EP0096236B1 - Wagon de transport sur rails, train de transport et méthode pour le chargement et le déchargement de matériau de construction de chemin de fer - Google Patents
Wagon de transport sur rails, train de transport et méthode pour le chargement et le déchargement de matériau de construction de chemin de fer Download PDFInfo
- Publication number
- EP0096236B1 EP0096236B1 EP83104687A EP83104687A EP0096236B1 EP 0096236 B1 EP0096236 B1 EP 0096236B1 EP 83104687 A EP83104687 A EP 83104687A EP 83104687 A EP83104687 A EP 83104687A EP 0096236 B1 EP0096236 B1 EP 0096236B1
- Authority
- EP
- European Patent Office
- Prior art keywords
- transport
- truck
- transport truck
- digger
- track
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired
Links
- 239000000463 material Substances 0.000 title claims abstract description 58
- 238000000034 method Methods 0.000 title claims description 13
- 238000010276 construction Methods 0.000 title claims description 7
- 230000008878 coupling Effects 0.000 claims abstract 2
- 238000010168 coupling process Methods 0.000 claims abstract 2
- 238000005859 coupling reaction Methods 0.000 claims abstract 2
- 241000273930 Brevoortia tyrannus Species 0.000 claims description 10
- 239000004035 construction material Substances 0.000 claims description 4
- 239000004566 building material Substances 0.000 claims description 2
- 238000009412 basement excavation Methods 0.000 description 31
- 239000000872 buffer Substances 0.000 description 6
- 239000011798 excavation material Substances 0.000 description 3
- 238000009434 installation Methods 0.000 description 2
- 238000010521 absorption reaction Methods 0.000 description 1
- 230000015572 biosynthetic process Effects 0.000 description 1
- 238000005065 mining Methods 0.000 description 1
- 238000011144 upstream manufacturing Methods 0.000 description 1
Images
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B61—RAILWAYS
- B61D—BODY DETAILS OR KINDS OF RAILWAY VEHICLES
- B61D7/00—Hopper cars
- B61D7/06—Hopper cars with openings capable of discharging both between and outside the wheels
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01B—PERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
- E01B27/00—Placing, renewing, working, cleaning, or taking-up the ballast, with or without concurrent work on the track; Devices therefor; Packing sleepers
- E01B27/06—Renewing or cleaning the ballast in situ, with or without concurrent work on the track
Definitions
- the invention relates to a transport wagon according to the preamble of claim 1.
- a transport wagon is known from a publication in "Mining Journal 264, (1/19/1965), 675243, page 41.
- HRST material-transferring wagon one end of which can be raised hydraulically to such an extent that one end its wagon-specific conveyor located in the loading floor area can be raised above the adjacent end of the loading floor conveyor of an adjacent wagon and brought to this in an overlapping position.
- the cargo of the transport wagon HRST can then be delivered to the wagon's own conveyor device of the transport wagon HRS located in the loading floor area.
- the lifting of one end of the material-transferring wagon HRST involves extremely complex lifting hydraulics, especially when it is supposed to be a wagon as used in normal railway engineering. But that's not all:
- the raised material-passing wagon HRST must be brought into overlap with the neighboring material-receiving wagon after the lifting. This leads to a difficult handling.
- these buffers stand in the way. If you arrange the buffers in such a way that they remain on the chassis when lifting, they hinder the overlap.
- the buffers are attached to the hydraulically raised part, i.e.
- a railway funnel wagon with emptying slides on the multiple discharge hoppers and with vertical saddles underneath the car body is known, with a space between the discharge funnels and the distributor.
- a self-propelled conveyor belt which can be moved in the longitudinal direction of the wagon, swings out on all sides and is adjustable in height, is arranged in the intermediate space standing or hanging on the wagon body.
- the object of the invention is to facilitate the transfer of the material conveyed or stored on the wagon to a receiving point, in particular to an adjacent wagon, both constructively and in terms of handling in a transport wagon of the generic type.
- transport wagons are provided which on the one hand have a large capacity and on the other hand allow complete filling and emptying.
- heavy material such as. B. track bedding or substructure material
- the training according to claim 3 is extremely suitable.
