CN215519223U - I-shaped beam hanging hanger - Google Patents

I-shaped beam hanging hanger Download PDF

Info

Publication number
CN215519223U
CN215519223U CN202121517400.1U CN202121517400U CN215519223U CN 215519223 U CN215519223 U CN 215519223U CN 202121517400 U CN202121517400 U CN 202121517400U CN 215519223 U CN215519223 U CN 215519223U
Authority
CN
China
Prior art keywords
rod
plate
support
support rod
shaped
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202121517400.1U
Other languages
Chinese (zh)
Inventor
李夏珂
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Suzhou Jinyu Construction Group Co
Original Assignee
Henan Jinding Construction Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Henan Jinding Construction Engineering Group Co Ltd filed Critical Henan Jinding Construction Engineering Group Co Ltd
Priority to CN202121517400.1U priority Critical patent/CN215519223U/en
Application granted granted Critical
Publication of CN215519223U publication Critical patent/CN215519223U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model relates to a technical field that the steel construction was built specifically is an I-shaped roof beam hangs hoist, including being used for with wall fixed connection's pull rod, the pull rod articulates there is hoist and mount portion, and hoist and mount portion keeps away from that the one end of pull rod articulates there is the die-pin, and the die-pin can be connected with two support pieces with sliding, and two support pieces are installed respectively in the I-shaped both sides of beam and are used for connecting the I-shaped beam. This application has increased the commonality of hanging the hoist through the support piece of two adjustable intervals in order to adapt to the different sizes of I-beam.

