DE2425131A1 - BERGMAENNISCHE DRAWING MACHINE - Google Patents
BERGMAENNISCHE DRAWING MACHINEInfo
- Publication number
- DE2425131A1 DE2425131A1 DE19742425131 DE2425131A DE2425131A1 DE 2425131 A1 DE2425131 A1 DE 2425131A1 DE 19742425131 DE19742425131 DE 19742425131 DE 2425131 A DE2425131 A DE 2425131A DE 2425131 A1 DE2425131 A1 DE 2425131A1
- Authority
- DE
- Germany
- Prior art keywords
- machine
- conveyor
- mountains
- shield
- boom
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000005065 mining Methods 0.000 claims description 28
- 229910052500 inorganic mineral Inorganic materials 0.000 claims description 12
- 239000011707 mineral Substances 0.000 claims description 12
- 239000011435 rock Substances 0.000 claims description 9
- 238000009434 installation Methods 0.000 claims description 2
- 239000003245 coal Substances 0.000 description 10
- 238000000605 extraction Methods 0.000 description 5
- 238000000034 method Methods 0.000 description 4
- 238000009412 basement excavation Methods 0.000 description 3
- 230000005641 tunneling Effects 0.000 description 3
- 239000000463 material Substances 0.000 description 2
- 239000000428 dust Substances 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 230000007613 environmental effect Effects 0.000 description 1
- 239000011798 excavation material Substances 0.000 description 1
- 230000035939 shock Effects 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D9/00—Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
- E21D9/10—Making by using boring or cutting machines
- E21D9/1006—Making by using boring or cutting machines with rotary cutting tools
- E21D9/1013—Making by using boring or cutting machines with rotary cutting tools on a tool-carrier supported by a movable boom
- E21D9/102—Making by using boring or cutting machines with rotary cutting tools on a tool-carrier supported by a movable boom by a longitudinally extending boom being pivotable about a vertical and a transverse axis
Landscapes
- Engineering & Computer Science (AREA)
- Mining & Mineral Resources (AREA)
- Environmental & Geological Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Geology (AREA)
- Excavating Of Shafts Or Tunnels (AREA)
Description
Bergmännische Streckenvortriebsmaschine Zusatz zum Patent ... (P 21 45 076.0)Mining tunneling machine Addendum to the patent ... (P 21 45 076.0)
Gegenstand des Patents ... (Patentanmeldung P 21 45 076.0) ist ein Verfahren zum Auffahren von Abbaustrecken im Bergbau untertage, insbesondere im Zusammenhang mit einem zu Felde rückenden Langfront-Abbau in einem Mineralflöz, vorzugsweise Kohlenflöz, wobei zuerst das an die Markscheide des Flözes angrenzende Gebirge ausgebrochen und der Streckenkopf dadurch um einai verhältnismäßig geringen Betrag gegenüber dem Mineralstoß vorverlegt wird und wobei dann das der Markscheide benachbarte Mineral sowie das übrige Mineral am Stoß hereingewonnen wird. Dabei kann das der Mark-scheide des Flözes benachbarte Gebirge bis zu einem Maß des Vorrückens des Streckenkopfes ausgebrochen werden, welches im wesentlichen gleich der Breite des Knapps ist, der während jedes turnusmäßigen Vorrückens der Abbaufront im Flöz ausgebrochen wird. Das Ausbrechen des Gebirges geschieht durch eine Maschine, welche an derjenigen Seite der Mineralfront aufgestellt wird, die von der Gebirgs-The subject of the patent ... (patent application P 21 45 076.0) is a method for driving mining routes in underground mining, especially in connection with long-front mining moving towards the field in a mineral seam, preferably coal seam, where first the mountains bordering the marrow of the seam erupted and the line head thereby by a proportion a small amount is brought forward compared to the mineral shock and then the one adjacent to the medullary sheath Mineral as well as the remaining mineral at the joint is extracted. The mountains adjacent to the medullary divide of the seam can be used be broken out to a degree of advancement of the line head which is substantially equal to the width of the Knapps, which is broken out in the seam during each regular advance of the mining front. The eruption of the mountains is done by a machine that is set up on the side of the mineral front that is
409850/0355409850/0355
front abgewandt ist.facing away from the front.
