CS205823B1 - Central distributor of warm service water - Google Patents

Central distributor of warm service water Download PDF

Info

Publication number
CS205823B1
CS205823B1 CS179979A CS179979A CS205823B1 CS 205823 B1 CS205823 B1 CS 205823B1 CS 179979 A CS179979 A CS 179979A CS 179979 A CS179979 A CS 179979A CS 205823 B1 CS205823 B1 CS 205823B1
Authority
CS
Czechoslovakia
Prior art keywords
primary
pipe
hot water
water
line
Prior art date
Application number
CS179979A
Other languages
Czech (cs)
Inventor
Josef Krminsky
Original Assignee
Josef Krminsky
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Josef Krminsky filed Critical Josef Krminsky
Priority to CS179979A priority Critical patent/CS205823B1/en
Publication of CS205823B1 publication Critical patent/CS205823B1/en

Links

Landscapes

  • Domestic Hot-Water Supply Systems And Details Of Heating Systems (AREA)
  • Steam Or Hot-Water Central Heating Systems (AREA)

Description

Až dosud je těmto rozvod proiváděn talk, že ze .strojovny ústředního ohřevu (boilerOvé stanice) o.d zásobníku teplé užitkové vody, je vedeno primární potrubí is teplou užitkovou vodou ke spotřebičům ležatým .rOzVoIdém, .vedeným převážně v mejniiižlším podlaží, .na ikiterý nahrazují potrubí svislá, istoiulpací, s odbolčteami k jednotlivým výtokům. ’ N.a nOjvyšším bodě primárního stoupacího potrubí odbočuje potrubí círteulaiční, sekundární, (které je vedeno nejprve rovnoběžně se stoupajícím slv.islým a dále s ležatým potrubím primárním, odvádí urlčité množství ochlazené teplé užitkové voldy zpět do strtojovny ústředního ohřevu a zde do (vyhřívaného zásobníku teplé užitkové vo|dy. Tuto cirkulaci zajišťuje čerpadlo umístěné pa sekundárním potrubí ve strojovně ústředního Ohřevu. Při tomto způsobu řpšelní trubních .rozvodů pro dopravu teplé užitkové ivody ze strojovny (ústředního ohřevu k odběrovým výtokům, je primárním potrubím dopravováno množství yod.y požadohnáné .pro odběr u výtoků a ,dále mmiolžiství vody (potřebné pro cirkulaci, to- je pro vrácení· ke zpětnému ohřevu, které Ije .z této. soiulslťavy odebíráno čerpadlem pomocí sekundárního, cirkulačního·' potrubí. Musí být tedy primární .potrubí dimenzováno na celé množství potřebné pro odběr u výtoků a dále pro množství potřebné píro cirkulaci. Celý systém sestává Iz potrubí primárního, sloužícího k zásobování iteplioiu užitkovou vodou, tedy pokrytí spotřeby teplé vody a .dále z potrubí sekundárního, cirkulačního, sloužícího trvale pro vrácení části vody ochlazené pro opětovný ohřev.Until now, these distributions have been told that from the central heating plant (boiler station) from the domestic hot water storage tank, the primary pipeline and the hot domestic water are routed to the downstream appliances, which are mainly located on the lower floor, replacing the piping. vertical, istoiulpací, with odbolčteami to individual outflows. At the highest point of the primary riser, the circulating, secondary piping (which is guided first parallel to the rising upright and further down the primary pipeline) leads a certain amount of cooled hot utility vault back to the central heating stoking room and here to the (heated hot storage tank). This circulation is provided by a pump located on the secondary piping in the central heating engine room.In this way, the piping of the pipelines for conveying the hot utility water from the engine room (central heating to the drainage points) is transported by the primary pipeline the amount required for the. withdrawal at the outlets and, furthermore, the water supply (required for circulation, i.e. to return to the reheat which is withdrawn from this solute by the pump by means of a secondary circulation pipeline. Thus, the primary piping must be dimensioned. The whole system consists of the primary piping, which is used to supply iteplioium with service water, ie to cover the consumption of hot water, and further from the secondary, circulation piping, which is used permanently for the return of part of the system. water cooled for reheating.

Pro istále více ise Vyskytující výškové budovy je nutné řešit ústřední zásobování teplou Užitkovou voidou pomocí dvou nebo 1 více tlakových pásem, oddělených již ve strojovně Ústředního ohřevu samostatnými zásobníky telplé užitkové vody pro příslušné tlaky, včetně celých primárních t isekunidárnícih rozvodů teplé užitkové vody pro tyto tlaky, včetně ciiřkuilalč.níclh čerpadel a čerpadel píro. zajištění plotřebmýcih tlaků a množství spotřeby teplé uižlítkoivé vody.For more and more high-rise buildings, central utility hot water needs to be solved using two or more pressure zones separated in the central heating engine room by separate storage tanks for the respective pressures, including the whole primary tecuididary hot water distribution system for these pressures. , including circulating pumps and pipeline pumps. Ensuring plumemýcih pressures and hot water consumption.