Description

I-shaped beam hanging hanger
Technical Field
The application relates to the technical field of steel structure construction, in particular to an I-shaped beam hanging hanger.
Background
In the process of building a steel structure, I-shaped steel is often used as a cross beam, namely an I-shaped beam. In order to increase the stability of the construction of the i-beam, a hanging hanger is usually installed between the i-beam and the wall surface, so that the i-beam is hung on the wall surface. However, due to different sizes and specifications of the I-beams, the hanging hangers with different specifications are usually required to be matched with I-beams with different specifications, and the universality is poor.
Disclosure of Invention
Aiming at the defects in the prior art, the invention aims to provide an I-shaped beam hanging hanger which has higher universality and is suitable for the installation of I-shaped beams with more specifications.
The above application purpose of the present application is achieved by the following technical solutions:
an i-beam hanger comprising:
the pull rod is fixedly connected with the wall surface;
the hoisting part is hinged with the pull rod;
the supporting rod is hinged to one end of the hoisting part, which is far away from the pull rod;
two supporting pieces which can be glidingly connected with the supporting rod;
the two supporting pieces are respectively arranged on two sides of the I-shaped beam and used for connecting the I-shaped beam.
Optionally, the hoisting part comprises a first boom and a second boom;
the first hanging rod is hinged to the pull rod;
the second hanging rod is hinged to the supporting rod; and
a fastener provided with a threaded through hole;
the first suspension rod and the second suspension rod are respectively connected to the fastener through threads at one end of the threaded through hole, and the thread directions of the first suspension rod and the second suspension rod are opposite.
Optionally, the support comprises a first plate and a second plate;
a first plate slidably connected to the support rod;
the second plate is fixedly arranged on the bottom surface of the I-shaped beam and used for supporting the I-shaped beam;
the first plate is fixedly connected with the second plate.
Optionally, the support comprises a first plate and a second plate;
a first plate slidably connected to the support rod;
the second plate is fixedly arranged at the waist of the I-shaped beam and used for supporting the I-shaped beam; and
and two sides of the third plate are respectively fixedly connected to the first plate and the second plate so as to connect the first plate and the second plate.
Optionally, the supporting rod is a threaded rod, and a plurality of first nuts are connected to the supporting rod through threads;
at least one first nut is arranged on each of two sides of the supporting piece and used for fixing the position of the supporting piece on the supporting rod.
Optionally, the hoisting part comprises a first pull ring, and the first pull ring is located at one end, close to the support rod, of the hoisting part;
the first pull ring is sleeved on the support rod.
The installation of the hanger is not limited by the height of the wall body higher than the I-shaped beam to a certain extent, and the universality of the hanger is improved.
Optionally, a plurality of second nuts are arranged on the support rod;
and at least one second nut is respectively arranged on two sides of the first pull ring and used for fixing the position of the first pull ring on the support rod.
Optionally, one end of the pull rod, which is used for being fixed on the wall body, is an expansion bolt.
Optionally, the pull rod comprises a second pull ring, the second pull ring is fixedly connected to the expansion bolt, and the hoisting part is far away from one end of the support rod and is fixedly connected with a drag hook.
In summary, the present application includes at least one of the following beneficial technical effects:
1. the support piece 31 can be arranged in a sliding manner, and the distance between the support piece 31 and the I-shaped beam can be changed by sliding, so that the I-shaped beam can adapt to I-shaped beams with different specifications, the universality of the suspension hanger is improved, and the use is more convenient;
2. the positions of the supporting piece, the second hanging rod and the supporting rod are fixed through the arrangement of the first nut and the second nut, so that the connection is more stable;
3. due to the arrangement of the draw hook, the hoisting part is more convenient to connect with the draw rod.
Drawings
Fig. 1 is a schematic overall structure diagram of an embodiment of an i-beam suspension spreader of the present application;
fig. 2 is a schematic overall structure diagram of another embodiment of an i-beam suspension spreader of the present application;
FIG. 3 is an enlarged schematic view of portion A of FIG. 1;
fig. 4 is an enlarged schematic view of a portion B in fig. 1.
Reference numerals: 1. a pull rod; 11. an expansion bolt; 12. a second tab;
2. a hoisting part; 21. a first boom; 211. pulling a hook; 22. a second boom; 221. a first pull ring; 23. a fastener;
3. a bracket; 31. a support member; 311. a first plate; 312. a second plate; 313. a third plate; 32. a support rod; 321. a first nut; 322. a second nut.
Detailed Description
The present application is described in further detail below with reference to figures 1-4.
