CS210793B1 - Circuit for insatntaneous digital evaluation of instantaneous deviation - Google Patents

Circuit for insatntaneous digital evaluation of instantaneous deviation Download PDF

Info

Publication number
CS210793B1
CS210793B1 CS654278A CS654278A CS210793B1 CS 210793 B1 CS210793 B1 CS 210793B1 CS 654278 A CS654278 A CS 654278A CS 654278 A CS654278 A CS 654278A CS 210793 B1 CS210793 B1 CS 210793B1
Authority
CS
Czechoslovakia
Prior art keywords
block
input
output
power
clock
Prior art date
Application number
CS654278A
Other languages
Czech (cs)
Inventor
Zdenek Cepel
Original Assignee
Zdenek Cepel
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zdenek Cepel filed Critical Zdenek Cepel
Priority to CS654278A priority Critical patent/CS210793B1/en
Publication of CS210793B1 publication Critical patent/CS210793B1/en

Links

Landscapes

  • Supply And Distribution Of Alternating Current (AREA)

Description

Vynález se týká zapojeni obvodu pro okamžité číslicové vyhodnocování okamžité odchylky mezi skutečným a předem určeným odběrem elektrické energie.The invention relates to a circuit for instantaneous digital evaluation of the instantaneous deviation between actual and predetermined power consumption.

Pro zajištění pokud možno rovnoměrného odběru elektrické energie v jednotlivých hodinách dne i v jednotlivých dnech v týdnu a za účelem potlačení odběrových špiček, sjednávají rozvodné závody s velkoodběrateli elektrické energie, kterými jsou převážně průmyslové podniky, množství odebrané elektrické energie a rozložení odběru v jednotlivých dnech a jednotlivých hodinách. Množství a rozložení odběru se sjednává pravidelně s měsíčním předstihem.In order to ensure as uniform a consumption of electricity as possible during the hours of the day and of the days of the week and to suppress peak demand, the distribution plants shall negotiate with large-scale electricity customers, predominantly industrial enterprises, electricity consumption and day-to-day distribution; individual hours. The quantity and distribution of the collection is agreed regularly one month in advance.

Přehled předem sjednaného množství odběru elektrické energie v jednotlivých dnech a hodinách se nazývá odběrový diagram. Nedodržení odběrového diagramu,a to jak překročení, tak neodebrání se od určité meze penalizuje, přičemž dodržování odběrového diagramu se sleduje a porovnává samostatně pro každou hodinu. Porovnává se tedy skutečný odběr v jednotlivé hodině se sjednaným odběrem y této hodině. Proto se v průmyslových podnicích průběžně každou hodinu zjištuje, zda nedochází k nedovolené odchylce mezi skutečným a předem sjednaným odběrem. Pokud k této odchylce dochází, provádí podnik regulační opatření tím, že zapíná nebo vypíná vhodné spotřebiče, čímž se odchylka odstraní, anebo se alespoň minimalizuje.An overview of the pre-agreed amount of electricity consumption in individual days and hours is called a consumption diagram. Failure to comply with the sampling diagram, whether exceeded or not, shall be penalized from a certain limit, and compliance with the sampling diagram shall be monitored and compared separately for each hour. Therefore, the actual consumption at an individual hour is compared with the agreed consumption at that hour. For this reason, it is continuously monitored in industrial companies every hour whether there is an unauthorized deviation between actual and pre-agreed offtake. If this deviation occurs, the enterprise takes regulatory action by switching on or off suitable appliances, thereby eliminating the deviation or at least minimizing it.

Ne jjednodušší způsob sledování odchylky mezi sjednaným a skutečným odběrem elektrické energie v podnicích se provádí tak, že se v prvních třech čtvrthodinách každé hodiny odebírá elektrická energie podle potřeby a v poslední čtvrthodině se odběr ručně reguluje bu3 zapínáním nebo vypínáním některých například méně důležitých spotřebičů tak, aby se skutečný odběr co nejvíce přiblížil sjednanému odběru. Jak dalece se to podařilo se zjištuje po vytištění skutečného hodinového odebraného množství tiskárnou maxigrafu a porovnáním této hodnoty s odběrovým diagramem.The simplest way to monitor the deviation between the agreed and actual electricity consumption in companies is by taking electricity as needed during the first three quarters of an hour, and manually controlling the consumption by switching on or off some of the less important appliances in the last quarter. so that the actual consumption is as close as possible to the agreed consumption. How far this has been done is determined by printing the actual hourly quantity taken by the maxigraph printer and comparing this value with the sampling diagram.