Výše uvedené nedostatky odstraňuje předmět vynálezu, tj. ústřední rozvod teplé užlťkoivé vody. Podstata vynálezu (spočívá v tom,· že zásobník teplé .užitkové vody je napojen přiváděcím potrubím na veřejnou vodovodní síť. V místě určeném pro vracení iochla!zen,é vody je mapo jen druhým potrubím přes pnvmí a zpětný ventil jednak na sekundární potrubí a jednak přes druhý (zpětný ventil nia- potrubí primární .a spolu s ním na sání nejméně jednoho cirkulačního čerpadla. Dále ije zásobník vybaven pojistným ventilem a •v místě určeném pno· lotdběr ohřáté vody nápojem na primární potrubí, vybavené třetím zpětným ventilem a popřípadě i .průtokoměrem, kte205823 ré navazuje nia potrubí čtvrté, napojené přes čtvrtý zpětný ventil na výtlačnou stranu cir.kulalčjních čerpadel. (Primární plotnuibí je dále spojeno s primárním potrubím vybaveným manometrem, přičemž mezi táto primární potrubí, a me'zi sekundární potrubí jsou vložena odběrová potrubí, opatřená odporovými vložkami rozmístěnými podle výpočtu a po celé délce výtoky.The aforementioned drawbacks are overcome by the subject of the invention, i.e. the central distribution of hot, yellowish water. SUMMARY OF THE INVENTION [0003] The hot water storage tank is connected via a supply line to a public water supply network. At the point for returning the cooled water, only the second line is routed through the primary and non-return valves to the secondary line and the tank is equipped with a safety valve and, at a designated point, the collection of heated water by a beverage on the primary pipe, equipped with a third non-return valve and optionally i. a flowmeter connected to the fourth pipe connected via the fourth non-return valve to the discharge side of the circulation pumps (the primary plate is further connected to a primary pipe equipped with a pressure gauge, the sampling pipes being interposed between the primary pipes and the secondary pipes , provided with resistive inserts spaced according to the calculation and along the entire spout.

Předností úsporného. řešení (ústředního rozvodu teplé užitkové viody je .podstatná Úspora trubního materiálu Vzniklá tím, že odpadají svislá cirkulační potrubí a (jejich funkci .přejímají v případě kritické a|ž nulové spotřeby teplé užitkové vody Isvfelá potrubí odběrová a dále tím, že obě ležatá potrubí primární i sekundární pří odběru nad hodnotu kritickou .až ido hodnoty maximální jsou obě zásobovací, tedy dopravují vodu k Svislým potrubím, do kterých podle místa a velikosti odběru vtéká teplá užitková voda, jak sihoira, talk i zdola, čímž .potřebné průměry těchto potrubí jsou nťžíší nejméně o jednu výrobní dimenzi. Z výše uvedeného plynou rovněž nižší tepelné ztráty v potrubních' rozvodech, které závisí ,na celkové ploiše povrchu trubních rotevodů. Tato plocha je plřímb (úměrná délkám a průměrům potrubí, jejichž hodnoty se obě uváděným řešením 'snižují. iNa 'velikosti tepelných ztrát 'závisí i potřebné množství vody pro cirkulaci, které jsme -výše označovali jiako 'kritické množství, a tedy i velikost cirlkuláčiního čerpadla a spotřeba energie na čerpání. Další předností výše popsaného řešení roizlvidďů teplé užitkové vody je možnost zásobovat všechna ' tlaková pásma u výškovýdh budov iz jedněch 'zásobníků teplé užitkové Vody, a to s použitím zásobníků teplé Užitkové vody pro tlalk nejnižšíího tlakového pásma, neboť potřebný tlak ©e získává pomocí čerpadel umístěných na potrubí tak, že tlakové zásobníky teplé Užitkové Vody jsou na straně sání a vyšší tlaková pásma rnla straně výtluku čerpadel, kde primární potrulbí vede teplou .užitikoVou vodu až do. mejvyfšišílho tlakového, pásma, odkud teprve ve vyšším tlakovém pásmu ve Svislých odběrových potrubích neodebraná voda protéká přes ventily redukční db nižšího tlakového pásma, přičemž části svislých odběrových potrubí příslušející do nejnižšíího tlakového pásma jdou zásobovány teplou užitkovou vodou především dolním sekundárním rozvodem. Rovněž zde dojde k (cirkulaci teplé užitkové Vody alž po· poklesu odběrů na hodnotu kritickou nebo nižší, popřípadě nulovou.Advantages of economical. solution (central distribution of hot utility water is essential. Saving of pipe material) Due to the fact that vertical circulation pipelines are eliminated and (they function in the case of critical to zero consumption of hot service water). Even in the case of secondary withdrawal above the critical value, both supply water supplies, ie they transport water to vertical pipelines, into which hot service water flows, such as sihoira, talk and bottom, depending on the place and size of the pipeline, thus reducing the required piping diameters. This also results in lower heat losses in the piping, which depend on the total surface area of the pipe rotors, which is proportional (proportional to the lengths and diameters of the pipelines, both of which are reduced by the present solution). 'size thermal The amount of water required for circulation, which we have referred to above as a critical amount, and hence the size of the circulation pump and the energy consumption for pumping, also depends on the loss. Another advantage of the above-described domestic hot water distribution system is that it is possible to supply all pressure zones for high-rise buildings as well as one domestic hot water storage tank, using hot water storage tanks to pressurize the lowest pressure zone, on the piping so that the hot service water pressure tanks are on the suction side and the higher pressure zones are on the pump discharge side where the primary pipe leads the hot service water up to. the highest pressure zone in which only the higher pressure zone in the vertical sampling lines flows through the pressure reducing valves of the lower pressure zone, whereby the parts of the vertical sampling lines belonging to the lowest pressure zone are supplied with warm service water mainly through the lower secondary distribution. There will also be (circulation of hot service water but after the consumption has dropped to a critical value or lower or zero.

