ECSP088671A - PR-1 PARALLEL DUAL COMPLEMENTATION SYSTEM FOR SUBMERSIBLE ELECTRO PUMPING - Google Patents
PR-1 PARALLEL DUAL COMPLEMENTATION SYSTEM FOR SUBMERSIBLE ELECTRO PUMPINGInfo
- Publication number
- ECSP088671A ECSP088671A EC2008008671A ECSP088671A ECSP088671A EC SP088671 A ECSP088671 A EC SP088671A EC 2008008671 A EC2008008671 A EC 2008008671A EC SP088671 A ECSP088671 A EC SP088671A EC SP088671 A ECSP088671 A EC SP088671A
- Authority
- EC
- Ecuador
- Prior art keywords
- production
- possibility
- well
- hole
- hanger
- Prior art date
Links
- 230000009977 dual effect Effects 0.000 title abstract 2
- 238000005086 pumping Methods 0.000 title abstract 2
- 238000005553 drilling Methods 0.000 abstract 1
- 230000000694 effects Effects 0.000 abstract 1
- 239000012530 fluid Substances 0.000 abstract 1
- 238000009434 installation Methods 0.000 abstract 1
- 239000003129 oil well Substances 0.000 abstract 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B17/00—Drilling rods or pipes; Flexible drill strings; Kellies; Drill collars; Sucker rods; Cables; Casings; Tubings
- E21B17/02—Couplings; joints
- E21B17/04—Couplings; joints between rod or the like and bit or between rod and rod or the like
- E21B17/07—Telescoping joints for varying drill string lengths; Shock absorbers
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/12—Methods or apparatus for controlling the flow of the obtained fluid to or in wells
- E21B43/121—Lifting well fluids
- E21B43/128—Adaptation of pump systems with down-hole electric drives
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B17/00—Drilling rods or pipes; Flexible drill strings; Kellies; Drill collars; Sucker rods; Cables; Casings; Tubings
- E21B17/10—Wear protectors; Centralising devices, e.g. stabilisers
- E21B17/1035—Wear protectors; Centralising devices, e.g. stabilisers for plural rods, pipes or lines, e.g. for control lines
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B17/00—Drilling rods or pipes; Flexible drill strings; Kellies; Drill collars; Sucker rods; Cables; Casings; Tubings
- E21B17/18—Pipes provided with plural fluid passages
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/14—Obtaining from a multiple-zone well
Landscapes
- Engineering & Computer Science (AREA)
- Life Sciences & Earth Sciences (AREA)
- Geology (AREA)
- Mining & Mineral Resources (AREA)
- Physics & Mathematics (AREA)
- Environmental & Geological Engineering (AREA)
- Fluid Mechanics (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Mechanical Engineering (AREA)
- Earth Drilling (AREA)
Abstract
La invención permite la instalación simultánea de dos (2) Sistemas de Bombeo Electro Sumergible en forma Paralela definido con las siglas (S.B.E.S) con dos cables de poder posicionados de manera convencional ya sea con mordazas o bandas en el exterior de la tubería de producción. El objetivo de aislar la producción de dos o más zonas de producción en el mismo pozo restringido sin la posibilidad de que se mezclen los fluidos producidos separadamente.Esto es en pozos de petróleo que son perforados verticalmente, especialmente desviados de la vertical o perforados horizontalmente inclinados del eje vertical. La invención del sistema elimina la tendencia o posibilidad de que los dos "S.B.E.S" llegaran a torcerse uno sobre el otro conforme pasan a través de la geometría del hoyo, la cual gira gradualmente a la derecha debido al efecto rotacional del hoyo impartido por la mesa rotaria a la sarta de perforación o al ensamblaje de fondo durante la perforación del pozo. El sistema permite un asentamiento simultáneo de dos mandriles colgadores en la armadura del cuerpo del colgador de la tubería del cabezal cuando las dos sartas de producción de un "S.B.E.S" son amordazadas juntas eliminando movimientos independientes de rotación. Finalmente la invención compensa los problemas relacionados por la tensión mecánica de la línea de flujo de producción del pozo a menudo encontrada previamente en diseños de Sistemas de Completamiento Dual Paralelo.The invention allows the simultaneous installation of two (2) Electro Submersible Pumping Systems in a parallel manner defined with the acronym (S.B.E.S) with two power cables positioned in a conventional manner with either jaws or bands on the outside of the production pipe. The objective of isolating the production of two or more production areas in the same restricted well without the possibility of mixing separately produced fluids.This is in oil wells that are drilled vertically, especially deviated from the vertical or horizontally inclined drilled. of the vertical axis. The invention of the system eliminates the tendency or possibility that the two "SBES" will twist over each other as they pass through the geometry of the hole, which gradually turns to the right due to the rotational effect of the hole imparted by the table It would rotate to the drill string or to the bottom assembly during well drilling. The system allows a simultaneous settling of two hanger chucks in the body armor of the head pipe hanger when the two production strings of an "S.B.E.S" are gagged together eliminating independent rotational movements. Finally, the invention compensates for problems related to the mechanical tension of the well production flow line often found previously in Dual Parallel Completion System designs.
