, during grouting, it is dilute after mud is first dense, it is therefore an objective to tiny and distant fracture void elder generation packing, then to increase concentration again, be allowed to fill larger gap crack.Mud fills drilling, then by each borehole sealing, can thus realize watertight grouting.
Description
Technical field
The utility model belongs to water conservancy projects technical field, and in particular to a kind of seepage control of dam processing system.
Background technology
At the slope foot of dam downstream, i.e., leakage is often had at the dam foundation, water level is higher, and leakage is more serious, this indicates that dam side
It is damaged at angle, leakage is produced, the repair mode of the dam foundation is typically manually repaired in the prior art, the mode manually repaired
Danger coefficient is high, and heavy workload, and labor intensity is big, and work efficiency is low.
Utility model content
The technical problems to be solved in the utility model is in view of the foregoing drawbacks, there is provided a kind of seepage control of dam processing system, should
Seepage control of dam processing system is easy to the reparation of leakage, good seepage-proof property.
In order to solve the above technical problems, the utility model includes dam body, the upper surface of the dam body is interval with multiple energy
The drilling connected with dam body bottom, is connected between each foot of hole by cross through hole, sleeve is equipped with the inner wall respectively to drill,
The outer surface of the sleeve is equipped with impervious barrier, and the inner surface of sleeve is evenly equipped with multiple protrusions.
Each sleeve includes concrete layer, and the middle part of concrete layer is equipped with reinforcing bar.
The depth of each sleeve is all higher than 2/3rds of drilling depth.
The upper end of each sleeve is equipped with clamping portion, and the diameter in each clamping portion is all higher than the diameter of each drilling.
Each sleeve diameter is respectively less than a diameter for drilling.
The drilling is set in a row along the length direction of dam body, and the drilling is provided with two rows.
Two row hole drilling is staggered.
The center of circle per row hole drilling is on same straight line.
The utility model has the following advantages compared with prior art:The mud mixed up is poured into from drilling, mud is boring
The bottom in hole is mutually communicated, so that dam body bottom is all in the milk, improves grouting quantity, and then improve anti-seepage effect.Filling process
Middle mud can cause impact force to the inner wall of drilling, and sleeve can reduce the impact force, avoid the inner wall of drilling from being damaged, and
The flow velocity of mud, further cuts down impact force when protrusion on sleeve lining can slow down grouting.In addition, during grouting, mud is first
It is dilute after dense, it is therefore an objective to tiny and distant fracture void elder generation packing, then to increase concentration again, be allowed to fill larger gap
Crack.Mud fills drilling, then by each borehole sealing, can thus realize watertight grouting.
In conclusion the utility model is easy to the reparation of leakage, good seepage-proof property.
Brief description of the drawings
Specific embodiment of the present utility model is described in further detail below in conjunction with the accompanying drawings:
Fig. 1 is the structure diagram of the utility model;
Fig. 2 is sectional view along A-A in Fig. 1;
The top view of Fig. 3 Fig. 1;
Fig. 4 is the structure diagram of sleeve.
Embodiment
Seepage control of dam processing system as Figure 1-Figure 4, including dam body 1, the upper surface of dam body 1 are interval with multiple energy
The drilling 2 connected with dam body bottom, drilling 2 are set in a row along the length direction of dam body 1, and drilling 2 is provided with two rows.Two row hole drillings
2 are staggered, and this setup can destroy the support strength of dam body to avoid drilling 2.The center of circle per row hole drilling 2 is same
On bar straight line.As shown in Fig. 2, respectively being connected between 2 bottoms of drilling by cross through hole 3, the grouting area of bottom, Jin Erzeng are improved
Big anti-seepage effect.Sleeve 4 is equipped with the inner wall of each drilling 2, the outer surface of sleeve 4 is equipped with impervious barrier 43, avoids leakage from causing
Dam body support strength reduces.The inner surface of sleeve 4 is evenly equipped with multiple raised 44.Each sleeve 4 includes concrete in the present embodiment
Layer 41, the middle part of concrete layer 41 is equipped with reinforcing bar 42, and the sleeve 4 of the structure can improve anti-impact force.The depth of each sleeve 4 is equal
More than 2/3rds of 2 depth of drilling, increase the protection domain of sleeve 4.As shown in Figure 3 and Figure 4, the upper end of each sleeve 4 is equal
Clamping portion 40 is equipped with, the diameter in each clamping portion 40 is all higher than the diameter of each drilling 2, and clamping portion 40 is contacted with the outer of drilling 2,
Easy to the installation of sleeve 4, clamping portion 40 can realize the positioning of sleeve 4.Each 4 diameter of sleeve is respectively less than a diameter for drilling 2, just
In sleeve 4 is inserted into drilling 2 in.