213793213793

2,07932,0793

Výhodnější způsob sladování a vyhodnocování této odchylky je za použiti impulsového elektroměru a čítače. Údaje z impulsového elektroměru se shromažďují v čítači, jehož stav se po každé čtvrthodině nuluje. Obsluha má možnost v každé minutě kontrolovat množství skutečně odebrané elektrické energie a porovnávat ji s předem připravenou tabulkou předpokládaného odběru v této době.A more preferred method of malting and evaluating this deviation is by using a pulse electrometer and a counter. Data from the pulse meter are collected in a counter, which is reset every quarter hour. The operator has the possibility to check the amount of electricity actually consumed at each minute and compare it with a pre-prepared table of expected consumption at this time.

Tabulka je vypracována podle údajů odběrového diagramu. Srovnáním údajů v tabulce a údajů skutečného odběru se obsluha rozhoduje o způsobu regulace.The table is based on the sampling diagram. By comparing the data in the table with the actual consumption data, the operator decides on the control method.

Dosud známé způsaby vyhodnocování jsou značně nepřesné a nepohotové. Jsou velmi náročné na obsluhu, její zkušenost a bystrost. Kladou značné požadavky na rychlou reakci obsluhy a vyvolávají její značné psychická zatížení. Pracovník, který rozhoduje o zapnutí nebo vypnutí určitých spotřebičů, má obvykle značnou kvalifikaci, zkušenosti i přehled o chodu podniku, aby mohl správně rozhodovat a nezpůsobil nesprávným rozhodnutím výpadky při výrobě nebo jiné obtíže.The known methods of evaluation are very inaccurate and unwilling. They are very demanding on the operator, their experience and sharpness. They place considerable demands on the operator's rapid reaction and cause considerable psychological stress. A worker who decides to turn certain appliances on or off usually has considerable qualifications, experience and insight into the operation of the business so that he can make the right decisions and not cause production failures or other difficulties by making incorrect decisions.

Dále jsou známá zapojeni, která slouží pro sledování dvou hodnot maxima, a to jednoho maxima při nočním odběru a jednoho maxima při denním odběru. U těchto zapojení se předpokládá, že maximum ve sledovaném denním nebo nočním období bude ve všech hodinách stejná.In addition, there are known connections which serve to monitor two peak values, one peak at night and one peak at day. For these connections, the maximum in the monitored day or night period is expected to be the same in all hours.

Jsou známá táž zapojeni, které přeměňuji frekvenci impulsů odpovídajících skutečnému a požadovanému odběru na stejnosměrné napětí a porovnávají skutečnou a předpokládanou hodnotu. Při nebezpečí překročení nebo nedodržení žádané hodnoty vysílají signály, nebo se ovládají spínací relé pro zapnutí nebo vypnutí jednoho nebo více spotřebičů či skupin spotřebičů.The same circuitry is known which converts the pulse frequency corresponding to the actual and desired demand to DC voltage and compares the actual and predicted value. If there is a danger of exceeding or falling below the setpoint, they send signals or operate a switching relay to turn one or more appliances or groups of appliances on or off.

Nevýhodou těchto zapojení, která jsou na vysoké technické úrovni je, že nejsou vhodná v případech, kdy se požadavky na odběr energie mění nejen v jednotlivých dnech týdne i v hodinách jednotlivých dnů. Další nevýhodou těchto zapojení je, že odvozují srovnávací kmitočet od kmitočtu sítě. Toto řešení .vyhovuje v těch případech, kdy je kmitočet sítě konstant ní. V případě kolísání síťového kmitočtu, jsou výsledky nepřesné. Proto se hledají cesty, které by umožnily sledovat v každém okamžiku odchylku od odběrového diagramu, který se v jednotlivých dnech i hodinách mění, přičemž srovnávací kmitočet nemá být závislý na síťovém kmitočtu sítě.The disadvantage of these high-tech connections is that they are not suitable in cases where energy demand changes not only on individual days of the week, but also on individual days of the day. A further disadvantage of these wiring is that they derive the comparator frequency from the grid frequency. This solution is suitable in those cases where the network frequency is constant. In case of mains frequency fluctuations, the results are inaccurate. Therefore, ways are sought which would allow to observe at any moment a deviation from the sampling diagram, which varies from day to hour, while the comparison frequency should not be dependent on the network frequency of the network.

