EP0333712B1 - Installation de forage et d'extraction destinee a l'exploitation miniere - Google Patents
Installation de forage et d'extraction destinee a l'exploitation miniere Download PDFInfo
- Publication number
- EP0333712B1 EP0333712B1 EP87905960A EP87905960A EP0333712B1 EP 0333712 B1 EP0333712 B1 EP 0333712B1 EP 87905960 A EP87905960 A EP 87905960A EP 87905960 A EP87905960 A EP 87905960A EP 0333712 B1 EP0333712 B1 EP 0333712B1
- Authority
- EP
- European Patent Office
- Prior art keywords
- drilling
- mining
- tools
- extraction
- head
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
- 238000005553 drilling Methods 0.000 title claims abstract description 63
- 238000005065 mining Methods 0.000 title claims abstract description 35
- 238000009434 installation Methods 0.000 title claims abstract description 12
- 238000005520 cutting process Methods 0.000 claims description 3
- 239000000969 carrier Substances 0.000 claims description 2
- 230000008878 coupling Effects 0.000 claims 3
- 238000010168 coupling process Methods 0.000 claims 3
- 238000005859 coupling reaction Methods 0.000 claims 3
- 238000006073 displacement reaction Methods 0.000 claims 1
- 238000000034 method Methods 0.000 abstract description 6
- 238000000605 extraction Methods 0.000 description 61
- 210000003128 head Anatomy 0.000 description 30
- 239000011435 rock Substances 0.000 description 21
- 238000010276 construction Methods 0.000 description 13
- 238000005422 blasting Methods 0.000 description 3
- 241000196324 Embryophyta Species 0.000 description 2
- 229910000831 Steel Inorganic materials 0.000 description 2
- 230000006978 adaptation Effects 0.000 description 2
- 238000009412 basement excavation Methods 0.000 description 2
- 230000015572 biosynthetic process Effects 0.000 description 2
- 238000004519 manufacturing process Methods 0.000 description 2
- 239000010959 steel Substances 0.000 description 2
- 241000122469 Hypericum hypericoides Species 0.000 description 1
- 230000001419 dependent effect Effects 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000005265 energy consumption Methods 0.000 description 1
- 239000002360 explosive Substances 0.000 description 1
- 238000005304 joining Methods 0.000 description 1
- 239000007788 liquid Substances 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 238000007789 sealing Methods 0.000 description 1
- 239000007787 solid Substances 0.000 description 1
- 239000004575 stone Substances 0.000 description 1
- 238000005303 weighing Methods 0.000 description 1
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D9/00—Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
- E21D9/10—Making by using boring or cutting machines
- E21D9/1093—Devices for supporting, advancing or orientating the machine or the tool-carrier
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B15/00—Supports for the drilling machine, e.g. derricks or masts
- E21B15/006—Means for anchoring the drilling machine to the ground
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D9/00—Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
- E21D9/006—Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries by making use of blasting methods
Definitions
- the invention relates to a drilling extraction system for mining, with the aid of which drilling and extraction can be carried out with high productivity and economically.
- the drilling or extraction of rocks from mining objects, as well as tunnels, trenches, pits, canals, underpasses and the like, is carried out essentially in two ways.
- the rock is loosened by blasting holes drilled by hand drills or, in the case of rock with a loose structure, by extraction using hand breakers or sharp hand tools.
- the disadvantage of this method is that a working space of 0.8-1 m is required per man, which means e.g. A maximum of 4-5 men can be seated side by side in a 4 m wide route, which limits the performance.
- a frame In the case of longer stretches, a frame must be set up to extract the rock material above, which is dismantled after completion of the work required to extract a layer with a width of 1-1.5 m and then again to carry out the next work cycle must be rebuilt. The extraction work is suspended while the frame is being assembled and dismantled.
- the known drilling rigs generally only work with 1 to 3 drilling machines and drilling tools, one of each separate support structure is assigned. In this way, the operations for each borehole on each of the drilling tools must be controlled separately. This task places a considerable strain on the operating personnel of the drilling rig, furthermore, because of the circumstances described above, additional work steps associated with a lot of loss of time have to be carried out which render the use of these drilling rigs ineffective.
