CN217403274U - Balloon injection device - Google Patents

Balloon injection device Download PDF

Info

Publication number
CN217403274U
CN217403274U CN202221446340.3U CN202221446340U CN217403274U CN 217403274 U CN217403274 U CN 217403274U CN 202221446340 U CN202221446340 U CN 202221446340U CN 217403274 U CN217403274 U CN 217403274U
Authority
CN
China
Prior art keywords
connecting pipe
funnel
balloon
fan
pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202221446340.3U
Other languages
Chinese (zh)
Inventor
郑傲麟
龚页莘
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Luzhou Jiangyang District Public Security Equipment Co ltd
Original Assignee
Luzhou Jiangyang District Public Security Equipment Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Luzhou Jiangyang District Public Security Equipment Co ltd filed Critical Luzhou Jiangyang District Public Security Equipment Co ltd
Priority to CN202221446340.3U priority Critical patent/CN217403274U/en
Application granted granted Critical
Publication of CN217403274U publication Critical patent/CN217403274U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Toys (AREA)

Abstract

The utility model discloses a balloon injection apparatus belongs to training articles for use technical field. The method comprises the following steps: the vibration assembly comprises a funnel and a vibration exciter, and the vibration exciter is used for driving the funnel to vibrate; the conveying pipeline comprises a first connecting pipe, a second connecting pipe and a third connecting pipe which are sequentially communicated, the second connecting pipe is communicated with the neck of the funnel, the first connecting pipe and the third connecting pipe are respectively positioned at two sides of the neck of the funnel, a first fan is arranged in the first connecting pipe, and a flow dividing piece is arranged at the joint of the second connecting pipe and the third connecting pipe; the spraying assembly comprises a second fan, the second fan is located beside the end portion, far away from the second connecting pipe, of the third connecting pipe, and the second fan is used for blowing the balloon sliding out of the third connecting pipe. The utility model discloses can replace the manual work to throw and put, reduce the cost of labor, improve the flexibility ratio of training.

Description

一种气球喷射装置A balloon ejection device

技术领域technical field

本实用新型涉及训练用品技术领域,具体而言,涉及一种气球喷射装置。The utility model relates to the technical field of training supplies, in particular to a balloon jetting device.

背景技术Background technique

当前公安民警进行气球靶训练时,气球靶的使用依旧停留在依靠人力完成气球空气填充、放置气球等步骤的阶段,而训练时需要配备专门的人工对气球进行抛放以达到气球靶训练的目的,一方面浪费人力,提高了人工成本,另一方面,由于训练时需要人工对气球进行抛放,难以灵活实现单人训练。At present, when the public security police conduct balloon target training, the use of balloon targets still remains at the stage of relying on manpower to complete the steps of balloon air filling and balloon placement, while training needs to be equipped with special personnel to throw the balloons to achieve the purpose of balloon target training. On the one hand, it wastes manpower and increases labor costs. On the other hand, it is difficult to flexibly implement single-person training because the balloon needs to be manually thrown during training.

实用新型内容Utility model content

本实用新型提供了一种气球喷射装置,通过设置振动组件、输送管道以及喷射组件相互配合,将充好气的气球依次抛放,替代人工进行抛放,减少人工成本,提高训练的灵活度。The utility model provides a balloon ejection device. By arranging vibrating components, conveying pipes and ejecting components to cooperate with each other, the inflated balloons are thrown in sequence, instead of manual throwing, labor costs are reduced, and training flexibility is improved.

本实用新型通过下述技术方案实现:The utility model is realized through the following technical solutions:

一种气球喷射装置,包括:振动组件,震动组件包括漏斗和激振器,激振器用于驱动漏斗震动;输送管道,输送管道包括依次连通的第一连接管、第二连接管以及第三连接管,第二连接管与漏斗的颈部连通,第一连接管与第三连接管分别位于漏斗的颈部两侧,第一连接管中安装有第一风机,第二连接管和第三连接管的连接处设置有分流件;喷射组件,喷射组件包括第二风机,第二风机位于第三连接管远离第二连接管的端部旁,第二风机用于吹动从第三连接管中滑出的气球。A balloon injection device, comprising: a vibration component, the vibration component includes a funnel and a vibration exciter, and the vibration exciter is used to drive the funnel to vibrate; a conveying pipe, the conveying pipe includes a first connecting pipe, a second connecting pipe and a third connecting pipe which are connected in sequence The second connecting pipe communicates with the neck of the funnel, the first connecting pipe and the third connecting pipe are respectively located on both sides of the neck of the funnel, the first connecting pipe is installed with a first fan, and the second connecting pipe and the third connecting pipe are connected The connection of the pipes is provided with a diverter; the spray assembly includes a second fan, the second fan is located beside the end of the third connecting pipe away from the second connecting pipe, and the second fan is used to blow air from the third connecting pipe Balloons that slide out.