Tyto požadavky splňuje zapojení obvodu pro okamžité číslicové vyhodnocování okamžité odchylky mezi skutečným a předem určeným odběrem elektrické energie, u kterého je výstup každého spínačového bloku spojen se spínačovým vstupem odpovídajícího synchronizačního bloku a synchronizovaný výstup prvního synchronizačního bloku je spojen s hodnotovým vstupem vyhodnocovacího bloku podle vynálezu. Podstata vynálezu spočívá v tom, že třetí hodinový výstup generátoru hodinových pulsů je spojen s hodinovým vstupem dělicího bloku, jehož výstup je spojen se srovnávacím vstupem vyhodnocovacího bloku. Nastavovací vstup vyhodnocovacího bloku je spojen s nastavovacím vstupem dělicího bloku a s nastavovacím výstupem druhého synchronizačního bloku, jehož první hodinový vstup je spojen s prvním hodinovým vstupem prvního synchronizačního bloku a s prvním hodinovým výstupem generátoru hodinových pulsůThese requirements are met by an instantaneous digital evaluation circuit of instantaneous deviation between actual and predetermined power consumption, in which the output of each switch block is connected to the switch input of the corresponding synchronization block and the synchronized output of the first synchronization block is connected to the value input of the evaluation block. SUMMARY OF THE INVENTION The third clock output of the clock pulse generator is coupled to a clock input of a partition block, the output of which is connected to a comparative input of the evaluation block. The setting input of the evaluation block is connected to the setting input of the dividing block and to the setting output of the second synchronization block, whose first clock input is connected to the first clock input of the first synchronization block and to the first clock output of the clock pulse generator.

Druhý hodinový výstup generátoru hodinových puleů je spojen se druhým hodinovým vstupem prvního synchronizačního bloku a se druhým hodinovým vstupem druhého synchronizačního bloku, jehož spínačový vstup je spojen se vstupem druhého spínacího bloku. První napájecí vstup druhého synchronizačního bloku je spojen s prvním napájecím výstupem zdroje, s prvním napájecím vstupem vyhodnocovacího bloku, s napájecím vstupem dělicího bloku, s napájecím vstupem generátoru hodinových pulsů a s prvním napájecím vstupem prvního synchronizačního bloku, jehož spínačový výstup je spojen se vstupem prvního spínacího bloku. Druhý napájecí vstup prvního synchronizačního bloku je spojen se druhým napájecím vstupem druhého synchronizačního bloku a 3Θ druhým napájecím výstupem zdroje, jehož třetí napájecí výstup je spojen se druhým napájecím vstupem vyhodnocovacího bloku.The second clock output of the clock pulse generator is coupled to the second clock input of the first sync block and to the second clock input of the second sync block whose switch input is coupled to the input of the second switching block. The first power input of the second sync block is coupled to the first power supply of the power supply, the first power input of the evaluation block, the power input of the splitter block, the power input of the clock pulse generator, and the first power input of the first sync block. block. The second power input of the first synchronization block is coupled to the second power input of the second synchronization block and the 3Θ second power output of the power supply, the third power output of which is connected to the second power input of the evaluation block.

Výhodou uspořádání podle vynálezu je, že umožňuje v každém okamžiku sledovat odchylky mezi skutečným a sjednaným množstvím odběru elektrické energie i v těch případech, kdy se odběr v jednotlivých dnech v týdnu i v jednotlivých hodinách dne mění. Vyhodnocuje jek velikost, tak smysl odchylky a dává předpoklady pro její odstranění průběžným regulováním odběru vhodných spotřebičů. Srovnávací frekvence vychází z vlastního generátoru hodinových pulsů, takže je zcela nezávislá na kolísání kmitočtu sítě, což zvyšuje přesnost vyhodnocení.The advantage of the arrangement according to the invention is that it allows to monitor the deviations between the actual and the agreed amount of electricity consumption at all times, even when the consumption varies from day to day and from day to day. It evaluates the magnitude and the meaning of the deviation and gives preconditions for its elimination by continuously regulating the consumption of suitable appliances. The benchmark frequency is based on its own clock pulse generator, so it is completely independent of grid frequency fluctuations, which increases the accuracy of the evaluation.

Celá zapojení je vytvořeno z dostupných součástek. Je relativně levná a nenáročná na údržbu. Vytváří předpoklady pro automatickou regulaci odběru elektrická energie v souladu se složitým odběrovým diagramem.The entire wiring is made up of available components. It is relatively inexpensive and low-maintenance. It creates conditions for automatic regulation of electricity consumption in accordance with a complex consumption diagram.

Příklad uspořádání podle vynálezu je znázorněn v blokovém schématu na připojeném výkresu.An example of an arrangement according to the invention is shown in the block diagram of the attached drawing.

