CN219528337U - A prefabricated stairwell assembly construction operation platform - Google Patents
A prefabricated stairwell assembly construction operation platform Download PDFInfo
- Publication number
- CN219528337U CN219528337U CN202320742842.9U CN202320742842U CN219528337U CN 219528337 U CN219528337 U CN 219528337U CN 202320742842 U CN202320742842 U CN 202320742842U CN 219528337 U CN219528337 U CN 219528337U
- Authority
- CN
- China
- Prior art keywords
- platform
- stairwell
- construction
- prefabricated
- bar
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000010276 construction Methods 0.000 title claims abstract description 52
- 239000002023 wood Substances 0.000 abstract 1
- 238000010586 diagram Methods 0.000 description 5
- 238000000034 method Methods 0.000 description 5
- 230000001174 ascending effect Effects 0.000 description 2
- 230000002787 reinforcement Effects 0.000 description 2
- 229910000831 Steel Inorganic materials 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000006073 displacement reaction Methods 0.000 description 1
- 238000009415 formwork Methods 0.000 description 1
- 238000009434 installation Methods 0.000 description 1
- 230000008569 process Effects 0.000 description 1
- 230000001681 protective effect Effects 0.000 description 1
- 230000003014 reinforcing effect Effects 0.000 description 1
- 230000008439 repair process Effects 0.000 description 1
- 239000010959 steel Substances 0.000 description 1
- 238000005728 strengthening Methods 0.000 description 1
- 230000007306 turnover Effects 0.000 description 1
Landscapes
- Steps, Ramps, And Handrails (AREA)
Abstract
Description
技术领域technical field
本申请涉及预制楼梯的楼梯间施工技术领域,尤其涉及一种预制楼梯间装配式施工操作平台。The present application relates to the technical field of stairwell construction of prefabricated staircases, in particular to an assembled construction operation platform for prefabricated stairwells.
背景技术Background technique
随着建筑行业的发展,装配式建筑得到人们的广泛认可。装配式建筑是指把传统建造方式中的大量现场作业工作转移到工厂进行,在工厂加工制作好建筑用构件和配件(如楼板、墙板、楼梯、阳台等),运输到建筑施工现场,通过可靠的连接方式在现场装配安装而成的建筑。预制楼梯是装配式建筑中常用的构件之一,预制楼梯的预制构件主要是混凝土预制踏板,平台板和支撑的结构。楼梯的主要支撑方式分为墙壁承重式,悬臂踏步式,梁承重式三种,其具有效率高、施工速度快、质量可控性高等优点。With the development of the construction industry, prefabricated buildings have been widely recognized by people. Prefabricated building refers to the transfer of a large number of on-site operations in the traditional construction method to the factory, where the building components and accessories (such as floor slabs, wall panels, stairs, balconies, etc.) are processed and manufactured in the factory, and transported to the construction site. Reliable connections are assembled and installed on site. Prefabricated stairs are one of the commonly used components in prefabricated buildings. The prefabricated components of prefabricated stairs are mainly concrete prefabricated treads, platform slabs and supporting structures. The main support methods of stairs are divided into three types: wall load-bearing type, cantilever step type and beam load-bearing type, which have the advantages of high efficiency, fast construction speed and high quality controllability.
预制楼梯装配的楼梯间如说明书附图1所示结构,楼梯间预留有上梯台阶和下梯台阶,两者均通过两侧的建筑墙体水平延伸出,并在两者的水平面上还预埋有与预制楼梯装配的高强螺栓,该建筑墙体之间围构成楼梯间。目前通过将预制的楼梯搭接在上梯台阶和下梯台阶之间并紧固,即可实现步行楼梯的快速施工成型。The stairwell assembled by the prefabricated staircase has the structure shown in Figure 1 of the instruction manual. The stairwell is reserved with steps for the upper and lower steps, both of which extend horizontally through the building walls on both sides, and are also on the horizontal plane of the two. The high-strength bolts assembled with the prefabricated stairs are pre-buried, and the walls of the building form the stairwell. At present, the rapid construction of walking stairs can be realized by lapping and fastening the prefabricated stairs between the upper and lower steps.
