CN220318445U - Mud-rock flow thing combined type barrage structure - Google Patents

Mud-rock flow thing combined type barrage structure Download PDF

Info

Publication number
CN220318445U
CN220318445U CN202321869747.1U CN202321869747U CN220318445U CN 220318445 U CN220318445 U CN 220318445U CN 202321869747 U CN202321869747 U CN 202321869747U CN 220318445 U CN220318445 U CN 220318445U
Authority
CN
China
Prior art keywords
debris flow
dam
piles
interception
structure according
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202321869747.1U
Other languages
Chinese (zh)
Inventor
王运兴
史向阳
黄永庭
贾雪梅
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Geological Natural Disaster Prevention Research Institute Gansu Academy Of Sciences
Original Assignee
Geological Natural Disaster Prevention Research Institute Gansu Academy Of Sciences
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Geological Natural Disaster Prevention Research Institute Gansu Academy Of Sciences filed Critical Geological Natural Disaster Prevention Research Institute Gansu Academy Of Sciences
Priority to CN202321869747.1U priority Critical patent/CN220318445U/en
Application granted granted Critical
Publication of CN220318445U publication Critical patent/CN220318445U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Devices Affording Protection Of Roads Or Walls For Sound Insulation (AREA)

Abstract

The utility model discloses a mud-rock flow compound retaining dam structure, which comprises retaining dams arranged in mud-rock flow channels along the width direction, wherein the retaining dams are provided with drainage holes or drainage grids in a distributed manner; the device is characterized by further comprising interception piles which are arranged at the upstream end of the blocking dam in a row along the width direction, wherein the spacing size of the adjacent interception piles is larger than the size of the drainage holes or the holes of the drainage grating on the blocking dam. The composite blocking dam structure can effectively intercept objects such as trees and stones with larger sizes in debris flow, meanwhile, the fluid-shaped objects are guaranteed to pass through, the harm of the large-diameter objects to subsequent debris flow prevention and treatment engineering and artificial buildings is reduced, and the composite blocking dam structure is stable and reliable in structure and long in service life, and is particularly suitable for debris flow mixed with trees and stones with larger sizes.