Generátor 6 hodinových pulsů je známý obvod, vytvořený z jednoho RS klopného obvodu řízeného krystalem a z děliček kmitočtu, který generuje hodinové pulsy. První hodinový výstup 62 generátoru 6 hodinových pulsů je spojen s prvním hodinovým vstupem j4 prvního synchronizačního bloku £ a s prvním hodinovým vstupem 54 druhého synchronizačního bloku £.The 6-clock pulse generator is a known circuit, formed from a single RS flip-flop circuit controlled by a crystal and a frequency divider that generates clock pulses. The first clock output 62 of the clock 6 generator is coupled to the first clock input 14 of the first synchronization block 6 and to the first clock input 54 of the second synchronization block 6.

Součástí prvního synchronizačního bloku £ je oddělovací relé ke galvanickému oddělení elektroměru od vlastního prvního synchronizačního bloku. Ve znázorněném provedení se předpokládá, že oddělovací relé je součástí prvního synchronizačního bloku £. Oddělovací relé nebo jiné galvanické oddělení může být též vytvořeno jako samostatný blok.Part of the first synchronization block 6 is a separation relay for galvanic separation of the meter from the first synchronization block itself. In the illustrated embodiment, it is assumed that the isolation relay is part of the first synchronization block 6. The isolation relay or other galvanic isolation can also be designed as a separate block.

Vlastní první synchronický blok je vytvořen ze tří klopných obvodů typu D. Slouží k odstranění nežádoucích jevů, které způsobují zákmity při odskakování kontaktů relé tzv. přel kontaktů. Dále slouží k synchronizaci pulsů s časovou základnou a k definováni dálky pulsů. Druhý synchronizační blok £ obsahuje rovněž oddělovací relé ke galvanickému oddělení vlastního druhého synchronizačního bloku od druhého spínacího bloku 4· Galvanické oddělení může být rovněž buá součástí druhého synchronizačního bloku £, jak je naznačeno na výkrese, nebo může být vytvořeno jako zvláštní oddělovací blok, ve kterém se provádí galvanické odděleni buá oddělovacím relé nebo jiným způsobem. Vlastni druhý synchronizační blok £ je vytvořen ž klopných obvodů typu D, z posuvného registru, z hradel, z luminiscenční diody a z tlačítka.The first synchronous block is made up of three D-type flip-flops. It is used to eliminate undesirable phenomena that cause fluttering when the relay contacts bounce. It also serves to synchronize the pulses with the time base and to define the pulse distance. The second synchronization block 8 also comprises a separation relay for galvanically separating its own second synchronization block from the second switching block 4. The galvanic separation can also be part of the second synchronization block 8, as indicated in the drawing, or it can be formed as a separate separation block in which This is done by galvanic isolation either by a decoupling relay or otherwise. The second synchronization block 8 itself is formed by flip-flops of type D, a shift register, gates, a luminescent diode and a pushbutton.

Slouží jednak k odstraněni prelu kontaktů, jednak k zapamatování a indikaci čtvrthodinových pulsů a ke generování jednoho hodinového pulsu synchronizovaného s časovou základnou na jeho nastavovacím výstupu 56. Druhý hodinový výstup 6£ generátoru 6 hodinových pulsů je spojen se druhým hodinovým vstupem 35 prvního synchronizačního bloku £. Třetí hodinový výstup 64 generátoru 6 hodinových pulsů je spojen s hodinovým vstupem 73 dělicího bloku 2· Dělicí blok 2 je sestaven z číslicového přepínače z pamětí, z hradel a z děliček.It serves both to remove the contact break, to memorize and indicate quarter-hour pulses and to generate one clock pulse synchronized with the time base at its setting output 56. The second clock output 64 of the clock pulse generator 6 is coupled to the second clock input 35 of the first synchronization block . The third clock output 64 of the 6-clock pulse generator is coupled to the clock input 73 of the splitter block 2. The splitter block 2 is comprised of a digital switch from memories, gates and dividers.

Číslicový přepínač slouží k nastaveni hodnoty odběru následující hodiny, paměti slouží k zapamatování plánovaného odběru probíhající hodiny a děličky slouží k dělení vstupní frekvence úměrné velikosti obsahu paměti. Výstup 74 dělicího bloku 2 je spojen se srovnávacím vstupem 14 vyhodnocovacího bloku 1· Vyhodnocovací blok J. je sestaven z dekodérů, z obousměrných čítačů, z RS klopného obvodu, z hradel a z displeje. Vyhodnocovací blok J. slouží k vyhodnocení znaménka odchylky, shromažáuje údaje o velikosti odchylky a indikuje skutečnou hodnotu a smysl odchylky na displeji. Signál o okamžitém stavu čítače spolu s návaznými obvody, které nejsou na výkrese znázorněny může být výstupem pro automatickou regulaci. Hodnotový vstup 15 vyhodnocovacího bloku £ je spojen se synchronizovaným výstupem 37 prvního synchronizačního bloku £.,The numeric switch is used to set the value of the consumption of the following hour, the memory is used to remember the scheduled consumption of the current hour and the dividers are used to divide the input frequency proportional to the amount of memory content. The output 74 of the partition block 2 is connected to the comparative input 14 of the evaluation block 1. The evaluation block J is composed of decoders, bidirectional counters, RS flip-flop, gates and a display. The evaluation block J. serves to evaluate the sign of the deviation, collects data on the magnitude of the deviation and indicates the actual value and the meaning of the deviation on the display. The instantaneous counter signal together with the associated circuits, not shown in the drawing, can be an output for automatic control. The value input 15 of the evaluation block 6 is connected to the synchronized output 37 of the first synchronization block 6,

