CS223452B1 - Heating circuit connection for heating buildings - Google Patents

Heating circuit connection for heating buildings Download PDF

Info

Publication number
CS223452B1
CS223452B1 CS219179A CS219179A CS223452B1 CS 223452 B1 CS223452 B1 CS 223452B1 CS 219179 A CS219179 A CS 219179A CS 219179 A CS219179 A CS 219179A CS 223452 B1 CS223452 B1 CS 223452B1
Authority
CS
Czechoslovakia
Prior art keywords
heating circuit
branch
heating
pump
cold
Prior art date
Application number
CS219179A
Other languages
Czech (cs)
Inventor
Ludek Klazar
Original Assignee
Ludek Klazar
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Ludek Klazar filed Critical Ludek Klazar
Priority to CS219179A priority Critical patent/CS223452B1/en
Publication of CS223452B1 publication Critical patent/CS223452B1/en

Links

Landscapes

  • Steam Or Hot-Water Central Heating Systems (AREA)

Abstract

Topný okruh obsahuje alespoň dvě tepelné čerpadla, jejichž výparníky jsou připojeny paralelně na rozváděči potrubí opatřené podávacíml čerpadly chlazené látky. První tepelné čerpadlo je zařazeno v prvním topném okruhu a je propojeno s vytápěcím systémem chladnou a teplou větví. Chladná větev je vybavena jedním oběhovým čerpadlem a teplá větev dvěma paralelními oběhovými čerpadly. Chladná větev a teplá větev je v místech před sáním oběhových čerpadel vzájeně propo ­ jena a spojena s vyrovnávací nádrží. Stu ­ dená a teplá větev prvního topného okru ­ hu jsou paralelně propojeny se stejnými větvemi druhého topného okruhu do které ­ ho je zapojeno druhé tepelné čerpadlo. Druhý topný okruh, vybavený cirkulační ­ mi čerpadly, je současně součásti aku ­ mulačního okruhu, obsahujícího akumulač ­ ní nádrž s vestavěným elektrickým top ­ ným tělesem. V chladné větvi druhého top ­ ného okruhu je zařazen první termoreguleč- ní ventil, jehož čidlo je v teplé větvi tohoto okruhu. Chladná větev prvního top ­ ného okruhu jepřed oběhovým čerpadlem pro ­ pojena spojovacím potrubím vybaveným po- dávacím čerpadlem β chladnou částí aku ­ mulační nádrže. Teplá větev prvního top ­ ného okruhu je propojena před paralelní ­ mi oběhovými čerpadly s teplou částí akumulační nádrže dalším spojovacím po ­ trubím, obsahujícím druhý termoregulační ventil, jehož čidlo je zabudováno v teplé větvi prvního topného okruhuza místem připojení dalšího spojovacího potrubí.The heating circuit contains at least two heat pumps, the evaporators of which are connected in parallel to the distribution pipe equipped with coolant supply pumps. The first heat pump is included in the first heating circuit and is connected to the heating system by a cold and a hot branch. The cold branch is equipped with one circulation pump and the hot branch with two parallel circulation pumps. The cold branch and the hot branch are interconnected in the places before the suction of the circulation pumps and connected to the buffer tank. The cold and hot branches of the first heating circuit are connected in parallel with the same branches of the second heating circuit to which the second heat pump is connected. The second heating circuit, equipped with circulation pumps, is also part of the storage circuit, containing an storage tank with a built-in electric heating element. The first thermoregulation valve is included in the cold branch of the second heating circuit, the sensor of which is in the hot branch of this circuit. The cold branch of the first heating circuit is connected to the cold part of the storage tank by a connecting pipe equipped with a feed pump β before the circulation pump. The hot branch of the first heating circuit is connected to the hot part of the storage tank before the parallel circulation pumps by another connecting pipe containing a second thermoregulation valve, the sensor of which is built into the hot branch of the first heating circuit at the point of connection of the next connecting pipe.

Description

Vynález se týká zapojení* topného okruhu k vytápání budov jednak přímo produkovaným teplem topného okruhu a jednak akumulovaným teplem v teplonoené látce z akumulační nádrže.The invention relates to the connection of a heating circuit to the heating of buildings on the one hand by the directly produced heat of the heating circuit and on the other hand by the accumulated heat in the heat transfer substance from the storage tank.