Description

Mud-rock flow thing combined type barrage structure
Technical Field
The utility model relates to the technical field of debris flow treatment, in particular to a debris flow compound blocking dam structure.
Background
Debris flow refers to a special flood that is caused by precipitation (heavy rain, glaciers, snow melt water) on valleys or hillsides and carries a large amount of solid matter such as silt, stones, and boulders. Is a disastrous geological phenomenon. It is extremely destructive because of its high speed of travel, having a strong energy. The occurrence of debris flow often damages traffic facilities such as highways, railways and the like, even villages and towns and the like, and causes huge losses.
In order to better prevent and treat the debris flow, the applicant considers designing a sectional type debris flow treatment mode, wherein the thought of the treatment mode is to divide a source area, a circulation area and a stacking area along the flowing direction of the debris flow according to the flowing path of the debris flow, then forestation is carried out on slope surfaces at two sides of a debris flow channel of the source area, and the slope body source materials forming the debris flow are firmly blocked; blocking and intercepting large-diameter objects entrained in the debris flow in the circulation area and/or the accumulation area; and then carrying out energy dissipation treatment on the residual fluid of the debris flow at the tail part of the accumulation area, and guiding the fluid of the debris flow to rapidly finish accumulation. Thus, the debris flow can be better treated, and the damage of the debris flow is reduced.
However, how to better realize blocking and interception of large-diameter objects in a circulation area and/or a stacking area, and to primarily dissipate energy of debris flow, so as to reduce impact and harm of debris flow to subsequent building engineering, is a problem to be considered and solved by those skilled in the art.
Disclosure of Invention
Aiming at the defects in the prior art, the utility model aims to solve the technical problems that: how to provide a mud-rock flow compound blocking dam structure which can better block and intercept large-diameter objects in mud-rock flow, primarily dissipate energy of the mud-rock flow and reduce impact and harm of the mud-rock flow to subsequent building engineering.
In order to solve the technical problems, the utility model adopts the following technical scheme:
a mud-rock flow thing combined type block dam structure, including setting up the block dam in the mud-rock flow channel along the width direction, the block dam is distributed and provided with the drainage hole or drainage grating; the device is characterized by further comprising interception piles which are arranged at the upstream end of the blocking dam in a row along the width direction, wherein the spacing size of the adjacent interception piles is larger than the size of the drainage holes or the holes of the drainage grating on the blocking dam.
Therefore, when the debris flow flows through the composite blocking dam structure, preliminary energy dissipation can be realized by blocking the debris flow through the blocking piles and the blocking dams. Moreover, the large-size objects such as trees, large-size rock blocks and the like can be trapped by the blocking piles firstly, then the relatively small-size parts of the large-size objects are blocked and trapped by the blocking dams again, and the fluid which does not contain the large-size objects is left to flow out to the lower part, so that the large-size objects with high destructiveness and danger are better prevented from damaging subsequent prevention engineering buildings and peripheral artificial buildings along with debris flow impact. Meanwhile, after the large-size objects in the fluid are removed, the energy dissipation treatment of the residual debris flow with the fluid characteristics can be better carried out by the follow-up prevention and treatment engineering structure.
Further, the interception piles are at least provided with two rows, and the interception pile arrangement interval at the upstream end is larger than the interception pile arrangement interval at the downstream end.
Thus, the grading interception effect on large-size objects can be better achieved.
Further, the interception stake at the upstream end is provided at a greater height than the interception stake at the downstream end.
In this way, the upstream end of the interception stake is more prone to intercept objects of larger size.
Further, hinges are fixedly connected between each row of interception piles, and two ends of each hinge extend forwards and are fixed on foundation piles buried at the upstream end of the debris flow channel.
Therefore, because the impact of the large-size objects, such as large rocks, on the single interception pile is overlarge, each row of interception piles are fixedly connected into a whole by virtue of the hinge, the impact can be better born, part of impact can be transferred to the foundation pile in front, the stability of the structure of the interception piles is ensured, and the interception effect can be better played.
Further, the foundation pile is buried at the bottom of the mud-rock flow channel at the upstream end, a foundation pile pressing plate positioned on the bottom surface of the mud-rock flow channel is arranged on the upper surface of the foundation pile, and the area of the foundation pile pressing plate is ten times or more than that of the cross section of the foundation pile.
This is because the debris flow has a high specific gravity and is characterized by rolling, and the debris flow passes over the pile platen before reaching the picket. So the greater the mud-rock flow is to the greater the interception stake impact, the more the mud-rock flow also can be greater to the pressure that foundation pile clamp plate rolled, can press foundation pile below firmly for the hinge can bear bigger pulling force, produces bigger holding power to the foundation pile. So the stability can also be correspondingly improved when the impact of the interception pile is increased, so that the foundation pile can bear larger debris flow impact, and the stability of the foundation pile structure is better ensured.
Further, the whole retaining dam is arc-shaped with the middle part protruding towards the upstream end.
Like this, the arc can be with partial impact force conversion for to the backward pressure in both sides for the dam can bear the impact better, and this curved structure can hold the deflection that the dam expend with heat and contract with cold leads to better at ordinary times simultaneously, guarantees the stability of structure.
Further, the heights of the two sides of the retaining dam are higher than the height of the middle position.
Thus, the arc shape of the blocking dam can push and split the intercepted larger-diameter stone blocks to the two sides, and the two sides of the blocking dam are higher to form larger accommodating space in front so as to accommodate the larger-diameter stone blocks pushed to the blocking dam.
Further, a water passing culvert is further arranged below the middle part of the blocking dam and below the bottom surface of the debris flow channel, and the size of the water passing culvert is larger than that of the drainage holes or the drainage grids on the blocking dam.
Therefore, the normal passing of water flow can be facilitated in the period that the debris flow does not burst.