而从现场实际施工过程中观察发现,通常在装配式建筑中,预制楼梯往往滞后于施工作业面,有时会滞后多层,在未搭接预制楼梯的楼梯间(层)通常还需要进行其他如墙柱模板的拆除及安装、管线预留预埋、混凝土结构施工后的修补打磨等施工作业项目,而在该类施工时通常需要搭设作业平台,在现场施工中,因施工作业平台本身结构及现场条件(未搭接预制楼梯,使得楼梯间作业为高处作业)的限制,导致预制楼梯间施工作业平台存在一定的局限性和安全隐患。现在常用的施工方法有:直接搭设落地脚手架(只适用于较低楼层);或现在楼梯平台较低一侧搭设马镫,然后在搭设施工平台;或直接在脚手架上直接搭设木跳板作为施工平台;也有采用钢管斜向搭设支撑架体的方法作为操作平台等,以上作法在实际作业中均存在一定的安全隐患。From the observation of the actual construction process on site, it is generally found that in prefabricated buildings, prefabricated stairs often lag behind the construction work surface, sometimes lagging behind multiple layers, and in stairwells (floors) that do not overlap prefabricated stairs, other things such as Removal and installation of wall column formwork, pre-embedding of pipelines, repair and grinding of concrete structures after construction, etc., and in this type of construction, it is usually necessary to set up a work platform. During on-site construction, due to the structure and The limitation of the site conditions (the prefabricated stairs are not overlapped, making the stairwell operation a high-altitude operation) leads to certain limitations and potential safety hazards in the construction work platform of the prefabricated stairwell. The commonly used construction methods are: directly set up floor-to-ceiling scaffolding (only applicable to lower floors); or set up stirrups on the lower side of the stair platform, and then set up a construction platform; or directly set up a wooden springboard directly on the scaffold as a construction platform; There is also the method of adopting steel pipes to set up the supporting frame obliquely as the operating platform, etc., all of which have certain potential safety hazards in actual operation.
发明内容Contents of the invention
针对上述存在的问题,本申请旨在提供一种预制楼梯间装配式施工操作平台,该平台可逐层进行搭设,解决目前直接搭设落地脚手架等搭设方式存在的局限性和安全隐患,同时本申请的平台还可根据施工高度进行快速调节,提高施工的便捷性。In view of the above-mentioned problems, this application aims to provide a prefabricated stairwell assembly-type construction operation platform, which can be erected layer by layer to solve the limitations and potential safety hazards of the current erection methods such as direct erection of floor scaffolding. At the same time, this application The platform can also be quickly adjusted according to the construction height to improve the convenience of construction.
为了实现上述目的,本申请所采用的技术方案如下:一种预制楼梯间装配式施工操作平台,所述楼梯间预留有上梯台阶和下梯台阶,其特征在于:在所述下梯台阶上水平间距且竖向支撑有竖杆,在所述上梯台阶上水平间距且水平支撑有横杆,每个所述横杆的另一端均与对应的竖杆连接。In order to achieve the above object, the technical scheme adopted by the present application is as follows: a prefabricated stairwell assembly type construction operation platform, the stairwell is reserved with an upper ladder step and a lower ladder step, and it is characterized in that: Vertical bars are horizontally spaced and vertically supported on the upper step, horizontal bars are horizontally spaced and supported horizontally on the steps of the upper ladder, and the other end of each of the horizontal bars is connected to the corresponding vertical bar.
优选的,在所述竖杆底部水平设置有限位支撑杆,在所述限位支撑杆和所述竖杆底端均穿设有顶紧在所述下梯台阶上的紧固螺杆。Preferably, a limit support rod is arranged horizontally at the bottom of the vertical rod, and a fastening screw rod tightened on the step of the descending ladder is threaded through the limit support rod and the bottom end of the vertical rod.