In order to more clearly understand the technical solution shown in the embodiments of the present application, an existing i-beam is first processed The working principle of the suspension spreader is introduced.
The I-shaped beam hanging hanger is characterized in that the I-shaped frame is connected with the I-shaped beam, the I-shaped beam is clamped in a U-shaped groove formed by the U-shaped frame, and the U-shaped frame is of a fixed structure, namely the U-shaped groove formed by the U-shaped frame is of a fixed specification.
From the perspective of a user, for example, when the I-beam of 10# I-steel is hung, the leg width is 68mm, and the groove width of the U-shaped groove on the U-shaped frame is required to be not less than 68mm, and when the I-beam of 16# I-steel is hung, the leg width is 88mm, that is, the groove width of the U-shaped groove on the U-shaped frame is required to be not less than 88mm, at this time, the U-shaped frame capable of installing 10# I-steel is not necessarily used for installing 16# I-steel, and the U-shaped frame is inconvenient for workers to use when installing the U-shaped frame.
Please refer to fig. 1, which is a schematic diagram illustrating an i-beam hanger disclosed in an embodiment of the present application, including a pull rod 1 for being fixedly connected to a wall surface, a bracket 3 for being fixedly connected to an i-beam, and a lifting portion 2 for connecting the pull rod 1 and the bracket 3, wherein the lifting portion 2 is hinged to the pull rod 1 and the bracket 3, the bracket 3 includes two supporting members 31 and two supporting rods 32, the two supporting members 31 are slidably connected to the supporting rods 32, and the supporting members 31 are used for being fixedly connected to the i-beam and are disposed on two sides of the i-beam during installation.
Thus, when the I-beams with different specifications are installed, the supports 31 which can be arranged on the two sides of the I-beam in a sliding mode are used for changing the distance between the supports by sliding so as to adapt to the I-beams with different specifications.
Further description is provided below with respect to specific usage scenarios.
When the lifting device is used, the lifting part 2 is connected to the bracket 3, then the two supporting pieces 31 are fixedly connected to the two sides of the proper position of the I-shaped beam, the pull rod 1 is installed at one end, far away from the bracket 3, of the lifting part 2, and the pull rod 1 is fixedly connected to the proper position of a wall body.
When the I-beam with different specifications needs to be installed, the distance between the two supporting pieces 31 is changed by sliding the supporting pieces 31 so as to adapt to the size change of the I-beam. From the consideration of a user, the same suspension lifting appliance can be used for installing I-beams with different specifications, and different suspension lifting appliances do not need to be adapted according to the specifications of the I-beams, so that the universality of the suspension lifting appliance is improved, and the use is more convenient.
Referring to fig. 2, as an embodiment of the drum beam hanger provided by the present application, the supporting member 31 includes a first plate 311 and a second plate 312, the first plate 311 is slidably connected to the supporting rod 32, the second plate 312 is fixedly mounted on the bottom surface of the drum beam for supporting the drum beam, and the first plate 311 and the second plate 312 are fixedly connected to make the supporting member 31 in an L shape. When the mounting is carried out, the upper end face of the second plate 312 is attached to the bottom face of the I-beam and fixed by bolting or welding.
In the overall sense of the word,the I-shaped beam hanging hanger provided by the embodiment of the application can adapt to I-shaped beams with different specifications through the two supporting pieces 31 which can slide to change the distance between the supporting pieces, when the I-shaped beam hanging hanger is used, the two supporting pieces 31 are respectively and fixedly connected to one side of the I-shaped beam, and the two supporting pieces 31 are not fixedly connected with each other and are not influenced by the width of the I-shaped beam.
In some possible implementations, the first plate 311 and the second plate 312 are both rectangular plates, and the first plate 311 and the second plate 312 are integrated, that is, the supporting member 31 is a bent member.
As another specific embodiment of the heating mat provided by the application,referring to fig. 2, the supporting member 31 includes a first plate 311 and a second plate 312And a third plate 313, wherein the first plate 311 is slidably connected to the supporting rod 32, the second plate 312 is fixedly installed at the waist of the I-beam for supporting the I-beam, and two sides of the third plate 313 are respectively fixedly connected to the first plate 311 and the second plate 312, so that the supporting member 31 is Z-shaped. When the I-beam is installed, the second plate 312 is parallel to the waist of the I-beam, the third plate 313 is attached to the bottom surface of the upper leg of the I-beam, and bolts are arranged on the second plate 312 and penetrate through the two supporting pieces and the waist of the I-beam.