- the measure of claim 4 prevents undesired falling of material outside the wagons even when the train is about to turn; With regard to strongly curved track arches, the transfer device can then follow the curve movement of the adjacent transport wagon.
- the measure of claim 5 is aimed at unloading the transport wagons individually if necessary.
- Claims 6 and 7 relate to a transport train which is formed from transport wagons according to the invention.
- claims 8 to 17 deal with the addition of the transport train according to the invention to a special device for the removal and removal of excavated material.
- the design of the excavation device with a plurality of partial excavation devices leads to a very large amount of excavation material per unit of time, which requires a particularly high removal rate. This high removal performance is provided by the transport train designed according to claims 6 and 7.
- each partial excavation device can be adapted to the particular consistency and quantity of the respective material, so that the overall performance is further increased.
- the individual partial excavation devices can be adapted to the respective local conditions below and to the side of the track grate.
- Claims 18 to 21 relate to a method for receiving track construction material at a track construction site, in which the transport train according to claim 6 is used. This method is particularly applicable for the removal and removal of track building material from the area of a railway track grating that is preserved.
- the removed excavation material can be deposited on a group of transport wagons that precede the excavation means in the working direction of the excavation means, and can be moved there from the work area. Since the material initially collects on the wagons removed from the excavation means and then progressively on the wagons closer to the excavation means, the initially filled transport wagons remote from the excavation means can be carried with their load without interrupting the excavation work.
- the measure of claim 19 shows in particular how to proceed in order to largely suppress a rubbing movement of the material relative to the conveying device of the transport wagon to be filled in each case, in particular with respect to the upper run of an endless conveying means.
- the slow running of the transport wagon to be filled in each case means that the filling of the transport wagon is practically finished when the material first reaches the end of the transport wagon remote from the receiving end of the transport wagon.
- the claims 20 and 21 show in detail a method which allows continuous work at the excavation site without interruption by the removal of the filled transport wagons.
- the claim 22 relates to a method for delivering track construction material from a transport train according to claim 6 to a track construction site, which is particularly applicable when the material stored on a transport wagon is to be released at a narrowly defined location along a railway track without the possibility of to move the transport wagon towards the pick-up location during unloading.
- An interesting application for this is the installation 'of bedding and / or sub-base material at an installation location. This possibility is further expanded by the procedure according to claim 23 for the case of a longer transport train.
- claim 24 specifies a possibility of achieving a particularly high unloading performance, in particular if the receiving area for the material extends over a longer distance along the track.
- a track grating is designated by 10
- a track treatment train generally designated by 12 travels on this track grate, in the working direction according to arrow 14.
- two excavation wagons 16 and 18 are arranged according to FIGS. 1A and 2A.
- a first partial excavation device 20 is arranged on the excavation wagon 16 in the form of an excavation chain looping around the track grate 10. This excavation chain is intended to accommodate the bedding material 22 lying directly under the track grating 10. This bedding material 22 is conveyed into a bunker 24.
- an excavator 26 is arranged on the excavation wagon 16 as a second partial excavation device, which can be pivoted about a vertical axis 28 and with its excavator shovel 30 can grasp the material lying on both sides of the track grate 10.
- This excavator 26 releases the excavated material optionally into two bunkers 32 and 34, which are arranged behind or in front of the excavator in the direction of travel.
- the excavator 26 can initially - as shown in FIG. 2A - place the material in the bunker 32 and after further advancement in the direction of the arrow 14 according to FIG. 1A the excavator can pick up the material in the direction of the arrow in front of the obstacle 36 and place it in the bunker 34, so that the swivel path of the excavator is also minimal in each case.
- a third partial excavation device 38 is arranged on the excavation wagon 18 in the form of a further excavation chain which wraps around the track grate 10 and which is designed to excavate the material 40 lying below the bedding material 22 (FIG. 1A). That from the end Lifting chain 38 excavated material arrives in a bunker 42 and via conveyor belts 44 and 46 into an intermediate bunker 48 on the front excavation wagon 16. The material received in bunkers 48, 32, 34 and 24 is conveyed by conveyor belts 50, 52 and 54 onto a first transport wagon 56 given that the excavation wagon 16 leads in the direction of arrow 14. An endless scale belt 58 is arranged on the transport wagon 56 at the height of the normal loading area, the upper run 59 of which serves to hold the material.