Nastavovací vstup 13 vyhodnocovacího bloku J. je spojen s nastavovacím vstupem 72 dělicí ho bloku Jas nastavovacím výstupem 56 druhého synchronizačního bloku £. Spínačový výstup druhého synchronizačního bloku 5 je spojen se vstupem 41 druhého spínacího bloku 4.The setting input 13 of the evaluation block J is connected to the setting input 72 of the dividing block Brightness by the setting output 56 of the second synchronization block 6. The switch output of the second synchronization block 5 is connected to the input 41 of the second switching block 4.

Druhý spínací blok 4 je v podstatě kontakt časového spínače energetických závodů, který spíná pravidelně po uplynutí každých ,5 minut. Slouží ke spuštění tiskárny maxigrafu, která zaznamenává skutečný odběr elektrické energie v každé uplynulé čtvrthodině a která není na výkrese znázorněna. Výstup 42 druhého spínacího bloku 4 je spojen se spínačovým vstupem 53 druhého synchronizačního bloku 4·The second switch block 4 is essentially a power plant timer contact that switches regularly every 5 minutes. Used to start a maxigraph printer that records the actual power consumption of each elapsed quarter of an hour and which is not shown in the drawing. The output 42 of the second switching block 4 is connected to the switch input 53 of the second synchronization block 4.

Spínačový výstup 36 prvního synchronizačního bloku 4 je spojeg se vstupem 21 prvního spínacího bloku 2. První spínací blok 2 je v podstatě kontakt spínacího elektroměru. Spíná po odebrání určitého množství elektrické energie, například po odebrání každých 5 kW.The switch output 36 of the first synchronization block 4 is connected to the input 21 of the first switching block 2. The first switching block 2 is essentially a contact of the switching electricity meter. Switches when a certain amount of electricity is consumed, for example every 5 kW.

Výstup 22 prvního spínacího bloku 2 je spojen se spínačovým vstupem 33 prvního synchronizačního bloku J. První napájecí vstup 31 prvního synchronizačního bloku 4 je spojen s prvním napájecím vstupem 51 druhěho synchronizačního bloku 4> s prvním napájecím vstupem 11 vyhodno covacího bloku i, s prvním napájecím vstupem 61 generátoru 6 hodinových pulsů, s prvním napájecím vstupem 71 dělicího bloku 2, s prvním napájecím výstupem 81 zdroje 8.The output 22 of the first switching block 2 is connected to the switch input 33 of the first synchronization block J. The first power input 31 of the first synchronization block 4 is connected to the first power input 51 of the second synchronization block 4 to the first power input 11 of the evaluation block 1. input 61 of the 6-clock pulse generator, with first power input 71 of partition block 2, with first power output 81 of source 8.

Zdroj 8 je vytvořen z transformátoru, ze stabilizovaného zdroje a z akumulátoru. Slouží k napájení jednotlivých bloků ve třech napěťových úrovních a k dobíjení akumulátoru, který je připevněn jako záloha pro napájení při výpadku sítě. Druhý napájecí výstup 82 zdroje 8 je spojen se druhým napájecím vstupem 52 druhého synchronizačního bloku 4 a se druhým napájecím vstupem 32 prvního synchronizačního bloku 4· Třetí napájecí výstup 84, zdroje 4 je spojen se druhým napájecím vstupem 12 vyhodnocovacího bloku 4.The source 8 is formed from a transformer, a stabilized source and an accumulator. It is used to power individual blocks in three voltage levels and to recharge the battery, which is mounted as a backup for power supply in the event of a power failure. The second power supply output 82 of the power supply 8 is connected to the second power input 52 of the second synchronization block 4 and to the second power input 32 of the first synchronization block 4. The third power output 84 of the power supply 4 is connected to the second power input 12 of the evaluation block 4.