Příklad provádění ústředního rozvodu teplé užitkové vody podle vynálezu je znázorněn na přiloženém výkrese. Rozrod je kreslen pro tři různé provozní stavy. .Rozrod sestává ze zásobníku 1 teplé Užiíťkbvé vody, který je přiváděcím piotrubím 2 napojen na veřejnou vodovodní síť. V místě určeném pro 'vracení ochlazené vody je zásobník 1 druhým potrubím 10 přes první zpětný ventil 12 napojen jednak na ležaté sekundární potrubí 9 a jednak přes drulhý zpětný ventil 11 napojen na třetí potrubí 4. To je zapojeno spolu s potrubím 3 pomocí čtvrtého potrubí 5 na sáhl nejméně jednoho cirkulačního čerpiadla 6. Zásobník 1 je vybaven. pojišťovacím ventilem . 19 a je v místě určeném pro oldlběr ohřáté vody napojen na primární .potrubí 3, Vybavené třetím zpětným ventilem 13 a prŮtokOměrem 7, a zapojeným na sání nejméně jednoho cirkulačního čerpadla 6, čtvrtým potrubím 5, které na výtlaku čerpadla 6 je vybaveno čtvrtým zpětným .ventilem 14. Primární potrubí 3 naivaizuje dále na ležaté primární potrubí 8, vybavené manometrem 20. Mázl ležaté primární potrubí 8 a mezi ležaté sekundární potrubí 9 jsou vložena sivilslá odběrová potrubí 15, opatřená odporovými vložkami 16 jejichž rozmístění se určí 'výpočtem a v jednotlivých podlažích potřebným minožlstvím výtoků 17 itepié užitkové vody. Do odběrového isivřslého (potrubí 13 jisou .na rozhraní tlakových pálsem podle potřeby zdraženy redukční ventily 18.An exemplary embodiment of a central hot water distribution system according to the invention is shown in the attached drawing. The divergence is drawn for three different operating states. The plant consists of a hot water storage tank 1 which is connected to the public water supply system via a supply line 2. At the chilled water return point, the reservoir 1 is connected via a second line 10 via a first check valve 12 to a downstream secondary line 9 and connected via a second check valve 11 to a third line 4. This is connected together with line 3 via a fourth line 5 it has reached at least one circulation pump 6. Tray 1 is equipped. safety valve. 19 is connected to a primary line 3, equipped with a third non-return valve 13 and a flow direction 7 and connected to the suction of at least one circulation pump 6, a fourth line 5, which is equipped with a fourth return line at the discharge of the pump 6. The primary conduit 3 is further naïve to the horizontal primary conduit 8, equipped with a pressure gauge 20. The horizontal primary conduit 8 and the horizontal secondary conduit 9 are fitted with gray sampling conduits 15, provided with resistive inserts 16 whose distribution is determined by calculation and on individual floors the necessary amount of effluents 17 for domestic hot water. Reducing valves 18 are supplied to the sampling line (piping 13 at the pressure plate interface as required).

Provoz zařízení sestává z ňásledujících provozních stavů:Operation of the equipment consists of the following operating states:

1. Maximální odběr teplé užitkové vody otevřenými výtoky 17.1. Maximum consumption of domestic hot water through open outlets 17.

2. Odběr teplé užitkové vody otevřenými výtoky 17 je nižší než je obíjemavá kapacita cirkulačního čerpadla 6, tj. kritická hodnota odběru, nebo je tento odběr i .nlultívý. (Přechod od jednoho provozního sta/vu ke druhému je plynulý. )2. The hot water withdrawal through the open outlets 17 is lower than the circulating capacity of the circulation pump 6, i.e., the critical withdrawal value, or the withdrawal is even less. (The transition from one operating state to another is smooth.)