Odpadní teplo chladicích zařízení, které je v podstatě druhotnou jeho funkcí je již delží dobu účelná využíváno v různých spotřebičích a to především tam, kde jsou pro to příznivé podmínky. Význam využití tohoto tepla nabývá stále většího významu zejména v současné době světové energetické krize. Některá chladicí zařízení proto využívají jak primární chladicí funkci zařízení, tak druhotnou funkci vytápěcí. U tepelných čerpadel je pak výroba tepla funkoí základní a výroba chladu funkcí druhotnou. Využití tepelných čerpadel k vytápání budov je ekonomické váude tam, kde není k dispozici lacinájáí zdroj tepla a je nutno budovy vytápět elektricky. Topný faktor, který je určen poměrem vyrobeného tepla a příkonu elektrické energie je u tepelných čert pádel v průměru třínáeobně příznivější než u přímého elektrického vytápění. Způsob vytápění budov chladicím zařízením na funkci tepelných čerpadel je znám desítky let. Je znám i způsob vytápění, při kterém je využíváno i akumulované teplo v teplonoené látce, které je získáváno v nočních hodinách, to je v čase mimo vysoké energetické zatížení a při nižších nákladech. Tímto způsobem vytápění se dále zvyšuje instalovaný elektrická výkon topného okruhu, dodávajícího teplo vytápěnému zařízení budovy.The waste heat of refrigeration equipment, which is essentially a secondary function of the latter, has long been expediently used in various appliances, especially where there are favorable conditions. The importance of using this heat is becoming increasingly important especially in the current world energy crisis. Some cooling devices therefore utilize both the primary cooling function of the device and the secondary heating function. In heat pumps, the heat production is funkoí basic and the cold production is a secondary function. The use of heat pumps to heat buildings is economical wherever a cheap source of heat is not available and it is necessary to heat the buildings electrically. The heating factor, which is determined by the ratio of the heat produced and the power input, is on average three-person more favorable for thermal devils than for direct electric heating. The method of heating buildings with a heat pump cooling system has been known for decades. There is also known a method of heating, in which the accumulated heat in the heat-carrying substance, which is obtained at night, is used, that is in time outside the high energy load and at lower costs. This way of heating further increases the installed electrical output of the heating circuit, supplying heat to the heated building equipment.

Dalšího vylepšení vytápění se dosáhne zapojením topného okruhu k vytápění budov podle vynálezu. Podstatou zapojení topného okruhu podle vynálezu je, že topný okruh obsahuje alespoň dvě tepelná čerpadla, jejichž výparníky jsou připojeny paralelně na rozváděči potrubí, opatřené podávacími čerpadly chlazené látky. První tepelné čerpadlo je zařazeno v prvním topném okruhu,A further heating improvement is achieved by connecting a heating circuit for heating buildings according to the invention. The principle of the heating circuit according to the invention is that the heating circuit comprises at least two heat pumps, the evaporators of which are connected in parallel to a manifold provided with refrigerant feed pumps. The first heat pump is in the first heating circuit,