Má-li vyhodnocováni okamžité odchylky odběru od předem dohodnutého odběru začít od určité celé hodiny, je třeba v poslední Čtvrthodině předcházející hodiny provést následující úkony. Sepnout spínač ve zdroji 8, čímž se uvede v činnost generátor 6 hodinových pulsů. Nastavit číslicový přepínač v dělicím bloku 2 na hodnotu sjednaného odběru následující hodiny ve shodě s odběrovým diagramem. Stlačit tlačítko na druhém synchronizačním bloku 4. čímž se nastaví paměť čtvrthodin na čtvrtou čtvrthodinu. Druhý synchronizační blok 4 je připraven luminiscenčními diodami indikovat jednotlivé čtvrthodiny v každé hodině. Po uplynutí čtvrté čtvrthodiny sepne druhý spínací blok 4» který spíná každou čtvrthodinu a ze svého výstupu 42 dá impuls na spínačový vstup 53 druhého synchronizačního bloku 4· Druhý synchronizační blok 4 °d tohoto okamžiku začne indikovat první čtvrthodinu sledované hodiny, takže signalizuje luminiscenční dioda, která ohlašuje, že probíhá první čtvrthodina.If the evaluation of the instantaneous sampling deviation from a pre-agreed subscription is to start from a certain full hour, the following operations must be performed in the last quarter of the previous hour. Close the switch in the source 8 to activate the 6-hour pulse generator. Set the numeric switch in division block 2 to the value of the agreed subscription the following hours in accordance with the sampling diagram. Press the button on the second sync block 4 to set the quarter hour memory to the fourth quarter hour. The second synchronization block 4 is prepared by luminescent diodes to indicate individual quarter-hours in each hour. After the fourth quarter of an hour, the second switching block 4, which switches every quarter of an hour, switches from its output 42 to the input 53 of the second synchronization block 4. The second synchronization block 4 ° d starts to indicate the first quarter which announces that the first quarter of an hour is in progress.

Současně ze druhého nastavovacího výstupu 56 druhého synchronizačního bloku 4 vychází synchronizovaný puls, který přichází na nastavovací vstup 72 dělicího bloku 2· Tímto synchronizovaným pulsem se vynulují děličky kmitočtu ve druhém synchronizačním bloku 4 a obsah číslicového přepínače se přepíše do paměti. Synchronizovaný puls jde současně na nastavovací vstup 14. vyhodnocovacího bloku 4 ve kterém se vynuluje čítač odchylky.Simultaneously, from the second setting output 56 of the second synchronization block 4, a synchronized pulse comes to the setting input 72 of the splitter block 2. This synchronized pulse resets the frequency dividers in the second synchronization block 4 and overwrites the contents of the digital switch. The synchronized pulse goes simultaneously to the setting input 14 of the evaluation block 4, in which the deviation counter is reset.

Všchny tyto činnosti od sepnutí relé ve druhém synchronizačním bloku 4 proběhnou řádově ve dvou mikrosekundách sledované hodiny. Od tohoto okamžiku se začne vyhodnocovat a indikovat okamžitá odchylka skutečného a plánovaného to je sledovaného odběru. 2 yýstupu 74 dělicího bloku 2 začnou vycházet pulsy úměrné sjednanému odběru v právě probíhající hodině. Tyto pulsy jdou na srovnávací vstup 14 vyhodnocovacího bloku 4, ve kterém se shromažďují v čítači. Když se odebere určité jednotkové množství energie, sepne kontakt spínacího elektroměru v prvním spínacím bloku 2.All these operations since the relay has been switched on in the second synchronization block 4 will take place in the order of two microseconds of the monitored hour. From this moment, the actual deviation of the actual and planned it is monitored and indicated. 2 at the output 74 of the partition block 2, pulses commensurate with the agreed demand at the current hour. These pulses go to comparative input 14 of evaluation block 4, in which they are collected in a counter. When a certain amount of energy is drawn, the contact of the switching electricity meter in the first switching block 2 closes.