优选的,在所述上梯台阶上卡套有F型结构的调节竖杆,并在该调节竖杆和竖杆上均间距开设有与所述横杆连接的调节孔。Preferably, an adjusting vertical bar of F-shaped structure is clamped on the step of the ascending ladder, and adjusting holes connected with the cross bar are equally spaced on the adjusting vertical bar and the vertical bar.
优选的,在所述调节竖杆上穿设有顶紧在所述上梯台阶底面上的所述紧固螺杆。Preferably, the fastening screw is threaded on the adjustment vertical rod and pressed against the bottom surface of the ascending step.
本申请的有益效果是:该施工作业平台以楼梯间预留的上梯台阶和下梯台阶为搭设基础进行搭设,搭设后具有较好的稳定性,并实现平台作业面高度的调节。该平台可逐层进行搭设,解决目前直接搭设落地脚手架,只适用于较低楼层的限制;以及搭设马镫、木跳板等存在的高空安全隐患,同时本申请的平台还可根据施工高度进行快速调节,提高施工的便捷性。该平台可拆卸连接(各杆件的连接均采用螺栓进行连接)还便于储存运输及周转。The beneficial effects of the application are: the construction operation platform is built on the basis of the upper and lower steps reserved in the stairwell, has better stability after erection, and realizes the adjustment of the height of the platform working surface. The platform can be erected layer by layer, which solves the current limitation of directly erecting floor-to-ceiling scaffolding, which is only applicable to lower floors; and erects stirrups, wooden springboards, etc., which exist high-altitude safety hazards. At the same time, the platform of this application can also be quickly adjusted according to the construction height. , Improve the convenience of construction. The platform can be detachably connected (connection of each rod is connected by bolts) and is also convenient for storage, transportation and turnover.
附图说明Description of drawings
图1为本申请预制楼梯装配的楼梯间结构图。Fig. 1 is the structural diagram of the stairwell assembly of the prefabricated staircase of the present application.
图2为本申请施工操作平台搭设图示一。Fig. 2 is the construction diagram 1 of the construction operation platform of the present application.
图3为本申请图2中施工操作平台左视图。Fig. 3 is a left view of the construction operation platform in Fig. 2 of the present application.
图4为本申请施工操作平台搭设图示二。Fig. 4 is the second diagram of setting up the construction operation platform of the present application.
图5为本申请图4中施工操作平台局部分解结构图。Fig. 5 is a partial exploded structure diagram of the construction operation platform in Fig. 4 of the present application.
图6为本申请施工操作平台的施工面高度调节示意图。Fig. 6 is a schematic diagram of height adjustment of the construction surface of the construction operation platform of the present application.
图中:6-加强杆;7-斜拉杆;8-防护栏杆;9-高强螺栓。In the figure: 6-strengthening rod; 7-diagonal tie rod; 8-protective railing; 9-high-strength bolt.
具体实施方式Detailed ways
为了使本领域的普通技术人员能更好的理解本申请的技术方案,下面结合附图和实施例对本申请的技术方案做进一步的描述。In order to enable those skilled in the art to better understand the technical solution of the present application, the technical solution of the present application will be further described below in conjunction with the drawings and embodiments.
参照附图1~6所示的一种预制楼梯间装配式施工操作平台,所述楼梯间预留有上梯台阶10和下梯台阶20,两者均通过两侧的建筑墙体水平延伸出,该建筑墙体之间围构成楼梯间。目前通过将预制的楼梯搭接在上梯台阶10和下梯台阶20之间,即可实现步行楼梯的快速施工成型。Referring to the prefabricated stairwell assembly-type construction operation platform shown in Figures 1 to 6, the stairwell is reserved with an upper step 10 and a lower step 20, both of which extend horizontally through the building walls on both sides. , the walls of the building form a stairwell. At present, the rapid construction of the walking stairs can be realized by lapping the prefabricated stairs between the upper step 10 and the lower step 20 .
