EP0417090A1 - Transportvorrichtung für die verlegung des landverkehrs auf den wasserweg - Google Patents
Transportvorrichtung für die verlegung des landverkehrs auf den wasserwegInfo
- Publication number
- EP0417090A1 EP0417090A1 EP88906151A EP88906151A EP0417090A1 EP 0417090 A1 EP0417090 A1 EP 0417090A1 EP 88906151 A EP88906151 A EP 88906151A EP 88906151 A EP88906151 A EP 88906151A EP 0417090 A1 EP0417090 A1 EP 0417090A1
- Authority
- EP
- European Patent Office
- Prior art keywords
- transport device
- carriage
- terminals
- rail track
- land
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn
Links
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims abstract description 16
- 238000010276 construction Methods 0.000 claims description 4
- 239000002352 surface water Substances 0.000 claims description 2
- 238000009966 trimming Methods 0.000 claims description 2
- 230000005540 biological transmission Effects 0.000 claims 1
- 239000007787 solid Substances 0.000 description 2
- 238000012423 maintenance Methods 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
- 238000000034 method Methods 0.000 description 1
- 230000003287 optical effect Effects 0.000 description 1
- 238000003825 pressing Methods 0.000 description 1
- 238000005096 rolling process Methods 0.000 description 1
- 239000003643 water by type Substances 0.000 description 1
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B61—RAILWAYS
- B61B—RAILWAY SYSTEMS; EQUIPMENT THEREFOR NOT OTHERWISE PROVIDED FOR
- B61B9/00—Tramway or funicular systems with rigid track and cable traction
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01B—PERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
- E01B25/00—Tracks for special kinds of railways
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D1/00—Bridges in general
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D15/00—Movable or portable bridges; Floating bridges
- E01D15/14—Floating bridges, e.g. pontoon bridges
- E01D15/145—Floating bridges, e.g. pontoon bridges displaceable or with sections movable to allow passing of water-borne traffic
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B63—SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
- B63B—SHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING
- B63B35/00—Vessels or similar floating structures specially adapted for specific purposes and not otherwise provided for
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B63—SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
- B63B—SHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING
- B63B35/00—Vessels or similar floating structures specially adapted for specific purposes and not otherwise provided for
- B63B35/44—Floating buildings, stores, drilling platforms, or workshops, e.g. carrying water-oil separating devices
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B63—SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
- B63H—MARINE PROPULSION OR STEERING
- B63H15/00—Marine propulsion by use of vessel-mounted driving mechanisms co-operating with anchored chains or the like
Definitions
- the present invention refers to a transport device for transpor of land-based traffic over a water-way, between at least tw land-connected terminals, which water-way is used by deep-draugh vessels, and between which terminals is provided at least on rail track situated under the water level on a vertical clearanc deepth, and which transport device incorporates at least on track-bound carriage, which is movable along the rail track.
- Thes ferries may either be self-propelled or so called rope ferries which are pulled by a motor from one ferry berth to the other
- the purpose of the invention is to provide a transport device which neither limits the sailing-free height nor the vertical clearance depth, which requires no manning and which can be summoned at any time night or day for transfer.
- Another purpose of the invention is, that a plant in which the transport device shall be a part, shall need a considerably lower manufacturing cost than a conventional plant even if rather large distances must be bridged.
- the transport device shall be easy to dismantle and to tow to a repairment shipyard for service and repairment and also in some cases during winter.
- Fig. 1 shows a side view of a transport device according to the invention.
- Fig. 2 shows in bigger scale the transport device according to
- Fig. 1 in a view from above.
- Fig. 3 shows in still bigger scale a side view of a modified transport device according to the invention with land-fixed terminals.
- Fig. 4 shows a section through the rail track along line IV-IV in
- Fig. 5 shows a further variant of the transport device according
- Fig. 6 shows a side view of a land-connected floating terminal according to a second embodiment.
- Fig. 7 shows in perspective the transport device according to the invention in an alternative embodiment.
- the transport device consists of two land-fixed terminals 11 and 12, which depending on local conditions may have a lan -connection via a road embankment, a low level bridge or a pontoon bridge (Fig. 1) or the like, whereby the terminals either may be driven down to solid ground (Fig. 1 and 3) or be afloat (Fig. 5 and 6).
- a rail track 14 which in the embodiment shown consists by a system of girders 15, which is either connected to fixed abutments (Fig. 1 and 3) or supported by pontoons 13.