Priority Applications (2)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| EC2008008671A ECSP088671A (en) | 2008-08-08 | 2008-08-08 | PR-1 PARALLEL DUAL COMPLEMENTATION SYSTEM FOR SUBMERSIBLE ELECTRO PUMPING |
| PCT/EC2009/000010 WO2010025741A1 (en) | 2008-08-08 | 2009-08-05 | Parallel electric submersible pumping system |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| EC2008008671A ECSP088671A (en) | 2008-08-08 | 2008-08-08 | PR-1 PARALLEL DUAL COMPLEMENTATION SYSTEM FOR SUBMERSIBLE ELECTRO PUMPING |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| ECSP088671A true ECSP088671A (en) | 2008-12-30 |
Family
ID=40459925
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| EC2008008671A ECSP088671A (en) | 2008-08-08 | 2008-08-08 | PR-1 PARALLEL DUAL COMPLEMENTATION SYSTEM FOR SUBMERSIBLE ELECTRO PUMPING |
Country Status (2)
| Country | Link |
|---|---|
| EC (1) | ECSP088671A (en) |
| WO (1) | WO2010025741A1 (en) |
Families Citing this family (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN107701126A (en) * | 2017-11-09 | 2018-02-16 | 盐城凯发石油机械有限公司 | A kind of erection device of going into the well for aiding in sucker rod connection |
Family Cites Families (7)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US3653435A (en) * | 1970-08-14 | 1972-04-04 | Exxon Production Research Co | Multi-string tubingless completion technique |
| GB1478206A (en) * | 1974-09-12 | 1977-06-29 | Weatherford Oil Tool | Control line positioning device for use in wells |
| US4403654A (en) * | 1981-03-23 | 1983-09-13 | Baker International Corporation | Torque transmitting expansion joint and a hanger assembly incorporating same |
| GB2121091A (en) * | 1982-05-27 | 1983-12-14 | Edeco Developments Limited | Control line protector |
| GB2138056B (en) * | 1983-04-07 | 1986-07-02 | Weatherford Lamb | Control line protector for oil well tubing string |
| US5343949A (en) * | 1992-09-10 | 1994-09-06 | Halliburton Company | Isolation washpipe for earth well completions and method for use in gravel packing a well |
| US6250390B1 (en) * | 1999-01-04 | 2001-06-26 | Camco International, Inc. | Dual electric submergible pumping systems for producing fluids from separate reservoirs |
-
2008
- 2008-08-08 EC EC2008008671A patent/ECSP088671A/en unknown
-
2009
- 2009-08-05 WO PCT/EC2009/000010 patent/WO2010025741A1/en not_active Ceased
Also Published As
| Publication number | Publication date |
|---|---|
| WO2010025741A1 (en) | 2010-03-11 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| BR112012021013A2 (en) | reverse circulation device and methods for using the same | |
| CY1123018T1 (en) | MULTIFLUID DRILLING SYSTEM | |
| EA201791161A1 (en) | MODULAR TOP DRIVE | |
| BRPI0800758A (en) | pressure control method during an underwater intervention operation, method, and system | |
| MX393861B (en) | Modular top drive system | |
| PE20211612A1 (en) | GUIDANCE METHOD FOR DIRECTIONAL MULTILATERAL DRILLING | |
| MX386266B (en) | COMPLETION DEFLECTOR FOR SMART WELL COMPLETION. | |
| EA201270335A1 (en) | COMPONENT OF DRILLING COLUMN FOR COMBATING NOISE DURING SHOCK DRILLING | |
| EA201490942A1 (en) | DEVICE AND METHOD FOR DRILLING WELLS IN THE UNDERGROUND PLATE | |
| BRPI1010580A2 (en) | assembly to produce a threaded connection for drilling and exploration of hydrocarbon wells, and the resulting threaded connection. | |
| MX2012008366A (en) | At-bit magnetic ranging and surveying. | |
| GB2485738A (en) | Systems and methods for running casing into wells drilled wtih dual-gradient mud systems | |
| WO2011031696A3 (en) | Drill bits and methods of drilling curved boreholes | |
| IN2014KN01610A (en) | ||
| EA201391259A1 (en) | METHOD AND DRILLING SYSTEM OF SIDE-WELLS OF WELLS IN FORMATIONS OF CLAY SHAFT | |
| BR112016006040A2 (en) | pulse telemetry system for digital data communication, and data transmission methods developed in a wellbore for a surface unit and for manufacturing a wellbore pulse telemetry unit | |
| WO2011084566A3 (en) | T-frac system run in system | |
| MX2016011860A (en) | CEMENT PULSATIONS FOR SUBMARINE SURVEY. | |
| AR104497A1 (en) | PERFORATION TOOL WITH ELECTRONIC ELEMENTS NEAR TO THE BARRENA | |
| EA200801333A1 (en) | WELLS STEM SYSTEM | |
| ECSP088671A (en) | PR-1 PARALLEL DUAL COMPLEMENTATION SYSTEM FOR SUBMERSIBLE ELECTRO PUMPING | |
| AR056001A1 (en) | SYSTEM AND METHOD FOR INSTALLING AND MAINTAINING AN EXPLORATION AND PRODUCTION SYSTEM COAST OUTSIDE THAT HAS AN ADJUSTABLE FLOATING CHAMBER | |
| GB201308128D0 (en) | Pumping mud by electrohydrodynamic propulsion | |
| EA200870450A1 (en) | DISPERSARY DRILLING FLUID FOR DRILLING WITHOUT STANDING | |
| BRPI0604303A (en) | jacking structure for an offshore offshore drilling rig, offshore offshore drilling rig, and wellhead alignment method of an offshore offshore drilling platform |