在上述技术方案中,将充好气的气球从漏斗开口放入,激振器带动漏斗震动,气球从漏斗颈部进入到第二连接管中,第一风机吹动气球运输,经由分流器一个一个进入到第三连接管,从第三连接管出来后,由第二风机吹动气球,达到人工抛放的效果,无需人工进行抛放,解放人力,提高装置整体使用的灵活度。In the above technical solution, the inflated balloons are put into the opening of the funnel, the vibration exciter drives the funnel to vibrate, the balloons enter the second connecting pipe from the neck of the funnel, the first blower blows the balloons for transportation, and one by one via the shunt After entering the third connecting pipe, after coming out of the third connecting pipe, the balloon is blown by the second fan to achieve the effect of manual throwing, without manual throwing, liberating manpower and improving the overall use flexibility of the device.

进一步的,第二连接管上表面设置有连接口,漏斗的颈部端口位于连接口中,第二连接管的轴线与水平面具有一定夹角,第二连接管远离第一连接管的端部朝着远离漏斗的方向倾斜,漏斗的进步与连接口之间灵活连接,便于漏斗的震动。Further, the upper surface of the second connecting pipe is provided with a connecting port, the neck port of the funnel is located in the connecting port, the axis of the second connecting pipe has a certain angle with the horizontal plane, and the end of the second connecting pipe far away from the first connecting pipe faces toward the connecting port. The direction away from the funnel is inclined, and the progress of the funnel is flexibly connected with the connection port, which is convenient for the vibration of the funnel.

进一步的,第三连接管倾斜设置,且第三连接管的轴线位于第二连接管的轴线延长线远离漏斗的一侧;第三连接管包括朝着远离第三连接管轴线方向隆起的隆起部,隆起部位于第三连接管远离漏斗的一侧;分流件安装在隆起部的内侧壁上;分流件在隆起部中,不会影响到气球本身的运输通道,还能够对气球起到分流作用。Further, the third connecting pipe is arranged obliquely, and the axis of the third connecting pipe is located on the side of the extension line of the axis of the second connecting pipe away from the funnel; , the bulge is located on the side of the third connecting pipe away from the funnel; the shunt is installed on the inner side wall of the bulge; the shunt is in the bulge, it will not affect the transportation channel of the balloon itself, and can also divert the balloon. .

进一步的,分流件包括风车和转轴,转轴转动连接在隆起部内侧壁上,输送管道外设置有电机与转轴同轴固定连接,风车套设固定在转轴外,且与转轴同轴设置,电机能够驱动风车在隆起部内转动。Further, the diverter includes a windmill and a rotating shaft, the rotating shaft is rotatably connected to the inner side wall of the bulge, a motor is arranged outside the conveying pipe and is coaxially and fixedly connected to the rotating shaft, the windmill is sleeved and fixed outside the rotating shaft, and is coaxially arranged with the rotating shaft, and the motor can The driven windmill rotates within the bulge.

进一步的,风车具有四个叶片,任意相邻两个叶片之间的夹角为90度,风车未转动时,气球位于风车叶片上方,风车转动时,位于叶片上方的气球随着风车的转动掉落,同时,有新的气球重新输送到风车叶片上。Further, the windmill has four blades, and the angle between any two adjacent blades is 90 degrees. When the windmill is not rotating, the balloon is located above the windmill blades. When the windmill is rotating, the balloon located above the blades falls off with the rotation of the windmill. At the same time, new balloons are re-delivered to the windmill blades.

进一步的,风车的叶片为采用橡胶或硅胶材料制作的片状结构,避免叶片太硬戳破气球。Further, the blade of the windmill is a sheet-like structure made of rubber or silicone material to prevent the blade from being too hard to puncture the balloon.

进一步的,输送管道还包括与第三连接管连通的第四连接管,第三连接管端部与第四连接管的连接位置位于第四连接管侧壁;第二风机设置在第四连接管的任一端部,第二风机的出风方向与第四连接管的轴线相同。Further, the conveying pipeline also includes a fourth connecting pipe that communicates with the third connecting pipe, and the connection position between the end of the third connecting pipe and the fourth connecting pipe is located on the side wall of the fourth connecting pipe; the second fan is arranged on the fourth connecting pipe. At either end of the second fan, the air outlet direction of the second fan is the same as the axis of the fourth connecting pipe.