- the girder system 15 of the rail track 14 is provided with rails 17 for cooperation with a track-bound carriage 16. Upon this is provided a post 18 or the like, which extends above the water level and supports a platform 19 or a cabin 20.
- the rail track 14 is positioned at such a depth in relation to the water level 21 that also deep-draught vessels can pass above the rail track by a comfortable margin. This means that the post 18 of the carriage 16 must be of such a height that the platform 19 is situated above the water level 21 or the highest water level if the terminals 11, 12 are based on solid ground.
- the girder system 14 is balanced by means of floating bodies 22, thus that at least its dead weigth does not affect it.
- the floating bodies may be positioned inside and/or outside the girders 15.
- the carriage 16 is preferably driven by means of an endless wire or chain 23, connected to the carriage.
- a driving machinery e.g. a hydraulic motor 24 positioned at one end of the rail track, pulls the carriage like a shuttle to and fro between the terminals 11, 12.
- Control members similar to those used for operating elevators are provided at the terminals 11 and 12 for summoning the carriage 16, whereas the manoeuvering of the carriage is carried out by means of other control members from inside the carriage in forward or rearward direction and also for allowing the carriage to be stopped.
- the rail track 14 consist preferably of a displaced box girder construction, the inner of which is filled with a foamed plastic to such an extent that the girder system 15 with the carriage 16 and the cabin 20 is almost "weight-less", i.e. it is outbalanced. In this manner it is poosible to minimize the dimensions of the girders also for very large spans. If necessary the girders may also be supported e.g. at the middle by bottom foundations.
- ballast tanks can be positioned so deep below the water level that surface water waves do not af ect these and the rail track 14.
- the entire transport device thus can be manufactured ashore e.g. at a ship-yard and it can be launched and trimmed thus that it in a manner ensuring safety can be towed to the intended position.
- the pontoons and/or the displaced rolling girder construction of the rail track may be equipped with ballast tanks for trimming the level of the transport device.
- Such a completed transport device needs only be moored in position and it is by means of appropriate gangways 28 connected to the abutment in the form of a pontoon bridge or the like.
- the pillars For facilitating the connection of the rail track 14 to fixed pillars supporting the terminal 11 or 12, it is possible to provide the pillars with guides 30 for guiding the end portions of the rail track 14. These guides 30 can be used on one hand for steering and pressing down the rail track 14 to its fixed attachment 31 but also for allowing the rail track to move upwards if it for any reason must be repaired or subjected to service.
- the control members for controlling the carriage are connected to traffic lights 25 (Fig. 2) arranged at the entrance opening of the transport device, which traffic lights give a red light during the crossing of the carriage 16 and a green light when the carriage is in its parking position at one of the terminals.
- traffic lights 25 Fig. 2
- an optical passage guard 26 in form of e.g. a laser light beam and a photocell, which passage guard, when a boat passes, disconnects the current supply to the carriage, when this is in parking position. The current is disconnected until the boat has passed the passage guard for outwards bound boats.
- the distance from the passage guard 26 to the rail track 14 is chosen so, that the carriage will reach the opposite side if an incoming boat should have overlooked the red traffic light.
- the land-based terminals 11 and 12 can advantageously be built in form of cofferdams with built-in pontoons, which make it possible to transport the terminals by sea to their positions.
- the rail track thus can incorporate tracks for one carriage each, which independent of each other can attend to the traffic.
- the carriage in the above embodiment has been described as consisting of a chassis, which via a post supports a cabin. It is of course also possible and is quite within the scope of the invention that the cabin may float on the water and be towed by the carriage via appropriate transfer means.