According to a specific use scene, the specification change of a common I-beam relates to leg width, waist height and waist thickness, the support members 31 change the distance between the two support members 31 through sliding to adapt to the change of the leg width or the waist thickness, so that the support members 31 can be adapted to the I-beams with more specifications, and the universality of the suspension hanger is improved.
In some possible implementations, the first plate 311 and the second plate 312 are both rectangular plates, and the first plate 311, the second plate 312 and the third plate 313 are integrated, that is, the supporting member 31 is a bent member.
As another specific embodiment of the heating mat provided by the application,the hoisting part 2 comprises a first suspender 21, a second suspender 22 and a fastener 23, the first suspender 21 is hinged on the pull rod 1, the second suspender 22 is hinged on the supporting rod 32, the fastener 23 is provided with a threaded through hole, the threaded through hole penetrates through the fastener 23, the first suspender 21 and the second suspender 22 are respectively connected with the fastener 23 from one end of the threaded through hole in a threaded manner, and the thread turning directions of the first suspender 21 and the second suspender 22 are opposite.
By combining a specific use scene, when the pull rod 1 is installed after the bracket 3 is installed, the situation that the lifting part 2 is too short and the pull rod 1 cannot be installed in place or the lifting part 2 is too long and the lifting part 2 is loose and cannot provide tension for the bracket 3 can occur. By turning the fastener 23, the first boom 21 and the second boom 22 move toward each other or away from each other simultaneously when the fastener 23 is turned, because the screw threads of the first boom 21 and the second boom 22 are turned in opposite directions. Further, the total length of the sling portion 2 is increased or shortened to accommodate the above-mentioned possible situations, facilitating the installation for the user.
In some possible implementations, the first hanger bar 21 and the second hanger bar 22 are cylindrical bars, and the fastener 23 is a circular tube.
As another specific embodiment of the heating mat provided by the application,the supporting rod 32 is a threaded rod, a plurality of first nuts 321 are connected to the supporting rod 32 through threads, and at least one first nut 321 is installed on each of two sides of the supporting member 31 and used for fixing the position of the supporting member 31 on the supporting rod 32.
It should be understood that the supporting members 31 are slidably disposed on the supporting rods 32, the fixing of the supporting members 31 on the i-beam may be inconvenient due to the movable connection of the supporting members 31, and the first nuts 321 on both sides clamp the supporting members 31 to fix the positions of the two supporting members 31 on the supporting rods 32, so that the supporting members 31 are in a stable state to facilitate the fixing and mounting work on the i-beam.
As another specific embodiment of the heating mat provided by the application,referring to fig. 2-3, the sling 2 includes a first tab 221, and the first tab 221 is located at an end of the sling 2 near the support rod 32.
It should be understood that the lifting part 2 is hinged to the bracket 3, and the first pull ring 221 on the lifting part 2 is sleeved on the support rod 32, so that the lifting part is connected simply and conveniently, and the lifting part is convenient for workers to install.
Furthermore, a plurality of second nuts 322 are disposed on the support rod 32, and at least one second nut 322 is respectively disposed on two sides of the first pull ring 221 for fixing the position of the first pull ring 221 on the support rod 32.
It should be understood that the first pulling ring 221 is slidably disposed on the support rod 32, and the first pulling ring 221 is fastened by the second nuts 322 disposed on both sides of the first pulling ring 221, so as to fix the position of the first pulling ring 221 on the support rod 32, thereby reducing the possibility of the first pulling ring 221 sliding on the support rod 32 and increasing the stability of hoisting the i-beam.
As another specific embodiment of the heating mat provided by the application,referring to fig. 4, one end of the tie rod 1 for fixing to a wall is an expansion bolt 11.
It will be appreciated that the tie rod 1 is fixed to the wall to provide tension to the i-beam and the expansion bolts are a relatively simple means of fixing for installation by the crew.
As another specific embodiment of the heating mat provided by the application,pull rod 1 includes second pull ring 12, and second pull ring 12 fixed connection is in 11 terminal surfaces of expansion bolts, and the one end fixedly connected with drag hook 211 of die-pin 32 is kept away from to hoist and mount portion 2.
It should be understood that the connection of the lifting part 2 to the pull rod 1 provides tension for the I-shaped beam, and the hooking of the second pull ring 12 by the pull hook 211 is a simple connection method for the installation of the worker.
The embodiments of the present invention are preferred embodiments of the present application, and the scope of protection of the present application is not limited by the embodiments, so: all equivalent changes made according to the structure, shape and principle of the present application shall be covered by the protection scope of the present application.