The slurry of grouting in the present embodiment selects silty clay to be made with weight silt loam and cement, and clay content is
30%, silty content is 40%, cement content 20%.Mud density is controlled in 1.5-1.7g/cm3, concentration of hydraulic mixture: slime water
Soil is than control 1: 0.5-1: 1.4.The mud mixed up is poured into from drilling 2, mud is mutually communicated in the bottom of drilling 2, so that
Dam body bottom is all in the milk, improve grouting quantity, and then improve anti-seepage effect.Mud can be to the inner wall of drilling 2 in filling process
Impact force is caused, and sleeve 4 can reduce the impact force, avoid the inner wall of drilling 2 from being damaged, and the protrusion on 4 inner wall of sleeve
The flow velocity of 44 mud when can slow down grouting, further cuts down impact force.In addition, during grouting, it is dilute after mud is first dense, it is therefore an objective to
Tiny and distant fracture void elder generation packing, then increases concentration again, is allowed to fill larger gap crack.Mud will drill
2 fill, and then by each borehole sealing, can thus realize watertight grouting.
The above is the specific constructive form of the utility model, and the present utility model is not limited to the above embodiments,
For those skilled in the art, equivalent variations and part replacement based on concrete structure on the utility model are all new in this practicality
In the protection domain of type.
Claims (8)
1. a kind of seepage control of dam processing system, including dam body (1), the upper surface of the dam body (1) is interval with multiple energy and dam
The drilling (2) of body bottom connection, is respectively connected between drilling (2) bottom by cross through hole (3), equal on the inner wall of (2) that respectively drills
Equipped with sleeve (4), the outer surface of the sleeve (4) is equipped with impervious barrier (43), and the inner surface of sleeve (4) is evenly equipped with multiple protrusions
(44)。
2. seepage control of dam processing system according to claim 1, it is characterized in that:Each sleeve (4) includes concrete layer
(41), the middle part of concrete layer (41) is equipped with reinforcing bar (42).
3. seepage control of dam processing system according to claim 2, it is characterized in that:The depth of each sleeve (4) is all higher than drilling
(2) 2/3rds of depth.
4. seepage control of dam processing system according to claim 3, it is characterized in that:The upper end of each sleeve (4) is equipped with
Clamping portion (40), the diameter of each clamping portion (40) are all higher than the diameter of each drilling (2).
5. seepage control of dam processing system according to claim 4, it is characterized in that:Each sleeve (4) diameter is respectively less than a drilling
(2) diameter.
6. seepage control of dam processing system according to claim 2, it is characterized in that:Length of the drilling (2) along dam body (1)
Direction is set in a row, and the drilling (2) is provided with two rows.
7. seepage control of dam processing system according to claim 6, it is characterized in that:Two row hole drilling (2) is staggered.