- the material arriving from the conveyor belt 54 falls on the end of the scale belt 58 trailing in the working direction 14 and is conveyed by means of the scale belt to the end of the transport wagon 56 leading in the working direction 14.
- the material is discharged from the shed belt 58 to a transfer belt 60, possibly via an intermediate bunker (not shown).
- a movable unloading flap 62 is arranged at the front end of the transport wagon 56.
- the transfer belt 60 ends - as can be seen from FIG. 1B - over the trailing end of a further transport wagon 56 i , which is constructed in exactly the same way as the transport wagon 56.
- this transport wagon 56 1 with a drive device 64 can be seen Views 1B, 2B; 1C, 2C and 1D, 2D further transport wagons 562, 56 3 and 56 4 with associated transfer belts 60 to 60 4 .
- the transport wagon 56 4 is already completely filled and the transport wagon 56 3 is being filled.
- the scale belt of the transport wagon 56 3 runs slower than the scale belt of the preceding transport wagons 56 to 56 2 , so that on the scale belt of the transport wagon 56 3 the pile formation - as shown - occurs.
- the transfer belt 60 3 can be pivoted out about a vertical axis. This applies to all transport wagons. If all transport wagons are equipped with swiveling transfer belts, all wagons can be emptied at the same time. However, it is also conceivable - as shown in FIG. 1 - to have the transport wagon 56 4 - as shown in FIG.
- 1C - be followed by an unloading and / or transfer wagon 66 with an unloading or transfer belt 68 which is used for the delivery a group of wagons connected in series takes over, the material then being conveyed from wagon to wagon up to this unloading or transfer wagon 66.
- 1C. 2C and 1D, 2D further transport wagons 56 5 to 56 7 and a further emptying and transfer wagon 66 1 are shown. It is believed that these have just returned from an unloading tour and to the. Wagons 56 to 56 4 has been coupled again. Now the load of the transport wagons 56 3 and 56 4 can be transferred to the transport wagons 56 5 to 56 7 , so that they can be transported to a material delivery point again and the transport wagons 56 to 56 4 can be filled again.
- the group of transport wagons 56 6 , 56 7 can optionally be used together with the unloading and transfer wagon 66 1 for the removal and delivery of bedding and / or substructure material at a work station, where possible is that they follow the excavation wagons 16 and 18 in the working direction 14 and introduce new substructure or bedding material under the track grating 10.
- the conveyor belt can run continuously, with an approximately constant, upper loading level. However, it is also possible to drive the conveyor belt step by step, in which case individual piles are more or less clearly recognizable, as shown in FIG. 1B at 56 3 .
Landscapes
- Engineering & Computer Science (AREA)
- Transportation (AREA)
- Mechanical Engineering (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Chain Conveyers (AREA)
- Loading Or Unloading Of Vehicles (AREA)
- Intermediate Stations On Conveyors (AREA)
- Structure Of Belt Conveyors (AREA)
- Train Traffic Observation, Control, And Security (AREA)
- Magnetic Heads (AREA)
Claims (24)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| AT83104687T ATE22137T1 (de) | 1982-05-19 | 1983-05-11 | Schienengaengiger transportwaggon, transportzug und verfahren zur aufnahme und abgabe von gleisbaumaterial. |
Applications Claiming Priority (2)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| DE3219025 | 1982-05-19 | ||
| DE3219025A DE3219025C2 (de) | 1982-05-19 | 1982-05-19 | Transportzug für Gleisbehandlungszwecke und Verfahren zu dessen Befüllung und Entleerung |
Publications (3)