Further, the downstream side of the dam is also provided with supporting walls in a spaced fit. Therefore, the anti-overturning force of the blocking dam can be improved, and the stability of the dam body is better ensured.
Further, the support walls are arranged in a row at intervals of 5 m. The supporting effect is better improved.
Like this, foretell combined type barrage structure can effectively intercept objects such as trees and stone of great size in the mud-rock flow, guarantee the passage of fluid form material simultaneously, reduce the harm of major diameter object to follow-up mud-rock flow prevention and cure engineering and artificial building, make things convenient for follow-up energy dissipation to mud-rock flow and make it pile up generally, and self structure has stable and reliable, and longer effect of life is especially suitable for the mud-rock flow that is mingled with trees and has big or small stone.
Drawings
FIG. 1 is a schematic diagram of an embodiment of the present utility model. Arrows in the drawings indicate the direction of water flow.
Fig. 2 is a D-D sectional view of fig. 1 for illustrating a dam structure.
Figure 3 is an E-E cross-sectional view of figure 1 showing the longitudinal configuration of the composite dam.
Detailed Description
The present utility model will be described in further detail with reference to the following embodiments.
Best mode for carrying out the utility model: 1-3, a debris flow object composite type blocking dam structure comprises blocking dams 11 arranged in a debris flow channel along the width direction, wherein the blocking dams 11 are provided with drainage holes 12 (or drainage grids) in a distributed manner; and the device also comprises interception piles 13 which are arranged at the upstream end of the blocking dam in rows along the width direction, wherein the spacing size of the adjacent interception piles 13 is larger than the hole size of a drainage hole (or a drainage grid) on the blocking dam.
Therefore, when the debris flow flows through the composite blocking dam structure, preliminary energy dissipation can be realized by blocking the debris flow through the blocking piles and the blocking dams. Moreover, the large-size objects such as trees, large-size rock blocks and the like can be trapped by the blocking piles firstly, then the relatively small-size parts of the large-size objects are blocked and trapped by the blocking dams again, and the fluid which does not contain the large-size objects is left to flow out to the lower part, so that the large-size objects with high destructiveness and danger are better prevented from damaging subsequent prevention engineering buildings and peripheral artificial buildings along with debris flow impact. Meanwhile, after the large-size objects in the fluid are removed, the energy dissipation treatment of the residual debris flow with the fluid characteristics can be better carried out by the follow-up prevention and treatment engineering structure.
Wherein, the interception piles 13 are provided with at least two rows, and the interception pile arrangement space at the upstream end is larger than the interception pile arrangement space at the downstream end.
Thus, the grading interception effect on large-size objects can be better achieved. When the method is implemented, the setting interval of the upstream end interception piles can be set according to 1.5-2.5 meters, and the setting interval of the downstream end interception piles can be set according to 0.5-1.5 meters.
Wherein, the interception stake that is located the upstream end sets up the height and is greater than the interception stake that is located the downstream end.
In this way, the upstream end of the interception stake is more prone to intercept objects of larger size.
Wherein, each row of interception piles 13 are fixedly connected with a hinge 14, and two ends of the hinge 14 extend forwards and are fixed on foundation piles 15 buried at the upstream end of the debris flow channel.
Therefore, because the impact of the large-size objects, such as large rocks, on the single interception pile is overlarge, each row of interception piles are fixedly connected into a whole by virtue of the hinge, the impact can be better born, part of impact can be transferred to the foundation pile in front, the stability of the structure of the interception piles is ensured, and the interception effect can be better played.
The foundation pile 15 is buried at the bottom of the debris flow channel at the upstream end, the foundation pile upper surface is provided with a foundation pile pressing plate 16 positioned on the bottom surface of the debris flow channel, and the area of the foundation pile pressing plate 16 is ten times or more than that of the cross section of the foundation pile.
This is because the debris flow has a high specific gravity and is characterized by rolling, and the debris flow passes over the pile platen before reaching the picket. So the greater the mud-rock flow is to the greater the interception stake impact, the more the mud-rock flow also can be greater to the pressure that foundation pile clamp plate rolled, can press foundation pile below firmly for the hinge can bear bigger pulling force, produces bigger holding power to the foundation pile. So the stability can also be correspondingly improved when the impact of the interception pile is increased, so that the foundation pile can bear larger debris flow impact, and the stability of the foundation pile structure is better ensured.
Wherein the whole of the dam 11 is in an arc shape with a convex middle part towards the upstream end.
Like this, the arc can be with partial impact force conversion for to the backward pressure in both sides for the dam can bear the impact better, and this curved structure can hold the deflection that the dam expend with heat and contract with cold leads to better at ordinary times simultaneously, guarantees the stability of structure.
Wherein, the heights of the two sides of the blocking dam 11 are higher than the height of the middle position.
Thus, the arc shape of the blocking dam can push and split the intercepted larger-diameter stone blocks to the two sides, and the two sides of the blocking dam are higher to form larger accommodating space in front so as to accommodate the larger-diameter stone blocks pushed to the blocking dam.
The middle part of the blocking dam 11 is provided with a water passing culvert 17 below the bottom of the debris flow channel, and the size of the water passing culvert 17 is larger than that of the drainage hole on the blocking dam.
Therefore, the normal passing of water flow can be facilitated in the period that the debris flow does not burst.
The downstream side of the dam 11 is also fitted with support walls 18 at intervals. Therefore, the anti-overturning force of the blocking dam can be improved, and the stability of the dam body is better ensured.
Wherein the support walls 18 are arranged in a row at intervals of 5 m. The supporting effect is better improved.
Like this, foretell combined type barrage structure can effectively intercept objects such as trees and stone of great size in the mud-rock flow, guarantees the passage of fluid form material simultaneously, reduces the harm of major diameter object to follow-up mud-rock flow prevention and cure engineering and artificial building, makes things convenient for follow-up energy dissipation to mud-rock flow and makes it pile up generally, and self structure has stable and reliable, and longer effect of life is especially adapted to the mud-rock flow that has big or small stone.