Claims (9)

1.一种工型梁悬挂吊具,其特征在于,包括:1. an I-beam suspension sling, is characterized in that, comprises: 拉杆(1),用于与墙面固定连接;Pull rod (1), used for fixed connection with the wall; 吊装部(2),铰接于拉杆(1);The hoisting part (2) is hinged to the tie rod (1); 托杆(32),铰接于吊装部(2)远离拉杆(1)的一端;The support rod (32) is hinged to the end of the hoisting part (2) away from the pull rod (1); 两个支撑件(31),可滑移地连接于托杆(32);two support members (31), slidably connected to the support rod (32); 两个支撑件(31)分别安装于工形梁两侧用以连接工形梁。Two supporting pieces (31) are respectively installed on both sides of the I-shaped beam to connect the I-shaped beam. 2.根据权利要求1所述的一种工型梁悬挂吊具,其特征在于:所述吊装部(2)包括第一吊杆(21)与第二吊杆(22);2. An I-beam suspension hanger according to claim 1, characterized in that: the hoisting part (2) comprises a first hanger rod (21) and a second hanger rod (22); 第一吊杆(21),铰接于所述拉杆(1);a first boom (21), hinged to the draw rod (1); 第二吊杆(22),铰接于所述托杆(32);以及a second boom (22) hinged to the support rod (32); and 紧固件(23),设置有螺纹通孔;Fasteners (23), provided with threaded through holes; 第一吊杆(21)与第二吊杆(22)分别从所述螺纹通孔的一端螺纹连接于所述紧固件(23),第一吊杆(21)与第二吊杆(22)的螺纹旋向相反。The first hanger rod (21) and the second hanger rod (22) are respectively threadedly connected to the fastener (23) from one end of the threaded through hole, and the first hanger rod (21) and the second hanger rod (22) ) threads in the opposite direction. 3.根据权利要求1所述的一种工型梁悬挂吊具,其特征在于:所述支撑件(31)包括第一板(311)与第二板(312);3. An I-beam suspension hanger according to claim 1, characterized in that: the support member (31) comprises a first plate (311) and a second plate (312); 第一板(311),可滑移地连接于托杆(32);The first plate (311) is slidably connected to the support rod (32); 第二板(312),固定安装于工形梁的底面用以托起工形梁;The second plate (312) is fixedly installed on the bottom surface of the I-shaped beam to hold up the I-shaped beam; 第一板(311)与第二板(312)固定连接。The first board (311) is fixedly connected with the second board (312). 4.根据权利要求1所述的一种工型梁悬挂吊具,其特征在于:所述支撑件(31)包括第一板(311)与第二板(312);4. An I-beam suspension hanger according to claim 1, characterized in that: the support member (31) comprises a first plate (311) and a second plate (312); 第一板(311),可滑移地连接于托杆(32);The first plate (311) is slidably connected to the support rod (32); 第二板(312),固定安装于工形梁的腰用以支撑工形梁;以及A second plate (312) fixedly mounted on the waist of the I-beam to support the I-beam; and 第三板(313),两侧分别固定连接于第一板(311)与第二板(312)以连接第一板(311)与第二板(312)。The third board (313) has two sides respectively fixedly connected to the first board (311) and the second board (312) to connect the first board (311) and the second board (312). 5.根据权利要求1所述的一种工型梁悬挂吊具,其特征在于:所述托杆(32)为螺纹杆,所述托杆(32)上螺纹连接有多个第一螺母(321);5. An I-beam suspension hanger according to claim 1, characterized in that: the support rod (32) is a threaded rod, and the support rod (32) is threadedly connected with a plurality of first nuts ( 321); 所述支撑件(31)两侧至少分别安装有一个所述第一螺母(321),用以固定所述支撑件(31)在所述托杆(32)上的位置。At least one first nut (321) is respectively installed on both sides of the support member (31) to fix the position of the support member (31) on the support rod (32). 6.根据权利要求1所述的一种工型梁悬挂吊具,其特征在于:所述吊装部(2)包括第一拉环(221),所述第一拉环(221)位于所述吊装部(2)靠近所述托杆(32)的一端;6 . An I-beam suspension hanger according to claim 1 , wherein the hoisting part ( 2 ) comprises a first pull ring ( 221 ), and the first pull ring ( 221 ) is located in the The hoisting part (2) is close to one end of the support rod (32); 所述第一拉环(221)套于所述托杆(32)。The first pull ring (221) is sleeved on the support rod (32). 7.根据权利要求6所述的一种工型梁悬挂吊具,其特征在于:所述托杆(32)上设置有多个第二螺母(322);7. An I-beam suspension hanger according to claim 6, characterized in that: a plurality of second nuts (322) are provided on the support rod (32); 所述第一拉环(221)两侧至少分别安装有一个第二螺母(322),用以固定所述第一拉环(221)在所述托杆(32)上的位置。At least one second nut (322) is respectively installed on both sides of the first pull ring (221) to fix the position of the first pull ring (221) on the support rod (32). 8.根据权利要求1至7任意一项所述的一种工型梁悬挂吊具,其特征在于:所述拉杆(1)用于固定在墙体上的一端为膨胀螺栓(11)。8. An I-beam suspension hanger according to any one of claims 1 to 7, characterized in that: one end of the tie rod (1) for fixing on the wall is an expansion bolt (11). 9.根据权利要求8所述的一种工型梁悬挂吊具,其特征在于:所述拉杆(1)包括第二拉环(12),所述第二拉环(12)固定连接于所述膨胀螺栓(11),所述吊装部(2)远离所述托杆(32)的一端固定连接有拉钩(211)。9 . An I-beam suspension hanger according to claim 8 , wherein the pull rod ( 1 ) comprises a second pull ring ( 12 ), and the second pull ring ( 12 ) is fixedly connected to the In the expansion bolt (11), a pull hook (211) is fixedly connected to one end of the hoisting part (2) away from the support rod (32).
CN202121517400.1U 2021-07-05 2021-07-05 I-shaped beam hanging hanger Active CN215519223U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202121517400.1U CN215519223U (en) 2021-07-05 2021-07-05 I-shaped beam hanging hanger