- the drill support described in HU-PS 169 650 for jointly engaging several rock drilling tools in which the drilling mount is mounted on an articulated mechanism which can be rotated about an axis, essentially has the aim of avoiding the problems mentioned above.
- DE-OS 2 361 566 describes a drilling rig in which the freedom of movement of the drill carriages is larger due to the lighter design and the smaller space requirement, and also the expedient mounting of the cantilever arm carrying the drill carriages, whereby the zones previously inaccessible for drilling are essentially larger become accessible and the drilling rig is suitable for drilling rock anchor drill holes.
- the system described above can therefore be used well because of its great degree of freedom in pit sections with different inclinations and shapes, however, due to its console-like design, the tool holder is suitable for receiving a limited number of extraction tools, as a result of which only a relatively low output can be achieved.
- the system only has extraction tools suitable for the extraction, so that it cannot be used either for the formation of a blast hole or for the formation of a rock bolt hole; therefore a separate facility is required for this purpose.
- variable rock strengths to which these known rock combinations can only be adapted to a limited extent, ie that their use in solid rock is no longer economical. For this reason, it is necessary for a single section excavation work to use both the continuously operating rock extraction combination and the drilling rig which is provided for the production of the drill holes required for rock blasting. Since these devices can never be used together, but only separately, because of the relatively small cross-sectional area and the variable rock strength, one of the devices is always unused. This fact significantly increases the cost of driving up the route.
- the invention solves the problem of creating a universal drilling extraction system which can be used for the design of construction objects and the like and which has a relatively large number of mining tools which are suitable for drilling and / or extraction and which process a relatively small rock surface are easily and quickly interchangeable or their function can be switched, the system being able to be adapted well to the shape and inclination of the cross-section of the mining objects, tunnels and the like, determined by different aspects, due to the high degree of freedom of its work-performing construction unit, and thus beyond productive extraction can also be used for sinking wells and for knocking out excavations.
- the construction of the plant should also enable the productive production of drill holes required for blasting, as well as rock anchor drill holes and other drill holes required for the expansion of the mining objects for exploration and security purposes with an optimal arrangement.
- a drilling and extraction system for mining which preferably a mobile support frame, one attached to this, from Working cylinders and / or supports existing supporting structure and a work-carrying construction unit mounted on this supporting structure via a supporting structure connecting element, optionally provided with a rotary drive, and receiving a plurality of dismantling tools assigned to the supporting, driving and driving elements
- the system being characterized in the sense of the invention, that the work-performing construction unit has a plurality of coupled tool holders, each of which holds a plurality of dismantling tools arranged parallel to one another, the dismantling tools for connecting a drilling head and a extraction head being equally assigned suitable drive elements.
- the neighboring tool holders are connected to one another via their mutual adjustment, suitably arranged in pairs.
- the drilling and extraction system according to the invention can also be provided with drilling or extraction tools that are easily interchangeable.
- the dismantling tool of the installation is provided with a separately and also jointly operable combined drilling and extraction head, the shaft of the drilling head connected to the drive member being coaxial and supported by the cutting knife provided conical extraction head is passed, in the narrower end of which a recess suitable for the rotationally fixed and form-fitting reception of the drilling head is formed.
- the construction unit consists of five tool holders 1, 2, 3, 4 and 5, which each combine a plurality of dismantling tools 12 arranged parallel to one another to form a tool group.
- the middle tool holder 1 is connected to the adjacent tool holders 2 and 3 by means of joint devices 6 and 7, while the tool holders 2 and 3 are connected to the outer tool holders 4 and 5 by means of joint devices 8 and 9.
- These Joint devices are designed such that the intermediate tool holder 2 and 3 can be pivoted up and down relative to the tool holder 1.
- the outer tool holders 4 and 5 are pivotable relative to the tool holders 2 and 3.
- the swivel angle can also reach 140 °.
- the middle tool holder 1, the intermediate tool holder 2 and 3, and also the outer tool holder 4 and 5 can also be made into a fan shape relative to one another.
- the connecting elements of the hinge devices 6 and 8 are released, which enables the tool holders 1, 2, 3, 4, 5 to be placed in a fan shape around the hinge devices 7 and 9.