进一步的,第四连接管端部还设置有红外感应器,红外感应器位于第二风机旁,红外感应器与第二风机信号连接,通过红外感应器控制第二风机的启动。Further, the end of the fourth connecting pipe is also provided with an infrared sensor, the infrared sensor is located beside the second fan, the infrared sensor is signally connected to the second fan, and the start of the second fan is controlled by the infrared sensor.

进一步的,第四连接管的轴线与漏斗的轴线平行设置,且第二风机和漏斗分别位于第二连接管两侧。Further, the axis of the fourth connecting pipe is arranged in parallel with the axis of the funnel, and the second fan and the funnel are respectively located on both sides of the second connecting pipe.

进一步的,还包括安装架,漏斗架设在安装架上,激振器固定在安装架上,输送管道与安装架固定设置。Further, it also includes an installation frame, the funnel is erected on the installation frame, the vibration exciter is fixed on the installation frame, and the conveying pipeline is fixedly arranged with the installation frame.

本实用新型与现有技术相比,具有如下的优点和有益效果:Compared with the prior art, the utility model has the following advantages and beneficial effects:

本实用新型通过设置震动组件,将多个气球一次通过漏斗颈部输送到输送管道中,使得气球一个个顺序排列在输送管道中,并由分流件和震动组件进行配合,使得风机一次只吹动一个气球,达成一次抛放一个气球的目的,便于进行气球靶训练,无需人工对气球进行抛放,减少人力成本,单人也能使用该设备进行训练,提高训练灵活度。In the utility model, a plurality of balloons are transported into the conveying pipeline through the funnel neck at one time by setting the vibration component, so that the balloons are sequentially arranged in the conveying pipeline, and the diverter and the vibration component cooperate with each other, so that the fan only blows at a time One balloon can achieve the purpose of throwing one balloon at a time, which is convenient for balloon target training, without the need to manually throw the balloons, reducing labor costs, and a single person can also use the equipment for training, improving training flexibility.

附图说明Description of drawings

为了更清楚地说明本实用新型示例性实施方式的技术方案,下面将对实施例中所需要使用的附图作简单地介绍,应当理解,以下附图仅示出了本实用新型的某些实施例,因此不应被看作是对范围的限定,对于本领域普通技术人员来讲,在不付出创造性劳动的前提下,还可以根据这些附图获得其他相关的附图。In order to illustrate the technical solutions of the exemplary embodiments of the present invention more clearly, the accompanying drawings required in the embodiments will be briefly introduced below. It should be understood that the following drawings only illustrate some implementations of the present invention. For example, therefore, it should not be regarded as a limitation of the scope. For those of ordinary skill in the art, other related drawings can also be obtained from these drawings without any creative effort.

图1为本实用新型的整体结构图一;Fig. 1 is the overall structure diagram one of the utility model;

图2为本实用新型的整体结构图二;Fig. 2 is the overall structure diagram two of the utility model;

图3为本实用新型的整体结构图三;Fig. 3 is the overall structure diagram three of the utility model;

图4为本实用新型的整体结构图四;Fig. 4 is the overall structure diagram four of the utility model;

图5为本实用新型的漏斗和连接口结构图。Fig. 5 is the structure diagram of the funnel and the connection port of the utility model.

附图中标记及对应的零部件名称:The marks in the attached drawings and the corresponding parts names:

101-漏斗,102-激振器,201-第一连接管,202-第二连接管,203-第三连接管,204-第四连接管,3-第一风机,4-分流件,501-第二风机,502-红外感应器,6-气球,7-连接口,8-隆起部,9-安装架。101-Funnel, 102-Exciter, 201-First connecting pipe, 202-Second connecting pipe, 203-Third connecting pipe, 204-Fourth connecting pipe, 3-First fan, 4-Diverting piece, 501 -The second fan, 502-infrared sensor, 6-balloon, 7-connection port, 8-protrusion, 9-mounting frame.

具体实施方式Detailed ways

为使本实用新型的目的、技术方案和优点更加清楚明白,下面结合实施例和附图,对本实用新型作进一步的详细说明,本实用新型的示意性实施方式及其说明仅用于解释本实用新型,并不作为对本实用新型的限定。In order to make the purpose, technical solutions and advantages of the present utility model clearer, the present utility model will be described in further detail below in conjunction with the embodiments and the accompanying drawings. The invention is not intended to limit the present invention.

