DK0722013T3 - Process and track building machine for carrying out track building work - Google Patents
Process and track building machine for carrying out track building workInfo
- Publication number
- DK0722013T3 DK0722013T3 DK95890216T DK95890216T DK0722013T3 DK 0722013 T3 DK0722013 T3 DK 0722013T3 DK 95890216 T DK95890216 T DK 95890216T DK 95890216 T DK95890216 T DK 95890216T DK 0722013 T3 DK0722013 T3 DK 0722013T3
- Authority
- DK
- Denmark
- Prior art keywords
- track
- track building
- carrying
- point
- work
- Prior art date
Links
- 238000012423 maintenance Methods 0.000 abstract 3
- 238000005259 measurement Methods 0.000 abstract 1
- 238000011144 upstream manufacturing Methods 0.000 abstract 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01B—PERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
- E01B35/00—Applications of measuring apparatus or devices for track-building purposes
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01B—PERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
- E01B2203/00—Devices for working the railway-superstructure
- E01B2203/16—Guiding or measuring means, e.g. for alignment, canting, stepwise propagation
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Machines For Laying And Maintaining Railways (AREA)
- Feeding Of Workpieces (AREA)
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
The track maintenance system measures the actual position of the rail track (5) at a defined point (69), upstream of the maintenance point (68), relative to a spaced reference position (20), with the measured value being stored, for comparison with a subsequently measured value for the same point, obtained after working on the track. The track maintenance device (7) is maintained in operation as long as the compared position values are the same. Pref. the reference position for the actual track position measurement is provided by an adjacent rail track to that being worked on.
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| AT2495 | 1995-01-10 |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| DK0722013T3 true DK0722013T3 (en) | 2000-07-10 |
Family
ID=3479517
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| DK95890216T DK0722013T3 (en) | 1995-01-10 | 1995-12-06 | Process and track building machine for carrying out track building work |
Country Status (4)
| Country | Link |
|---|---|
| EP (1) | EP0722013B1 (en) |
| AT (1) | ATE191032T1 (en) |
| DE (1) | DE59508056D1 (en) |
| DK (1) | DK0722013T3 (en) |
Families Citing this family (8)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| EP0806523A1 (en) * | 1996-05-09 | 1997-11-12 | J. Müller Ag | Machine for obtaining a rated railway track |
| EP0930398A1 (en) * | 1998-01-19 | 1999-07-21 | Franz Plasser Bahnbaumaschinen-Industriegesellschaft m.b.H. | Correction method for the position of a railway track |
| EP1172482A3 (en) * | 2000-07-10 | 2003-07-30 | GSG Knape Gleissanierung GmbH | Method for laying railway tracks, especially ballastless tracks, and apparatus for performing the method |
| AT4766U3 (en) | 2001-06-21 | 2002-05-27 | Plasser Bahnbaumasch Franz | TRACK CONSTRUCTION MACHINE AND METHOD FOR DETECTING A TRACK SITUATION |
| AT512159B1 (en) * | 2012-04-11 | 2013-06-15 | Plasser Bahnbaumasch Franz | Machine for the maintenance of a track |
| CN107255445B (en) * | 2017-07-26 | 2023-03-28 | 中铁四局集团第一工程有限公司 | Detection system and method for CRTS III type plate type ballastless track plate |
| RU187173U1 (en) * | 2018-08-06 | 2019-02-22 | Общество с ограниченной ответственностью "Сибдорпроект" | Gravel cleaning machine |