Z výstupu 22 prvního spínacího bloku 2 přichází puls na spínačový vstup 33 prvního synchronizačního bloku 4· Tento puls se v prvním synchronizačním bloku 4 synchronizuje a synchronizovaný pul3 vychází ze synchronizovaného výstupu 37 prvního synchronizačního bloku 4 a přichází na hodnotový vstup 1? vyhodnocovacího bloku 4. Ve vyhodnocovacím bloku 4 se tento puls odečítá od stavu čítače a výsledkem je okamžitá odchylka skutečného a plánovaného odběru'elektrické energie, která se indikuje na displeji. Po uběhnutí patnácti minut, sepne opět kontakt ve druhém spínacím bloku 4, čímž vyšle puls, který přichází přes spínačový vstup 33 do druhého synchronizačního bloku 4·From the output 22 of the first switching block 2 pulse arrives at the input of the switch 33 of the first sync block 4 · This pulse is the first sync block and four syncs pul3 synchronized based on the synchronized output 37 of the first sync block 4, and comes to the input value 1? In the evaluation block 4, this pulse is subtracted from the counter state and the result is an instantaneous deviation of the actual and projected electricity consumption, which is indicated on the display. After fifteen minutes has elapsed, the contact in the second switching block 4 closes again, sending a pulse that arrives via the switch input 33 to the second synchronization block 4.

Ve druhém synchronizačním bloku 2 se tento puls zapamatuje a rozsvítí se luminiscenční dioda, která označuje, že probíhá druhá čtvrthodina . Po čtvrtém sepnutí kontaktu ve druhém spínacím bloku 2, to je po uplynutí celé sledované hodiny, vychází opět z nastavovacího výstupu 56 druhého synchronizačního bloku 2 synchronizovaný puls, který vynuluje přes nastavovací vstup 1 3 čítač ve vyhodnocovacím bloku JJ a přepíše přes nastavovací vstup 72 do paměti v dělicím bloku 2 předvolbu následující hodiny a celý proces se opakuje. 2 prvního napájecího výstupu 81 zdroje 8 se napájí integrované obvody ve všech blocích zapojení. Ze druhého napájecího výstupu 82 zdroje 8 se napájí oddělovací relé v prvním synchronizačním bloku J a ve druhém synchronizačním bloku 2· Ze třetího napájecího výstupu 83 zdroje 8 se napájí displej ve vyhodnocovacím bloku J.. Při výpadku elektrické sítě se integrované obvody všech bloků a oddělovací relé obou synchronizačních bloků 2 a 2 napájí z akumulátoru který je součástí zdroje 8.In the second sync block 2, this pulse is memorized and the luminescent diode lights up to indicate that the second quarter of an hour is running. After the fourth closing of the contact in the second switching block 2, that is, after the entire monitored hour, the synchronized pulse is reset from the setting output 56 of the second synchronization block 2, which resets via setting input 13 the counter in evaluation block 11. memory in partition block 2 preselect the next hour and the whole process is repeated. 2 of the first power output 81 of power supply 8, the integrated circuits are powered in all wiring blocks. The second power output 82 of the power supply 8 supplies the isolation relay in the first synchronization block J and the second synchronization block 2. The third power output 83 of the power supply 8 supplies the display in the evaluation block J. In the event of a power failure the relays of both synchronization blocks 2 and 2 supply from the accumulator which is part of the power supply 8.

Vynálezu se využije u velkoodběratelů elektrické energie zejména u průmyslových podniků při sledování a minimalizaci odchylky mezi sjednanou a skutečně odebranou elektrickou energií.The invention will be used by large consumers of electricity, especially industrial companies, to monitor and minimize the deviation between the agreed and actually consumed electricity.

Claims (1)