3. Provoz ve výškových budovách se dvěma nebo více tlakovými pásmy.3. Operation in high-rise buildings with two or more pressure zones.

iV případě prvním je Istudená voda do zásobníků 1 teplé Užitkové Vody dopraivloVána <z vnější veřejné vodovodní isíitě potrubím 2 ,a ze zásobníku 1 teplé užltkoVé vody dopravována ke svislým odběrovým potrubím 15, na kterých jsou odbočky .pro výtoky 17, přes pdtrubí primární 3 a itřetí potrubí 4 a průtokoměr 7 ve strojovně ohřevu a přes druhý zpětný Ventil 11 a třetí zpětný Ventil 13 iv téže Isitrojevně, přičemž jsou první zpětný ventil 12 ia čtvrtý zpětný ventil 14 Uzavřeny, a dále oběma ležatými rozvody primárními 8 a .sekundárními 9, tj. každé .Jednotlivé svislé .odběrové /potrubí 15 Je zásobováno jak zdola, tak 1 Shora, podle (velikosti odebíraného množství .teplé užitkové vody. Oldlběr z ležatých rozvodů 8, 9 se pák děje v poměru Vzdálenosti otevřených výtoků 17 .old příslušných konců svislého odběrového potrubí 15.. Do ležatého rozvodu 'sekundárního potrubí 9 přitéká teplá 'užitková voda ze zásobníku 1 primárním potrubím '3 ia třetím pioltnulbím 4 přes druhý zpětný ventil 11. Do ležatého, rozvodu primárního potrubí 8 přitéká teplá užitková voda ze zásobníku 1 primárním potrubím 3 přes třetí zpětný ventil 13 la Iprůtokoměr 7. (Čerpadlo' 6 nemuísí být pří tomto provozním stavu v chodu. Pokud je vlšaik i při (tomto provozním stavu čerpadlo 8 spuštěné, protéká kritické množství teplé užitkové vody čtvrtým potrubím 5 přes čerpadlo 6 a přes čtvrtý zpětný Ventil 14. V druhém případě je teplá ujžiitkolvá voda lze zásobníku 1 dopravována .ke svislým odběrovým potrubím 15 primár ním potrubím 3 -a -čtvrtým potrubím 3, přes spuštěné čerpadlo 6 a Čtvirtý (zpětný ventil 14 ve strojovně io'hře!viu iteplé ulžítkiojvé 'vody, přičemž je třetí -zpětný ventil 13 uaavřen a dále primárním horním -leSžatým piotrubím -8 a protéká· Svislými potrubími 13 -do sekundárního -dolního -ležatého potrubí 9 -a itíPito- potrubím 9 je vrácena -zpět d-o -zásobníku 1 k opětovnému ohřevu -přeis první zpětný ventil 12 druhým potrubím 10, přičemž dr.uhý izpětný ventil 11 je při tomto směru proudění luzaívlř-e-n tlakem cirkulující teplé UžiitkOvé (vioídy, vyvozeným spuštěným čerpadlem 6. Spuštění čerpadla 8 může být provedeno -obsluhou. Lépe ije ale (spuštění čerpadla 8 automaticky dd poklesu průtoku na hodnotu kritickou, pomocí -impulsu od průtokoměru 7. Pro zabránění -zkratům v proudění musí být svislé plotrubí tak dimenzováno, aby tlakové ztráty vzniklé prouděním byly,-Vždy u odběrových potrubí 15 svislých, vzdálenějších bd istro-jovny pr-o přípravu teplé Užitko-vé vbdy nižší, než tlakové ztráty u svislých odběrových potrubí 15 bližších ke strojovně teplé uižitkiotvé vody. K dosažení této podmínky (je 'v některých případech nutné vkládat do svislých potrubí vložky 18 pro zvýšení -odporu proti proudění. Tyto Vložky 16 -a jeji-ch -rbzmístění musí být Opodstatněny technickým výpočtem.In the first case, the cold water is conveyed to the domestic hot water storage tank 1 from the external public water main via line 2, and from the hot-water storage tank 1 to the vertical sampling lines 15 on which the outlets 17 for outflows 17 are passed through the primary pipe 3. The third pipe 4 and the flowmeter 7 in the heating engine room and through the second check valve 11 and the third check valve 13 also in the same manner, the first check valve 12 and the fourth check valve 14 are closed, and both horizontal distributions are primary 8 and secondary 9, i.e. Each vertical sampling line 15 is supplied both from below and from above, according to the size of the domestic hot water tapped. Old collecting from horizontal pipes 8, 9 is levied in proportion to the open spacing 17 .old of the respective ends of the vertical tap. to the horizontal distribution system of the secondary pipe 9 ad the domestic hot water from the tank 1 flows through the primary pipe 3 and the third pioltnulbim 4 through the second check valve 11. The domestic hot water from the tank 1 flows through the primary pipe 3 through the primary pipe 3 through the third check valve 13 l and the flowmeter 7. (Pump) '6 may not be operating in this operating state. If the pump 8 is running (in this operating state), a critical amount of hot water flows through the fourth line 5 through the pump 6 and the fourth check valve 14. In the second case, the hot water can be transported to the storage tank. 4 through a lowered pump 6 and a four-way valve (check valve 14 in the engine room , using hot water, the third check valve 13 being closed, and the primary upper downstream pipe 8). flows through the vertical ducts 13 into the secondary-lower-lying duct 9 and then returns via the duct 9 back to the reheat reservoir 1 through the first check valve 12 through the second duct 10, wherein the non-return valve 11 is at In this direction of flow, it is driven by the pressure of the circulating hot 6. Start-up of pump 8 can be done by the operator. However, it is better (start-up of pump 8 automatically dd decreasing the flow rate to a critical value by means of -pulse from flowmeter 7. To avoid -short shortages) The flow rates were always lower for the sampling lines 15 of the vertical, more distant bd lines for preparing hot utility, than the pressure losses of the vertical sampling lines 15 closer to the machine room for hot water. In order to achieve this condition (in some cases it is necessary to insert inserts 18 to increase the flow resistance in vertical ducts. These inserts 16 and its positioning must be justified by technical calculation.

