CS207953B1 - Inventary casing for concreting the plates of the bridge floor of the coopled steel-concrete bridges - Google Patents

Inventary casing for concreting the plates of the bridge floor of the coopled steel-concrete bridges Download PDF

Info

Publication number
CS207953B1
CS207953B1 CS374979A CS374979A CS207953B1 CS 207953 B1 CS207953 B1 CS 207953B1 CS 374979 A CS374979 A CS 374979A CS 374979 A CS374979 A CS 374979A CS 207953 B1 CS207953 B1 CS 207953B1
Authority
CS
Czechoslovakia
Prior art keywords
bridge
formwork
main
beams
plates
Prior art date
Application number
CS374979A
Other languages
Czech (cs)
Inventor
Zdenek Severin
Miloslav Klimes
Otakar Zelenka
Pavel Cieslar
Heinz Gramel
Original Assignee
Zdenek Severin
Miloslav Klimes
Otakar Zelenka
Pavel Cieslar
Heinz Gramel
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zdenek Severin, Miloslav Klimes, Otakar Zelenka, Pavel Cieslar, Heinz Gramel filed Critical Zdenek Severin
Priority to CS374979A priority Critical patent/CS207953B1/en
Publication of CS207953B1 publication Critical patent/CS207953B1/en

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Description

Vynález se týká inventárního bednění k betonování desek mostovky spřažených ocelobetonových mostů a podobných konstrukcí.BACKGROUND OF THE INVENTION The present invention relates to inventive formwork for concreting deck slab composite steel-concrete bridges and similar structures.

Betonování desek mostovek ocelobetonových mostů a podobných konstrukcí lze provádět za pomoci bednění ze dřeva, které je formou, tvořící negativ tvaru desky mostovky, do níž se betonuje. Poměrně vysokou spotřebu deficitního materiálu na zhotovení bednění a nezbytného lešení pro celou délku mostu, jakož i vysoké náklady na odbedňování částečně odstraňuje opakovaně používané inventární dřevěné bednění, přičemž se pro úsporu dřeva používá kovové bednění. Nevýhodou těchto druhů inventárního bednění je nepříznivý poměr jejich amortizace k pořizovací ceně a dále to, že jsou nevhodné pro betonování desek mostovky u spřažených ocelobetonových mostů, protože jejich montáž a demontáž je pracná.The concreting of bridge deck slabs of steel-concrete bridges and similar constructions can be carried out with the help of wood formwork, which is a form forming a negative shape of the slab deck into which the concrete is concreted. The relatively high consumption of deficient material for the formwork and the necessary scaffolding for the entire length of the bridge, as well as the high cost of the formwork, is partially eliminated by reusable inventory wood formwork, using metal formwork to save wood. The disadvantage of these types of inventory formwork is the unfavorable ratio of their amortization to the purchase price and furthermore that they are unsuitable for concreting the deck slabs of composite steel-concrete bridges because their assembly and dismantling is laborious.

Uvedené nedostatky odstraňuje předložený vynález, jehož předmětem je inventární bednění k betonování desek mostovky spřažených ocelobetonových mostů a podobných konstrukcí. Podstatou vynálezu je, že inventární bednění sestává například z vlnitých plechů, překrytých rovnými plechy shodných rozměrů a že k betonování desek mostovky v prostoru mezi dvěma hlavními nosníky mostu jsou desky bednění uloženy pod dolním lícem horních přírub hlavních nosníků mostu na montážních příčnících, připojených odnímatelně spojovacími úhelníky a šrouby ke stojinám hlavních nosníků mostu. Podstatou vynálezu dále je, že betonování desek mostovky vně hlavních nosníků mostu jsou desky bednění uloženy na profilových konzolách, spojených odnímatelně prostřednictvím šroubů s jedněmi konci osově stavitelných trubkových vzpěr, jejichž druhé konce jsou k usazení mezi horním lícem dolních přírub a stojinami hlavních nosníků mostu opatřeny tvarovanými patkami.The present invention is directed to inventive formwork for concreting deck slabs of composite steel-concrete bridges and similar structures. The essence of the invention is that the inventive formwork consists, for example, of corrugated sheets covered with straight sheets of equal dimensions and that, for concrete slab decking in the space between two main bridge beams, the formwork is mounted below the lower face of the upper flange of the main bridge beams on mounting crossbars angles and bolts to the webs of the main bridge beams. It is a further object of the invention that the concreting slabs of the decking outside the main bridge beams are formwork mounted on profile brackets connected detachably by bolts to one end of the axially adjustable tubular struts, the other ends of which are seated between the upper face of the lower flanges and shaped feet.