为解决目前预制楼梯滞后于施工作业面而搭设施工作业平台时,存在一定的局限性和安全隐患的问题,本申请设计可装配式的施工操作平台,具体结构如图2所示,在所述下梯台阶20上水平间距且竖向支撑有竖杆1(该竖杆1优选为方管结构,其可套设在下梯台阶20的高强螺栓9上实现限位),根据楼层梯级的宽度,本申请间距设置有两根竖杆1,如图3所示结构,以下梯台阶20对竖杆1进行竖向支撑。在所述上梯台阶10上水平间距且水平支撑有横杆2,同样设置有两根,每个所述横杆2的另一端均与对应的竖杆1连接,而上梯台阶10上的高强螺栓9可以对横杆2实现水平限位,避免移位后的落空。整体结构如图2所示,竖杆1以下梯台阶20支撑,横杆2以上梯台阶10支撑,并将竖杆1和横杆2连接,构成L型支撑架体,以适配未搭设预制楼梯的楼梯间。In order to solve the problems of certain limitations and potential safety hazards when the prefabricated stairs lag behind the construction work surface and erect the work platform, this application designs a construction operation platform that can be assembled. The specific structure is shown in Figure 2. The horizontal spacing and vertical support on the steps 20 of the ladder are vertically supported by a vertical rod 1 (the vertical rod 1 is preferably a square tube structure, which can be sleeved on the high-strength bolts 9 of the steps of the lower ladder 20 to achieve spacing), according to the width of the floor steps, The present application is provided with two vertical rods 1 at intervals, and the structure is shown in FIG. 3 , and the vertical rods 1 are supported vertically by the steps 20 of the lower ladder. Horizontally spaced and horizontally supported on the ladder steps 10, there are two cross bars 2, the other end of each of the cross bars 2 is connected with the corresponding vertical bar 1, and the upper ladder steps 10 The high-strength bolt 9 can realize the horizontal limit to the cross bar 2, so as to avoid the failure after the displacement. The overall structure is shown in Figure 2. The vertical bar 1 is supported by the steps 20 below the ladder, and the horizontal bar 2 is supported by the steps 10 above the ladder. Stairwell of stairs.
优选的,在对称的竖杆1和横杆2之间连接有加强杆(优选采用螺栓实现可拆卸连接),用以提高整个架体的稳固性。在横杆2的加强杆上可铺设工作台平板(图中未示出),用以形成操作平台面,而竖杆1的加强杆则可用于施工人员攀登至工作台平板上。Preferably, a reinforcing rod (preferably adopting bolts to achieve detachable connection) is connected between the symmetrical vertical rod 1 and the horizontal rod 2, so as to improve the stability of the whole frame. A workbench flat plate (not shown) can be laid on the reinforcement bar of the cross bar 2 to form an operating platform surface, while the reinforcement bar of the vertical bar 1 can be used for construction personnel to climb onto the workbench flat plate.
为了进一步提高操作平台的稳固性,在竖杆1和横杆2之间还可拆卸的连接有斜拉杆,其优选采用螺栓实现可拆卸连接。在竖杆1外侧还竖向设置有防护栏杆,提高该平台的防护性。In order to further improve the stability of the operating platform, a diagonal tie rod is detachably connected between the vertical bar 1 and the cross bar 2, which is preferably detachably connected by bolts. A protective railing is also vertically arranged on the outside of the vertical bar 1 to improve the protection of the platform.
在上述操作平台实际使用时,施工人员的施工作业会造成平台整体晃动,进而会使得平台整体相较于上梯台阶10和下梯台阶20的偏移,存在安全隐患,因此,如图2所示,在所述竖杆1底部水平设置有限位支撑杆3,在所述限位支撑杆3和所述竖杆1底端均穿设有顶紧在所述下梯台阶20上的紧固螺杆4。在上述将平台搭设还后,通过依次旋紧限位支撑杆3和所述竖杆1上的紧固螺杆4,以下梯台阶20为基础,实现对平台整体的限位,进而克服平台受施工外力而出现的偏移。When the above operating platform is actually used, the construction work of the construction personnel will cause the overall shaking of the platform, which will cause the overall platform to deviate compared with the steps 10 of the upper ladder and the steps 20 of the lower ladder, posing potential safety hazards. Therefore, as shown in Figure 2 As shown, a limit support rod 3 is horizontally arranged at the bottom of the vertical rod 1, and a fastening rod that is fastened on the step 20 of the descending ladder is perforated at the bottom end of the limit support rod 3 and the vertical rod 1. screw 4. After the above-mentioned platform is set up, by sequentially tightening the limit support rod 3 and the fastening screw 4 on the vertical bar 1, the lower ladder step 20 is used as the basis to realize the overall limit of the platform, and then overcome the construction of the platform. deflection due to external force.