8. seepage control of dam processing system according to claim 7, it is characterized in that:The center of circle per row hole drilling (2) is same
On bar straight line.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201721317267.9U CN207348024U (en) | 2017-09-29 | 2017-09-29 | Seepage control of dam processing system |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201721317267.9U CN207348024U (en) | 2017-09-29 | 2017-09-29 | Seepage control of dam processing system |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN207348024U true CN207348024U (en) | 2018-05-11 |
Family
ID=62357995
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201721317267.9U Expired - Fee Related CN207348024U (en) | 2017-09-29 | 2017-09-29 | Seepage control of dam processing system |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN207348024U (en) |
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN112360514A (en) * | 2020-12-03 | 2021-02-12 | 招金矿业股份有限公司蚕庄金矿 | Steady-flow sedimentation feeding cylinder for mine construction |
| CN117702688A (en) * | 2024-01-05 | 2024-03-15 | 中国水利水电第三工程局有限公司 | Leakage blocking construction method for dam body of hydropower station |
-
2017
- 2017-09-29 CN CN201721317267.9U patent/CN207348024U/en not_active Expired - Fee Related
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN112360514A (en) * | 2020-12-03 | 2021-02-12 | 招金矿业股份有限公司蚕庄金矿 | Steady-flow sedimentation feeding cylinder for mine construction |
| CN117702688A (en) * | 2024-01-05 | 2024-03-15 | 中国水利水电第三工程局有限公司 | Leakage blocking construction method for dam body of hydropower station |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN202337976U (en) | In-hole impact high-pressure jet grouting equipment | |
| CN103015413A (en) | Construction method of composite pile with implanting-in rigid-body embedded into hard bearing stratum | |
| CN104912039A (en) | Concrete panel void repairing method | |
| CN102660952A (en) | Controllable clay paste slurry grouting technique | |
| CN108797621A (en) | A kind of water sealing structure and its construction method in rich water depth ovum gravel erratic boulder stratum front pre-grouting | |
| CN104631438A (en) | Method for constructing long auger bored cast-with-pressure concrete uplift pile | |
| CN105064288A (en) | A hybrid dam structure and construction method of a concrete dam and an earth-rock dam | |
| CN203361143U (en) | Combination structure of high-pressure jet grouting pile and prestressed pipe pile | |
| CN109538295A (en) | Seal groundwater in mining area library system | |
| CN109440757A (en) | A kind of foundation reinforcement method for karst region | |
| CN207348024U (en) | Seepage control of dam processing system | |
| CN105133641A (en) | Thin-wall continuous-wall-type foundation reinforcing structure and method | |
| CN106978817A (en) | A kind of Novel retaining wall based process pattern and a kind of Novel retaining wall | |
| CN107938652B (en) | Rock-inlaid steel reinforced cement stirring wall and construction method thereof | |
| CN103114602B (en) | Foundation pit waterproof curtain achieving secondary melting mending through seepage dipping poly condensation bonding bodies and construction method | |
| CN206800431U (en) | A kind of sealing bottom type caisson wall | |
| CN108625388A (en) | A kind of sleeve combination formula large diameter single pile foundation and its construction method suitable for Shallow Bedrock geological conditions | |
| CN105672329B (en) | The large size prefabricated building enclosure of deep basal pit and construction method | |
| CN101255797B (en) | Method for mounting blown sand and slip-casting of mine well wall as well as slip-casting pipe | |
| CN207080242U (en) | Cup-type horizontal reinforcement structure of bamboo reinforcement grouting anchor rod at the end of shield tunnel | |
| CN207512727U (en) | A kind of embedding rock single pile and its construction system | |
| CN104594369A (en) | Karst region high-pressure group hole replacement grouting method and structure thereof | |
| CN104895066B (en) | The construction method of overlength churning strength core built pile | |
| CN210564650U (en) | Assembled slurry storage device for filling underwater deep closed space | |
| CN207904910U (en) | A kind of embedding lithotype steel cement mixing wall |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| GR01 | Patent grant | ||
| GR01 | Patent grant | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20180511 Termination date: 20180929 |
|
| CF01 | Termination of patent right due to non-payment of annual fee |