- the middle tool holder 1, the intermediate tool holder 2 and 3, and also the outer tool holder 4 and 5 are connected to each other, in addition to the articulation devices 6 to 9, preferably also via hydraulically actuatable pivotable working cylinders 10.
- the working cylinders 10 are arranged in pairs, the pairs, as seen in FIG. 4 in the direction of the longitudinal axis of the central tool holder 1, crossing each other in a shape reminiscent of the St. Andrew's cross, the lower and upper edges of the sides of the tool holders connected to one another connect.
- the middle tool holder 1 is provided with a supporting structure connecting element 11, and the work-performing structural unit is attached to the mechanism built on the undercarriage, ie to the supporting structure, which is described with reference to FIG. 2.
- the supporting structure connecting element 11 is provided with a rotary drive, in particular in the case of lines with a circular cross section, which makes it possible to rotate the entire work-performing structural unit together or to rotate the horizontal longitudinal axis of the central tool holder 1 at the desired angle.
- the middle tool holder 1, the intermediate tool holder 2 and 3 and the outer tool holder 4 and 5 are essentially designed as support frames 36, 45 made of section steel, steel plates.
- Carriage holders 44, 49 are connected to the support frames 36, 45, on which drive elements 13 for removal tools 12 provided with drilling heads and / or extraction heads, as well as lines, fastening means and other actuating devices are arranged.
- the number of drive elements 13 or removal tools 12, which are adjustably fastened on the slide holders 44, 49 assigned to the tool holders 1 to 5, can in principle be arbitrary.
- the construction unit performing the work is fastened via the supporting structure connecting member 11 to the prismatic supporting structure 75 consisting of hydraulic working cylinders 14, 15 and 16 and rear supporting beams 74. Eyes 17 and bolts are arranged on the rear surface of the housing of the supporting structure connecting element 11, to which the one ends of the upper and lower working cylinders 16 are articulated, whereby one side of the supporting structure 75 is actually formed by the supporting structure connecting element 11.
- the side of the support structure 75 opposite the support structure connecting element 11 is formed by two rear support beams 74 - shown vertically in FIG. 2 - which are connected to one another at the top by a beam which is not visible in the figure and are articulated at the bottom to a slide 18.
- the other ends of the upper and lower working cylinders 16 are connected to the upper and lower ends of the vertically drawn rear support beams 74.
- the support structure connecting member 11 together with the to it connected work-performing construction unit to a degree dependent on the dimensions of the working cylinders 16 and the rear support beams 74 raised and lowered, furthermore in the plane corresponding to the plane of the drawing, for example for the purpose of drilling rock bolt drill holes.
- the length of the working cylinder 16 is also changed.
- the carriage 18 is arranged on the turntable 19, on the guide surface 20 of which the carriage 18 can be displaced in the longitudinal direction of the lying surface 22 by means of the working cylinder 21.
- the movability of the slide 18 in the longitudinal direction, its rotatability on the turntable 19, the elevation and lowerability of the supporting structure connecting element 11, its rotatability in the plane of the drawing and the rotatability of the tool holder 1 by means of the supporting structure connecting element 11 enable the removal tools 12 to be set in any position and direction inside the work space.
- the guide surface 20 is mounted on a crawler tractor 23. Between the caterpillars of the tractor 23 there is arranged a conveyor device known per se and in front of this a loading device 24 also known per se.
- While the drilling and extraction system shown in FIG. 2 is mounted on the tractor 23 that can be moved on the lying end 22, the system in the arrangement shown in FIG. 3 is suspended on two parallel hanging rails 26 attached to the hanging end 25.
- the hanging rails 26 can be extended in advance in accordance with the progress of the extraction.
- a correspondingly designed, slidable and consisting of sleeves lockable in their set positions existing slide 27 is arranged, which arranged the support structure 75 correspondingly arranged working cylinder 16 and the rear support beams 74 and the working cylinders 14 and 15 and the supporting structure connecting member 11 substantially same Way carries the carriage 18 in the arrangement according to FIG. 2.
- the tool holders designed as support frames 36, 45 are always designed depending on the number of drive elements 13, i.e. the design of the tool holder changes depending on whether more or fewer drive members 13 are arranged on the support frames 36, 45 by directly carrying the slide carriers 44 49.