V třetím případě, při provozu ve výškových budovách se dvěma nebo více tlakovými pásmy j-e provoz analogický, (jako u provozních -stavů prvního a druhého, pouze s tím rozdílem, že mUsí [být nejméně (jedno čerpadlo 6 tťvale 'v chodu pro zajištění potřebného- tlaku v-e vyšších tlakových pásmech. Ostatní čerpadla 6 se spouští o-d poklesu tlaku V primárním potrubí 8, aby dodávala potřebné mniožlství teplé užitkové Voidy a 'vypínají 'se o-d překročení stanoveného tlaku. K impulsu pro spínání -těchto čerpadel 6 slouží kontaktní manometr 20. iSviislá -odběrová potrubí 15 musí být vyhaívena na rozhraní tl-ako-vých pásem redukčními ventily 18 a zásobníky 1 m-usí být opatřeny pojišťovacímu ventily 19 k zabezpečení proti překročení dovoleného tlaku nejnižšího tlakového (pás-ma.In the third case, when operating in high-rise buildings with two or more pressure zones, the operation is analogous (as in the first and second operating states, except that it must be at least one pump 6 running permanently to provide the necessary The other pumps 6 start from the pressure drop in the primary line 8 to supply the necessary amount of hot utility Voids and 'turn off' when the set pressure is exceeded The impulse for switching these pumps 6 is via a contact pressure gauge 20. The vertical sampling lines 15 must be heated at the interface of the tensile zones by pressure reducing valves 18 and the reservoirs 1 m must be provided with safety valves 19 to protect against exceeding the allowable pressure of the lowest pressure zone.

Úsporné řešení úls-třieldního rolzivodu teplé Užitkové -vody, k-te-ré <j-e předmětem přihlášky vynálezu, -zajišťuje stejnou funkci -v zásobování teplou Užitkovou v-odo-u ijiafco dosavadní způsoby rozVodů této -vo-dy, -avšak bez .samostatného cirkulačního potrubí, sloužícího trv-al-e jen- tomuto účelu, č-elhioiž j-e (dosaženo tím, že izásoboivání svislých odběrových'potrubí 15 s výtoky 17 pro odběry teplé mžitkové vbdy je prováděno Ije-dinak shora primárním potrubím 8 a -jednak ado-la, sekundárním potrubím 9, a lže -cirkulační čerpadlo 6 čerpá -'teplou užitkovou Vodu pro clrkula-ci -směrem od zásobníků -teplé Užitkové v-odý 1 k -odběrným potrubím 15 svislým -a 'sékundární potrubí 9 je opatřeno -druhým .zpětným ventilem 11 a prvním zpětným 'ventilem 12, zajišťujícími potřebný -směr toku pr-o zásobování nebo cirkulaci teplé užitkové v-ody -a primární -potrubí 8 je v místě -o-saízení cirkulačního -čerpadla 8 opatřeno třetím 'zpětným ventilem 13 -a čtvrtým -zpětným ventilem 14 umožňujícími průtok teplé užitkové vlotíy primárním potrubím 8 1 při zastavení cirkulačního čerpadla 6.The economical solution of the hot-water hot-water pipe which is the subject of the invention provides the same function in the supply of hot-water hot water as in the existing methods of distribution of this water, but without it. a separate circulation pipe serving this purpose only is achieved by the fact that the accumulation of the vertical sampling pipes 15 with the outlets 17 for hot tapping is taken from the primary pipe 8 and from above The circulation pump 6 pumped the domestic hot water to be circulated away from the storage tanks. The domestic hot water supply 1 to the sampling line 15 with the vertical line 9 and the secondary line 9 is provided with: a second non-return valve 11 and a first non-return valve 12 providing the necessary flow direction for the supply or circulation of the hot service line and the primary line 8 is at the location of the line. The circulation pump 8 is provided with a third non-return valve 13 and a fourth non-return valve 14 to allow the flow of the domestic hot water through the primary pipe 8 1 when the circulation pump 6 is stopped.