PŘEDMĚT VYNÁLEZUSUBJECT OF THE INVENTION Zapojení obvodu pro okamžité číslicové vyhodnocování okamžité odchylky mezi skutečným a předem určeným odběrem elektrické energie, u kterého je výstup každého spínačového bloku spojen se spínačovým vstupem odpovídajícího synchroničního bloku a synchronizovaný výstup prvního synchronizačního bloku je spojen s hodnotovým vstupem vyhodnocovacího bloku, vyznačující se tím, Že třetí hodinový výstup (64) generátoru (6) hodinových pulsů je spojen s hodinovým vstupem (73) dělicího bloku (7), jehož výstup (74) je spojen se srovnávacím vstupem (14) vyhodnocovacího bloku (1), jehož nastavovací vstup (13) je spojen s nastavovacím vstupem (72) dělicího bloku (7) as nastavovacím výstupem (56) druhého synchronizačního bloku (5), jehož první hodinový vstup (54) je spojen s prvním hodinovým vstupem (34) prvního .synchronizačního bloku (3) as prvním hodinovým výstupem (62) generátoru (6) hodinových pulsů, jehož druhý hodinový výstup (63) je spojen se druhým hodinových vstupem (35) prvního synchronizačního bloku (3) se druhým hodinovým vstupem (55) druhého synchronizačního bloku (5), jehož spínačový vstup (57) je spojen se vstupem (41) druhého spínacího bloku (4) a první napájecí vstup (5') druhého synchronizačního bloku (5) je spojen s prvním napájecím výstupem (81) zdroje (8), s prvním napájecím vstupem (11) vyhodnocovacího bloku (1), s napájecím vstupem (71) dělicího bloku (7), s napájecím vstupem (61) generátoru (6) hodinovýcn pulsů a s prvním napájecím vstupem (31) prvního synchronizačního bloku (3), jehož spínačový výstup (36) je spojen se vstupem (21) prvního spínacího bloku (2) a druhý napájecí vstup (32) prvního synchronizačního bloku (3) je spojen se druhým napájecím vstupem (52) druhého synchronizačního bloku (5), a se druhým napájecím výstupem (82) zdroje (8), jehož třetí napájecí výstup (83) je spojen se druhým napájecím vstupem (12) vyhodnocovacího bloku (1).Circuit for instantaneous digital evaluation of instantaneous deviation between actual and predetermined power consumption, in which the output of each switch block is connected to the switch input of the corresponding synchronization block, and the synchronized output of the first synchronization block is connected to the value input of the evaluation block, the third clock output (64) of the clock pulse generator (6) is coupled to the clock input (73) of the splitter block (7), the output of which (74) is connected to the comparator input (14) of the evaluation block (1) ) is connected to a set input (72) of the partition block (7) and a set output (56) of the second synchronization block (5), the first clock input (54) of which is connected to the first clock input (34) of the first synchronization block (3) and with a first clock output (62) of a clock pulse generator (6) the second of which the din output (63) is connected to the second clock input (35) of the first synchronization block (3) with the second clock input (55) of the second synchronization block (5), whose switch input (57) is connected to the input (41) of the second switching block (4) and the first power input (5 ') of the second synchronization block (5) is connected to the first power output (81) of the power supply (8), to the first power input (11) of the evaluation block (1), to the power input (71) divider block (7), with the power input (61) of the clock pulse generator (6) and with the first power input (31) of the first synchronization block (3) whose switch output (36) is connected to the input (21) of the first switching block (2) and the second power input (32) of the first synchronization block (3) is connected to the second power input (52) of the second synchronization block (5), and to the second power output (82) of the power supply (8) whose third power output (83) is connected to the other the power input (12) of the evaluation block (1).
CS654278A 1978-10-09 1978-10-09 Circuit for insatntaneous digital evaluation of instantaneous deviation CS210793B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CS654278A CS210793B1 (en) 1978-10-09 1978-10-09 Circuit for insatntaneous digital evaluation of instantaneous deviation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CS654278A CS210793B1 (en) 1978-10-09 1978-10-09 Circuit for insatntaneous digital evaluation of instantaneous deviation

Publications (1)

Publication Number Publication Date
CS210793B1 true CS210793B1 (en) 1982-01-29

Family

ID=5412716

Family Applications (1)

Application Number Title Priority Date Filing Date
CS654278A CS210793B1 (en) 1978-10-09 1978-10-09 Circuit for insatntaneous digital evaluation of instantaneous deviation

Country Status (1)

Country Link
CS (1) CS210793B1 (en)

Similar Documents

Publication Publication Date Title
DE69605375T2 (en) Electronic timers
CA1152217A (en) Data processor apparatus for multitariff meter
US6813525B2 (en) Energy management system
KR100358662B1 (en) Program timer
GB1314351A (en) Control of the supply of electrical energy
CH621878A5 (en)
US3643420A (en) Clock system
US4347576A (en) Load management control apparatus with improved duty cycle operation
EP3602732B1 (en) Method for operation of an electrical installation comprising a plurality of electrical consumers, power supply unit and electrically operated installation
DE2715096A1 (en) Automatically regulated quartz clock - is synchronised with received time signal via slave clock periodically used to correct time registers
DE3688706T2 (en) System for accumulating verifiable energy consumption data from remote electricity meters.
US4424454A (en) Electrical time switch
US2994184A (en) Master clock system
DE2922161A1 (en) Room thermostat which sets several different temperatures - has switches controlled by digital clock circuit including time display, programmer and store
DE950701C (en) Working time control device
DE2247414B2 (en) METHODS OF MONITORING AND LIMITING THE CONSUMPTION OF ENERGY
US2549854A (en) Battery charger
GB2209616A (en) Changeover switch
DE3004607A1 (en) Switching system for electronic clock - uses control signals obtained from filters connected to mains supply in place of timing pulses
GB2188749A (en) Programmable timer
EP0185991A1 (en) Control apparatus
US2083363A (en) Electric time system
SU1162007A1 (en) Device for controlling electric load of industrial factory
Conradie et al. Escom's proposed real time computer based control and load despatch system
EP0190627A1 (en) Modular multifunctional clock