| Publication Number | Publication Date |
|---|---|
| EP0096236A1 EP0096236A1 (fr) | 1983-12-21 |
| EP0096236B1 true EP0096236B1 (fr) | 1986-09-10 |
| EP0096236B2 EP0096236B2 (fr) | 1989-07-05 |
Family
ID=6164106
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| EP83104687A Expired EP0096236B2 (fr) | 1982-05-19 | 1983-05-11 | Wagon de transport sur rails, train de transport et méthode pour le chargement et le déchargement de matériau de construction de chemin de fer |
Country Status (3)
| Country | Link |
|---|---|
| EP (1) | EP0096236B2 (fr) |
| AT (1) | ATE22137T1 (fr) |
| DE (2) | DE3219025C2 (fr) |
Families Citing this family (14)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| AT389333B (de) * | 1986-09-08 | 1989-11-27 | Plasser Bahnbaumasch Franz | Gleisverfahrbare schuettgutverladewagen-anordnung mit regelbaren entladeschurren |
| DE8908700U1 (de) * | 1988-11-05 | 1989-09-07 | Hermann Wiebe Grundstücks- und Maschinenanlagen KG, 2800 Bremen | Schienengebundener Transportwaggon |
| DE58903476D1 (de) * | 1989-11-27 | 1993-03-18 | Wiebe Hermann Grundstueck | Speicherbehaelter. |
| ATE90630T1 (de) * | 1989-12-01 | 1993-07-15 | Plasser Bahnbaumasch Franz | Schienengaengiger verladewagen fuer schuettgut. |
| DE59100158D1 (de) * | 1990-12-14 | 1993-07-22 | Plasser Bahnbaumasch Franz | Verladewagen fuer schuettgut. |
| DE19641717A1 (de) * | 1996-10-10 | 1998-04-16 | Weiss Gmbh & Co Leonhard | Verfahren zum Aufarbeiten von Schotter aus Bahngleisen |
| DE19833521A1 (de) * | 1998-07-25 | 2000-01-27 | Weiss Gmbh & Co Leonhard | Verfahren zum Aufarbeiten von aus Bahngleisen ausgehobenem Schotter |
| DE10139765B4 (de) * | 2001-04-23 | 2015-02-12 | Gsg Knape Gleissanierung Gmbh | Verfahren zur Materialaufbereitung und/oder Materialwaschung und/oder Lehmausscheidung betreffend Schüttgutmaterial insbesondere im Zusammenhang mit Bauarbeiten an einer Linienbaustelle und entsprechende schienengängige oder strassengängige Anlage |
| ES2284737T3 (es) | 2001-04-12 | 2007-11-16 | Gsg Knape Gleissanierung Gmbh | Metodo de renovacion de lechos de blasto y tren de tratamiento de vias para su realizacion. |
| DE10118393B4 (de) * | 2001-04-12 | 2004-02-19 | Gsg Knape Gleissanierung Gmbh | Schienengängiger Förder- und Silo-Waggon, Transportzug und Verfahren zur Aufnahme, Zwischenspeicherung und Abgabe von Materialien im Zusammenhang mit Gleisbauarbeiten |
| DE10128374B4 (de) * | 2001-04-23 | 2011-04-21 | Gsg Knape Gleissanierung Gmbh | Verfahren zur Versorgung einer Linienbaustelle mit Baumaterialien und zugehörige Transport- oder Förderkette, sowie hierbei einsetzbare Klassifizier- und Fraktioniereinrichtung |
| DE50205153D1 (de) | 2001-04-12 | 2006-01-12 | Gsg Knape Gleissanierung Gmbh | Verfahren zur Versorgung einer Baustelle mit Baumaterialien |
| AT5021U3 (de) * | 2001-11-14 | 2002-07-25 | Plasser Bahnbaumasch Franz | Speicherwagen zum transport und zur speicherung von schüttgut |
| DE102009041237B4 (de) * | 2009-09-11 | 2019-07-11 | Ralf Zürcher | Verfahren zum Sanieren des Gleisunterbaus einer Bahnstrecke |
Family Cites Families (10)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| DE523923C (de) * | 1931-04-30 | Becker & Van Huellen | Gleisbettungswagen | |
| DE539577C (de) * | 1930-05-21 | 1931-11-30 | August Henkes | Bettungsmaschine fuer in Fliessarbeit stattfindenden Gleisumbau |
| US2182139A (en) * | 1936-08-15 | 1939-12-05 | Speno Frank | Dirt conveyer |
| FR1009272A (fr) * | 1948-06-01 | 1952-05-27 | Perfectionnements apportés aux appareils pour enlever et transporter des matériaux meubles, disposés le long ou sous des voies de chemins de fer, notamment pour le dégarnissage en ballast de ces voies | |
| GB723984A (en) * | 1951-12-01 | 1955-02-16 | Jacques Drouard | Machine for clearing away the ballast from under the railway track sleepers |