223 452 v jehož prvnf chladné větvi je zapojeno před kondensátorem prvého tepelného čerpadla prvé oběhové čerpadlo a v jehož teplé větvl je zapojeno před vytápěcím systémem budovy druhé oběhové čerpadlo a s ním paralelné vysokovýkonné Čerpadlo. Prvnf chladná větev a prvnf teplá větev prvního topného okruhu jsou mezi sáním oběhových čerpadel a vysokovýkonného čerpadla vzájemné propojeny propojovacím potrubím, které je připojeno na vyrovnávací nádrž. První topný okruh je paralelné propojen s druhým topným okruhem, obsahujícím druhé tepelné čerpadlo jednak chladným meziokruhovým potrubím, které spojuje první chladnou vétev prvního topného okruhu s druhou chladnou větví druhého topného okruhu a jednak teplým meziokruhovým potrubím, spojujícím první teplou větev prvního topného okruhu s druhou teplou větví druhého topného okruhu. Druhý topný okruh, opatřený v druhé chladné větvi před kondensátorem druhého tepelného čerpadla prvním cirkulačním čerpadlem je současně součástí akumulačního okruhu, obsahujícího akumulační nádrž s náplní teplonosné látky s vestavěným elektrickým topným tělesem. Za výstupem druhé chladné větve akumulačního okruhu au akumulační nádrže je zařazen první termoregulační ventil, jehož první čidlo je zapojeno v druhé teplé větvi akumulačního okruhu před druhým cirkulačním čerpadlem, za nímž druhá teplá větev vyúsťuje do teplé části akumulační nádrže. První chladná větev prvního topného okruhu je před prvním oběhovým čerpadlem propojena spojovacím potrubím, obsahujícím třetí podávači čerpadlo, s chladnou částí akumulační nádrže. První teplá větev prvního topného okruhu je propojena před druhým oběhovým čerpadlem a vysokovýkonným čerpadlem s teplou částí akumulační nádrže dalěím spojovacím potrubím obsahujícím druhý termoregulační ventil, jehož druhé čidlo je zabudováno v první teplé větvi prvního topného okruhu za místem připojení dalšího spojovacího potrubí.223 452 in whose first cold branch a first circulation pump is connected upstream of the condenser of the first heat pump, and in whose warm branch a second circulation pump and a parallel high-performance pump are connected upstream of the building heating system. The first cold branch and the first warm branch of the first heating circuit are interconnected between the suction of the circulation pumps and the high-performance pump by a connecting pipe connected to a buffer tank. The first heating circuit is connected in parallel to a second heating circuit comprising a second heat pump having a cold inter-circuit duct connecting the first cold branch of the first heating circuit with a second cold branch of the second heating circuit and a warm inter-circuit duct connecting the first warm branch of the first heating circuit with the second the warm branch of the second heating circuit. The second heating circuit provided in the second cold branch upstream of the second heat pump condenser by the first circulation pump is also part of an accumulation circuit comprising an accumulation tank with a charge of heat transfer fluid with a built-in electric heater. The first thermoregulation valve is connected downstream of the second cold branch of the accumulation circuit and at the accumulation tank, the first sensor of which is connected in the second warm branch of the accumulation circuit upstream of the second circulation pump, after which the second warm branch leads to the hot part of the accumulation tank. The first cold branch of the first heating circuit is connected upstream of the first circulation pump by a connecting line comprising a third feed pump to the cold part of the storage tank. The first warm branch of the first heating circuit is connected upstream of the second circulation pump and the high-performance pump to the hot part of the storage tank by another connecting line comprising a second thermoregulation valve, the second sensor of which is incorporated in the first warm branch of the first heating circuit.

Výhodou zapojení topného okruhu k vytápění budov podle vynálezu je, že lze ekonomicky a energeticky výhodně akumulovat v akumulační nádrži dvojiiásobné množství tepla než při ohřátí teplonosné náplně v akumulační nádrži na pracovní teplotu teplé větve topného okruhu. Noční akumulace tepla je tedy dvojnásobná a je i tehdy výhodná, probíhá-li za krajních teplotních podmínek při venkovních teplotách pod -5*C, kdy je nutno použít k druhému stupni akumulace přitápění elektrickým topným tělesem. Dvou223 452 stupňová akumulace tepla umožňuje značné snížení objemu akumulačních zásobníků.The advantage of connecting the heating circuit to the heating of the buildings according to the invention is that it is economically and energetically advantageous to store twice as much heat in the storage tank than when heating the heat transfer charge in the storage tank to the working temperature of the hot branch of the heating circuit. Night heat accumulation is therefore doubled and it is also advantageous if it takes place under extreme temperature conditions at outdoor temperatures below -5 ° C, when it is necessary to use additional heating with electric heating element for the second stage of accumulation. The two-level 2223 452 degree heat storage allows for a significant reduction in the volume of storage tanks.

Na připojených obrázcích je znázornčn příklad provedení zapojení topného okruhu k vytápání budov podle vynálezu/ obr. 1 znázorňuje zapojení topného okruhu při vnájáích teplotách do -5’C.The accompanying drawings show an exemplary embodiment of the heating circuit for building heating according to the invention / Figure 1 shows the heating circuit at ambient temperatures up to -5 ° C.

Na obr. 2 je znázornčno zapojení topného okruhu při odbčru akumulovaného tepla a na obr. 3 je znázornčno zapojení topného okruhu při vnčjčích teplotách vzduchu pod -5’C.Fig. 2 shows the connection of the heating circuit when the accumulated heat is drawn, and Fig. 3 shows the connection of the heating circuit at outside air temperatures below -5 ° C.

Zapojení k vytápání budov znázornáné schematicky na připojených obrázcích 1, 2, a 3 je tvořeno topným okruhem a vytápácím systémem Topný okruh obsahuje dvá tepelná čerpadla 2 a 3» jejichž výparníky jsou připojeny paralelná na rozvádácí potrubí 4 opatřené podávacími čerpadly 5, 6 chlazené látky. První tepelné čerpadlo 2 je zařazeno v prvním topném okruhu 7, v jehož první chladné vátvi 8 je zařazeno před kondenzátorem prvého tepelného čerpadla 2 prvé obáhové čerpadlo 9. V prvé teplé vátvi 10 prvního topného okruhu je zapojeno před vytápácím systémem druhé obáhové čerpadlo 11 a e ním paralelná vysokovýkonné čerpadlo 12. První chladná vátev 8 a první teplá vátev 10 prvního topného okruhu 7 jsou mezi sáním obáhových čerpadel 9 a 11 a vysokovýkonného čerpadla 12 vzájemná propojeny propojovacím potrubím 13, které je připojeno na vyrovnávací nádrž 14» První topný okruh 7 je paralelná propojen s druhým topným okruhem 15, obsahujícím druhé tepelné čerpadlo 3 jednak pomocí chladného meziokruhového potrubí 16, které spojuje první chladnou vátev 8 prvního topného okruhu 7 e druhou chladnou vátvi 17 druhého topného okruhu 15 a jednak pomocí teplého meziokruhového potrubí 18 spojujícího první teplou vátev 10 prvního topného okruhu 7 s druhou teplou vátví 19 druhého topného okruhu 15« Druhý topný okruh 15 opatřený v druhé chladné vátvi 17 před kondenzátorem druhého tepelného čerpadla 3 prvním cirkulačním čerpadlem 20 je současná eoučáetí akumulačního okruhu 21 obsahujícího akumulační nádrž 22 e náplní teplonosné látky s veetaváným elektrickým topným táleeem 23. Za výstupem druhé chladné vátve 17 akumulačního okruhu 21 z akumulační nádrže 22 je zařazen první termoregulační ventil 24, jehož první čidlo 25 je zapojeno v druhé teplé vátvi 19 akumulačního okruhu 21 před druhým cirkulačním čerpadlem 26, za nímž druhá teplá vátev 19 ústí do teplé části akumulační nádrže 22. První1, 2, and 3 is a heating circuit and a heating system. The heating circuit comprises two heat pumps 2 and 3 whose evaporators are connected in parallel to a manifold 4 provided with refrigerant feed pumps 5, 6. The first heat pump 2 is connected to the first heating circuit 7, in which the first cold flow 8 is connected upstream of the condenser of the first heat pump 2, the first circulation pump 9. In the first hot flow 10 of the first heating circuit, the second circulation pump 11 is connected upstream of the heating system. parallel high-performance pump 12. The first cold circuit 8 and the first hot circuit 10 of the first heating circuit 7 are interconnected between the suction of the circulation pumps 9 and 11 and the high-performance pump 12 by a connecting line 13 which is connected to a buffer tank 14. interconnected with a second heating circuit 15 comprising a second heat pump 3 both by means of a cold intermediate circuit 16 which connects the first cold line 8 of the first heating circuit 7 to a second cold branch 17 of the second heating circuit 15 and The second heating circuit 15 provided in the second cold stem 17 in front of the condenser of the second heat pump 3 by the first circulation pump 20 is the simultaneous accumulation of the accumulation circuit 21 containing the accumulation tank 22e of the heat transfer charge. A second thermoregulation valve 24 is connected downstream of the second cold end 17 of the accumulation circuit 21 from the accumulation tank 22, whose first sensor 25 is connected in the second hot branch 19 of the accumulation circuit 21 in front of the second circulation pump 26. the second hot run 19 opens into the warm portion of the storage tank 22. The first

223 432 chladná větev 8 prvního topného okruhu 7 je před prvním oběhovým čerpadlem 9 propojena spojovacím potrubím 27, obsahujícím třetí podávači čerpadlo 28, s chladnou částí akumulační nádrže 22. První teplá větev 10 prvního topného okruhu 7 je propojena před druhým oběhovým čerpadlem 11 a vysokovýkonným čerpadlem 12 s teplou částí akumulační nádrže 22 dalěím spojovacím potrubím 29, obsahujícím druhý termoregulační ventil 30» jehož druhé čidlo 31 je zabudováno v první teplé větvi 10 prvního topného okruhu 7 za místem připojení dasího spojovacího potrubí 29.223 432, the cold branch 8 of the first heating circuit 7 is connected upstream of the first circulation pump 9 by a connecting line 27 comprising a third feed pump 28 to the cold part of the accumulation tank 22. The first hot branch 10 of the first heating circuit 7 is connected upstream of the second circulation pump 11 and a high by a pump 12 with a warm part of the accumulation tank 22 by a further connecting line 29, comprising a second thermoregulation valve 30 whose second sensor 31 is incorporated in the first warm branch 10 of the first heating circuit 7 after the connection point of the other connecting line 29.

x. Zapojení dle obr. 1 je provedeno tak, že po celý den, kromě energetických ěpiček a doby, kdy není k dispozici akumulované teplo, pracuje první tepelné čerpadlo 2 a první topný okruh 7.x. The connection according to FIG. 1 is carried out in such a way that the first heat pump 2 and the first heating circuit 7 operate throughout the day, apart from the energy peaks and when no accumulated heat is available.

V provozu je první podávači čerpadlo 5., první oběhové čerpadlo 9» druhé oběhové čerpadlo 11 a vytápěcí systém j_ budovy. Při teplotách vzduchu vySSích než -5*0 se výkon prvého tepelného čerpadla 2 přiměřeně reguluje (nezakresleno). Druhé tepelné čerpadlo 3, a akumulační okruh 21 pracuje pouze v noci. V provozu je druhé podávači čerpadlo. (>, první-cirkulační čerpadlo 20 a druhé cirkulační čerpadlo 26. Produkované teplo se akumuluje v akumulační nádrži 22 ohřevem náplně teplonosné látky. Druhý termostatický ventil 30 je vyřazen z provozu obtokem (nezakresleno). Akumulace tepla probíhá ve dvou stupních. V prvním stupni se teplonosná látka v akumulační nádrži 22 ohřeje na teplotu, která je shodná s pracovní teplotou v teplé větvi 10 prvního topného okruhu 7, nebol tepelná Čerpadla 3. a 4, Prvn^ oběhové čerpadlo 9 spolu s prvním cirkulačním Čerpadlem 20 a druhé oběhové čerpadlo 11 spolu s druhým cirkulačním čerpadlem 26 mají shodné parametry. Ve druhém stupni se teplonosná látka v akumulační nádrži 22 ohřeje na teplotu zhruba dvojnásobnou. Je tomu tak proto, že celá nápln akumulační nádrže 22 projde druhým tepelným čerpadlem 2 dvakrát.The first feed pump 5, the first circulation pump 9, the second circulation pump 11 and the building heating system 11 are in operation. At air temperatures higher than -5 ° 0, the output of the first heat pump 2 is appropriately controlled (not shown). The second heat pump 3 and the accumulation circuit 21 only work at night. A second feed pump is in operation. (>, the first circulation pump 20 and the second circulation pump 26. The heat produced is stored in the accumulation tank 22 by heating the charge. The second thermostatic valve 30 is bypassed (not shown). the heat exchange medium in the storage tank 22 is heated to a temperature which is equal to the working temperature of the hot branch 10 of the first heating circuit 7, the heat pump 3 and 4, the P-RVN circulating pump 9, with the first circulation pump 20 and the second circulating pump 11 have the same parameters with the second circulation pump 26. In the second stage, the heat transfer medium in the storage tank 22 is heated to about twice the temperature because the entire charge of the storage tank 22 passes through the second heat pump 2 twice.

Při energetické špičce (obr. 2), případně i po delěí dobu pokud je k dispozici akumulované teplo se zastavuje první tepelné čerpadlo 2 v prvním topném okruhu 7 a současně i první podávači čerpadlo 5 a první oběhové čerpadlo 9. Topný okruh pak pracuje tak, že část teplonosné látky ochlazené ve vytápěcím systému _1. je z prvé chladné větve 8 prvního topného okruhu 7 spojovacím potrubím 27 dopravována třetím podávacím čerpadlem 28 do chladné části akumulační nádrže 22, odkud vytlačuje dalěím spo223 452 jovacím potrubím 29 teplou teplonosnou látku do první teplé větve 10 k druhému oběhovému čerpadlu 11 . Protože teplota teplonosné látky v akumulační nádrži 22 je vyssí než pracovní teplota v první teplé větvi 10 prvního topného okruhu 7 řídí druhý termoregulační ventil 30 průtok teplonosné látky z akumulační nádrže 22 tak, že v první teplé větvi 10 dochází ke směšování této přehřáté teplonosné látky s ochlazenou teplonosnou látkou, která je do první teplé větve 10 přiváděna z první chladné větve 8 propojovacím potrubím 13» na požadovanou pracovní teplotu.At the energy peak (Fig. 2), possibly for longer periods if heat accumulation is available, the first heat pump 2 in the first heating circuit 7 and at the same time the first feed pump 5 and the first circulation pump 9 stop. The heat transfer medium is cooled according to claim 1, characterized in that part of the heat transfer medium cooled in the heating system 1. is transported from the first cold branch 8 of the first heating circuit 7 through the connecting line 27 to the cold part of the accumulation tank 22 by a third feed pump 28, from where it further discharges the heat transfer medium into the first hot branch 10 to the second circulation pump. Since the temperature of the heat transfer medium in the accumulation tank 22 is higher than the working temperature in the first hot branch 10 of the first heating circuit 7, the second thermoregulation valve 30 controls the flow of the heat transfer medium from the accumulation tank 22 so that in the first hot branch 10 with a heat transfer fluid, which is fed to the first hot branch 10 from the first cold branch 8 via a connecting line 13 to the desired operating temperature.

Při teplotách venkovního vzduchu pod -5*C je funkce zapojení následující (obr. 3)· Po celý den kromě energetických Špiček a po celou noc je v provozu celý topný okruh. Pracují obě tepelná čerpadla 2 a 3 a celý první topný okruh 7 a druhý topný okruh 15» vzájemně paralelně propojené meziokruhovým potrubím 16, 18. Množství obíhající teplonosné látky v topném okruhu je zvýšeno, v provozu jsou čerpadla 5, 6, 9» 20» 12 a vytápěcí systém £. Ve dne pracuje druhé tepelné čerpadlo 3 se sníženým výkonem. V noci pracují dvě tepelná čerpadla 2, 3 s plným výkonem. Přebytek tepelného výkonu druhého.tepelného čerpadla 3 se. využívá k ohřevu náplně teplonosné látky v akumulační nádrži 22. V provozu jsou opět čerpadla 5., 6t 9» 20» 12 a navíc druhé cirkulační čerpadlo 26, které dopravuje ohřátou teplonosnou látku do teplé části akumulační nádrže 22 a vytlačuje z ní chladnou teplonosnou látku do druhé chladné větve 17 akumulačního okruhu 21. Regulaci odběru přebytečně produkovaného tepla do akumulační nádrže 22 v závislosti na množství nadbytečného tepla zajiěíuje první termoregulační ventil 24 s prvním čidlem 25., který řídí průtok teplonosné látky druhou chladnou větví 17 a druhou teplou větví 19 tak, že je zajištěna požadovaná teplota v druhé teplé větvi 19 akumulačního okruhu 21. Protože obě tepelná čerpadla 2^, 3 pracují i v noci trvale pro topný okruh je možno druhým tepelným čerpadlem ohřát náplň v akumulační nádrži 22 jen na pracovní teplotu teplých potrubí topného okruhu, což značí, že při teplotě vzduchu pod -5*C lze druhým tepelným čerpadlem 3. zajistit pouze první stupeň akumulace tepla. Druhý stupeň akumulace tepla v teplonosné látce v akumulační nádrži 22 se zajiSíuje přímým ohřevem elektrickým topným tělesem 23 zabudovaným v akumulační nádrži 22. Při energetické špičce v podmínkách nízkých teplot vzduchu pod -5’C se zastavují obě tepelné čerpadla 2, 3For outdoor air temperatures below -5 ° C, the wiring function is as follows (Fig. 3) · The whole heating circuit is in operation all day except energy peaks and all night. Both heat pumps 2 and 3 operate and the entire first heating circuit 7 and the second heating circuit 15 »are interconnected in parallel with the inter-circuit pipes 16, 18. The amount of circulating heat carrier in the heating circuit is increased, pumps 5, 6, 9» 20 are in operation » 12 and a heating system 6. During daytime, the second heat pump 3 operates at reduced power. At night, two heat pumps 2, 3 operate at full capacity. The excess heat output of the second heat pump 3 is. It utilizes pumps 5, 6 t 9, 20, 12 and a second circulation pump 26, which transports the heated substance to the warm part of the storage tank 22 and expels the cool heat carrier from it. The first thermoregulation valve 24 with the first sensor 25 controls the flow of excess heat produced to the accumulation tank 22 depending on the amount of excess heat. so that the desired temperature in the second hot branch 19 of the accumulation circuit 21 is ensured. Since both heat pumps 24, 3 operate permanently at night for the heating circuit, the second heat pump can only heat the charge in the accumulation tank 22 to circuit, which means that at t air temperature below -5 ° C, only the first degree of heat storage can be ensured by the second heat pump. The second stage of heat storage in the heat transfer medium in the storage tank 22 is provided by direct heating by the electric heater 23 incorporated in the storage tank 22. At an energy peak in conditions of low air temperatures below -5 ° C, both heat pumps 2, 3 stop.

223 452 a současné čerpadla 5, 9, 20 a spouští se třetí podávači čer padlo 28. Provozní funkce části zapojení zajištujícího dodávku tepla do vytápčcího systému £ je stejná jak byla popsána při teplotách nad -5*C s tím rozdílem, ze místo druhého ohšhového čerpadla 11 je zapojeno do pracovního okruhu vysokovýkonné čerpadlo 12.223 452 and the current pumps 5, 9, 20, and the third feed pump 28 is started. The operating function of the heat delivery part of the heating system 6 is the same as described above at temperatures above -5 ° C, with the difference that pump 11 is connected to the working circuit of the high-performance pump 12.

223 452223 452

Claims (1)

PREDMET VYNÁLEZUOBJECT OF THE INVENTION 1. Zapojení topného okruhu k vytápění budov, vyznačující se tím, že topný okruh obsahuje alespoň dvě tepelná čerpadla (2,3) jejichž výparníky jsou připojeny paralelně na rozváděči potrubí (4) opatřené podávacími čerpadly (5,6) chlazené látky, přičemž první tepelné čerpadlo (2) je zařazeno v prvním topném okruhu (7), v jehož první chladné větvi (8) je zapojeno před kondenzátorem prvého tepelného čerpadla (2) prvé oběhové čerpadlo (9) a v jehož první teplé větvi (10) je zapojeno před vytápěcím systémem (1) budovy druhé oběhové čerpadlo (11) a s ním paralelně vysokovýkonné čerpadlo (12), přičemž první chladná větev (8) a první teplá větev (10) prvního topného okruhu (7) jsou mezi sáním oběhových čerpadel (9,11) a vysokovýkonného čerpadla (12) vzájemně propojeny propojovacím potrubím (13), které je připojeno na vyrovnávací nádrž (14), přitom první topný okruh (7) je paralelně propojen s druhým topným okruhem (15) obsahujícím druhé tepelné čerpadlo (3) jednak chladným meziokruhovým potrubím (16), které spojuje první chladnou větev (8) prvního topného okruhu (7) a druhou chladnou větví (17) druhého topného okruhu (15) a jednak teplým meziokruhovým potrubím (18), spojujícím první teplou větev (10) prvního topného okruhu (7) s druhou teplou větví (19) druhého topného okruhu.>(15), přitom druhý topný okruh (15), opatřený v druhé chladné větvi (17) před kondensátorem druhého tepelného čerpadla (3) prvním cirkulačním čerpadlem (20) je současně součástí akumulačním okruhu (21), obsahujícího akumulační nádrž (22) s náplní teplqnosné látky s vestavěným elektrickým topným tělesem (23), přičemž za výstupem druhé chladné větve (17) akumulačního okruhu (21) z akumulační nádrže (22) je zařazen první termoregulační ventil (24), jehož první čidlo (25) je zapojeno v druhé teplé větvi (19) akumulačního okruhu (21) před druhým cirkulačním čerpadlem (26), za nímž druhá teplá větev (19) vyúsžuje do teplé části akumulační nádrže (22), přitom první chladná větev (8) prvního topného okruhu (7) je před prvním oběhovým čerpadlem (9) propojena spojovacím po, trubím (27), obsahujícím třetí podávači čerpadlo (28), s chladnou částí akumulační nádrže (22) a první teplá větev (10) prvního topného okruhu (17) je propojena před druhým oběhovým čerpadlem (11) a vysokovýkonným čerpadlem (12) a teplou částí akumulační nádrže (22) dalším spojovacím potrubím (29) obsahujícímHeating circuit connection for heating buildings, characterized in that the heating circuit comprises at least two heat pumps (2,3) whose evaporators are connected in parallel to a manifold (4) provided with the refrigerant feed pumps (5,6), the first the heat pump (2) is arranged in a first heating circuit (7) in which a first cold branch (8) is connected upstream of the condenser of the first heat pump (2) a first circulation pump (9) and in which the first warm branch (10) is connected in front of the building heating system (1), a second circulation pump (11) and a high-performance pump (12) in parallel therewith, the first cold branch (8) and the first warm branch (10) of the first heating circuit (7) being in between 11) and a high-performance pump (12) interconnected by a connecting pipe (13), which is connected to a buffer tank (14), while the first heating circuit (7) is connected in parallel with a second heating circuit (15) comprising a second heat pump (3), on the one hand, through a cold intermediate circuit (16) connecting the first cold branch (8) of the first heating circuit (7) and the second cold branch (17) of the second heating circuit (15); a warm intermediate circuit (18) connecting the first warm branch (10) of the first heating circuit (7) with the second warm branch (19) of the second heating circuit. (15), the second heating circuit (15) provided in the second cold branch (18). 17) in front of the condenser of the second heat pump (3), the first circulation pump (20) is also part of an accumulation circuit (21) comprising an accumulation tank (22) filled with a heating medium with an integrated electric heater (23); (17) of the accumulation circuit (21) from the accumulation tank (22) is a first thermoregulation valve (24), the first sensor (25) of which is connected in the second warm branch (19) of the accumulator of the heating circuit (21) in front of the second circulation pump (26), after which the second warm branch (19) extends into the hot part of the accumulation tank (22), the first cold branch (8) of the first heating circuit (7) is upstream of the first circulation pump 9) interconnected by a connecting pipe (27) comprising a third feed pump (28) with a cold part of the accumulation tank (22) and a first warm branch (10) of the first heating circuit (17) is connected upstream of the second circulation pump (11); a high-performance pump (12) and a hot part of the storage tank (22) through an additional connecting line (29) comprising 223 452 druhý termoregulační ventil (30), jeho druhé čidlo (31) je zabu dováno v první teplé větvi (10) prvního topného okruhu (7) sa místem připojení dalšího spojovacího potrubí (29).223 452, a second thermoregulatory valve (30), its second sensor (31) being incorporated in the first warm branch (10) of the first heating circuit (7) with the connection point of the other connecting pipe (29).
CS219179A 1979-03-31 1979-03-31 Heating circuit connection for heating buildings CS223452B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CS219179A CS223452B1 (en) 1979-03-31 1979-03-31 Heating circuit connection for heating buildings

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CS219179A CS223452B1 (en) 1979-03-31 1979-03-31 Heating circuit connection for heating buildings

Publications (1)

Publication Number Publication Date
CS223452B1 true CS223452B1 (en) 1983-10-28

Family

ID=5358310

Family Applications (1)

Application Number Title Priority Date Filing Date
CS219179A CS223452B1 (en) 1979-03-31 1979-03-31 Heating circuit connection for heating buildings

Country Status (1)

Country Link
CS (1) CS223452B1 (en)

Similar Documents

Publication Publication Date Title
US4522253A (en) Water-source heat pump system
US5239838A (en) Heating and cooling system having auxiliary heating loop
US4242872A (en) Attic mounted solar assist multi-source/sink residential heat pump system
US4086072A (en) Air source heat pump with multiple slide rotary screw compressor/expander
US4070870A (en) Heat pump assisted solar powered absorption system
US4143642A (en) High temperature thermal storage system utilizing solar energy units
US5429179A (en) Gas engine driven heat pump system having integrated heat recovery and auxiliary components
US4165037A (en) Apparatus and method for combined solar and heat pump heating and cooling system
US4363218A (en) Heat pump using solar and outdoor air heat sources
US4364239A (en) Hot water supply apparatus comprising a thermodynamic circuit
US4134273A (en) Home heating and cooling system
JPS62242774A (en) Heat pump mechanism having three action and heat pump method
GB1593521A (en) Heat pump systems
US11530831B2 (en) System for conditioning air in a living space
CN216636080U (en) Pure electric unmanned mining vehicle and thermal management system thereof
SU1550189A1 (en) Maneuverable central-heating and power installation
US5806331A (en) Water-based hot water heat pump
US6990830B2 (en) System and method for supplying consumers with heat energy or with cooling energy
CN105222337A (en) Parallel mutual defrosting air source heat pump water heater
US4368624A (en) Absorption type heat pump having indoor and outdoor radiators connected in series in a water flow circuit during heat mode
US4589262A (en) Absorption type air conditioning system
NO142491B (en) INSTALLATION OF AIR TREATMENT FOR ONE OR MORE LOCATIONS
US3259317A (en) Loading and drive systems for heat pumps
CN114593478B (en) Air conditioning system, control method and device thereof, and storage medium
USRE31281E (en) Heat pump system