- the system is stabilized at the dismantling front with fastening mandrels 126.
- feed lines supplying electrical energy and / or high-pressure liquid are passed.
- the feed lines 28 supply the energy through a suitable distributor for driving the removal tools 12 and for actuating the pulling, locking and conveying devices of the installation.
- An annular groove 29 is formed in the interior of the housing of the supporting structure connecting element 11, into which the flange 30 of the rear end of the central tool holder 1 fits.
- the flange 30 is held and guided by the annular groove 29 around the longitudinal axis during the rotation of the tool holder 1.
- a circular ring 31 protrudes from the rear surface of the flange 30, on the inner surface of which there is a ring gear.
- the teeth of the ring gear are continuously toothed with the teeth of the small toothed wheel 33 which can be rotated by means of the motor 32 fastened on the housing of the supporting structure connecting element 11, so that the circular ring 31 and thus together the middle tool holder 1 and the tool holders 1 to 5 shown in FIG. 1 are rotated when the gear 33 rotates.
- FIG. 4 shows the work-performing construction unit of the drilling and extraction system according to the invention shown in FIG. 1 in a front view, seen from the dismantling front 80.
- the middle tool holder 1 is set for carrying and actuating five removal tools 12, which are arranged at the points marked with circles.
- the intermediate tool holder 2 and 3 are with the sides of the tool holder 1 in the manner shown in the figure by means of working cylinders 10 crossing each other in view and by means of the upper and lower joint devices 6 in the drawing, further, behind the joint devices 6, by means of which in the the support structure connecting element 11 facing end of the middle tool holder located articulation devices 7 rotatably connected to each other.
- Two rows of removal tools 12 are arranged one below the other in the tool holders 2 and 3. Between these rows (shown horizontally in FIG. 4) there is a free space 34 of adjustable height.
- the tool holders 2 and 3 are rotatably connected to the outer tool holders 4 and 5, similarly as set out above, by means of working cylinders 10 or joint devices 8 and 9.
- the twisting can be carried out with a corresponding actuation of the working cylinders 10 located in a pair.
- the removal tools 12 are arranged in four positions or rows one below the other. From the figure it can be seen that the system according to the invention can be built in many embodiments or versions in accordance with the respective drilling and extraction requirements.
- the rows of Removal tools 12 carrying separate support frames 36, 45 are held one above the other by means of four working cylinders 35 which have the position shown in FIG. 4 with dash-dotted lines.
- the rows of the removal tools 12 located in the outer tool holders 4 and 5 are held one above the other by two working cylinders 35.
- the distance between the rows, ie the height of the free spaces 34, can be adjusted using the working cylinders 35 belonging to the tool holders 1.
- Figure 5 shows an embodiment of the conventional drilling or extraction head of the mining tool 12 replacing combined drilling and extraction head 77 or the connection of this drilling and extraction head 77 with the tool holder designed as a support frame 45 in side view, partially in section.
- the drilling 78 or extraction heads 79 of the mining tools 12, which serve both the drilling and extraction activities are arranged together along the sides of the support frames 36, 45 facing the mining front 80.
- the drill heads 78 are provided with drive edges 81, while the conical spiral-edged extraction heads 79 are provided with cutting blades 82.
- the drilling heads 78 are connected to the shaft of the mining tool 12, which is coaxial and supported through the inside of the extraction head 79, while the extraction heads 79 are connected to the support frames 36, 45 by means of the hollow bolt elements 84 provided with bolt eyes 83 and ending as a truncated cone in such a way that the extraction heads 79 can be carried forward and backward with the actuation of the pistons 86 of the working cylinders 85 fastened to the support frame along the axis line of the removal tools 12.
- the inner cylindrical surface of the extraction heads 79 is provided with a groove-like extraction head ring gear 87.
- plug-in insert driving inserts 91 provided with outer 89 and inner 90 toothed rings or edges are connected.
- the plug-in inserts 91 driving the extraction head can be carried forward and backward in the longitudinal direction of the removal tools 12, because the plug-in inserts 91 driving the extraction head in the exemplary embodiment by designing the ends of the plug-in inserts 91 opposite the removal front 80 as pistons 92 and by providing the hollow bolt elements 84 with sealing rings 93 and power line connections 94 are designed as working cylinders.