Výhodou inventárního bednění podle vynálezu je, že není nutno budovat montážní lešení, připojení montážních příčníků a profilových konzol spojovacími úhelníky a šrouby umožňuje snadnou montáž desek bednění a to nezávisle, pokud jde o část mostovky v prostoru mezi dvěma hlavními nosníky nebo vně hlavních nosníků, takže desky bednění lze odbedňovat postupně po dílech. Montážní příčníky mezi hlavními nosníky mostu plní dočasně funkci zavětrování; vzpěry pro uložení desek bednění vně hlavních nosníků mostu lze osově stavět vzhledem k jejich teleskopickému uspořádání. Dosáhne se rovného podhledu ocelobetonové desky mostovky a dolní líc horních přírub hlavních nosníků mostu je po celé délce mostu zachován.The advantage of inventive inventive formwork is that there is no need to build a scaffolding, connecting crossbeams and profile brackets with connecting angles and bolts allows easy assembly of formwork boards, independently of the deck deck in the space between two main beams or outside the main beams, so The shuttering boards can be stripped off in steps. The crossbars between the main bridge beams temporarily perform the bracing function; the struts for supporting the formwork plates outside the main bridge beams can be axially adjusted due to their telescopic arrangement. A flat ceiling of the steel-concrete slab of the bridge deck is achieved and the lower face of the upper flanges of the main bridge beams is maintained along the entire length of the bridge.

Na připojeném výkresu je schematický znázorněn příklad provedení inventárního bednění k be207953 tónování desek mostovky spřaženého ocelobetonového mostu podle vynálezu, kde na obr. 1 je nakreslen příčný řez částí mostní konstrukce, opatřené inventárním bedněním podle vynálezu a obr. 2 představuje půdorysný pohled na tuto část mostní konstrukce před betonováním desek mostovky.BRIEF DESCRIPTION OF THE DRAWINGS FIG. 1 is a cross-sectional view of a portion of a bridge structure provided with inventive formwork; and FIG. 2 is a plan view of this portion of the bridge deck. constructions before concreting of bridge deck slabs.

Inventární bednění podle příkladného provedení je tvořeno deskami 7 bednění. Desky 7 bednění sestávají ze širokých ohýbaných profilů, vyrobených z plechu. Tento tvarovaný plech je překryt rovnými plechy. Tím je dosazeno rovného podhledu desky mostovky po jejím vybetonování. K betonování desek mostovky v prostoru mezi dvěma hlavními nosníky 1 mostu jsou desky 7 bednění uloženy svými delšími stranami rovnoběžně s podélnou osou mostu a to pod dolním lícem horních přírub hlavních nosníků 1 mostu na montážních příčnících 4, které jsou vyrobeny z U profilů a jsou připojeny odnímatelně za pomoci spojovacích úhelníků 5 a šroubů 6 ke stojinám hlavních nosníků 1 mostu. Po vybetonování desky mostovky zůstává dolní líc horních přírub hlavních nosníků 1 mostu zachován a zesílení těchto horních přírub je provedeno do betonové hmoty desky mostovky. Montážní příčníky 4, připojené k hlavním nosníkům 1 mostu, plní při betonování až do zatuhnutí betonové hmoty desek mostovky a sejmutí inventárního bednění podle vynálezu též funkci zavětrování. K betonování desek mostovky vně hlavních nosníků 1 mostu jsou desky 7 bednění uloženy na profilových konzolách 3, vyrobených z úhelníků a spojených odnímatelně prostřednictvím šroubů s jedněmi konci stavitelných trubkových vzpěr 2, jejichž druhé konce jsou k usazení mezi horním lícem dolních přírub a stojinami hlavních nosníkůThe inventive formwork according to the exemplary embodiment consists of the formwork plates 7. The formwork plates 7 consist of wide bent profiles made of sheet metal. This shaped sheet is covered with straight sheets. Thus, a flat soffit of the bridge deck slab is achieved after concreting. For concrete slab decking in the space between two bridge main girders 1, the formwork boards 7 are placed with their long sides parallel to the longitudinal axis of the bridge under the lower face of the upper flanges of the bridge main girders 1 on mounting crossbars 4 made of U profiles and connected detachably by means of connecting angles 5 and screws 6 to the webs of the main beams 1 of the bridge. After concreting the deck slab, the lower face of the upper flanges of the main bridge beams 1 is retained and the upper flanges are reinforced into the concrete mass of the deck slab. The mounting crossbars 4, connected to the main bridge beams 1, also perform the bracing function during concreting until the concrete mass of the decking boards solidifies and the inventive formwork is removed. For concrete slab decking outside the main bridge beams 1, the formwork plates 7 are mounted on profile brackets 3 made of angles and connected detachably by bolts with one end of the adjustable tubular struts 2, the other ends of which are seated between the upper face of the lower flanges and the main beams