| DE1021005B (de) * | 1953-08-10 | 1957-12-19 | Scheuchzer Fils Auguste | Schotterraeummaschine fuer Eisenbahngleise |
| AT200604B (de) * | 1956-03-03 | 1958-11-25 | Alfred Scheuchzer | Geleiseumbauverfahren und Vorrichtung zu seiner Durchführung |
| FR1260625A (fr) * | 1960-03-28 | 1961-05-12 | Entpr Louis Meleux & Cie | Dispositif pour le chargement automatique en bout d'une rame de wagons applicable enparticulier au chargement des détritus d'épuration du ballast des voies ferrées |
| AT235328B (de) * | 1962-01-31 | 1964-08-25 | Matisa Materiel Ind Sa | Einrichtung zur Erneuerung des Schotters von Eisenbahngleisen |
| DE1181259B (de) * | 1963-04-03 | 1964-11-12 | Uerdingen Ag Waggonfabrik | Eisenbahn-Trichterwagen mit Entleerungs-schiebern an Auslauftrichtern und mit Verteiler-saetteln unterhalb des Wagenkastens |
-
1982
- 1982-05-19 DE DE3219025A patent/DE3219025C2/de not_active Expired
-
1983
- 1983-05-11 AT AT83104687T patent/ATE22137T1/de not_active IP Right Cessation
- 1983-05-11 DE DE8383104687T patent/DE3366007D1/de not_active Expired
- 1983-05-11 EP EP83104687A patent/EP0096236B2/fr not_active Expired
Also Published As
| Publication number | Publication date |
|---|---|
| DE3219025A1 (de) | 1983-11-24 |
| EP0096236B2 (fr) | 1989-07-05 |
| DE3219025C2 (de) | 1984-09-20 |
| DE3366007D1 (en) | 1986-10-16 |
| ATE22137T1 (de) | 1986-09-15 |
| EP0096236A1 (fr) | 1983-12-21 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| EP0426004B1 (fr) | Machine pour collecter et redistribuer le ballast | |
| EP0096236B1 (fr) | Wagon de transport sur rails, train de transport et méthode pour le chargement et le déchargement de matériau de construction de chemin de fer | |
| CH661074A5 (de) | Schuettgutverladewagen, insbesondere zur eingliederung in einen einer schotterbett-reinigungsmaschine vorgeordneten abraumverladezug. | |
| DE3634397C2 (de) | Fahrbare Anlage zum Reinigen und anschließenden Verdichten der Schotterbettung von Gleisen | |
| DE2057197C3 (de) | Fahrbare Maschine zum Aufnehmen, Reinigen und Wiedereinbringen des Bettungsschotters von Eisenbahngleisen | |
| DE3711707A1 (de) | Gleisverfahrbarer schuettgutverladewagen mit regelbaren entladeschurren | |
| EP0505933B1 (fr) | Wagon pour la réception, le transport et la décharge des matériaux en vrac | |
| DE2853099C2 (de) | Selbstfahrbare Gleisbett-Reinigungsmaschine mit Speichervorrichtung | |
| DE9116535U1 (de) | Verladewagen für Schüttgut | |
| EP0442094A1 (fr) | Wagon de manutention de matériau en vrac | |
| AT404039B (de) | Maschine zum verteilen und planieren des bettungsschotters | |
| DE1658343A1 (de) | Verfahren und Einrichtungen zum kontinuierlich fortschreitenden Erneuern von Gleisen | |
| CH615969A5 (en) | Movable machine arrangement for transporting bulk material | |
| EP1249535A2 (fr) | Wagon pour transporter et stocker, méthode pour enlever, stocker et distribuer des matériaux | |
| AT378973B (de) | Schuettgutverladewagen, insbesondere zur abraumverladung von einer schotterbett-reinigungsmaschine | |
| DE69007216T2 (de) | Eisenbahnwagen für den Transport von Schutt. | |
| DE3501509C2 (de) | Fördereinrichtung mit Aufgabeeinrichtung und Durchgangsbrecher für Streckenvortriebe des Untertagebetriebes | |
| DE4213925A1 (de) | Wagenzug fuer den schuettgut-transport | |
| DE3519208A1 (de) | Brueckengeraet fuer das abraeumen von schuettguthalden | |
| DE2342952C3 (de) | Kratzerkombination zum Abräumen von Schüttguthalden | |
| DE69300556T2 (de) | Selbstbe- und entladener hochbordiger güterwagen. | |
| AT398592B (de) | Verladewagen zum aufnehmen, weitertransportieren und abwerfen von schüttgut | |
| AT375048B (de) | Schienengebundener transportwagen fuer schuettgueter | |
| AT375113B (de) | Vorrichtung zum auswechseln der schwellen bestehender gleisanlagen | |