- the extraction heads 79 are driven by taking the drive edges 81 with them from the internal toothed ring 90 which positively adjoins them and by actuating the drive elements 13 of the removal tools 9, 12.
- the extraction head driving plug inserts 91 can also be used directly to drive the extraction heads 79 if their ends opposite the extraction front 80 are directly connected to the drive elements 13.
- This embodiment can be used in the extraction of hard rock with high extraction resistance, this embodiment allowing greater torque to be transmitted to the extraction heads 79 without deformation of the mining tools 12 due to torsion thereof.
- Figure 6 shows the drilling and extraction system for mining in a rotated into the vertical position part of an embodiment in which the supporting structure connecting element 11 are connected to the working cylinders 14, 15 and 16 via sliding eyes 95 which can be towed.
- This embodiment may be necessary because of the advantageous rotation of the system that can be carried out from the horizontal to the vertical position (for example for the purpose of making rock bolt drill holes).
- a pair of grooves 96 is formed at the bottom thereof.
- working cylinders 97 which are suitable for locking and releasing the sliding eyes 95, are connected to the lower and upper base parts.
- the grooved bolts 103 of the pistons of the working cylinders 101 (which serve to receive the piston rods 102 of the working cylinders 99) connected, which are arranged along the leading pair of elements 100 which adjoin the tool holder designed as a support frame 36.
- FIG. 7 shows a perspective view of such an embodiment of the drilling and extraction system for mining, in which a support structure connecting element 11 is used to support the structure 75 carried by the carriage 27, which can be moved in the hanging rail 26 mounted on the hanging wall 25 of a pit section such tool holder is connected, which consists of a frame system 104, which is formed by the joining of working cylinders 105 and support members 106.
- This enables the setting of both the distance between the removal tools 12 and their directions of travel.
- Separate driver and drive elements 13 are arranged on each of the components located in the longitudinal direction, ie support elements 106, of the frame system 104.
Landscapes
- Engineering & Computer Science (AREA)
- Mining & Mineral Resources (AREA)
- Life Sciences & Earth Sciences (AREA)
- Geology (AREA)
- Environmental & Geological Engineering (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Mechanical Engineering (AREA)
- Physics & Mathematics (AREA)
- Fluid Mechanics (AREA)
- Earth Drilling (AREA)
Abstract
Claims (6)
- Installation de forage ou d'extraction pour l'exploitation minière, comprenant un châssis de support, de préférence mobile, une structure de support (75) rapportée sur ce châssis et constituée avantageusement de vérins d'actionnement (14, 15, 16) et/ou de supports (74) ainsi qu'une unité de structure à grand rendement, disposée sur un organe de raccordement de structure de support (11) muni, le cas échéant, d'un entraînement en rotation, sur laquelle unité sont montés, sur un porte-outils une pluralité d'outils d'abattage (12) disposés parallèlement les uns aux autres, associés à des organes de support, de prise et d'entraînement (36, 45; 76; 13), caractérisée en ce que l'unité de structure à grand rendement comporte plusieurs porte-outils (1, 2, 3, 4, 5) couplés les uns aux autres et sur chacun desquels sont montés plusieurs outils d'abattage (12) disposés parallèlement les uns aux autres, et en ce que les organes d'entraînement (13) associés aux outils d'abattage (12) sont également aptes à être raccordés à une tête de forage et à une tête d'extraction et en ce que les porte-outils voisins (1, 2, 3, 4, 5) sont reliés les uns aux autres par des vérins (10) disposés avantageusement par paires, et permettant des déplacements de sens opposé.
- Installation de forage et d'extraction selon la revendication 1, caractérisée en ce que les porte-outils (1, 2, 3, 4, 5) sont réalisés sous la forme de cadres de support multi-étagés (36, 45), assemblés à partir d'un ou de plusieurs éléments rigides et/ou articulés.
- Installation de forage et d'extraction selon la revendication 2, caractérisée en ce qu'elle comporte des vérins d'actionnement (35) disposés sur des cadres de support déterminés (45) et servant au réglage de la distance entre les étages.