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Mechanical Engineering (AREA)
- Transportation (AREA)
- Bridges Or Land Bridges (AREA)
- Road Paving Structures (AREA)
- Platform Screen Doors And Railroad Systems (AREA)
Applications Claiming Priority (2)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| SE8701671A SE458850B (sv) | 1987-04-22 | 1987-04-22 | Transportanordning foer befodran av landbaserad trafik oever en vattenled |
| PCT/SE1988/000302 WO1989011999A1 (en) | 1987-04-22 | 1988-06-02 | A transport device for transport of land-based traffic over a waterroute |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| EP0417090A1 true EP0417090A1 (de) | 1991-03-20 |
Family
ID=42313755
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| EP88906151A Withdrawn EP0417090A1 (de) | 1987-04-22 | 1988-06-02 | Transportvorrichtung für die verlegung des landverkehrs auf den wasserweg |
Country Status (3)
| Country | Link |
|---|---|
| EP (1) | EP0417090A1 (de) |
| SE (1) | SE458850B (de) |
| WO (1) | WO1989011999A1 (de) |
Families Citing this family (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| WO2006028413A1 (en) * | 2004-09-07 | 2006-03-16 | Grenzone Pte Ltd | Shuttle floating jetty used as a ferry |
| NO338664B1 (no) * | 2010-09-10 | 2016-09-26 | Lund Mohr & Giæver Enger Marin As | Anordning ved en flytebro som er innfestet i to festepunkter ved land hvori flytebroen er sammensatt av et antall flytebroelementer. |
| NO334941B1 (no) * | 2010-09-10 | 2014-07-28 | Lund Mohr & Giæver Enger Marin As | Flytebro |
Family Cites Families (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| DE289285C (de) * | ||||
| DE227470C (de) * | ||||
| DE213904C (de) * | 1900-01-01 | |||
| DE240097C (de) * | ||||
| DE259937C (de) * |
-
1987
- 1987-04-22 SE SE8701671A patent/SE458850B/sv not_active IP Right Cessation
-
1988
- 1988-06-02 EP EP88906151A patent/EP0417090A1/de not_active Withdrawn
- 1988-06-02 WO PCT/SE1988/000302 patent/WO1989011999A1/en not_active Ceased
Non-Patent Citations (1)
| Title |
|---|
| See references of WO8911999A1 * |
Also Published As
| Publication number | Publication date |
|---|---|
| SE8701671L (sv) | 1988-10-23 |
| SE8701671D0 (sv) | 1987-04-22 |
| SE458850B (sv) | 1989-05-16 |
| WO1989011999A1 (en) | 1989-12-14 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| US20090038088A1 (en) | Rapid deployment floating bridges | |
| US3604389A (en) | Water transportation system with shore-based propulsion | |
| KR20010082066A (ko) | 정박 시설이 없는 해안선에서의 승하선을 위한 크래프트 | |
| CN101234662A (zh) | 一种浮动式酒店 | |
| CN108407984A (zh) | 一种开放海岸运输系统的构建方法 | |
| CN108216502A (zh) | 一种开放海岸的浮桥滚装运输系统 | |
| CN114855694A (zh) | 一种适应大潮差条件的码头浮式滚装设施及作业方法 | |
| US3903807A (en) | Mass rapid system | |
| EP0417090A1 (de) | Transportvorrichtung für die verlegung des landverkehrs auf den wasserweg | |
| US3069862A (en) | Floating transfer bridge | |
| US7600946B2 (en) | Mooring arrangement provided with floating mobile systems for moving booms | |
| US6539887B1 (en) | Bus to boat passenger transfer facility | |
| US1463558A (en) | Freight-transferring system | |
| CN209798656U (zh) | 大船小码头、人工礁盘及海洋旅游系统设施 | |
| RU2020108C1 (ru) | Перевозной паром | |
| CN223279288U (zh) | 具有船坞功能的浮码头 | |
| JP3350483B2 (ja) | 自動車運搬船の離着桟システム | |
| Salzer | Factors in the selection of drydocking systems for shipyards | |
| RU2238213C1 (ru) | Самоходный паром д.р. жабарова | |
| RU2709377C1 (ru) | Автомобильно-железнодорожный переход через пролив Невельского. | |
| VI | Glossary of terms and definitions in inland water transport: draft part VI “Navigation rules” | |
| GREATHEAD | THE CONSTRUCTION AND OPERATION OF A TEMPORARY TRAINFERRY ON THE ORANGE RIVER AT UPINGTON, SOUTH AFRICA. | |
| SU1052613A1 (ru) | Причал | |
| Stileman | Barrow Docks and Approaches by Land and Sea | |
| PALMER et al. | DISCUSSION ON THE DESIGN AND CONSTRUCTION OF SOME SLIPWAYS UP TO 1,200 TONS. MARITIME AND WATERWAYS ENGINEERING DIVISION. |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| PUAI | Public reference made under article 153(3) epc to a published international application that has entered the european phase |
Free format text: ORIGINAL CODE: 0009012 |
|
| 17P | Request for examination filed |
Effective date: 19901128 |
|
| AK | Designated contracting states |
Kind code of ref document: A1 Designated state(s): BE DE FR GB IT NL SE |
|
| 17Q | First examination report despatched |
Effective date: 19920514 |
|
| STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: THE APPLICATION IS DEEMED TO BE WITHDRAWN |
|
| 18D | Application deemed to be withdrawn |
Effective date: 19920925 |