在以下描述中,为了提供对本实用新型的透彻理解阐述了大量特定细节。然而,对于本领域普通技术人员显而易见的是:不必采用这些特定细节来实行本实用新型。在其他实施例中,为了避免混淆本实用新型,未具体描述公知的结构、电路、材料或方法。In the following description, numerous specific details are set forth in order to provide a thorough understanding of the present invention. It will be apparent, however, to one of ordinary skill in the art that these specific details need not be employed to practice the present invention. In other instances, well-known structures, circuits, materials or methods have not been described in detail in order to avoid obscuring the present invention.

在整个说明书中,对“一个实施例”、“实施例”、“一个示例”或“示例”的提及意味着:结合该实施例或示例描述的特定特征、结构或特性被包含在本实用新型至少一个实施例中。因此,在整个说明书的各个地方出现的短语“一个实施例”、“实施例”、“一个示例”或“示例”不一定都指同一实施例或示例。此外,可以以任何适当的组合和、或子组合将特定的特征、结构或特性组合在一个或多个实施例或示例中。此外,本领域普通技术人员应当理解,在此提供的示图都是为了说明的目的,并且示图不一定是按比例绘制的。这里使用的术语“和/或”包括一个或多个相关列出的项目的任何和所有组合。Throughout this specification, references to "one embodiment," "an embodiment," "an example," or "an example" mean that a particular feature, structure, or characteristic described in connection with the embodiment or example is included in the present invention Novel at least one embodiment. Thus, appearances of the phrases "one embodiment," "an embodiment," "one example," or "an example" in various places throughout this specification are not necessarily all referring to the same embodiment or example. Furthermore, the particular features, structures or characteristics may be combined in any suitable combination and/or subcombination in one or more embodiments or examples. Furthermore, those of ordinary skill in the art will appreciate that the drawings provided herein are for illustrative purposes and that the drawings are not necessarily drawn to scale. As used herein, the term "and/or" includes any and all combinations of one or more of the associated listed items.

在本实用新型的描述中,术语“前”、“后”、“左”、“右”、“上”、“下”、“竖直”、“水平”、“高”、“低”“内”、“外”等指示的方位或位置关系为基于附图所示的方位或位置关系,仅是为了便于描述本实用新型和简化描述,而不是指示或暗示所指的装置或元件必须具有特定的方位、以特定的方位构造和操作,因此不能理解为对本实用新型保护范围的限制。In the description of the present invention, the terms "front", "rear", "left", "right", "upper", "lower", "vertical", "horizontal", "high", "low"" The orientation or positional relationship indicated by "inside", "outside", etc. is based on the orientation or positional relationship shown in the drawings, and is only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the indicated device or element must have A specific orientation, construction and operation in a specific orientation should not be construed as a limitation on the scope of protection of the present invention.

实施例Example

本实施例提供了一种气球6喷射装置,如图1到图5所示,包括:振动组件,震动组件包括漏斗101和激振器102,激振器102用于驱动漏斗101震动;输送管道,输送管道包括依次连通的第一连接管201、第二连接管202以及第三连接管203,第二连接管202与漏斗101的颈部连通,第一连接管201与第三连接管203分别位于漏斗101的颈部两侧,第一连接管201中安装有第一风机3,第二连接管202和第三连接管203的连接处设置有分流件4;喷射组件,喷射组件包括第二风机501,第二风机501位于第三连接管203远离第二连接管202的端部旁,第二风机501用于吹动从第三连接管203中滑出的气球6。This embodiment provides a balloon 6 ejection device, as shown in FIG. 1 to FIG. 5 , including: a vibration component, the vibration component includes a funnel 101 and a vibration exciter 102, and the vibration exciter 102 is used to drive the funnel 101 to vibrate; a conveying pipeline , the conveying pipeline includes a first connecting pipe 201, a second connecting pipe 202 and a third connecting pipe 203 which are connected in sequence, the second connecting pipe 202 is communicated with the neck of the funnel 101, and the first connecting pipe 201 and the third connecting pipe 203 are respectively Located on both sides of the neck of the funnel 101, a first fan 3 is installed in the first connecting pipe 201, and a diverter 4 is provided at the connection between the second connecting pipe 202 and the third connecting pipe 203; the spraying assembly includes a second The blower 501 and the second blower 501 are located beside the end of the third connection pipe 203 away from the second connection pipe 202 , and the second blower 501 is used to blow the balloon 6 sliding out of the third connection pipe 203 .