Claims (2)

PŘEDMĚTSUBJECT 1. Inventární bednění k betonování desek mostovky spřažených ocelobetonových mostů a podobných konstrukcí, vyznačené tím, že je tvořeno deskami (7) bednění, sestávajícími například z vlnitých plechů, překrytých rovnými plechy shodných rozměrů přičemž k betonování desek mostovky v prostoru mezi dvěma hlavními nosníky (1) mostu jsou desky (7) bednění uloženy pod dolním lícem horních přírub hlavních nosníků (1) mostu na montážních příčnících (4), připojených odnímatel1 mostu opatřeny tvarovanými patkami. Prostorová tuhost trubkových vzpěr 2 je zajištěna zavětrovacími trubkami, spojenými odnímatelně se vzpěrami 2 a situovanými rovnoběžně s osou mostu. Otvory ve spojovacích úhelnících 5, v montážních příčnících 4 a v profilových konzolách 3 jsou vhodně zvětšeny, aby byla usnadněna montáž a demontáž montážních příčníků 4, profilových konzol 3 a desek 7 bednění.Inventory formwork for concreting decking slabs of composite steel-concrete bridges and similar structures, characterized in that it consists of formwork boards (7), consisting, for example, of corrugated sheets covered with flat sheets of equal dimensions, and for concreting decking slabs in the space between two main beams 1) of the bridge, the shuttering boards (7) are placed under the lower face of the upper flanges of the main bridge beams (1) on the mounting crossbars (4) connected by the bridge remover 1 with shaped feet. The spatial stiffness of the tubular struts 2 is ensured by bracing tubes connected detachably to the struts 2 and situated parallel to the bridge axis. The apertures in the connecting angles 5, the mounting crossbars 4 and the profile brackets 3 are suitably enlarged to facilitate the assembly and disassembly of the mounting crossbars 4, the profile brackets 3 and the shuttering plates 7. Montáž desek 7 bednění v prostoru mezi dvěma hlavními nosníky 1 mostu se provede tak, že se ke spojovacím úhelníkům 5, připojeným šrouby 6 ke stojinám hlavních nosníků 1 mostu, připevní dalšími šrouby 6 montážní příčníky 4, na které se svými delšími stranami, rovnoběžnými s osou mostu, uloží' jednotlivé desky 7 bednění. Rovné plechy desek 7 bednění, přivrácených k horním přírubám hlavních nosníků 1 mostu, se přitom podsunou pod dolní líc těchto přírub, takže se při následujícím vybetonování desky mostovky nachází dolní líc horních přírub hlavních nosníků 1 v jedné rovině s horní stranou desky 7 bednění. Odbednění postupuje tak, že se odmontují montážní příčníky 4 a jednotlivé desky 7 bednění. Obdobně se postupuje při montáži bednění pro betonování desek mostovky vně hlavních nosníků 1 mostu: k profilovým konzolám 3, připevněným spojovacími úhelníky 5 a šrouby 6 k hlavnímu nosníku 1 mostu, se přišroubují jedny konce vzpěr 2, které se druhými konci, opatřenými tvarovanými patkami, usadí mezi horním lícem dolní příruby a stojinou hlavního nosníku 1 mostu. Na profilové konzoly 3 se uloží jednotlivé desky 7 bednění a vzpěry 2 se navzájem spojí zavětrovacími trubkami, situovanými rovnoběžně s osou mostu. Demontáž bednění probíhá opačným postupem.The formwork plates 7 are mounted in the space between the two main bridge beams 1 by attaching the mounting crossbars 4 to the connecting angles 5, connected by screws 6 to the webs of the bridge main beams 1, to which they are parallel with axis of the bridge, the individual formwork plates 7 are supported. The straight sheets of the shuttering boards 7 facing the upper flanges of the bridge main beams 1 are thereby pushed below the lower face of the flanges so that the next face of the decking slab is aligned with the lower face of the main flanges 1 of the main beams. The formwork proceeds by removing the mounting crossbars 4 and the individual formwork plates 7. A similar procedure is followed for assembling the formwork for concrete slab decking outside the main bridge girders 1: one end of the struts 2 is screwed to the profile brackets 3, fastened with connecting angles 5 and screws 6 to the bridge girder 1, seat between the upper face of the lower flange and the web of the main beam 1 of the bridge. Individual formwork plates 7 are placed on the profile brackets 3 and the struts 2 are connected to each other by wind tubes situated parallel to the bridge axis. The formwork is dismantled in the reverse order. VYNÁLEZU ně spojovacími úhelníky (5) a šrouby (6) ke stojinám hlavních nosníků (1) mostu.SUMMARY OF THE INVENTION By means of connecting brackets (5) and screws (6) to the webs of the main beams (1) of the bridge. 2. Inventární bednění podle bodu 1, vyznačené tím, že k betonování desek mostovky vně hlavních nosníků (1) mostu jsou desky (7) bednění uloženy na profilových konzolách (3), spojených odnímatelně prostřednictvím šroubů s jedněmi konci osově stavitelných trubkových vzpěr (2), jejichž druhé konce jsou k usazení mezi horním lícem dolních přírub a stojinami hlavních nosníků (1) mostu opatřeny tvarovanými patkami.Inventory formwork according to claim 1, characterized in that the formwork boards (7) are mounted on profile brackets (3) connected removably by means of screws to one end of the axially adjustable tube struts (2) to concret the decking boards outside the main bridge beams (1). ), whose second ends are provided with shaped feet for seating between the upper face of the lower flanges and the webs of the main bridge beams (1).
CS374979A 1979-05-31 1979-05-31 Inventary casing for concreting the plates of the bridge floor of the coopled steel-concrete bridges CS207953B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CS374979A CS207953B1 (en) 1979-05-31 1979-05-31 Inventary casing for concreting the plates of the bridge floor of the coopled steel-concrete bridges