Claims (10)

1. A mud-rock flow thing combined type block dam structure, including setting up the block dam in the mud-rock flow channel along the width direction, the block dam is distributed and provided with the drainage hole or drainage grating; the device is characterized by further comprising interception piles which are arranged at the upstream end of the blocking dam in a row along the width direction, wherein the spacing size of the adjacent interception piles is larger than the size of the drainage holes or the holes of the drainage grating on the blocking dam.
2. The debris flow composite dam structure according to claim 1, wherein the intercepting piles are provided in at least two rows, and the intercepting pile arrangement pitch at the upstream end is greater than the intercepting pile arrangement pitch at the downstream end.
3. The debris flow composite dam structure according to claim 2, wherein the interception post at the upstream end is disposed at a greater height than the interception post at the downstream end.
4. The debris flow composite dam structure according to claim 1, wherein each row of the blocking piles is fixedly connected with each other by a hinge, and both ends of the hinge extend forward and are fixed on foundation piles buried in an upstream end of the debris flow channel.
5. The debris flow composite dam structure according to claim 4, wherein the foundation pile is buried at the bottom of the debris flow channel at the upstream end, and the foundation pile upper surface is provided with a foundation pile pressing plate located at the bottom surface of the debris flow channel, and the area of the foundation pile pressing plate is ten times or more than that of the cross section of the foundation pile.
6. The debris flow composite dam structure according to claim 1, wherein the dam is formed in a shape of an arc having a central portion protruding toward an upstream end.
7. The debris flow composite dam structure according to claim 6, wherein the heights of both sides of the dam are higher than the height of the middle position.
8. The debris flow composite dam structure according to claim 1, wherein a water culvert is further provided below the middle portion of the dam at the bottom of the debris flow channel, and the water culvert is larger than the drainage holes or the drainage grids on the dam.
9. The debris flow composite dam structure according to claim 1, wherein the downstream side of the dam is further provided with support walls in spaced engagement.
10. The debris flow composite dam structure according to claim 9, wherein the support walls are arranged in a row at intervals of 5 m.
CN202321869747.1U 2023-07-17 2023-07-17 Mud-rock flow thing combined type barrage structure Active CN220318445U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202321869747.1U CN220318445U (en) 2023-07-17 2023-07-17 Mud-rock flow thing combined type barrage structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202321869747.1U CN220318445U (en) 2023-07-17 2023-07-17 Mud-rock flow thing combined type barrage structure

Publications (1)

Publication Number Publication Date
CN220318445U true CN220318445U (en) 2024-01-09

Family

ID=89418896

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202321869747.1U Active CN220318445U (en) 2023-07-17 2023-07-17 Mud-rock flow thing combined type barrage structure

Country Status (1)

Country Link
CN (1) CN220318445U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN120250548A (en) * 2025-06-05 2025-07-04 中国科学院、水利部成都山地灾害与环境研究所 Debris flow fan ecological and geotechnical measures coordinated siltation prevention system

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN120250548A (en) * 2025-06-05 2025-07-04 中国科学院、水利部成都山地灾害与环境研究所 Debris flow fan ecological and geotechnical measures coordinated siltation prevention system

Similar Documents

Publication Publication Date Title
CN111335260B (en) Movable diversion blocking system for debris flow prevention and treatment
CN111270652A (en) Compound mud-rock flow system of blocking
CN106320252A (en) A blocking composite structure and method for gully water treatment and debris flow protection
US9797106B1 (en) Method of installing revetment blocks to reduce kinetic energy of water
CN205954559U (en) A ditch water treatment structure that is used for large -scale sediment field of blocking
CN206706712U (en) A kind of split type net cage for intercepting floating object
CN119177637B (en) A flood discharge system and flood discharge method for a pumped storage power station
CN116770780B (en) Energy dissipation method for completing rapid accumulation of debris flow treatment
CN211773880U (en) Anti-sinking shed tunnel structure for tunnel construction
CN210562017U (en) Mud-rock flow flexible blocking net and mud-rock flow flexible blocking dam
CN213233325U (en) Cutting and guiding structure applied to debris flow prevention and control
CN221193230U (en) Guide energy dissipation structure for interception energy dissipation threshold in debris flow channel
CN223983987U (en) A stepped debris flow retaining dam
CN221608645U (en) Prevent blocking dam structure that mountain body mud-rock flow impacted
CN214939878U (en) Multifunctional stepped weir dam
CN117738137A (en) Energy dissipation blocking structure for low-frequency burst high-level trough accumulation in warehouse
CN221989232U (en) Slide rail structure of lifting mud-rock flow blocking device
CN220927905U (en) A speed reduction interception structure for source district mud-rock flow district channel
CN221142708U (en) Practical ecological irrigation drainage canal
CN212896193U (en) Water stone shunting structure
CN223423269U (en) Repairing device applied to strip mine
CN222275522U (en) Slope ecological protection device to reduce water erosion
CN216892261U (en) Closed debris flow drainage structure
CN117286839B (en) A method for intercepting and clearing debris flows
CN223824064U (en) Debris Flow Prevention Structure in Railway Sections

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant