Multifunctional single-phase intelligent electric energy meter
Technical Field
The utility model relates to a power supply facility technical field, in particular to multi-functional single-phase intelligent electric energy meter.
Background
The single-phase electronic type intelligent electric meter used in a large area only has an electric energy metering function, a data recording function and a data transmission function, and the electric energy meter only meters on a phase line side, so that the function is simple. The common patent application at present is the electric energy meter for preventing electricity stealing, which is to add the function of preventing electricity stealing on the basis of the common electric energy meter, but the function is still simpler.
In the prior art, the client side behavior characteristics are considered in fewer layers: when no leakage protector is installed at the client side, the electricity utilization safety of the client cannot be guaranteed; when the client side leaks electricity, is short-circuited and is grounded, the large loss of the client electricity charge cannot be avoided; when the client side is suddenly short-circuited and grounded, the electric energy meter cannot play a role in protecting the client assets and the electric energy meter per se; the electricity stealing by zero at the client side cannot be avoided; the phenomenon of burning of the metering assets caused by overlarge current at the client side or infirm crimping of the meter tail wire cannot be avoided.
SUMMERY OF THE UTILITY MODEL
The utility model discloses a remedy prior art's defect, provide a multi-functional single-phase intelligent electric energy meter that easy operation, accuracy are high.
The utility model discloses a realize through following technical scheme:
a multifunctional single-phase intelligent electric energy meter comprises a meter box and is characterized in that a central processing unit, a phase line terminal I, a phase line terminal II, a zero line terminal I and a zero line terminal II are arranged in the meter box, a phase line connecting wire is arranged between the phase line terminal I and the phase line terminal II, a zero line connecting wire is arranged between the zero line terminal I and the zero line terminal II, and a current measuring unit and a circuit breaker are arranged on each of the phase line connecting wire and the zero line connecting wire; and temperature sensors are arranged beside the phase line terminal I, the phase line terminal II, the zero line terminal I and the zero line terminal II, and the temperature sensors, the circuit breaker and the current measuring unit are respectively connected with the central processing unit through signal transmission lines.
The current measuring unit comprises a current transformer sleeved on the phase line connecting wire or the zero line connecting wire, the current transformer is electrically connected with the analog-to-digital conversion chip, and the analog-to-digital conversion chip is electrically connected with the central processing unit.
And the first phase line terminal and the second phase line terminal are respectively connected with phase lines.
And the first zero line terminal and the second zero line terminal are respectively connected with a zero line.
The beneficial effects of the utility model are that:
1. the utility model discloses set up current measurement unit and circuit breaker on phase line connecting wire and the terminal connecting wire respectively, current measurement unit measured data transmits for central processing unit, carries out data calculation. The CPU makes a judgment according to the current measurement value, can control the action of the circuit breaker and can also carry out data communication with other units. The current measuring unit is intended to measure the current and the circuit breaker is intended to control the circuit to open.
2. The utility model can realize leakage protection and electricity larceny prevention; when the line on the client side leaks electricity, the phase line current and the zero line current are unequal in size, the central processing unit sends a signal to the background base station to prompt background workers, and meanwhile, the circuit breaker is turned off.
3. The utility model discloses can realize overflowing quick-break protect function: when a client side is in short circuit or grounded, at least one phase value of phase line current and zero line current is large (for example, larger than 30A), at the moment, the client side can be judged to have serious circuit fault, and when the current duration reaches a certain time (for example, 2 seconds), the central processing unit commands the circuit breaker to work, the power supply is disconnected, and meanwhile, a signal is sent to the background base station to prompt background workers. The current fixed value and the duration set value of the function can be opened to a client, and can be freely adjusted according to the self power utilization condition. The function can also prevent the burning phenomenon of the metering assets caused by overlarge current.
4. The utility model discloses can realize the charges of electricity protect function: due to various reasons, the electric quantity of a client is suddenly increased to reach a set value (for example, 50 kWh/day), the central processing unit controls the circuit breaker to work, the power supply is disconnected, and meanwhile, a signal is sent to the background base station to prompt background workers. The set value of the function can be opened to the client and can be freely adjusted according to the self power utilization condition. The loss of electricity charge due to short circuit, grounding, electric leakage and the like is prevented.
5. The utility model discloses can realize temperature protect function: when 4 terminals (two phase line terminals and two zero line terminals) are not firmly connected with the pressure welding lead, a heating phenomenon can be generated. The problem is hidden and difficult to be found by people. And in case this problem appears, causes the ammeter body to burn out easily, and serious easily arouses ammeter case to catch fire, and the normal operating of low-voltage equipment such as other electric energy meters causes great loss. The utility model discloses set up temperature sensor near 4 terminals, when 4 terminal temperature reached the setting value (for example 70 degrees centigrade), central processing unit control circuit breaker open circuit to send the message to the back platform, remind the staff to handle.
