EP0032860A2 - Vorgefertigtes Gebäude aus Metallelementen - Google Patents
Vorgefertigtes Gebäude aus Metallelementen Download PDFInfo
- Publication number
- EP0032860A2 EP0032860A2 EP81400048A EP81400048A EP0032860A2 EP 0032860 A2 EP0032860 A2 EP 0032860A2 EP 81400048 A EP81400048 A EP 81400048A EP 81400048 A EP81400048 A EP 81400048A EP 0032860 A2 EP0032860 A2 EP 0032860A2
- Authority
- EP
- European Patent Office
- Prior art keywords
- posts
- rail
- construction
- plate
- keys
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Ceased
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/18—Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
- E04B1/24—Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons the supporting parts consisting of metal
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/18—Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
- E04B1/24—Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons the supporting parts consisting of metal
- E04B1/2403—Connection details of the elongated load-supporting parts
- E04B2001/2415—Brackets, gussets, joining plates
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/18—Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
- E04B1/24—Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons the supporting parts consisting of metal
- E04B1/2403—Connection details of the elongated load-supporting parts
- E04B2001/2433—Connection details of the elongated load-supporting parts using a removable key
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/18—Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
- E04B1/24—Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons the supporting parts consisting of metal
- E04B1/2403—Connection details of the elongated load-supporting parts
- E04B2001/2451—Connections between closed section profiles
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/18—Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
- E04B1/24—Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons the supporting parts consisting of metal
- E04B1/2403—Connection details of the elongated load-supporting parts
- E04B2001/2454—Connections between open and closed section profiles
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/18—Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
- E04B1/24—Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons the supporting parts consisting of metal
- E04B1/2403—Connection details of the elongated load-supporting parts
- E04B2001/2463—Connections to foundations
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/18—Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
- E04B1/24—Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons the supporting parts consisting of metal
- E04B2001/2496—Shear bracing therefor
Definitions
- the present invention relates to a new method for producing a load-bearing framework for the erection of a building.
- the method according to the invention uses prefabricated metal elements capable of being transported and assembled on site.
- the invention can be used for the erection of multi-purpose buildings and can be used for the construction of individual constructions and in particular private dwellings such as pavilions etc ...; the invention can advantageously be implemented for use of premises for industrial purposes, such as workshops, factories, hangars, warehouses etc ... or collective or social buildings such as schools, hospitals, administrative offices etc ...
- the invention relates to a method of constructing buildings of the type in which framework elements formed of previously prefabricated metal beams are assembled in situ, characterized in that said framework elements after mounting and assembly are secured by keying.
- a reinforcement plywood will be put in place above the wall of the female element and plugged into said pin, the latter being provided with a length such that its low-cut head projects over the top of said plate, allowing the positioning of said locking key.
- These posts are secured at their base on the base or low rail and they are also secured at their top on a high rail, the whole thus forming a load-bearing wall.
- top and bottom rails respectively form a peripheral belt closed on itself and which follows the periphery or the perimeter of the construction.
- the assembly device which is the subject of the present invention allows a certain flexibility and in the event of seismic movements, the keyed framework elements can play slightly with respect to each other by adapting to the internal tensions. transmitted to the reinforcement without causing ruptures; the few deformations which could then be observed will not cause the entire building to collapse and fall, dangerous for the occupants and, moreover, these deformations can be repaired quickly.
- the invention also relates to a set of prefabricated elements for the implementation of the construction method described above and of the type consisting of a plurality of ptrtrelles or metal elements provided by prefabrication of assembly means and these elements are characterized in that they comprise assembly means consisting (1) of tenons or pins turned at their ends mounted on a plate secured to a first element (2) of recesses or lights formed on a second element dimensioned and positioned to be pluggable on said tenon (3) of plywoods also provided with recesses to allow their engagement on said tenons above the second key element (4) formed of forks with two teeth decreasing in thickness towards the end of the teeth , the interval between the two teeth allowing the positioning of the key on the ground of the post and the force locking of the assembly, the second element being trapped between the plate integral with the first element and the counter plate.
- the prefabricated assembly according to the invention comprises. more particularly longitudinal elements assembled end to end by fishplates and suitable for constituting the horizontal peripheral rail encircling the perimeter of the construction and carrying vertical posts, the posts being assembled on the rail, the rail comprising for this purpose plates regularly spaced along the rail and carrying tenons necklines, the posts having at their base a base projecting laterally on each side and provided with plug-in light on said studs and thus able to be secured to the rail by keying.
- the posts have at their top a male keying plate and comprising at least one and preferably two low-profile tenons for receiving by plugging in a female plate and provided for this purpose with lights provided on a high rail joining the poles and overhanging the low beam, surrounding the perimeter of the construction in the upper part and securing the posts, the whole low smooth, high smooth and posts thus forming a peripheral colonnade.
- the trusses themselves have support consoles for the purlins, and these consoles are provided according to the invention with locking pins, the purlins comprising plug-in lights on these tenons and able to be keyed on the console with interposition a counter plate.
- the method comprises the installation of a bottom rail 1 formed from profiled elements and assembled by fishplates in a known manner.
- the two lateral bases 8 and 8 ' are pierced with lights 9 and 9'; one is provided with the dimension to come to be engaged on the tenon 6; the other can advantageously be slightly ovalized so as to allow a certain tolerance; thus the plate 7 can come to engage on the tenons 6 and 6 'to ensure the establishment of the post; the assembly is secured by insertion of keys 10 and 10 'in the form of a fork with two teeth which come to engage, as seen in FIG. 3 so as to insert the neck 12 and 12' of the pins 6 and 6 '; for this purpose, the keys have a decreasing slope towards the end of the teeth.
- a monolithic structure is thus obtained which gives the construction a particularly effective seat by its rigidity and by its inertia; this seat being independent of the ground; on which it rests purely and simply, allows the construction resistance in particular to seismic movements as we have explained above.
- the posts are then assembled at their top by a high rail 15 which follows the construction belt, directly above the low rail 1; the top rail is formed, like the bottom rail, from cold-folded sections or sheets which are assembled longitudinally by splicing according to known means.
- pins 6 and 6 ′ of the low rail lights provided on the high rail 15.
- the half-trusses have, at the top and at the base of the punch and on each face, reinforcing plates 22, 22 '(at the top) and 23, 23' (at the base).
- the assembly is obtained by a splicing pin 28 which has two twisted pins 25, which fit into the slots 24; on the opposite face and after interposition of the counter-plate 29, the openings of which engage on the two tenons 25, the head of the tenon 25 is blocked by fitting the key 30.
- a splicing pin 31, similar to pin 28, is used, comprising two pins 26 which come to fit in the slots 24 of the two plates 23; on the opposite face, the counter-splice 32 is plugged in by its slots on the heads of the tenons 26 and the assembly is blocked by fitting the keys 33.
- the purlins are mounted on brackets 37, consisting of brackets secured by their sole on a crossbowman at the appropriate place; the bearing face of each console 37 supports a tenon 37 ′ on which lights are inserted. provided on the purlins respectively 34, 35, 36; after interposition of a counter plate 38, the assembly is keyed as previously described.
- the posts can also receive on a lateral face of the lights or openings 42, 43, 44, allowing the installation and the joining on the posts of the frames.
- the posts can be differentiated according to the characteristics and plans; it is advantageous to use reinforced posts compared to standard posts especially for angles or for farm support posts.
- a cable bracing can also be provided in the horizontal plane by cable connecting the corners of the building with respect to the trusses.
- the assembly thus produced can then be dressed according to architectural plans and according to tastes, climatic conditions, local establishments and traditions etc ...
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Physics & Mathematics (AREA)
- Electromagnetism (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Joining Of Building Structures In Genera (AREA)
- Conveying And Assembling Of Building Elements In Situ (AREA)
- Buildings Adapted To Withstand Abnormal External Influences (AREA)
Applications Claiming Priority (2)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| FR8000800A FR2473589A1 (fr) | 1980-01-15 | 1980-01-15 | Procede pour la realisation d'ossature porteuse de batiment a partir d'elements metalliques prefabriques et elements pour la mise en oeuvre du procede |
| FR8000800 | 1980-01-15 |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| EP0032860A2 true EP0032860A2 (de) | 1981-07-29 |
| EP0032860A3 EP0032860A3 (de) | 1981-08-05 |
Family
ID=9237547
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| EP81400048A Ceased EP0032860A3 (de) | 1980-01-15 | 1981-01-15 | Vorgefertigtes Gebäude aus Metallelementen |
Country Status (2)
| Country | Link |
|---|---|
| EP (1) | EP0032860A3 (de) |
| FR (1) | FR2473589A1 (de) |
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| GB2167155A (en) * | 1984-11-13 | 1986-05-21 | Unerman Greenman Berger Ltd | Knock-down fittings |
| EP4108851A1 (de) * | 2021-06-21 | 2022-12-28 | DOKA GmbH | Bolzenverbinder, baustruktur, schalungsvorrichtung und verfahren |
Family Cites Families (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| GB1339899A (en) * | 1970-12-22 | 1973-12-05 | Oetiker Hans | Frame structure |
-
1980
- 1980-01-15 FR FR8000800A patent/FR2473589A1/fr active Granted
-
1981
- 1981-01-15 EP EP81400048A patent/EP0032860A3/de not_active Ceased
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| GB2167155A (en) * | 1984-11-13 | 1986-05-21 | Unerman Greenman Berger Ltd | Knock-down fittings |
| EP4108851A1 (de) * | 2021-06-21 | 2022-12-28 | DOKA GmbH | Bolzenverbinder, baustruktur, schalungsvorrichtung und verfahren |
Also Published As
| Publication number | Publication date |
|---|---|
| FR2473589B1 (de) | 1984-04-06 |
| EP0032860A3 (de) | 1981-08-05 |
| FR2473589A1 (fr) | 1981-07-17 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| EP0180667B1 (de) | Vorgefertigte Baueinheiten und Gebrauch im Hochbau | |
| EP2061936B1 (de) | Bauwerk, insbesondere wohngebäude aus rahmen und stützen sowie verfahren zur dessen herstellung | |
| CA2625825C (fr) | Nouveau type de batiment, procede et moyens pour sa realisation | |
| FR2613403A1 (fr) | Pilier, notamment pour constructions a ossature bois et constructions faisant usage de tels piliers | |
| EP0440594A1 (de) | Gerippe für mehrstöckiges Gebäude und Gebäude mit solch einem Gerippe | |
| EP0174347A1 (de) | Baustruktur und herstellungsverfahren | |
| EP0985071A1 (de) | Gebäudegerüst | |
| FR2584461A1 (fr) | Procede d'assemblage modulaire tridimensionnel demontable destine a tout type de construction | |
| EP0032860A2 (de) | Vorgefertigtes Gebäude aus Metallelementen | |
| FR3033584B1 (fr) | Construction modulaire a partir d'elements prefabriques | |
| FR2464339A1 (fr) | Systeme de construction d'une ossature de batiment par assemblage d'elements prefabriques en beton | |
| FR2581112A1 (fr) | Procede de surelevation de toiture d'un batiment existant et moyens pour la mise en oeuvre du procede | |
| FR2880370A1 (fr) | Procede de montage d'un mur isolant antisismique et anticyclonique, et mur obtenu | |
| EP2489809B1 (de) | Verfahren zur Herstellung eines Strukturelements, und so hergestellte Elemente | |
| EP0147456B1 (de) | Für den bau von wänden bestimmte vorgefertigte schalungselemente, verfahren und vorrichtung dafür | |
| EP0826840A1 (de) | Bauzelle | |
| EP0440567A1 (de) | Einzelne und doppelte Träger und Pfosten, bestehend aus der Zusammensetzung von Z-Trägern, die insbesondere die Realisierung eines Rahmens oder einer Kniestütze für den Bau eines Gebäudes erlauben | |
| FR2733263A1 (fr) | Panneau composite, assemblage de panneaux et batiment de type prefabrique construit a l'aide de tels panneaux | |
| FR2744471A1 (fr) | Elements prefabriques en briques creuses pour la realisation de bardages, de murs porteurs, de murs antibruit, de murets et autres en construction | |
| FR2938858A1 (fr) | Ossature de plancher en beton, et procede de realisation d'une telle ossature. | |
| EP1784544A1 (de) | Lasttragende struktur für gebäude und verfahren zur herstellung einer lasttragenden struktur | |
| FR2564879A1 (fr) | Procede pour l'edification de murs de constructions et elements de structure pour la mise en oeuvre de ce procede | |
| CH491267A (fr) | Dispositif de coffrage pour mur en béton | |
| CH694702A5 (fr) | Construction modulaire comportant au moins quatre montants verticaux et des contreventements. | |
| FR2465847A2 (fr) | Perfectionnements aux procedes pour la fabrication standardisee de maisons individuelles |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| PUAI | Public reference made under article 153(3) epc to a published international application that has entered the european phase |
Free format text: ORIGINAL CODE: 0009012 |
|
| PUAL | Search report despatched |
Free format text: ORIGINAL CODE: 0009013 |
|
| AK | Designated contracting states |
Designated state(s): AT BE CH DE GB IT LU NL SE |
|
| AK | Designated contracting states |
Designated state(s): AT BE CH DE GB IT LU NL SE |
|
| 17P | Request for examination filed |
Effective date: 19820201 |
|
| STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: THE APPLICATION HAS BEEN REFUSED |
|
| 18R | Application refused |
Effective date: 19850427 |