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202121517400.1U CN215519223U (en) 2021-07-05 2021-07-05 I-shaped beam hanging hanger

Publications (1)

Publication Number Publication Date
CN215519223U true CN215519223U (en) 2022-01-14

Family

ID=79812207

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202121517400.1U Active CN215519223U (en) 2021-07-05 2021-07-05 I-shaped beam hanging hanger

Country Status (1)

Country Link
CN (1) CN215519223U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115749320A (en) * 2022-11-22 2023-03-07 滁州金诚金属制品有限公司 I-beam suspension adapter

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115749320A (en) * 2022-11-22 2023-03-07 滁州金诚金属制品有限公司 I-beam suspension adapter

Similar Documents

Publication Publication Date Title
CN215519223U (en) I-shaped beam hanging hanger
CN109048299A (en) The connecting rod bearing shell mounting tool and method of marine diesel
CN201145097Y (en) Universal suspension bracket
CN205916901U (en) Joist steel fixture
JP2009108473A (en) Hanging scaffold erection method for elevated structure
CN110043297A (en) A kind of tunnel inverted arch buried water strip fixture
CN111287378A (en) Ceiling with adjustable height and construction method thereof
CN207632338U (en) A kind of mechanical splice building pipeline lifting fixator
CN114043161B (en) Assembling fixing frame and method for reactor core heat exchanger of experimental reactor
CN208920568U (en) A kind of fan coil hanger
CN212297950U (en) A new type of hoisting piece and hanger
CN215981218U (en) Pipeline installation gallows under L shaped steel roof beam
CN212012004U (en) Welding-free hanger for steel structure building bridge
CN211257549U (en) A supporting steel beam structure
CN211694136U (en) Device for installing ceiling electric appliance
CN212297951U (en) A trapezoidal hoisting piece and hanger
CN217886832U (en) Device for preventing high falling
CN219517611U (en) Safety rope hanging and buckling device for steel structure
CN220976300U (en) Steel construction installation hangs hoist
CN222588524U (en) A steel structure welding and fixing optimization device
CN214733764U (en) A direct current through-wall casing lifting device
CN112587824A (en) Clamp mechanism for hanging safety belt
CN111412330B (en) Hoisting piece and hanging bracket at pipeline connecting position
CN104348100A (en) Substation maintenance platform with multiple installation modes and installation method thereof
CN216583739U (en) Hoisting device for construction steel structure installation construction

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20250325

Address after: Room 403, Building 3, Jingyuan New Village, Industrial Circle Zone, Suzhou City, Jiangsu Province 215000

Patentee after: Zhou Genda

Country or region after: China

Address before: 450000 No. 001, East head, Miaohou village, Bagang office, airport economic comprehensive experimental zone, Zhengzhou City, Henan Province

Patentee before: Henan Jinding Construction Engineering Group Co.,Ltd.

Country or region before: China

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20250524

Address after: 215000 Jiangsu Province Suzhou City Industrial Park Fengting Avenue 600

Patentee after: SUZHOU JINYU CONSTRUCTION Group Co.

Country or region after: China

Address before: Room 403, Building 3, Jingyuan New Village, Industrial Circle Zone, Suzhou City, Jiangsu Province 215000

Patentee before: Zhou Genda

Country or region before: China

TR01 Transfer of patent right