在楼梯间实际施工中,存在一定高度的施工面,如沿下梯台阶20直至施工至上梯台阶10位置处,因而上述平台结构不能满足该施工要求,因此如图4-6所示,在所述上梯台阶10上卡套有F型结构的调节竖杆5,并在该调节竖杆5和竖杆1上均间距开设有与所述横杆2连接的调节孔a。该结构的平台搭设时,首先将竖杆1支撑在下梯台阶20上,接着将调节竖杆5卡套在上梯台阶10(如图5所示结构),然后根据实际施工高度,将横杆2连接在竖杆1和调节竖杆5同等高度的调节孔a中,而在横杆2上同样间距开设有调节孔a,用以调节及连接斜拉杆,最后再通过旋紧限位支撑杆3和所述竖杆1上的紧固螺杆4,实现整个平台的快速搭设,并实现平台作业面高度的调节。In the actual construction of the stairwell, there is a construction surface of a certain height, such as along the step 20 of the lower ladder until the construction reaches the position of step 10 of the upper ladder, so the above-mentioned platform structure cannot meet the construction requirements, so as shown in Figure 4-6, in the An adjusting vertical bar 5 of F-shaped structure is sleeved on the upper step 10 , and adjusting holes a connected to the horizontal bar 2 are provided at equal intervals on the adjusting vertical bar 5 and the vertical bar 1 . When the platform of this structure is erected, the vertical bar 1 is first supported on the step 20 of the lower ladder, and then the adjusting vertical bar 5 is clamped on the step 10 of the upper ladder (the structure shown in Figure 5), and then according to the actual construction height, the horizontal bar 2 is connected to the adjustment hole a of the same height as the vertical bar 1 and the vertical bar 5, and the adjustment hole a is opened on the horizontal bar 2 at the same distance, which is used to adjust and connect the diagonal tie rod, and finally tighten the limit support rod 3 and the fastening screw 4 on the vertical bar 1 realize the rapid erection of the entire platform and the adjustment of the height of the working surface of the platform.
为进一步提高平台搭设的稳固性,如图4-6所示,在所述调节竖杆5上穿设有顶紧在所述上梯台阶10底面上的所述紧固螺杆4,其将调节竖杆5与上梯台阶10连接紧固后,与限位支撑杆3和竖杆1上的紧固螺杆4实现平台两端的固定限位。In order to further improve the stability of the platform erection, as shown in Fig. 4-6, the fastening screw 4 fastened on the bottom surface of the upper step 10 is pierced on the adjustment vertical bar 5, which will adjust After the vertical bar 5 is connected and fastened with the upper ladder step 10, the fastening screw rod 4 on the limit support bar 3 and the vertical bar 1 realizes the fixed positioning at both ends of the platform.
本申请的原理是:该施工作业平台以上梯台阶10和下梯台阶20为搭设基础,设置有竖杆1、横杆2、F型的调节竖杆5等部件。搭设时,首先将竖杆1支撑在下梯台阶20上,接着将调节竖杆5卡套在上梯台阶10,根据实际施工高度,将横杆2连接在竖杆1和调节竖杆5同等高度的调节孔a中,接着连接斜拉杆,最后再通过旋紧限位支撑杆3和所述竖杆1上的紧固螺杆4,实现整个平台的快速搭设,并实现平台作业面高度的调节。The principle of the present application is: the construction work platform is based on the upper ladder step 10 and the lower ladder step 20, and is provided with vertical bars 1, cross bars 2, F-type adjustment vertical bars 5 and other parts. When erecting, first support the vertical bar 1 on the step 20 of the lower ladder, then insert the adjusting vertical bar 5 on the step 10 of the upper ladder, and connect the horizontal bar 2 to the same height as the vertical bar 1 and the adjusting vertical bar 5 according to the actual construction height In the adjustment hole a, then connect the diagonal tie rod, and finally by tightening the limit support rod 3 and the fastening screw 4 on the vertical rod 1, the rapid erection of the entire platform is realized, and the adjustment of the height of the platform working surface is realized.