- Installation de forage et d'extraction selon l'une des revendications 2 ou 3, caractérisée en ce que sur les porte-outils (1, 2, 3, 4, 5) réalisés sous la forme de cadre de support (36, 45), sont montés des supports d'organes d'entraînement réalisés sous la forme de supports de chariot mobiles.
- Installation de forage et d'extraction selon l'une des revendications 1 à 4, caractérisée en ce qu'elle comporte des têtes de forage et des têtes d'extraction interchangeables les unes par rapport aux autres.
- Installation de forage et d'extraction selon l'une des revendications 1 à 4, caractérisée en ce que ses outils d'abattage(12) sont munis de têtes de forage et de têtes d'extraction combinées (77), séparées mais également susceptibles d'être actionnées simultanément, l'arbre de la tête de forage (78) accouplé à l'organe d'entraînement (13) étant monté coaxial et supporté par la tête d'extraction conique (79) munie de couteaux (82), en ce que la petite extrémité est réalisée de la tête d'extraction est réalisée sous la forme d'un évidement apte à recevoir, de façon solidaire en rotation et avec ajustement de forme, la tête de forage (78).
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| AT87905960T ATE107736T1 (de) | 1987-09-08 | 1987-09-08 | Bohr-gewinnungsanlage für den bergbau. |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| PCT/HU1987/000037 WO1989002513A1 (fr) | 1987-09-08 | 1987-09-08 | Installation de forage et d'extraction destinee a l'exploitation miniere |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| EP0333712A1 EP0333712A1 (fr) | 1989-09-27 |
| EP0333712B1 true EP0333712B1 (fr) | 1994-06-22 |
Family
ID=10980759
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| EP87905960A Expired - Lifetime EP0333712B1 (fr) | 1987-09-08 | 1987-09-08 | Installation de forage et d'extraction destinee a l'exploitation miniere |
Country Status (3)
| Country | Link |
|---|---|
| EP (1) | EP0333712B1 (fr) |
| DE (1) | DE3750141D1 (fr) |
| WO (1) | WO1989002513A1 (fr) |
Families Citing this family (7)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| ES2079990B1 (es) * | 1991-07-11 | 1996-08-01 | Ingemas S A | Maquina polivalente para trabajos de mineria y similares. |
| RU2143050C1 (ru) * | 1998-05-15 | 1999-12-20 | Сибирский государственный индустриальный университет | Буровой манипулятор |
| WO2000060211A1 (fr) * | 1999-04-07 | 2000-10-12 | Byron Percy Christos | Ensemble de forage pour mine souterraine |
| RU2242578C1 (ru) * | 2003-07-02 | 2004-12-20 | Сибирский государственный индустриальный университет | Буровой манипулятор |
| ITUB20159252A1 (it) * | 2015-12-28 | 2017-06-28 | Termigas S P A | Apparato e metodo per eseguire fori per il montaggio di elementi di attrezzature su pareti di galleria |
| RU200611U1 (ru) * | 2019-05-24 | 2020-11-02 | Ооо "Корум Груп" | Манипулятор для бурильной машины |
| AT526723B1 (de) * | 2022-11-29 | 2025-10-15 | Franz Friesenbichler Dipl Ing | Verfahren zur systematisch selektiven Gewinnung von festen mineralischen Rohstoffen |
Citations (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| DE3729056A1 (de) * | 1987-08-31 | 1989-03-09 | Metzeler Gmbh | Verfahren zur herstellung einer formschlauchverzweigung aus gummi und nach diesem verfahren hergestellte verzweigung |
Family Cites Families (7)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| DE2017738B2 (de) * | 1970-04-14 | 1974-07-25 | Maschinenfabrik Moenninghoff, 4630 Bochum | Bohrbühne mit Bohreinrichtungen und Verfahren zum Ein- und Ausrichten der Bohrbühne und der Bohreinrichtungen |
| DE2018778A1 (fr) * | 1970-04-18 | 1971-12-30 | ||
| DE2019039C3 (de) * | 1970-04-21 | 1975-03-20 | Maschinenfabrik Moenninghoff, 4630 Bochum | An Hängebahnschienen verfahrbare Bohreinrichtung zum Bohren der Sprenglöcher beim Vortrieb einer Abbaustrecke im Untertagebergbau |
| FI45374C (fi) * | 1970-10-19 | 1972-05-10 | Tampella Oy Ab | Viuhkaporauslaite. |