Při požadavku automatického spínání a vypínání -cirkulačního čerpadla 6 -olsa.dí Se na primární potrubí 8 -nebo přiváděči p-o-trubí 2 průtokomě-r 7, který při poklesu odběru teplé Užitkové vody .na kritickou hiodn-otu dá impuls pro spuštění -cirkulačního čerpadla 6. Kritickým množstvím teplé užiťko-vé vody se ro-zu-mí to množství, které |j-e potřebné ke krytí tepelných zt-rát -v trubním r-ozvioidu, tedy výkon čerpadla 8.If the circulation pump 6 is to be switched on and off automatically, the flow pipe 7 is provided on the primary pipe 8 or in the supply pipe, which gives an impulse to start the circulation circuit at a critical value at a critical value. The critical amount of hot edible water is that which is necessary to cover the heat loss in the pipe r-ozvioid, i.e. the power of the pump 8.

Dále toto úsporné řešení ústředního· -roZv-odu teplé Užitkové vo-dy pdsitraňuije svým Uspořádáním a -způsobem zař-aze-ní ciik-ulaičníh-o čerpadla 6 d-o funkce a volbou výkonových parametrů tohoto -čar,pudla 8, neb-o -i několika (těchto čerpadel 8, dělení výškových budo-v na tlaková pásma již -ve strojovně -ohřevu -teplé -Užitkové vo-dy -v zásobnících 1 Is tím, že pr-o všechna tlaková pásma slouží jedem zás-obova-cí a -současně -c-i-rfculační trubní oíkriuh vybavený zpětnými ventily -a podle potřeby i .redukčními ventily 18 a umožňuje využívání zásobníků 1 teplé užiltk-Uvé vody nejniiž-ší-ho -tlakového -pásma společně prlo- vše-chna tlaková pásma, -čímž se -podstatně sníží -nároky na celkový -objem zásobníků 1 it-eplé užitkové . vody -a -tím i na stavební pr-os-ťoiry (místnosti) pro zás-oibníky 1 teplé (Užitkové vo-dy.Furthermore, this economical solution of the central utility water will deteriorate its arrangement and manner by placing the pump 6 into the function and by selecting the power parameters of this line, poodle 8, or o -. several (these pumps 8, dividing the height buildings into pressure zones already in the machine-heating-hot-utility water in the storage tanks 1, in that all the pressure zones serve one buffer and At the same time, the control tube is equipped with non-return valves and, if necessary, pressure reducing valves 18, and allows the use of hot water storage tanks 1 of the lowest pressure band together all pressure zones, thereby The demand for the total volume of the water storage tanks 1 and, in particular, for the construction of the hot water storage rooms (the utility water) is substantially reduced.

P-ředin-oisití ú-sp-oímého- řešení -rozvodů te-plé užitko-vé voidy j-e- odstranění z-c-e-la (svislých 'fctrkula-čních p-otrulbí ,a Idál-e' vyUžívání dolní části ležatého iro-zjyod-u 9 podle Ukamlži-té Velikostí spotřeby teplé uiž-ltko(vé védy buď .pro zásobování, nebo pro- zajištění cirkulace tím, Iž-e v (této části potrubního ,rozvodu protéká 'vo-dia střídavě podle potřeby, tj. -v obou 'směrech. Odstranění 'svislých cirkulačních potrubí (j-e dosaženo· vyvedením primárního zásobova-clho- p-oitrlubí 8 -d-o nejblíže ine-jvyššíhlo podlaží zástavby -a vedení ležatého primárního potrubí 8 v mejvýšších podlažích -zástavby. Střídavého- využívání is-ekuinldá-rního ležatého p-o-trubí 9, vedeného ivěťšii-n-ou v nej-nižiším podlaží, p-oidle potřeby Ik -zásobování, neb-o k cirkulací za účelem -opětovného ohřevu teplé užitkové -v-o-dy j-e dolsaž-eino tím, že cirkulační čerpadlo 6 je pis.ázeno na primárním potrubí 8 tak, alby čerpalo Užitkovou -vodu isměrem o-d zásobníku 1 .teplé -Užitkové vody , d-o· trubních rozvodů vedoucích k mís-tům' spotřeby teplé užitkové vody. Tím je 1 objem-évá kapacita čerpadla 8 využívána pro (zásobování, pokud -o-dběr T-UV = = -teplé Užitko-vé (vody nepoklesne p-od tuto kapacitu, K clrkula-ci teplé užitkové vo-dy zpět k opětovnému ohřátí V zásobnících teplé užitkové (vody dojde ,automaticky tep-rVe -tehdy, až Začne (kíl-esiat ,o-dběr teplé užltko-vé ivo-dy po-d objemový výkon -cirkulačního čerpadla 8, 'a to (zcel-a pozvolna tak, ja|k butí-ou klesat odběry teplé Užltko-vé V-oldy.The solution for hot water utility distribution is the removal of the entire surface (vertical focussing), and the use of the lower part of the horizontal iro-zyod. In accordance with the utilized amount of consumption, the hot science (either the supply or circulation) by the water (this part of the pipeline flows alternately as needed, i.e. both). Removal of vertical circulation pipes (achieved by routing the primary supply-clho-p-o-tubing 8) to the nearest floor of the installation-and guiding the horizontal primary piping (8) on the upper floors-of the installation. The horizontal horizontal pipe 9, led more particularly at the lowest floor, as needed for the supply or circulation for the purpose of reheating the hot utility water, is furthermore achieved by the fact that Circulation no The pump 6 is described on the primary piping 8 so as to pump the utility water through the duct of the domestic hot water tank 1, the ducts leading to hot water consumption points. As a result, the 1 capacity of the pump 8 is used for (supply if -take-off T-UV = = hot utility) (the water does not drop from this capacity) to circulate the hot utility water back to heating in hot water storage tanks (water runs out, automatically warm-up until it starts (kilo-esiat, o-collection of hot-yellow food) after the volume capacity of the circulation pump 8, and that (totally) The withdrawal of the warm Yellow-V-oldy gradually decreases with the bead.