以上显示和描述了本申请的基本原理、主要特征和本申请的优点。在不脱离本申请精神和范围的前提下,本申请还会有各种变化和改进,这些变化和改进都落入要求保护的本申请范围内。The basic principles, main features and advantages of the present application have been shown and described above. On the premise of not departing from the spirit and scope of the present application, there will be various changes and improvements in this application, and these changes and improvements all fall within the scope of the claimed application.
Claims (2)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202320742842.9U CN219528337U (en) | 2023-04-06 | 2023-04-06 | A prefabricated stairwell assembly construction operation platform |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202320742842.9U CN219528337U (en) | 2023-04-06 | 2023-04-06 | A prefabricated stairwell assembly construction operation platform |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN219528337U true CN219528337U (en) | 2023-08-15 |
Family
ID=87585892
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN202320742842.9U Expired - Fee Related CN219528337U (en) | 2023-04-06 | 2023-04-06 | A prefabricated stairwell assembly construction operation platform |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN219528337U (en) |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN121611287A (en) * | 2026-01-19 | 2026-03-06 | 中国十七冶集团有限公司 | Special-shaped rotary stair peripheral operation rigid boot and use method |
-
2023
- 2023-04-06 CN CN202320742842.9U patent/CN219528337U/en not_active Expired - Fee Related
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN121611287A (en) * | 2026-01-19 | 2026-03-06 | 中国十七冶集团有限公司 | Special-shaped rotary stair peripheral operation rigid boot and use method |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN104895318B (en) | Aluminum alloy template system and construction method of same | |
| CN103403277B (en) | precast wall panels | |
| CN102216539B (en) | Unitised building system | |
| US20090249714A1 (en) | Precast concrete modular stairwell tower | |
| CN111236604A (en) | Safe construction method for cantilever platform on cylinder main body structure | |
| CN111255217A (en) | A kind of elevator shaft stereotyped operation platform and operation method thereof | |
| CN116537534A (en) | Construction method of high and large formwork engineering supporting system | |
| CN115627912A (en) | Construction method of assembled externally-mounted flower basket type overhanging scaffold | |
| CN116411694A (en) | An adjustable modular disc buckle support system and its support method | |
| CN107401279A (en) | Disposable one-piece casting staircase wall ladder combined steel formwork installation construction method | |
| CN107190861A (en) | A kind of contrary sequence method template construction technique | |
| AU2014268276A1 (en) | Method of Constructing a Core in Modular Construction | |
| CN114215333B (en) | Quick construction method for outer cornices of high-rise buildings | |
| CN114263275B (en) | Construction method for same-layer construction of high-rise assembled steel structure-core tube | |
| CN204876578U (en) | Building construction system | |
| CN113789924A (en) | A kind of quick-installed steel structure stairwell and installation method | |
| CN111236631B (en) | Semicircular concrete roof building supporting structure | |
| CN220336379U (en) | Modular disc buckle type supporting scaffold system | |
| CN219449157U (en) | ALC board installation construction system | |
| CN215670884U (en) | A prefabricated building stairwell operating platform | |
| CN214834781U (en) | Support Riser Structure in Multi-Stair Stair Formwork Support System | |
| CN116537513A (en) | Construction method for building engineering formwork | |
| CN116181037A (en) | A kind of construction structure and construction method of stairwell in super high-rise core tube by segmental jump | |
| CN224259824U (en) | Modularized temporary construction stair platform structure | |
| CN114439040B (en) | Auxiliary device and method for foundation construction between garbage compression |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| GR01 | Patent grant | ||
| GR01 | Patent grant | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20230815 |
|
| CF01 | Termination of patent right due to non-payment of annual fee |