| DE1932408A1 (de) | Geraet zum Beschicken und Rueckladen von Schuettgut |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| PUAI | Public reference made under article 153(3) epc to a published international application that has entered the european phase |
Free format text: ORIGINAL CODE: 0009012 |
|
| AK | Designated contracting states |
Designated state(s): AT BE CH DE FR GB IT LI LU NL SE |
|
| 17P | Request for examination filed |
Effective date: 19840127 |
|
| GRAA | (expected) grant |
Free format text: ORIGINAL CODE: 0009210 |
|
| AK | Designated contracting states |
Kind code of ref document: B1 Designated state(s): AT BE CH DE FR GB IT LI LU NL SE |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: IT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT;WARNING: LAPSES OF ITALIAN PATENTS WITH EFFECTIVE DATE BEFORE 2007 MAY HAVE OCCURRED AT ANY TIME BEFORE 2007. THE CORRECT EFFECTIVE DATE MAY BE DIFFERENT FROM THE ONE RECORDED. Effective date: 19860910 Ref country code: FR Free format text: THE PATENT HAS BEEN ANNULLED BY A DECISION OF A NATIONAL AUTHORITY Effective date: 19860910 |
|
| REF | Corresponds to: |
Ref document number: 22137 Country of ref document: AT Date of ref document: 19860915 Kind code of ref document: T |
|
| REF | Corresponds to: |
Ref document number: 3366007 Country of ref document: DE Date of ref document: 19861016 |
|
| EN | Fr: translation not filed | ||
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: LU Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 19870531 Ref country code: LI Effective date: 19870531 Ref country code: CH Effective date: 19870531 |
|
| PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: NL Payment date: 19870531 Year of fee payment: 5 |
|
| PLBI | Opposition filed |
Free format text: ORIGINAL CODE: 0009260 |
|
| 26 | Opposition filed |
Opponent name: KELLER, HEINRICH, ING. Effective date: 19870606 |
|
| NLR1 | Nl: opposition has been filed with the epo |
Opponent name: ING.HEINRICH KELLER |
|
| REG | Reference to a national code |
Ref country code: CH Ref legal event code: PL |
|
| GBPC | Gb: european patent ceased through non-payment of renewal fee | ||
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: GB Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 19881122 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: NL Effective date: 19881201 |
|
| NLV4 | Nl: lapsed or anulled due to non-payment of the annual fee | ||
| PUAH | Patent maintained in amended form |
Free format text: ORIGINAL CODE: 0009272 |
|
| STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: PATENT MAINTAINED AS AMENDED |
|
| 27A | Patent maintained in amended form |
Effective date: 19890705 |
|
| AK | Designated contracting states |
Kind code of ref document: B2 Designated state(s): AT BE CH DE FR GB IT LI LU NL SE |
|
| EN3 | Fr: translation not filed ** decision concerning opposition | ||
| EAL | Se: european patent in force in sweden |
Ref document number: 83104687.5 |
|
| PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: BE Payment date: 20010528 Year of fee payment: 19 |
|
| PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: AT Payment date: 20020410 Year of fee payment: 20 |
|
| PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: DE Payment date: 20020415 Year of fee payment: 20 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: BE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20020531 |
|
| PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: SE Payment date: 20021125 Year of fee payment: 20 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: AT Free format text: LAPSE BECAUSE OF EXPIRATION OF PROTECTION Effective date: 20030511 |
|
| EUG | Se: european patent has lapsed |