Rozděleiní na tlaková pásm-a jíž ve -s-trpijioivně zřizováním samotných tlakových zásobníků 1, neb-o je-jich skupin odděleně prd každé tlakové pásm-o je -odstraněno -tím, že 'Cirkulační čerpadla 8 na primár-Hím potrubí 8 rozvodu teplé užitkové vody, čerpající 'Směrem od zásobníků 1 k výtokům 17 na vertikálních 0'dhěro'vých potrubích 15 podle potřeby je možno zvolit o takových parametrech výkonu, aby dopravilo teplou užitkovou vodu do ležatého primárního rožviodu v nejí vylSším podlaží s potřebným přetlakem a -V po-, třebném mňoižlství. Případný, takto vzniklý přetlak ve isivislých potrubích 15 rozvodu teplé užitkové vody v niižiších podlažích je možné podle potřeby redukovat pomocí redukčních ventilů 18. Píro doisažení hospodárnosti provozu je vhodné u řešení vyšších tlakových pásem používat skupiny icirkulačních čerpadel 6, zapínaných postupně podle potřeby o)d poklesu tlaku ve výtlačném potrubí těchto .čerpadel 6 a vypínaných od stoupnutí tlaku nad potřebnou hodnotu.They are subdivided into a pressure zone by having the pressure reservoirs 1 themselves, or groups thereof separately from each pressure zone, being removed by circulating pumps 8 on the primary manifold 8. The domestic hot water pumping from the storage tanks 1 to the outlets 17 on the vertical 0'h line 15 can be selected as required to deliver the domestic hot water to the horizontal primary pipeline at the highest floor with the required overpressure, and In the needy moyancy. Any overpressure thus created in the horizontal pipes 15 of the domestic hot water distribution system on the lower floors can be reduced by means of pressure reducing valves 18 as required. In order to achieve economical operation, it is advisable to use groups of circulating pumps 6 the pressure drop in the discharge line of these pumps 6 and shut off from the pressure rise above the required value.

Využití ‘vynálezu ije lu lbytoivé výstavby především sídlištní, vícepodlažní, administrativních a sociálních budov průmyslových objektů, nemocnic a .rovněž u rekonstrukcí těchto budov, především u 'sídlišť, /kde v současné době trubní rozvody teplé užitkové vody Idóžívají.The use of the invention is in the construction of housing, multi-storey, office and social buildings of industrial buildings, hospitals, and also in the reconstruction of these buildings, especially housing estates, where currently hot water pipes are used.

Claims (2)