气球6靶训练训练时,需要将气球6一个个抛出,便于公安民警进行训练,使用本实施例提供的装置,将充好气的气球6放入到漏斗101中后,气球6将依次从第三连接管203的端口输出,由第二风机501将气球6吹到空中,便于进行训练,解放了双手,节约了人力成本,并且,即使只有一个人也能够进行训练,提高训练的灵活度。During the training and training of the balloon 6 targets, the balloons 6 need to be thrown out one by one, which is convenient for the public security police to carry out training. Using the device provided in this embodiment, after putting the inflated balloons 6 into the funnel 101, the balloons 6 will be sequentially The second fan 501 blows the balloon 6 into the air from the port output of the three connecting pipes 203, which facilitates training, frees hands, saves labor costs, and even only one person can perform training, improving the flexibility of training.

在本实施例中,还设置了安装架9,安装架9直接作为安装的基础平台,漏斗101直接架设在安装架9上,漏斗101的大口径端面边沿连接了挂耳,便于挂接在安装架9上,激振器102固定在安装架9上,激振器102的凸轮与漏斗101外侧壁接触,通过转轴驱动凸轮运动从而驱动漏斗101进行震动,漏斗101的颈部口径略大于气球6的横向宽度,小于气球6的竖向宽度,使得气球6只能沿竖直方向从漏斗101颈部落入到第二连接管202中。In this embodiment, a mounting frame 9 is also provided, the mounting frame 9 is directly used as the basic platform for installation, the funnel 101 is directly erected on the mounting frame 9, and the edge of the large-diameter end face of the funnel 101 is connected with hanging ears, which is convenient for hanging on the installation On the frame 9, the vibration exciter 102 is fixed on the mounting frame 9, the cam of the vibration exciter 102 is in contact with the outer wall of the funnel 101, and the cam is driven by the rotating shaft to drive the funnel 101 to vibrate. The diameter of the neck of the funnel 101 is slightly larger than that of the balloon 6. The lateral width of , is smaller than the vertical width of the balloon 6 , so that the balloon 6 can only fall into the second connecting pipe 202 from the neck of the funnel 101 in the vertical direction.

第二连接管202上表面设置有连接口7,如图5所示,漏斗101的颈部端口位于连接口7中,漏斗101的颈部与连接口7仅是接触连接,不会影响到漏斗101的震动,第二连接管202的轴线与水平面具有一定夹角,第二连接管202远离第一连接管201的端部朝着远离漏斗101的方向倾斜,便于气球6朝着第二连接管202的另一端输送,同时,位于第一连接管201中的第一风机3还朝着第二连接管202的轴线方向吹风,气球6在第一风机3以及重力的作用下会朝着第三连接管203移动。A connecting port 7 is provided on the upper surface of the second connecting pipe 202. As shown in FIG. 5, the neck port of the funnel 101 is located in the connecting port 7, and the neck of the funnel 101 is only in contact with the connecting port 7, which will not affect the funnel. 101 vibration, the axis of the second connecting pipe 202 has a certain angle with the horizontal plane, and the end of the second connecting pipe 202 away from the first connecting pipe 201 is inclined in the direction away from the funnel 101, which is convenient for the balloon 6 to move toward the second connecting pipe The other end of 202 is transported, and at the same time, the first fan 3 located in the first connecting pipe 201 is also blowing toward the axis of the second connecting pipe 202, and the balloon 6 will move toward the third under the action of the first fan 3 and gravity. The connecting pipe 203 moves.

第三连接管203倾斜设置,且第三连接管203的轴线位于第二连接管202的轴线延长线远离漏斗101的一侧,第三连接管203的倾斜程度大于第二连接管202的倾斜成都;第三连接管203包括朝着远离第三连接管203轴线方向隆起的隆起部8,隆起部8位于第三连接管203远离漏斗101的一侧;分流件4安装在隆起部8的内侧壁上;分流件4在隆起部8中,不会影响到气球6本身的运输通道,还能够对气球6起到分流作用,从第二连接管202移动过来的气球6在分流件4的作用下一个个落入第三连接管203。The third connecting pipe 203 is arranged obliquely, and the axis of the third connecting pipe 203 is located on the side of the extension line of the axis of the second connecting pipe 202 away from the funnel 101 , and the inclination of the third connecting pipe 203 is greater than that of the second connecting pipe 202 The third connecting pipe 203 includes a bulge 8 that is raised in the direction away from the axis of the third connecting pipe 203, and the bulge 8 is located on the side of the third connecting pipe 203 away from the funnel 101; The diverter 4 is in the raised portion 8, which will not affect the transportation channel of the balloon 6 itself, and can also play a diverting effect on the balloon 6. The balloon 6 moved from the second connecting pipe 202 is under the action of the diverter 4. One by one falls into the third connecting pipe 203 .