Drawings
The invention will be further described with reference to the accompanying drawings:
FIG. 1 is a schematic sectional view of the present invention;
fig. 2 is a schematic structural diagram of the current measuring unit.
In the figure, a meter box 1, a central processing unit 2, a temperature sensor 3, a first 4-phase terminal, a second 5-phase terminal, a first 6-zero line terminal, a second 7-zero line terminal, a current transformer 8, an analog-to-digital conversion chip 9, a circuit breaker 10, a phase line connecting line 11, a zero line connecting line 12, a signal transmission line 13, a phase line 14 and a zero line 15 are arranged.
Detailed Description
The attached drawings are specific embodiments of the invention. As shown in the figures 1 and 2, the multifunctional single-phase intelligent electric energy meter comprises a meter box 1, wherein a central processing unit 2, a phase line terminal I4, a phase line terminal II 5, a zero line terminal I6 and a zero line terminal II 7 are installed in the meter box 1, the central processing unit 2 is connected with a background base station in a remote communication mode, a temperature sensor 3 is installed beside the phase line terminal I4, the phase line terminal II 5, the zero line terminal I6 and the zero line terminal II 7 respectively, and the temperature sensor 3 is connected with the central processing unit 2 through a signal transmission line 13. A phase line connecting wire 11 is connected between the phase line terminal I4 and the phase line terminal II 5, and a current transformer 8 and a circuit breaker 10 are connected in series on the phase line connecting wire 11; a zero line connecting wire 12 is connected between the first zero line terminal 6 and the second zero line terminal 7, and a current transformer 8 and a circuit breaker 10 are also sleeved on the zero line connecting wire 12 in series; two ends of each current transformer 8 are connected to an analog-to-digital conversion chip 9 (which can also be connected through a signal line), and the current transformers 8 and the analog-to-digital conversion chips 9 form a current measuring unit; the analog-to-digital conversion chip 9 and the circuit breaker 10 are electrically connected to the central processing unit 2 through a signal transmission line 13.
The measured data of the current measuring unit is transmitted to the central processing unit 2 for data calculation. The cpu 2 makes a judgment according to the current measurement value, can control the operation of the disconnection switch 10, and can also perform data communication with other units. The current measuring unit is intended to measure the current and the disconnector 10 is intended to control the circuit to open.
Phase terminal one 4 and phase terminal two 5 are connected to phase line 14, respectively.
And the first neutral terminal 6 and the second neutral terminal 7 are respectively connected with a neutral wire 15.
After receiving the signal of the current measuring unit, the central processing unit 2 can realize the following functions after data calculation:
the utility model can realize the leakage protection and the electricity larceny prevention; when the line on the client side leaks electricity, the phase line current and the zero line current are different in size, the central processing unit sends a signal to the background base station to prompt background workers, and meanwhile, the circuit breaker is turned off.
The utility model discloses can realize overflowing quick-break protect function: when a client side is in short circuit or grounded, at least one phase of phase line current and zero line current has a large value (for example, greater than 30A), at the moment, the client side can be judged to have serious line fault, and when the current duration reaches a certain time (for example, 2 seconds), the central processing unit commands the circuit breaker to work, the power supply is disconnected, and meanwhile, a signal is sent to the background base station to prompt background workers. The current fixed value and the duration set value of the function can be opened to a client, and can be freely adjusted according to the self power utilization condition. The function can also prevent the phenomenon of burnout of metering assets caused by overlarge current.
The utility model discloses can realize the charges of electricity protect function: due to various reasons, the electric quantity of a client is suddenly increased to reach a set value (for example, 50 kWh/day), the central processing unit controls the circuit breaker to work, the power supply is disconnected, and meanwhile, a signal is sent to the background base station to prompt background workers. The set value of the function can be opened to the client and can be freely adjusted according to the self electricity utilization condition. Prevent the loss of electricity charge caused by short circuit, grounding, electric leakage and the like.
The utility model discloses can realize temperature protect function: when 4 terminals (two phase line terminals and two zero line terminals) are not firmly connected with the pressure welding lead, a heating phenomenon can be generated. The problem is hidden and difficult to be found by people. And in case this problem appears, causes the ammeter body to burn out easily, and serious easily arouses ammeter case to catch fire, and the normal operating of low-voltage equipment such as other electric energy meters causes great loss. The utility model discloses set up temperature sensor near 4 terminals, when 4 terminal temperature reached the setting value (for example 70 degrees centigrade), central processing unit control circuit breaker open circuit to send the message to the back platform, remind the staff to handle.
Other technical features than those described in the specification are known to those skilled in the art.