| US3813126A (en) * | 1972-10-02 | 1974-05-28 | Bendix Corp | Continuously operable underground mining vehicle |
| DE2437669C3 (de) * | 1974-08-05 | 1978-04-27 | Gewerkschaft Eisenhuette Westfalia, 4670 Luenen | Vortriebsvorrichtung für das Auffahren von Tunneln, Stollen und Strecken |
| DE2836659C3 (de) * | 1978-08-22 | 1982-04-15 | Wolfgang Dipl.-Ing. 3000 Hannover Ebeling | Kombinationsbohrvorrichtung |
-
1987
- 1987-09-08 DE DE3750141T patent/DE3750141D1/de not_active Expired - Fee Related
- 1987-09-08 EP EP87905960A patent/EP0333712B1/fr not_active Expired - Lifetime
- 1987-09-08 WO PCT/HU1987/000037 patent/WO1989002513A1/fr not_active Ceased
Patent Citations (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| DE3729056A1 (de) * | 1987-08-31 | 1989-03-09 | Metzeler Gmbh | Verfahren zur herstellung einer formschlauchverzweigung aus gummi und nach diesem verfahren hergestellte verzweigung |
Also Published As
| Publication number | Publication date |
|---|---|
| EP0333712A1 (fr) | 1989-09-27 |
| WO1989002513A1 (fr) | 1989-03-23 |
| DE3750141D1 (de) | 1994-07-28 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| DE2930136A1 (de) | Streckenvortriebsmaschine fuer den untertagebau | |
| DE2621674C3 (de) | Verfahren und Vorrichtung zum Vortrieb und Ausbau einer untertägigen Strecke sowie Streckenausbau zur Ausübung des Verfahrens | |
| DE3920011C3 (de) | Stetig arbeitendes Gewinnungsgerät für Tagebaue mit einem walzenförmigen Gewinnungsorgan | |
| DE2737330C2 (de) | Verfahren zum Auffahren und Ausbauen eines Tunnels und Bohreinrichtung zur Durchführung des Verfahrens | |
| DE2810386C2 (de) | Vorrichtung zum Vortrieb von Gräben | |
| DE102005040272A1 (de) | Verfahren zum Pfeilerrückbau beim Kammer-Pfeilerbau und Ausbaueinheit für den Pfeilerrückbau | |
| DE3108877A1 (de) | Verfahren zum herstellen eines ankerausbaues, sowie vorrichtung zur durchfuehrung dieses verfahrens | |
| DE2615597A1 (de) | Erdbearbeitungseinrichtung fuer eine tunnelvortriebsmaschine | |
| DE2932062A1 (de) | Grubenbohrerausleger | |
| EP0169393B1 (fr) | Dispositif pour la production de forages d'une section transversale inaccessible | |
| DE8336736U1 (de) | Verfahrbare bohreinrichtung | |
| WO1989002513A1 (fr) | Installation de forage et d'extraction destinee a l'exploitation miniere | |
| DE3804214C2 (fr) | ||
| DE3140707C3 (de) | Streckenvortriebsmaschine | |
| EP0153567B1 (fr) | Dispositif pour le forage de trou de grand diamètre et de trou pour explosifs | |
| DE10346583A1 (de) | Bohr- und Ankersetzeinrichtung für eine Teilschnittmaschine | |
| EP0561858B1 (fr) | Machine pour tracages en veine | |
| DE2514150C3 (de) | Schildvortriebsmaschine zum Auffahren von Tunneln und Strecken | |
| DE3421704C2 (de) | Vorrichtung zum Aufweiten des Querschnittsprofils eines Stollens, Tunnels od.dgl. | |
| DE1583078A1 (de) | Verfahren und Vorrichtung zum Vortreiben von Strecken,Tunneln,Bohrloechern od.dgl. | |
| DE3809768A1 (de) | Verfahren und geraet fuer den abbau unter tage | |
| DE1907611C2 (de) | Arbeitsorgan für eine Streckenvortriebsmaschine | |
| DE2651474C3 (de) | Verwendung einer Teilschnitt-Streckenvortriebsmaschine zum Durchbauen (Nachreißen) von deformierten Strecken im untertagigen Bergbau | |
| DE2031877B2 (de) | Gewinnungsmaschine, insbesondere für den Langfrontabbau von Kohlenlagerstätten | |
| DE2009271C3 (de) | Vorrichtung zur Richtungssteuerung einer Vollschnitt-Streckenvortriebsmaschine |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| PUAI | Public reference made under article 153(3) epc to a published international application that has entered the european phase |
Free format text: ORIGINAL CODE: 0009012 |
|
| AK | Designated contracting states |
Kind code of ref document: A1 Designated state(s): AT BE CH DE FR GB IT LI LU NL SE |
|
| 17P | Request for examination filed |
Effective date: 19890922 |
|
| 18D | Application deemed to be withdrawn |
Effective date: 19910403 |