Gegenstand des Hauptpatents ist auch eine Vorrichtung zur Durchführung des vorgenannten Verfahrens, und zwar eine Maschine zum Auffahren einer Abbaustrecke bei einem zu Felde ziehenden Langfront-Strebabbau in einem Mineralflöz untertage, mit einem zur Aufstellung in einerAbbaustrecke eingerichteten Maschinenkörper, einem sich darüber hinaus erstreckenden Ausleger, einem am freien Ende dieses Auslegers angeordneten Schrämwerkzeug, wobei dieses Werkzeug derart eingerichtet ist, daß es im Betrieb das Gebirge' ausbricht und die Strecke vortreibt. Dabei ist ein Schild vorgesehen, welcher vom Maschinenkörper derart vorragt, daß er sich oberhalb des Mineralstoßes in der Umgebung der Markscheide des Flözes erstreckt. Der Schild ist mit Fördereinrichtungen für das ausgebrochene Gestein ausgestattet.The subject of the main patent is also a device for carrying out the aforementioned method, namely one Machine for driving a mining section in a long-front long-front longwall mining in a mineral seam underground, with one set up for installation in a dismantling line Machine body, a boom extending beyond it, one arranged at the free end of this boom Cutting tool, this tool being set up in such a way that it breaks out the mountains during operation and drives the route. A shield is provided which protrudes from the machine body in such a way that it is above the mineral joint in the vicinity of the medullary sheath of the seam. The shield is with conveyors for the excavated rock fitted.
Der Erfindung liegt die Aufgabe zugrunde, den Gegenstand des Hauptpatents zu verbessern bzw. weiter auszubilden, insbesondere eine Maschine zu schaffen, mit der das Auffahren von Abbaustrecken gemäß dem Verfahren nach dem Hauptpatent unter bestimmten Bedingungen noch vorteilhafter durchgeführt werden kann.The invention is based on the object of improving or further developing the subject matter of the main patent, in particular to create a machine with which the driving of mining roads according to the method according to the main patent under certain conditions can be carried out even more advantageously.
Zur Lösung geht die Erfindung von einer Maschine mit Merkmalen gemäß dem Hauptpatent aus, und sie besteht darin, daß am Ausleger eine Stoß- und Schubvorrichtung zum Bewegen der Berge über den Schild zum Förderer angebracht ist.To solve the invention is based on a machine with features according to the main patent, and it consists in that on Boom a push and pull device is attached to move the mountains over the shield to the conveyor.
Vorteilhafte Ausgestaltungen der Erfindung ergeben sich aus den Unteransprüchen 2-6. Wirkungen und Vorteile sind der nachfolgenden Beispielsbeschreibung zu entnehmen.Advantageous embodiments of the invention emerge from the subclaims 2-6. Effects and benefits are the can be found in the following example description.
In der Zeichnung ist ein Ausführungsbeispiel der Erfindung - weitgehend schematisch - wiedergegeben, welches nachstehend beschrieben wird. Es zeigen:In the drawing, an embodiment of the invention is shown - largely schematically - which is shown below is described. Show it:
409850/0355409850/0355
Fig. 1 eine Seitenansicht der Maschine in ihrer Betriebsstellung, vor der Ortsbrust einer Abbaustrecke, Fig. 1 is a side view of the machine in its operating position, in front of the face of a mining section,
Fig. 2 eine nicht vollständige Grundrißansicht der Darstellung gemäß Fig. 1,FIG. 2 is an incomplete plan view of the representation according to FIG. 1,
Fig. 3 eine Ansicht auf einen Schnitt entlang der Linie III - III in Fig. 2,3 shows a view of a section along the line III - III in FIG. 2,
Fig. 4 eine Ansicht auf einen Schnitt entlang der Linie IV-IV in Fig. 2.4 shows a view of a section along the line IV-IV in Fig. 2.
Wie sich aus der Zeichnung ergibt, steht die erfindungsgemäße Maschine in einer Abbaustrecke 4 untertage vor einer Ortsbrust mit anstehendem Gebirge 3 im Einsatz, um die Abbaustrecke, von der nur das vorderste Ende gezeigt ist, weiter aufzufahren. Der Ausbruch des Gebirges 3 geschieht entsprechend dem Zufelderücken eines Langfront-Strebes 6 im Flöz 7. Bei der Abbaustrecke 4 handelt es sich um die sogenannte obere Abbaustrecke, d. h. um diejenige,durch welche die Bergleute in den Streb einfahren, das im Streb benötigte Material - Ausbauteile, Fördermittelteile, Teile für die Hereingewinnungsmaschine, Versa^tz - zugeführt wird und die Abwetter abziehen. Der Streb 6 hat an seinem der oberen Abbaustrecke 4 entgegengesetzten Ende in üblicher Weise eine untere Abbaustrecke (nicht dargestellt), durch welche die im Streb hereingewonnene Kohle abgefördert wird. Außerdem wird der für den Streb 6 bestimmte Wetterstrom durch die untere Abbaustrecke als Frischwetter zugeführt. Die untere Abbaustrecke kann ebenfalls durch eine Maschine, wie sie in der Zeichnung wiedergegeben ist, aufgefahren werden.As can be seen from the drawing, the inventive Machine in a mining section 4 underground in front of a face with pending mountains 3 in use to the mining section, from which only the foremost end is shown to open further. The eruption of the mountains 3 happens according to the ridge of the field of a long front strut 6 in the seam 7. At the Mining line 4 is the so-called upper mining line, d. H. those through which the miners drive into the longwall, the material required in the longwall - expansion parts, Conveyor parts, parts for the extraction machine, Versa ^ tz - is fed and the weathers subtract. Of the Longwall 6 has at its end opposite the upper mining section 4 in the usual way a lower mining section (not shown), through which the coal extracted in the longwall is conveyed away. In addition, the one intended for the longwall 6 will be used Weather stream fed through the lower mining section as fresh weather. The lower mining section can also be reached by a Machine, as it is shown in the drawing, are opened.
Im Streb 6 ist ein verstärkter Endlosförderer 8 verlegt, entlang welchem eine nicht dargestellte Hereingewinnungsmaschine für die Kohle verfahren wird. Die Maschine fährt in üblicher Weise am Förderer 8 hin und her und verritzt dabei das Mineral,In the longwall 6 a reinforced endless conveyor 8 is laid along which an unillustrated extraction machine for the coal is proceeded. The machine runs in the usual Way back and forth on the conveyor 8 and scratches the mineral,
409850/0355409850/0355
von dem ein^ entsprechend breiter Knapp ausgebrochen wird. Die Breite des Knapps ist in Fig. 1 mit dem Buchstaben X bezeichnet. Die Hereingewinnungsmaschine hat eine Schrämtrommel und ist damit in der Lage, die Kohle bis zum jeweiligen Endpunkt des Förderers 8 hereinzugewinnen, so daß auch die Umkehrstationen des Förderers 8 in den von der Schrämtrommel ausgekohlten Raum vorgerückt werden können.from which a ^ correspondingly broad scarp is broken out. The width of the Knapps is denoted by the letter X in FIG. The extraction machine has a cutting drum and is thus able to cut the coal up to the respective Win in end point of the conveyor 8, so that the reversing stations of the conveyor 8 in the of the Cutter drum charred space can be advanced.
Das Hangende des Strebs 6 wird durch nicht dargestellte Stempel unterfangen, während die Abbaustrecke 4 mit nicht dargestellten Bogenträgern ausgebaut ist.The hanging wall of the longwall 6 is underpinned by not shown punch, while the mining section 4 with not shown arched beams is expanded.
Die Maschine umfaßt einen Maschinenkörper 16, welcher auf der Sohle der Strecke 4 mittels Rückzylindern 17f die den Maschinenkörper mit dem Strebförderer 8 verbinden, vorgerückt werden kann. Ein vorzugsweise teleskopischer Ausleger 18, der in Fig. 2 und 4 nicht wiedergegeben ist, ist am Maschinenkörper 16 schwenkbar gelagert und läßt sich um horizontale und vertikale Achsen bewegen. Das freie Ende des Auslegers 18 trägt ein umlaufendes Schrämwerkzeug 20.The machine comprises a machine body 16 which can be advanced on the bottom of the track 4 by means of rear cylinders 17 f which connect the machine body to the face conveyor 8. A preferably telescopic boom 18, which is not shown in FIGS. 2 and 4, is pivotably mounted on the machine body 16 and can be moved about horizontal and vertical axes. The free end of the boom 18 carries a rotating cutting tool 20.
Der Maschinenkörper 16 weist ferner einen nach vorn ragenden Schild 32 auf, der sich über den Strebförderer 8 und teilweise über den als nächstes zur Hereingewinnung anstehenden Knapp des Flözes 7 erstreckt und mittels Hydraulikzylindern 33 um eine horizontale Achse verschwenkt werden kann.The machine body 16 also has a forwardly projecting shield 32 which extends over the face conveyor 8 and partially extends over the next pending to be won in the seam 7 and by means of hydraulic cylinders 33 can be pivoted about a horizontal axis.
Ein Förderer 34 ragt von der Vorderseite des Maschinenkörpers 16 aus bis zu einer Öffnung 35 vor, welche in der Mitte der rückwärtigen Oberfläche des Schildes 32 vorgesehen ist, damit das ausgebrochene Gebirge vom Schild zu einem seitlich offenen, wannenartigen Fülltrichter 36, der im Maschinenkörper 16 angeordnet ist, gefördert werden kann. Das Bergehaufwerk wird zur Öffnung 35 mittels einer Stoß- und Schubvorrichtung 37, beispielsweise in Gestalt von Schwenkflügeln, die am Ausleger 18 nahe dem Schrämwerkzeug 20 befestigt ist, weiter-A conveyor 34 protrudes from the front of the machine body 16 to an opening 35 formed in the center of the rear surface of the shield 32 is provided so the broken rock from the shield to a laterally open, trough-like filling funnel 36, which is located in the machine body 16 is arranged, can be promoted. The excavation material becomes the opening 35 by means of a push-and-pull device 37, for example in the form of swivel blades, which is attached to the boom 18 near the cutting tool 20, further-
409850/0355409850/0355
geleitet.directed.
Das über den Förderer 34 transportierte Haufwerk wird am Boden des Trichters 36 in den Weg eines nicht dargestellten Kübels einer Einrichtung zum Versatz der Berge im Alten Mann an den Seiten der Abbaustrecke 4, wie an sich bekannt, geleitet. Während des Betriebes wird der Kübel mittels eines endlosen Seiles 38 hin und her gehaspelt, wobei das Seil 38 über Seilscheiben 39, von denen in der Zeichnung nur einige dargestellt sind, geführt und mittels einer nicht dargestellten Winsch, die in der Abbaustrecke 4 neben dem Maschinenkörper 16 oder an ihm befestigt angeordnet ist, angetrieben wird. Bei jeder Fahrt des Kübels sammelt dieser das Haufwerk im Trichter 36 und fördert es zum Alten Mann, wo es beispielsweise pfeilerartig versetzt wird. Dieser Vorgang setzt sich so lange fort, bis das ganze, von dem Schrämer 20 ausgebrochene Material versetzt ist und der Versatz die seitlichen Stöße der Abbaustrecke 4 gebildet hat.The debris transported on the conveyor 34 is on Bottom of the funnel 36 in the path of a bucket, not shown, of a device for offsetting the mountains in the old man on the sides of the mining route 4, as is known per se, passed. During operation, the bucket is controlled by means of a endless rope 38 coiled back and forth, the rope 38 over pulleys 39, of which only a few in the drawing are shown, guided and by means of a winch, not shown, in the mining section 4 next to the machine body 16 or is arranged attached to it, is driven. Every time the bucket moves, it collects the debris in the Funnel 36 and conveys it to the old man, where it is moved, for example, like a pillar. This process continues for so long continue until all the material broken off by the cutter 20 is offset and the offset has formed the lateral joints of the mining section 4.
Der Trichter 36 hat eine obere gebogene Führung 40, durch die der Kübel am Trichterboden anliegend gehalten wird, während er durch den Trichter fährt. Angrenzend an die Seiten des Trichters sind weitere Führungen 41 für den Kübel vorgesehen, damit derselbe richtig in den Trichter einlaufen kann.The funnel 36 has an upper curved guide 40 by means of which the bucket is held against the funnel bottom, while driving through the funnel. Adjacent to the sides of the funnel, further guides 41 are provided for the bucket, so that it can properly run into the funnel.
Im Betrieb wird die Maschine so aufgestellt, daß der Schrämkopf 20 das anstehende Gebirge 3 der Ortsbrust berührt. Während dieses Betriebszustandes fluchtet der freiliegende Stoß des Gebirges mit dem entsprechenden Stoß des Kohlenflözes 7.In operation, the machine is set up so that the cutter head 20 touches the pending rock 3 of the face. While this operating state aligns the exposed joint of the Mountains with the corresponding collision of the coal seam 7.
Das Schrämwerkzeug 20 wird nun in Umdrehungen versetzt und über den Ortsbrustquerschnitt hin- und herbewegt, wobei das Gebirge verritzt und ausgebrochen wird. Während der Schwenkbewegungen des Schrämers 20 wird der Ausleger 18 teleskopisch verlängert, so daß das Gebirge entsprechend tiefer ausgebrochen wird und die Ortsbrust vorrückt.The cutting tool 20 is now set in revolutions and over the face cross-section is moved back and forth, whereby the rock is scored and broken out. During the swivel movements of the cutter 20, the boom 18 is telescopically extended, so that the mountains are broken out correspondingly deeper and the face advances.
409850/0355409850/0355
Das Maß dieses Vorrückens ist begrenzt auf eine verhältnismäßig geringe (shallow) Tiefe, die ungefähr der Breite des nächsten hereinzugewinnenden Kohlenknapps entspricht, wie es in Fig. 1 durch X bezeichnet ist. Die gestrichelten Linien in den Figuren 1-3 zeigen den zunehmenden Auffahrungsfortschritt der Abbaustrecke 4 im Gebirge 3 an.The extent of this advancement is limited to a relatively small (shallow) depth, which is approximately the width of the corresponds to the next coal trap to be recovered, as indicated by X in FIG. The dashed lines FIGS. 1-3 show the increasing progress of the excavation of the mining section 4 in the rock 3.
Während der Bewegungen des Schrämkopfes 20 über die anstehende Gebirgsfront fallen die herausgebrochenen Gesteinsbrocken auf den Schild 32, der ursprünglich die Ortsbrust der Strecke berührte und auf der oberen Oberfläche des Flözes 7 auflagert. Der Schild 32 verhindert, daß Berge in den Streb 6 hinunterfallen und auf den Strebförderer 8 gelangen. Anstatt dessen wird das steinige Haufwerk mittels der flügeiförmigen Stoß- und Schubvorrichtung 37 am Ausleger 8 zur öffnung 35 transportiert, von wo es mittels des Förderers 34 zum Trichter 36 gebracht und anschließend durch die Versatzvorrichtung in der bereits beschriebenen Weise versetzt wird.During the movements of the cutter head 20 over the pending mountain front, the rocks that have broken out fall on the shield 32, which originally touched the face of the route and rests on the upper surface of the seam 7. The shield 32 prevents mountains from falling down into the face 6 and get onto the face conveyor 8. Instead, the stony debris is removed by means of the wing-shaped impact and pushing device 37 transported on boom 8 to opening 35, from where it is brought to the hopper 36 by means of the conveyor 34 and then through the offset device in is moved in the manner already described.
Wenn der anstehende Gebirgsstoß mittels des Schrämkopfes 20 bis zur Breite des nächsten hereinzugewinnenden Kohlenknapps vorgetrieben ist (Fig. 1), wird die Vorderseite des Schildes 32 angehoben, und die Hereingewinnungsmaschine für die Kohle kann das Mineral nicht nur im Streb, sondern auch im Bereich der Abbaustrecke 4 ausbrechen. Im Anschluß daran fährt die Kohlengewinnungsmaschine längs der Abbaufront zurück, und der Strebförderer 8 wird in Richtung des Abbaufortschritts vorgerückt. Wenn der Förderer 8 ganz vorgerückt ist, wird auch die Streckenvortriebsmaschine vorgefahren, bis der Schild 32 wieder die Ortsbrust berührt. Während des Vorfahrens der Maschine ist der Ausleger 18 .zurückgezogen, so daß im Augenblick des vollständigen Vorgerücktseins der Maschine ein neuer Zyklus des Streckenvortriebs beginnen kann.When the pending rock face by means of the cutter head 20 up to the width of the next coal pit to be extracted is advanced (Fig. 1), the front of the shield 32 is raised, and the extraction machine for the coal the mineral can erupt not only in the face, but also in the area of the mining route 4. Then the Coal extraction machine back along the mining front, and the face conveyor 8 is advanced in the direction of the mining progress. When the conveyor 8 is fully advanced, the tunneling machine is also advanced until the shield 32 touches the face again. During the advance of the machine, the boom 18 is retracted, so that at the moment Once the machine has been fully advanced, a new cycle of excavation can begin.
Wie sich aus der vorstehenden Erläuterung ergibt, lehrt die Erfindung eine Vorrichtung zum Auffahren von AbbaustreckenAs can be seen from the above explanation, the invention teaches a device for driving excavation roads
409850/035 5'409850/035 5 '
ohne das Erfordernis eines komplizierten Systems zur Unterstützung des Hangenden des Flözes. Außerdem lassen sich in unmittelbarer Nähe der Kohlenfront schon die Streckenausbauelemente in ihrer endgültigen Form setzen, wodurch die unvermeidliche Beunruhigung der Gebirgsschichten auf ein Mindestmaß herabgesetzt wird.without the need for a complicated system of support of the hanging wall of the seam. In addition, the track extension elements can already be installed in the immediate vicinity of the coal front set in their final form, creating the inevitable disturbance of the mountain layers Minimum level is reduced.
Die Maschine schließt ferner die Notwendigkeit aus, Hangendbezirke preiszugeben, um den Vortrieb der Ortsbrust im Gebirge vollziehen zu können.The machine also eliminates the need for hillside districts to be able to drive the face in the mountains.
Darüberhinaus ergibt sich durch die erfindungsgemäße Maschine eine Erhöhung der Sicherheit der Arbeitsbedingungen in einer normalerweise sehr gefährlichen Zone. Weiterhin werden die örtlichen Umgebungsbedingungen, insbesondere in wettertechnischer Hinsicht, verbessert, weil die Verritzung des Gebirges nicht im Hauptwetterstrom stattfindet und deshalb die Staubentwicklung leichter überwacht und gesteuert werden kann.In addition, the machine according to the invention increases the safety of the working conditions in one usually very dangerous zone. Furthermore, the local environmental conditions, especially in terms of weather Regard, improved because the scoring of the mountain does not take place in the main weather stream and therefore the dust development can be monitored and controlled more easily.
Andere Ausführungsbeispiele der Streckenvortriebsmaschine gemäß der Erfindung haben an Stelle des umlaufenden Schrämkopfes 20 ein stoßend arbeitendes Werkzeug oder irgend ein anderes geeignetes Werkzeug zum Herausbrechen des Gesteins.Other embodiments of the tunneling machine according to the invention have instead of the rotating cutter head 20 a pushing tool or any other suitable tool for breaking out the rock.
Die in der vorstehenden Beschreibung, in der Zeichnung und in den nachfolgenden Patentansprüchen offenbarten Merkmale des Anmeldungsgegenstandes können sowohl einzeln als auch in beliebigen Kombinationen untereinander für die Verwirklichung der Erfindung in ihren verschiedenen Ausführungsformen wesentlich sein.The features disclosed in the above description, in the drawing and in the following patent claims the subject of the application can be used individually or in any combination for the realization be essential to the invention in its various embodiments.
PatentansprücheClaims
409850/0355409850/0355
Claims (6)
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| GB2511673A GB1433252A (en) | 1973-05-25 | 1973-05-25 | Apparatus for extending gate roadways to advancing faces in underground mines |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| DE2425131A1 true DE2425131A1 (en) | 1974-12-12 |
Family
ID=10222476
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| DE19742425131 Pending DE2425131A1 (en) | 1973-05-25 | 1974-05-24 | BERGMAENNISCHE DRAWING MACHINE |
Country Status (2)
| Country | Link |
|---|---|
| DE (1) | DE2425131A1 (en) |
| GB (1) | GB1433252A (en) |
Families Citing this family (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| GB2153876B (en) * | 1984-02-10 | 1987-09-16 | Dosco Overseas Eng Ltd | Tunnelling machine or roadheader with boom-mounted flipper arm |
-
1973
- 1973-05-25 GB GB2511673A patent/GB1433252A/en not_active Expired
-
1974
- 1974-05-24 DE DE19742425131 patent/DE2425131A1/en active Pending
Also Published As
| Publication number | Publication date |
|---|---|
| GB1433252A (en) | 1976-04-22 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| DE10393535T5 (en) | mining system | |
| DE2407584A1 (en) | METHOD OF DRIVING TUNNELS | |
| DE2307413C2 (en) | Device for the extraction of a floz-like deposit in longwall mining | |
| DE611738C (en) | Device for dismantling floezen in civil engineering with a broad view | |
| DE2145076C3 (en) | Process for driving excavation routes and tunneling machine for carrying out the process | |
| DE3629364A1 (en) | METHOD AND DEVICES FOR DRIVING A DIGITAL DISTANCE WITH A SHORT STAY | |
| DE2425131A1 (en) | BERGMAENNISCHE DRAWING MACHINE | |
| DE3009923A1 (en) | METHOD AND DEVICE FOR DISASSEMBLING THE PILLARS IN CHAMBER PILLAR CONSTRUCTION | |
| DE102005043236B4 (en) | Arrangement for mining of mining products in underground mining operations in quarry construction | |
| DE938543C (en) | Schraembaggergeraet with shield for mining underground natural resources, preferably lignite | |
| DE2322259B1 (en) | LINE EXPANSION FRAME FOR LINE FEEDING MACHINES | |
| DE562878C (en) | Open pit mine for the extraction and relocation of mountain layers | |
| DE19750484B4 (en) | Extraction device, in particular for the coal production in unterertätigen extraction struts | |
| DE102016015395B4 (en) | Tunneling machine | |
| DE2809723A1 (en) | Coal cutting machine guide system - has sloping ramp at end of face conveyor to raise level of machine | |
| DE3528117C1 (en) | Apparatus for parting and loading seam-like outcrops of mineral raw materials | |
| DE2920419C2 (en) | Device for opening the machine shed | |
| DE3335098A1 (en) | Mining method for seam-like deposits | |
| DE3110219C2 (en) | ||
| DE3536990A1 (en) | REMOVAL UNDER DEPOSITS | |
| DE812063C (en) | Schraemmaschine | |
| DE3416156A1 (en) | Apparatus for driving a gate road, in particular the top road, of a winning face | |
| AT403501B (en) | DRIVING MACHINE | |
| DE940221C (en) | Planer | |
| DE1131622B (en) | Process for the extraction and loading of coal in both face directions by means of a roller shaving machine and roller shaving machine which can be moved on a face conveying means for carrying out this process |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| OHN | Withdrawal |