| CN111764209A (en) * | 2020-05-29 | 2020-10-13 | 中国铁建高新装备股份有限公司 | A measurement control device and measurement control method of an excavating device |
Family Cites Families (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CA1140393A (en) * | 1978-11-01 | 1983-02-01 | John K. Stewart | Method and apparatus for correcting railroad track using a dynamic loading record of track condition |
| AT372725B (en) * | 1981-02-12 | 1983-11-10 | Plasser Bahnbaumasch Franz | TRACKABLE DEVICE FOR DETERMINING THE LOCATION OF THE NEIGHBORHOOD TRACK |
| AT403066B (en) * | 1991-07-12 | 1997-11-25 | Plasser Bahnbaumasch Franz | METHOD FOR DETERMINING THE DEVIATIONS OF THE ACTUAL LOCATION OF A TRACK SECTION |
| GB9211901D0 (en) * | 1992-06-05 | 1992-07-15 | British Railways Board | Methods of railway track maintenance |
-
1995
- 1995-12-06 EP EP95890216A patent/EP0722013B1/en not_active Expired - Lifetime
- 1995-12-06 AT AT95890216T patent/ATE191032T1/en active
- 1995-12-06 DE DE59508056T patent/DE59508056D1/en not_active Expired - Lifetime
- 1995-12-06 DK DK95890216T patent/DK0722013T3/en active
Also Published As
| Publication number | Publication date |
|---|---|
| EP0722013A1 (en) | 1996-07-17 |
| DE59508056D1 (en) | 2000-04-27 |
| ATE191032T1 (en) | 2000-04-15 |
| EP0722013B1 (en) | 2000-03-22 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| FI890862A0 (en) | Method and apparatus for monitoring the surface profile of a moving workpiece | |
| DE3771793D1 (en) | INDUSTRIAL ROBOT. | |
| AU644913B2 (en) | Procedure and apparatus for checking the straightness of elevator guide rails and straightening deflections, and a measuring apparatus | |
| ATE255978T1 (en) | DRIVE DEVICE FOR MOVING A PLATFORM IN A PLANE | |
| DE59508056D1 (en) | Process and track construction machine for performing track construction work | |
| ATE252045T1 (en) | METHOD AND DEVICE FOR CUTTING A RUNNING WEB OF MATERIAL | |
| DE59104141D1 (en) | Device for working bars. | |
| DE50001588D1 (en) | Ueberwachungsanlage | |
| NO151030C (en) | DEVICE FOR LIMITATION OF TREE PROFILES | |
| DE59905532D1 (en) | Device for fastening glass panes to building facades | |
| ATE184529T1 (en) | DEVICE FOR LONGITUDINAL CUTTING PIPES | |
| ATE84741T1 (en) | METHOD AND APPARATUS FOR SCORING A PIECE OF CLAY. | |
| DE59704227D1 (en) | Device for connecting profiles made of plastic | |
| DE19680348D2 (en) | Method and device for measuring and correcting the tension profile of saw blades | |
| EP0230297A3 (en) | Method for positioning and measuring work pieces on production lines | |
| DE59911123D1 (en) | Method and device for detecting the occurrence of a critical condition of a tool, in particular a saw blade | |
| DE68904179D1 (en) | GREENHOUSE, FIRST PROFILE AND CONNECTING PROFILE THEREFOR AND METHOD FOR BUILDING A GREENHOUSE. | |
| DE59600431D1 (en) | CUTTING STATION FOR CUTTING A CONTINUOUSLY PROMOTED TAPE MADE OF PLASTICALLY DEFORMABLE MATERIAL INTO SINGLE PIECES | |
| DE3361094D1 (en) | Method of guiding a track-positioning device, and apparatus for that purpose | |
| AU2003295039A1 (en) | Method for measuring with a machining machine-tool, tool adapted therefor and software product managing same | |
| DE69010437D1 (en) | Device for producing a groove bearing and method for producing a groove bearing using the device. | |
| SE9803924L (en) | Method and device for impact on a moving object | |
| SE9701388D0 (en) | Method and apparatus for determining position | |
| ATE174830T1 (en) | DEVICE FOR PRODUCING FRAME PARTS IN PAIRS OR INDIVIDUALLY | |
| ATE202961T1 (en) | DEVICE AND METHOD FOR DETECTING THE PROFILE WIDTH OF A PROFILE FRAME, SUCH AS WINDOW OR DOOR FRAMES |