分流件4包括风车和转轴,转轴转动连接在隆起部8内侧壁上,输送管道外设置有电机与转轴同轴固定连接,风车套设固定在转轴外,且与转轴同轴设置,电机能够驱动风车在隆起部8内转动,电机安装在输送管道的外侧壁上或者是安装架9上均可,风车在转轴的驱动下进行转动,风车具有四个叶片,任意相邻两个叶片之间的夹角为90度,初始位置,风车未转动时,风车其中一个叶片与第二连接管202的轴线齐平,且该叶片位于第二连接管202远离漏斗101的一侧,不会影响到气球6本身的运输通道,气球6在重力和第一风机3的吹动下移动,会移动到该叶片上方,抵接在另一个叶片上,如图1所示,由于下方叶片的存在,气球6也不会直接落入到第三连接管203中,需要注意的时,气球6下方的叶片端部与第三连接管203和第二连接管202的内侧连接处具有一定间隙,这是为了方便叶片转动时气球6能够快速落入到第三连接管203中,当电机带动风车转动时,过程图如图1到图4所示,下方的叶片朝着第三连接管203移动,随着下方叶片的倾斜,叶片上的气球6最终落入到第三连接管203中,而原来该气球6抵接的叶片则转动90度角,也会有新的气球6运输到该叶片上方,完成一个循环。The diverter 4 includes a windmill and a rotating shaft. The rotating shaft is rotatably connected to the inner side wall of the raised portion 8. A motor is arranged outside the conveying pipe and is fixedly connected to the rotating shaft. The windmill is sleeved and fixed on the outside of the rotating shaft and is coaxially arranged with the rotating shaft. The windmill rotates in the raised part 8, and the motor can be installed on the outer side wall of the conveying pipe or on the mounting frame 9. The windmill rotates under the drive of the rotating shaft. The windmill has four blades, and the blade between any two adjacent blades is The included angle is 90 degrees. In the initial position, when the windmill is not rotating, one of the blades of the windmill is flush with the axis of the second connecting pipe 202, and the blade is located on the side of the second connecting pipe 202 away from the funnel 101, which will not affect the balloon. 6 itself in the transport channel, the balloon 6 moves under the force of gravity and the blowing of the first fan 3, and will move to the top of the blade, abutting on another blade, as shown in Figure 1, due to the existence of the lower blade, the balloon 6 It will not directly fall into the third connecting pipe 203. It should be noted that there is a certain gap between the end of the blade under the balloon 6 and the inner connecting point of the third connecting pipe 203 and the second connecting pipe 202. This is for convenience. When the blade rotates, the balloon 6 can quickly fall into the third connecting pipe 203. When the motor drives the windmill to rotate, the process diagrams are shown in Figures 1 to 4. With the inclination of the blade, the balloon 6 on the blade finally falls into the third connecting pipe 203, and the blade that originally abutted the balloon 6 rotates at an angle of 90 degrees, and a new balloon 6 will be transported above the blade to complete a cycle.

风车的叶片为采用橡胶或硅胶材料制作的片状结构,避免叶片太硬戳破气球6。The blade of the windmill is a sheet-like structure made of rubber or silicone material to prevent the blade from being too hard and puncturing the balloon 6 .

为了最后第二风机501能够更好更准确地吹动气球6,设置与第三连接管203连通的第四连接管204,第四连接管204也安装在安装架9上,第三连接管203端部与第四连接管204的连接位置位于第四连接管204侧壁;第二风机501设置在第四连接管204的任一端部,第二风机501的出风方向与第四连接管204的轴线相同,当气球6从第三连接管203中出来时,第二风机501朝着气球6吹风,将气球6从第四连接管204的另一端吹出,此时则可开始训练。In order for the second fan 501 to blow the balloon 6 better and more accurately, a fourth connection pipe 204 is provided which communicates with the third connection pipe 203. The fourth connection pipe 204 is also installed on the mounting frame 9, and the third connection pipe 203 The connection position between the end portion and the fourth connecting pipe 204 is located on the side wall of the fourth connecting pipe 204; When the balloon 6 comes out of the third connecting pipe 203, the second fan 501 blows air toward the balloon 6, blowing the balloon 6 out from the other end of the fourth connecting pipe 204, and then the training can be started.

为了整体装置的顺畅性,第四连接管204端部还设置有红外感应器502,红外感应器502位于第二风机501旁,红外感应器502与第二风机501信号连接,通过红外感应器502控制第二风机501的启动,红外感应器502感应到气球6存在时,将会启动第二风机501;同时,第三连接管203和第二连接管202的连接部位也可设置与电机连接的红外感应器502,检测到叶片上方有气球6时则可启动电机。For the smoothness of the whole device, the end of the fourth connecting pipe 204 is also provided with an infrared sensor 502 , the infrared sensor 502 is located next to the second fan 501 , and the infrared sensor 502 is signally connected to the second fan 501 through the infrared sensor 502 Control the start of the second fan 501, when the infrared sensor 502 senses the existence of the balloon 6, it will start the second fan 501; at the same time, the connection part of the third connecting pipe 203 and the second connecting pipe 202 can also be set to be connected to the motor. The infrared sensor 502 can start the motor when it detects that there is a balloon 6 above the blade.

为了便于使用,第四连接管204的轴线与漏斗101的轴线平行设置,且第二风机501和漏斗101分别位于第二连接管202两侧,本实施例中,漏斗101与第四连接管204的出口在上方,便于气球6从下往上被吹出。For ease of use, the axis of the fourth connecting pipe 204 is parallel to the axis of the funnel 101, and the second fan 501 and the funnel 101 are located on both sides of the second connecting pipe 202, respectively. In this embodiment, the funnel 101 and the fourth connecting pipe 204 The outlet is above, which is convenient for the balloon 6 to be blown out from bottom to top.

使用本实用新型提供的设备时,首先需要准备多个充好气的气球6,在进行气球6靶训练时,将多个气球6装入到漏斗101中,然后启动装置的整体开关,气球6在漏斗101的震动下一个个输入到第二连接管202中,在第二连接管202端部由分流件4进行分隔落入第三连接管203,再从第三连接管203的端部落入到第四连接管204,第二风机501朝着气球6吹风,将气球6吹出第四连接管204,供进行气球6靶训练。When using the equipment provided by the present invention, it is necessary to prepare a plurality of inflated balloons 6 first. When carrying out balloon 6 target training, a plurality of balloons 6 are loaded into the funnel 101, and then the overall switch of the device is activated, and the balloons 6 are in the funnel 101. The vibration of the funnel 101 is input into the second connecting pipe 202 one by one, and the end of the second connecting pipe 202 is divided by the diverter 4 and falls into the third connecting pipe 203, and then falls into the third connecting pipe 203 from the end of the third connecting pipe 203. In the fourth connecting pipe 204, the second fan 501 blows air toward the balloon 6, and blows the balloon 6 out of the fourth connecting pipe 204, for the training of the balloon 6 target.

以上所述的具体实施方式,对本实用新型的目的、技术方案和有益效果进行了进一步详细说明,所应理解的是,以上所述仅为本实用新型的具体实施方式而已,并不用于限定本实用新型的保护范围,凡在本实用新型的精神和原则之内,所做的任何修改、等同替换、改进等,均应包含在本实用新型的保护范围之内。The specific embodiments described above further describe the purpose, technical solutions and beneficial effects of the present invention in detail. It should be understood that the above are only specific embodiments of the present invention and are not intended to limit the present invention The protection scope of the utility model, any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present utility model shall be included within the protection scope of the present utility model.

Claims (10)

1. A balloon injection apparatus, comprising:
the vibration assembly comprises a funnel (101) and an exciter (102), and the exciter (102) is used for driving the funnel (101) to vibrate;
the conveying pipeline comprises a first connecting pipe (201), a second connecting pipe (202) and a third connecting pipe (203) which are sequentially communicated, the second connecting pipe (202) is communicated with the neck of the funnel (101), the first connecting pipe (201) and the third connecting pipe (203) are respectively positioned on two sides of the neck of the funnel (101), a first fan (3) is installed in the first connecting pipe (201), and a flow dividing piece (4) is arranged at the joint of the second connecting pipe (202) and the third connecting pipe (203);
the spraying assembly comprises a second fan (501), the second fan (501) is located beside the end, away from the second connecting pipe (202), of the third connecting pipe (203), and the second fan (501) is used for blowing the balloon (6) sliding out of the third connecting pipe (203).
2. A balloon injecting apparatus as claimed in claim 1, wherein the side wall of said second connecting tube (202) is provided with a connecting port (7), the neck port of said funnel (101) is located in said connecting port (7), the axis of said second connecting tube (202) is at an angle to the horizontal, and the end of said second connecting tube (202) remote from said first connecting tube (201) is inclined in a direction away from said funnel (101).
3. A balloon injecting apparatus as claimed in claim 2, wherein said third connecting tube (203) is disposed obliquely, and an axis of said third connecting tube (203) is located on a side of an axis extension of said second connecting tube (202) away from said funnel (101); the third connecting pipe (203) comprises a raised part (8) raised towards the direction far away from the axis of the third connecting pipe (203), and the raised part (8) is positioned on the side, far away from the funnel (101), of the third connecting pipe (203); the flow divider (4) is mounted on the inner side wall of the bulge (8).
4. A balloon spraying device as claimed in claim 3, wherein the diversion member (4) comprises a windmill and a rotating shaft, the rotating shaft is rotatably connected to the inner side wall of the raised part (8), a motor is arranged outside the delivery pipe and is coaxially and fixedly connected with the rotating shaft, the windmill sleeve is fixed outside the rotating shaft and is coaxially arranged with the rotating shaft, and the motor can drive the windmill to rotate in the raised part (8).
5. A balloon spraying apparatus as claimed in claim 4, wherein the windmill has four vanes, and the included angle between any two adjacent vanes is 90 degrees.
6. A balloon spraying apparatus as claimed in claim 4, wherein the vanes of the windmill are of sheet-like construction made of rubber or silicone material.
7. A balloon injecting apparatus as claimed in claim 3, wherein said delivery pipe further comprises a fourth connecting pipe (204) communicating with said third connecting pipe (203), and a connecting position of an end of said third connecting pipe (203) and said fourth connecting pipe (204) is located on a side wall of said fourth connecting pipe (204);
the second fan (501) is arranged at any end of the fourth connecting pipe (204), and the air outlet direction of the second fan (501) is the same as the axis of the fourth connecting pipe (204).
8. The balloon spraying device according to claim 7, characterized in that an infrared sensor (502) is further arranged at the end of the fourth connecting pipe (204), the infrared sensor (502) is located beside the second fan (501), and the infrared sensor (502) is in signal connection with the second fan (501).
9. A balloon launching device according to claim 8 characterised in that the axis of the fourth connecting tube (204) is arranged parallel to the axis of the funnel (101) and the second fan (501) and the funnel (101) are located on either side of the second connecting tube (202).
10. A balloon spraying apparatus as claimed in claim 9, further comprising a mounting frame (9), wherein the funnel (101) is mounted on the mounting frame (9), the exciter (102) is fixed to the mounting frame (9), and the delivery conduit is fixedly arranged with the mounting frame (9).
CN202221446340.3U 2022-06-10 2022-06-10 Balloon injection device Expired - Fee Related CN217403274U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202221446340.3U CN217403274U (en) 2022-06-10 2022-06-10 Balloon injection device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202221446340.3U CN217403274U (en) 2022-06-10 2022-06-10 Balloon injection device

Publications (1)

Publication Number Publication Date
CN217403274U true CN217403274U (en) 2022-09-09

Family

ID=83147930

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202221446340.3U Expired - Fee Related CN217403274U (en) 2022-06-10 2022-06-10 Balloon injection device

Country Status (1)

Country Link
CN (1) CN217403274U (en)

Similar Documents

Publication Publication Date Title
US4207857A (en) Automatic ball server
US4858921A (en) Ball suspending apparatus and method
CN217403274U (en) Balloon injection device
CN109453585B (en) An environmentally friendly fog cannon dust removal device for pumping water through equipment and a pump
CN204364843U (en) A kind of table tenning ball servicing machine of rotary steerable
CN100525920C (en) Method and equipment for air-flow type ore-discharging for centrifugal ore-dressing machine
CN211904581U (en) Device for enabling condom to be sleeved before electric examination rod to have gesture consistency
CN209631519U (en) It is a kind of for producing the glue-spraying mechanism of glass ceiling
CN220671230U (en) Sand blown by wind test device
CN109453584B (en) Environment-friendly fog gun dust removal device
CN208003402U (en) A kind of table tennis practising device material
CN218838252U (en) Special granulation compounding equipment of sealing strip
CN207614303U (en) Pneumatic table tenning ball servicing machine
US6830044B2 (en) Pneumatic ball projecting apparatus
CN110593538A (en) Novel spraying direction gradual change type mortar throwing and ejecting device
CN212714279U (en) Pulp conveying device for paper core tube production
CN109772606B (en) Iron handicraft paint spraying device
CN214323056U (en) High-pressure water jet metal surface treatment device
CN207203383U (en) A kind of exhausting, which is inhaled, plays device
CN220057599U (en) Scribing device for highway construction
CN223626382U (en) A fertilizer spraying machine
CN217391541U (en) Badminton-footwork-based pitching machine for consistency training
CN218871220U (en) Football catapulting device for training goalkeeper reaction capability
CN118220695B (en) Rotatable air shower nozzle mechanism of ash bin anti-caking
CN222918070U (en) Adjustable table tennis trainer

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20220909

CF01 Termination of patent right due to non-payment of annual fee