PŘEDMĚTSUBJECT 1. Ústřední rozvod teplé užitkové vody pro zásobování výtoků teplou uaitkoivou 'vodou sestávající ize zásobníků teplé užitkové vody, čerpadel, zpětných ventilů, pojistných ventilů, redukčních ventilů, průtokoměrů, manometrů, spojovacího potrubí a výtoků teplé užitkové vody, vyznačený tím, že zásobník (1) teiplé užitkové vody je napojen 'přiváděcím potru. bím (2) ina veřejnou vodoVoldní'isíť a v místě určeném pro vracení ochlazené vody je druhým potrubím (10) na)pojen přels první zpětný ventil ;(1:2) jednak na ležaté sekundární potrubí i(9) a jednak přes druhý zpětný ventil (11) na třetí potrubí. (4) napojené spolu s primárním potrubím (3) pomočí čtvrtého potrubí j5) na nejméně jedno .cirkulační čerpadlo (6), dále je zásobník pl) opatřen pojistným ventilem .(19) .a v místě určeném pro odběr ohřáté vody napojen na prilmáirní poVYNALEZU triufoí '(3), vybavené iťřetím 'zpětným' ventilem (13) a popřípadě průtokoměrem (7), ‘které navazuje jednak na čtvrté potrubí (5) napojené přes čtvrté .zpětné ventily (14) na výtlačnou stranu cirkulačních čerpadel (6) a jednak na ležaté primární potrubí (8), přičemž mezi ležaté primární potrubí (8) a mezi ležaté sekundární potrubí ,(9) jisou vložena svislá .oidběrlová potrubí (15), opatřená v podlažích výtoky (17) teplé užitkové vody .a popřípadě 1 odporovými vložkami (16).A central domestic hot water distribution system for supplying hot and hot water outlets consisting of hot water tanks, pumps, non-return valves, safety valves, pressure reducers, flow meters, manometers, connecting pipes and hot water outlets, characterized in that the tank ( 1) the domestic hot water is connected to the supply screed. (2) in the public water mains and at the chilled water return point, the second line (10) is connected via the first non-return valve (1 : 2) to the downstream secondary line (9) and through the second return line a valve (11) on the third pipe. (4) connected together with the primary pipe (3) by means of the fourth pipe (5) to at least one circulation pump (6), the reservoir pl) is provided with a safety valve (19). OF THE INVENTION having a third non-return valve (13) and optionally a flow meter (7) connected to a fourth line (5) connected via a fourth non-return valve (14) to the discharge side of the circulation pumps (6) and, on the other hand, on the primary primary pipe (8), wherein vertical vertical collecting pipes (15) are provided between the primary primary pipe (8) and the secondary secondary pipe (9), provided with hot service water outlets (17) on the floors and optionally 1 with resistance inserts (16). 2. Ústřední rpzvod (teplé Užit ke v é vody .podle bodu 1, vyznačený 'tím, že u výškových budov na primárním potrubí .(8) /je oísažen. manometr (20) pro spínání čerpadel (6) tlakových pásem, a že do Svislého odběrového po trubí )(.16) jlsou na rozhraní tlakových pásem zařazeny redukční Ventily ,(18).2. A central water distribution system according to claim 1, characterized in that, in high-rise buildings on the primary pipe (8), a pressure gauge (20) is provided for switching the pressure band pumps (6) and that: (18) are fitted at the interface of the pressure zones with pressure reducing valves (18).
CS179979A 1979-03-19 1979-03-19 Central distributor of warm service water CS205823B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CS179979A CS205823B1 (en) 1979-03-19 1979-03-19 Central distributor of warm service water

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CS179979A CS205823B1 (en) 1979-03-19 1979-03-19 Central distributor of warm service water

Publications (1)

Publication Number Publication Date
CS205823B1 true CS205823B1 (en) 1981-05-29

Family

ID=5353273

Family Applications (1)

Application Number Title Priority Date Filing Date
CS179979A CS205823B1 (en) 1979-03-19 1979-03-19 Central distributor of warm service water

Country Status (1)

Country Link
CS (1) CS205823B1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CZ309979B6 (en) * 2023-01-11 2024-03-27 Pavel Ing Koudelka A circulation system for domestic water heating

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CZ309979B6 (en) * 2023-01-11 2024-03-27 Pavel Ing Koudelka A circulation system for domestic water heating
EP4400775A1 (en) 2023-01-11 2024-07-17 Pavel Koudelka A circulating system for domestic hot water

Similar Documents

Publication Publication Date Title
CN102278784B (en) Distributed direct-mixing heat supply system
EP2672190B1 (en) Ambient air-conditioning unit for residential use
US20100034528A1 (en) Water heating apparatus and system
AU2010338399B2 (en) Pressure enhancing device
EP2383523B1 (en) Heating plant for the production of domestic hot water
EP2963349A1 (en) Fluid-heating apparatus
EE01530U1 (en) A combined system of service water heating and a heating medium for domestic heating
CN104236102A (en) Water supply system
AU2007214261B2 (en) Hot water system
US12077949B2 (en) Method for operating a circulation system, and circulation system
CN206160500U (en) Hanging is water route control device for stove
CS205823B1 (en) Central distributor of warm service water
US11988395B2 (en) Thermal energy extraction assembly
SU765601A1 (en) Open heat supply system
CN107543240B (en) Heating system subregion conversion equipment
IT202000003386A1 (en) CENTRALIZED AIR CONDITIONING SYSTEM
RU105719U1 (en) BLOCK HEAT ITEM (OPTIONS)
CN210740506U (en) Heat exchange unit
JP2012063091A (en) Hot water supply apparatus
EP4400775A1 (en) A circulating system for domestic hot water
CN211474531U (en) Cooling water device for oil station of induced draft fan
CN210980000U (en) Low-energy-consumption steam generator system
ITMI990596A1 (en) COMBINED TYPE ACCUMULATION BOILER
CN205217530U (en) Ground heating coil incrustation scale circulation clearing device
CN215062324U (en) Multi-element cleaning heat supply system based on mixing of gas condensing boiler and medium-deep geothermal heat