CS244597B1 - Large-surface pillar above extracted space in mountain massif - Google Patents
Large-surface pillar above extracted space in mountain massif Download PDFInfo
- Publication number
- CS244597B1 CS244597B1 CS116385A CS116385A CS244597B1 CS 244597 B1 CS244597 B1 CS 244597B1 CS 116385 A CS116385 A CS 116385A CS 116385 A CS116385 A CS 116385A CS 244597 B1 CS244597 B1 CS 244597B1
- Authority
- CS
- Czechoslovakia
- Prior art keywords
- ribs
- pillar
- area
- pillars
- bearing
- Prior art date
Links
- 238000005065 mining Methods 0.000 claims description 5
- 230000006378 damage Effects 0.000 claims 2
- 238000000605 extraction Methods 0.000 claims 2
- 238000000034 method Methods 0.000 claims 2
- 238000009412 basement excavation Methods 0.000 claims 1
- ZLNQQNXFFQJAID-UHFFFAOYSA-L magnesium carbonate Chemical compound [Mg+2].[O-]C([O-])=O ZLNQQNXFFQJAID-UHFFFAOYSA-L 0.000 claims 1
- 229910000021 magnesium carbonate Inorganic materials 0.000 claims 1
- 235000014380 magnesium carbonate Nutrition 0.000 claims 1
- 239000001095 magnesium carbonate Substances 0.000 claims 1
- 230000035515 penetration Effects 0.000 claims 1
- 239000006187 pill Substances 0.000 claims 1
- 239000000945 filler Substances 0.000 description 3
- 230000015556 catabolic process Effects 0.000 description 1
- 229910052500 inorganic mineral Inorganic materials 0.000 description 1
- 239000011707 mineral Substances 0.000 description 1
- 239000002994 raw material Substances 0.000 description 1
- 239000011435 rock Substances 0.000 description 1
Landscapes
- Devices Affording Protection Of Roads Or Walls For Sound Insulation (AREA)
Description
Vynález sa týká velkoplošného piliera nad vyrúbaným priestorom v horskom masíve.The invention relates to a large-area pillar over a cut-out area in a mountain massif.
Pri hlbinnom dobývaní užitkových nemastných surovin velkej mocnosti, je často potřebné z bezpečnostných a technologických dovodov oddělovat vel'ké dobývané priestory od už vydobytého, alebo od rastlého masívu inej geologickej skladby, neporušenou kompaktnou vrstvou, ktorá sa označuje ako velkoplošný pilier. V podrobnejšom členení to može byť pilier nadložný, podložný, stropný a iný. Takýto pilier sa vytvára pri vydobytí časti ložiska na obzore, vydobytím celého obzoru alebo vláčej obzorov, Pilier je tvořený ložiskovou výplňou a jeho funkcia je trvalá, alebo časovo vymedzená. V každom případe úžitkový nerast, ktorý vytvára pilier, představuje stratu ložiskovej výplně. Pilier z hfadiska namáhania je obojstranne votknutý nosník obdížnikového tvaru, na ktorý posobia vonkajšie sily tiaže hmoty, rozpojenej alebo horským tlakom narušenej horniny. Tvar prierezu piliera z hfadiska jeho namáhania by mal zaistiť jeho požadovanú stabilitu, ale z hfadiska výrubností ložiskovej výplně by mal byť minimálny. Doposial zaužívaný obdlžnikový prierez nevyhovuje optimálně týmto požiadavkám.In the deep mining of commercial non-greasy raw materials, it is often necessary to separate large mining areas from the already extracted or grown massif of another geological structure from the safety and technological bases, an unbroken compact layer called the large-scale pillar. In a more detailed breakdown, it can be a pillar overlying, underlying, ceiling and other. Such a pillar is created by extracting a part of the deposit on the horizon, by extracting the entire horizon or by dragging the horizon, the Pillar is formed by a bearing filler and its function is permanent or time-limited. In any case, the utility mineral that creates the pillar represents a loss of bearing filler. The stress pillar is a double-sided, rectangular beam that is supported by the external forces of the mass disintegrated or by the mountain pressure of the disturbed rock. The cross-sectional shape of the pillar in view of its stress should ensure its desired stability, but it should be minimal in terms of the thickness of the bearing filler. The previously used rectangular cross section does not meet these requirements optimally.
Uvedené nevýhody odstraňuje velkoplošný pilier nad vyrúbaným priestorom v horskom masíve, usporiadaný medzi dvoma neporušenými časťami masívu. Jeho podstata podl'a vynálezu spočívá v tom, že velkoplošný pilier je najmenej na jednej z ploch odvrátených do vyrúbaného priestoru, opatřený v mieste povodných medzikomorových pilierov pozdížnými nosnými rebrami a v mieste povodných stropných pilierov priečnými nosnými rebrami.The above-mentioned disadvantages are eliminated by a large-scale pillar above the cut-out area in the mountain massif, arranged between two intact parts of the massif. The essence of the invention is that the large-area pillar is at least on one of the surfaces facing away from the cut-out space, provided at the location of the flood-interstitial pillars with longitudinal support ribs and at the location of the flood ceiling pillars with transverse support ribs.
Claims (2)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CS116385A CS244597B1 (en) | 1985-02-19 | 1985-02-19 | Large-surface pillar above extracted space in mountain massif |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CS116385A CS244597B1 (en) | 1985-02-19 | 1985-02-19 | Large-surface pillar above extracted space in mountain massif |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CS244597B1 true CS244597B1 (en) | 1986-07-17 |
Family
ID=5345305
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CS116385A CS244597B1 (en) | 1985-02-19 | 1985-02-19 | Large-surface pillar above extracted space in mountain massif |
Country Status (1)
| Country | Link |
|---|---|
| CS (1) | CS244597B1 (en) |
-
1985
- 1985-02-19 CS CS116385A patent/CS244597B1/en unknown
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| AU2014308405B2 (en) | An artificial dam of distributed coal mine underground reservoir and its constructing method | |
| CN108194088B (en) | A kind of soft top coal layer cuts top release gob-side entry retaining method without explosion | |
| CN103470261B (en) | The method of gob side entry driving under the former back in mining goaf | |
| CN107939402A (en) | The mining methods of firm inclined thick ore body more than a kind of back production ore-rock is medium | |
| RU2514933C1 (en) | Method of layer mining of high steeply inclined coal bed with extraction of coal from bedding pack | |
| CN109763821A (en) | A kind of compound shield lane method of dynamic pressure exploiting field main entry | |
| CS272752B2 (en) | Method of coal seams winning | |
| CN1026606C (en) | Roadway support method for gob-side entry driving under coal mine | |
| CS244597B1 (en) | Large-surface pillar above extracted space in mountain massif | |
| EP0360797B1 (en) | Store | |
| RU2360114C1 (en) | Procedure for development of thick steeply-dipping deposits of unstable ore | |
| SU1795100A1 (en) | Method for mining thick steeply dipping coal seams | |
| CN1110753A (en) | Open caisson method of inclined shaft | |
| RU2046947C1 (en) | Method to develop thick steep and inclined coal stratums | |
| SU1629543A1 (en) | Method of mining thick gently-sloping coal seams | |
| CN100552185C (en) | Concrete pole top protection mining method | |
| CN214787406U (en) | I-steel self-filling roadside support facility | |
| CN112412480A (en) | A shield working well with deep and shallow arrangement and its construction method | |
| CN114941546B (en) | Supporting structure for coal mine exploitation | |
| CN2820960Y (en) | Check shape underground wall self standing wall protection structure | |
| RU1800041C (en) | Device for protection of stopes | |
| CS242338B1 (en) | The way to reduce the load on large-area contact pillars in the surrounding massif area | |
| CN212896388U (en) | Foundation pit supporting device of environmental protection | |
| RU2018663C1 (en) | Method for driving of extraction drifts | |
| CN1421592A (en) | Vertically spaced digging process |