|
| 18RA | Request filed for re-establishment of rights before grant |
Effective date: 19910928 |
|
| 18RR | Decision to grant the request for re-establishment of rights before grant |
Free format text: 911028 ANGENOMMEN |
|
| D18D | Application deemed to be withdrawn (deleted) | ||
| 17Q | First examination report despatched |
Effective date: 19911111 |
|
| REG | Reference to a national code |
Ref country code: DE Ref legal event code: 8570 |
|
| GRAA | (expected) grant |
Free format text: ORIGINAL CODE: 0009210 |
|
| AK | Designated contracting states |
Kind code of ref document: B1 Designated state(s): AT BE CH DE FR GB IT LI LU NL SE |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: NL Effective date: 19940622 |
|
| REF | Corresponds to: |
Ref document number: 107736 Country of ref document: AT Date of ref document: 19940715 Kind code of ref document: T |
|
| REF | Corresponds to: |
Ref document number: 3750141 Country of ref document: DE Date of ref document: 19940728 |
|
| ITF | It: translation for a ep patent filed | ||
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: LU Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 19940930 Ref country code: LI Effective date: 19940930 Ref country code: CH Effective date: 19940930 |
|
| GBT | Gb: translation of ep patent filed (gb section 77(6)(a)/1977) |
Effective date: 19940927 |
|
| ET | Fr: translation filed | ||
| NLV1 | Nl: lapsed or annulled due to failure to fulfill the requirements of art. 29p and 29m of the patents act | ||
| EAL | Se: european patent in force in sweden |
Ref document number: 87905960.8 |
|
| PLBE | No opposition filed within time limit |
Free format text: ORIGINAL CODE: 0009261 |
|
| STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT |
|
| REG | Reference to a national code |
Ref country code: CH Ref legal event code: PL |
|
| 26N | No opposition filed | ||
| PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: GB Payment date: 19980901 Year of fee payment: 12 |
|
| PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: BE Payment date: 19980908 Year of fee payment: 12 |
|
| PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: DE Payment date: 19981127 Year of fee payment: 12 |
|
| PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: FR Payment date: 19990907 Year of fee payment: 13 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: GB Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 19990908 |
|
| PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: AT Payment date: 19990910 Year of fee payment: 13 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: BE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 19990930 |
|
| BERE | Be: lapsed |
Owner name: BOGDANY BELA Effective date: 19990930 |
|
| GBPC | Gb: european patent ceased through non-payment of renewal fee |
Effective date: 19990908 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: DE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20000701 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: AT Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20000908 |
|
| PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: SE Payment date: 20000922 Year of fee payment: 14 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: FR Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20010531 |
|
| REG | Reference to a national code |
Ref country code: FR Ref legal event code: ST |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: SE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20010909 |
|
| EUG | Se: european patent has lapsed |
Ref document number: 87905960.8 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: IT Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES;WARNING: LAPSES OF ITALIAN PATENTS WITH EFFECTIVE DATE BEFORE 2007 MAY HAVE OCCURRED AT ANY TIME BEFORE 2007. THE CORRECT EFFECTIVE DATE MAY BE DIFFERENT FROM THE ONE RECORDED. Effective date: 20050908 |