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CS374979A CS207953B1 (en) 1979-05-31 1979-05-31 Inventary casing for concreting the plates of the bridge floor of the coopled steel-concrete bridges

Publications (1)

Publication Number Publication Date
CS207953B1 true CS207953B1 (en) 1981-08-31

Family

ID=5378486

Family Applications (1)

Application Number Title Priority Date Filing Date
CS374979A CS207953B1 (en) 1979-05-31 1979-05-31 Inventary casing for concreting the plates of the bridge floor of the coopled steel-concrete bridges

Country Status (1)

Country Link
CS (1) CS207953B1 (en)

Similar Documents

Publication Publication Date Title
US20100071141A1 (en) Variable length beam
CA2249921C (en) Modular shoring frame and system
PT90137B (en) COVERS ASSEMBLY ACCESSORIES FOR THE CONSTRUCTION OF BETAO LEAKAGE MOLDS
US4098045A (en) Wall forming construction unit
US2687193A (en) Metal falsework carrier for reinforced brickwork and reinforced concrete structures
CN116201350B (en) A construction method of a steel-concrete combined large formwork system for fair-faced concrete construction
CN217760128U (en) Assembled floor support truss that does not fall to ground
JP2002061121A (en) Floor plate formwork structure for girder bridge and method of manufacturing the same
RU2081270C1 (en) Movable shutter for concreting floors
CZ748U1 (en) Shuttering for concreting deck slabs of composite reinforced-concrete bridges
JPH046450Y2 (en)
RU177134U1 (en) FORMWORK FOR MONOLITHIC CONCRETE OF CONSTRUCTION STRUCTURES
CN224032153U (en) Detachable temporary support truss and mounting structure thereof
CN115045484B (en) Erection method of reinforced concrete truss beam one-time casting support system
RU2161220C1 (en) Bridge and method for bridge erection
JPS6215403Y2 (en)
SU916715A1 (en) SHUTTLE FORMWORK 1
CN214220085U (en) Combined light steel keel concrete mixed structure
RU2164580C1 (en) Form for concreting ceilings
RU2163958C1 (en) Prefabricated three-dimensional building block
RU2049882C1 (en) Movable concrete form for concreting floors
JPH0421410Y2 (en)
SU1216273A1 (en) Reinforcement structure for steel-ferroconcrete bridge span
JPH0144686Y2 (en)
SU992706A1 (en) Knock-down shiftable small-board form